Skip to content

Section 20. Exempt Organization and Employee Plan Applications for Extension of Time to…

Internal Revenue Manual Part 3. Submission Processing · 2026-10-03 edition · updated 2026-10-04 · United States

3.11.20 Exempt Organization and Employee Plan Applications for Extension of Time to File

Manual Transmittal

Purpose

(1) This transmits a revised IRM 3.11.20, Returns and Document Analysis, Exempt Organization and Employee Plan Applications of Extension of Time to File Returns.

Exceptions & meaning →

Material Changes

(1) IRM 3.11.20.3.6(2) a, IPU 26U0365 issued 03-27-2026 - Added Return Codes 01, 3-12 or 15.

(2) IRM 3.11.20.3.6(2) b, IPU 26U0365 issued 03-27-2026 - Added Return Codes 13 or 14.

(3) IRM 3.11.20.3.6(2) b, IPU 26U0365 issued 03-27-2026 - Updated Notice Code 1 to Notice Code 3.

(4) IRM 3.11.20.4.2, IPU 26U0365 issued 03-27-2026 - Updated wording for clarification of extension received.

(5) IRM 3.11.20.4.2.2, IPU 26U0365 issued 03-27-2026 - Relocated subsection and updated title to include return codes.

(6) IRM 3.11.20.4.2.3(1), IPU 26U0365 issued 03-27-2026 - Revised paragraph for clarity.

(7) IRM 3.11.20.5, IPU 26U0365 issued 03-27-2026 - Updated Subsection Title.

(8) IRM 3.11.20.5.1, IPU 26U0365 issued 03-27-2026 - Updated Subsection Title.

(9) IRM 3.11.20.6(4), IPU 26U0365 issued 03-27-2026 - Updated instructions for extension requests received on Form 5558 (Rev 9-2018, Part III for Form 5330.

(10) IRM 3.11.20.6(6) Note, IPU 26U0365 issued 03-27-2026 - Add information for extension requests received on Form 5558 (Rev 9-2018, Part III for Form 5330.

(11) IRM 3.11.20.9.1(1) Table, IPU 26U0452 issued 04-17-2026 - Updated Section 01 table.

(12) IRM 3.11.20.11, IPU 26U0365 issued 03-27-2026 - Updated title and paragraph.

(13) IRM 3.11.20.11.1(1), IPU 26U0365 issued 03-27-2026 - Updated Section 01 table.

(14) IRM 3.11.20.11.2(1), IPU 26U0452 issued 04-17-2026 Table - Updated Section 01 Table.

(15) IRM 3.11.20.11.3(1), IPU 26U0452 issued 04-17-2026 - Removed Form 5558.

(16) IRM 3.11.20.11.3.2(1), IPU 26U0365 issued 03-27-2026 - Updated Correct Name Control table.

(17) IRM 3.11.20.11.4.2, IPU 26U0452 issued 04-17-2026 - Updated Correction Procedures for Name Control subsection.

(18) IRM 3.11.20.11.4.2(2), IPU 26U0365 issued 03-27-2026 - Removed Block B.

(19) IRM 3.11.20.11.5(1), IPU 26U0452 issued 04-17-2026- Updated TIN - Type 01TNT.

(20) IRM 3.11.20.11.5.1(1), IPU 26U0452 issued 04-17-2026 - Updated Validity Checks for TIN-Type - 01TNT.

(21) IRM 3.11.20.11.5.1(1), IPU 26U0365 issued 03-27-2026 - Updated TIN location on Form 8868 and note.

(22) IRM 3.11.20.11.5.2, IPU 26U0452 issued 04-17-2026 - Updated additional instructions to Correction Procedures for TIN-Type - 01TNT subsection.

(23) IRM 3.11.20.11.5.2(3), IPU 26U0365 issued 03-27-2026 - Removed Block B.

(24) IRM 3.11.20.11.6(1), IPU 26U0452 issued 04-17-2026 - Updated Taxpayer Identification Number - 01TIN.

(25) IRM 3.11.20.11.6(2), IPU 26U0365 issued 03-27-2026 - Updated Form 5558 to Form 8868.

(26) IRM 3.11.20.11.6.1(1), IPU 26U0452 issued 04-17-2026 - Updated Validity Check for Taxpayer Identification Number - 01TIN.

(27) IRM 3.11.20.11.6.2(3), IPU 26U0452 issued 04-17-2026 - Added instructions when an SSN is entered.

(28) IRM 3.11.20.11.7, IPU 26U0452 issued 04-17-2026 - Added tax period (Plan Year Ending) location for Form 8868 for Form 5330 extensions.

(29) IRM 3.11.20.11.7(2), IPU 26U0365 issued 03-27-2026 - Updated program 15560 to program 15540 (Form 5330).

(30) IRM 3.11.20.11.7.2(1) Note, IPU 26U0452 issued 04-17-2026 - Updated location of tax period entry.

(31) IRM 3.11.20.11.7.2(5) (6) and (7), IPU 26U0452 issued 04-17-2026 - Added Correction Procedures for plan year ending for Form 8868 for Form 5330 extension.

(32) IRM 3.11.20.11.8(1), IPU 26U0365 issued 03-27-2026 - Updated Plan Number location on Form 8868.

(33) IRM 3.11.20.11.8.1, IPU 26U0452 issued 04-17-2026 - Added Validity Checks for Master File Tax Code - 01MFT subsection.

(34) IRM 3.11.20.11.8.1(1), IPU 26U0365 issued 03-27-2026 - Updated validity checks for Form 8868 with return codes 13 and 14 that plan numbers cannot be blank or 000.

(35) IRM 3.11.20.11.8.1(1) Note, IPU 26U0365 issued 03-27-2026 - Updated information when plan number is blank, 000, or is more or fewer than three numerics.

(36) IRM 3.11.20.11.8.2, IPU 26U0452 issued 04-17-2026 - Added Correction Procedures for Master File Tax Code - 01MFT subsection.

(37) IRM 3.11.20.11.8.2(3), IPU 26U0365 issued 03-27-2026 - Add instructions when multiple plan numbers are present on one Form 8868.

(38) IRM 3.11.20.11.8.2(4), IPU 26U0365 issued 03-27-2026 - Updated Form 5558 to Form 8868.

(39) IRM 3.11.20.11.9, IPU 26U0452 issued 04-17-2026 - Added Plan Number - 01PL subsection.

(40) IRM 3.11.20.11.9.1, IPU 26U0452 issued 04-17-2026 - Added Validity Checks for Plan Number - 01PL subsection.

(41) IRM 3.11.20.11.9.2, IPU 26U0452 issued 04-17-2026 - Added Correction Procedures for Plan Number - 01PL.

(42) IRM 3.11.20.11.11.1(3), IPU 26U0452 issued 04-17-2026 - Added 01CCC instruction for Form 8868, Part III, for Form 5330 extensions.

(43) IRM 3.11.20.11.11.2(3), IPU 26U0452 issued 04-17-2026 - Added Corrections Procedures for - 01CCC for Form 8868, Part III, for Form 5330 extensions.

(44) IRM 3.11.20.11.12(2), IPU 26U0365 issued 03-27-2026 - Updated link title of IRM 3.11.20.5.1.

(45) IRM 3.11.20.11.12(4), IPU 26U0365 issued 03-27-2026 - Updated Notice Code 1 to 3.

(46) IRM 3.11.20.11.12.1(1), IPU 26U0365 issued 03-27-2026 - Updated Notice Code to 3, 4, 8, or 9.

(47) IRM 3.11.20.11.12.2(2), IPU 26U0365 issued 03-27-2026 - Updated link title

(48) IRM 3.11.20.11.12.2(3) Table, IPU 26U0365 issued 03-27-2026 - Updated Missing Code Section Notice Codes.

(49) IRM 3.11.20.11.12.2(4), IPU 26U0365 issued 03-27-2026 - Updated Notice Codes table.

(50) IRM 3.11.20.11.13(1) and (2), IPU 26U0452 issued 04-17-2026 - Updated Return Code - 01RTC instructions.

(51) IRM 3.11.20.11.15.2(2) (3)(4) and (5), IPU 26U0452 issued 04-17-2026 - Added to the Correction Procedures for Notice Code - 01NOT instructions.

(52) IRM 3.11.20.12, IPU 26U0452 issued 04-17-2026 - Updated title.

(53) IRM 3.11.20.12, IPU 26U0365 issued 03-27-2026 - Updated title and Form 5558 to Form 8868.

(54) IRM 3.11.20.12.1.3(3) Table, IPU 26U0365 issued 03-27-2026 - Updated Form 5558 to Form 8868.

(55) IRM 3.11.20.12.3.3(5), IPU 26U0365 issued 03-27-2026 - Updated Name Control Research Table.

(56) IRM 3.11.20.12.3.3(6), IPU 26U0452 issued 04-17-2026 - Added instructions when name control is incorrect.

(57) IRM 3.11.20.12.4, IPU 26U0452 issued 04-17-2026 - Added Error Code 005 - Missing Received Date subsection.

(58) IRM 3.11.20.12.4.1, IPU 26U0452 issued 04-17-2026 - Added Screen Display - Error Code 005 subsection.

(59) IRM 3.11.20.12.4.2, IPU 26U0452 issued 04-17-2026 - Added Invalid Condition - Error Code 005 subsection.

(60) IRM 3.11.20.12.4.3, IPU 26U0452 issued 04-17-2026 - Added Correction Procedures - Error Code 005.

(61) IRM 3.11.20.12.5, IPU 26U0452 issued 04-17-2026 - Added Error Code 006 Remittance with No Received Date subsection.

(62) IRM 3.11.20.12.5.1, IPU 26U0452 issued 04-17-2026 - Added Screen Display - Error Code 006 subsection.

(63) IRM 3.11.20.12.5.2, IPU 26U0452 issued 04-17-2026 - Added Invalid Condition - Error Code 006 subsection.

(64) IRM 3.11.20.12.5.3, IPU 26U0452 issued 04-17-2026 - Added Correction Procedures - Error Code 006 subsection.

(65) IRM 3.11.20.12.6, IPU 26U0452 issued 04-17-2026 - Added Error Code 007 - Received Date subsection.

(66) IRM 3.11.20.12.6.1, IPU 26U0452 issued 04-17-2026 - Added Screen Display - Error Code 007 subsection.

(67) IRM 3.11.20.12.6.2, IPU 26U0452 issued 04-17-2026 - Added Invalid Conditions - Error Code 007 subsection.

(68) IRM 3.11.20.12.6.3, IPU 26U0452 issued 04-17-2026 - Added Correction Procedures - Error Code 007 subsection..

(69) IRM 3.11.20.12.7.2(1), IPU 26U0365 issued 03-27-2026 - Updated plan numbers to 001-999.

(70) IRM 3.11.20.12.7.2(2), IPU 26U0365 issued 03-27-2026- Updated notice codes to 3, 4, 8, or 9.

(71) IRM 3.11.20.12.7.3(2), IPU 26U0365 issued 03-27-2026 - Updated Form 5558 to Form 8868 and notice codes to 3 and 4 in the table.

(72) IRM 3.11.20.12.8.2, IPU 26U0452 issued 04-17-2026 - Updated Invalid Condition - Error Code 100.

(73) IRM 3.11.20.12.8.3, IPU 26U0452 issued 04-17-2026 - Added Correction Procedures table to Error Code 100.

(74) IRM 3.11.20.12.14, IPU 26U0452 issued 04-17-2026 - Updated title.

(75) IRM 3.11.20.12.12(3), IPU 25U3626 issued 10-06-2025 - Added Note - MeF Form 8868 submitted Return Codes 13 and 14 will be received in ERS.

(76) IRM 3.11.20.12.12.2(3), IPU 25U3626 issued 10-06-2025 - Added routing instructions for MeF Form 8868 submitted with Return Codes 13 and 14 received in ERS.

(77) IRM 3.11.20.12.14.2, IPU 26U0452 issued 04-17-2026 - Updated Invalid Condition - Error Code 619 subsection.

(78) IRM 3.11.20.12.15, IPU 26U0452 issued 04-17-2026 - Updated title.

(79) IRM 3.11.20.12.15.2, IPU 26U0452 issued 04-17-2026 - Added to Invalid Condition - Error Code 680.

(80) IRM 3.11.20.12.15.3, IPU 26U0452 issued 04-17-2026 - Updated Correction Procedures - Error Code 680 subsection.

(81) IRM 3.11.20.13.12(3), IPU 26U0365 issued 03-27-2026 - Removed Note. No longer needed.

(82) IRM 3.11.20.13.12.1(1), IPU 26U0365 issued 03-27-2026 - Updated return codes.

(83) IRM 3.11.20.13.12.2(3), IPU 26U0365 issued 03-27-2026 - Removed instructions. No longer needed.

(84) IRM 3.11.20.13.14(4), IPU 26U0365 issued 03-27-2026 - Added notice code 3.

(85) IRM 3.11.20.13.14.1(2), IPU 26U0365 issued 03-27-2026 - Added Form 8868 with Return Codes 01, 03-12, or 15.

(86) IRM 3.11.20.13.14.1(3), IPU 26U0365 issued 03-27-2026 - Added Notice Codes for Form 8868 with Return Codes 13 or 14.

(87) IRM 3.11.20.13.14.2(1), IPU 26U0365 issued 03-27-2026 - Added link for reference.

(88) IRM 3.11.20.13.14.2(2), IPU 26U0365 issued 03-27-2026 - Updated table title to include Form 8868 with Return Codes 01, 03-12, or 15.

(89) IRM 3.11.20.13.14.2(2), IPU 26U0365 issued 03-27-2026 - Added a table for Notice Codes for Form 8868 with Return Codes 13 or 14.

(90) IRM 3.11.20.14.5.2(1), IPU 26U0365 issued 03-27-2026 - Added Return Code 13.

(91) IRM 3.11.20.14.5.3(2), IPU 26U0365 issued 03-27-2026 - Added Return Code 13.

(92) IRM 3.11.20.14.7.2(1), IPU 26U0365 issued 03-27-2026 - Added Return Codes 13 and 14.

(93) IRM 3.11.20.14.11.2(2) (3)(4) and (5), IPU 26U0365 issued 03-27-2026 - Added Return Codes 13 or 14 with Notice Codes 4, 8, or 9.

(94) IRM 3.11.20.14.11.3(2) b, IPU 26U0365 issued 03-27-2026 - Updated to include Form 8868 with Return Codes 01, 03-12, or 15.

(95) IRM 3.11.20.14.11.3(2) c, IPU 26U0365 issued 03-27-2026 - Added Form 8868 with Return Codes 13 or 14 instructions.

(96) Exhibit 3.11.20-1, IPU 26U0365 issued 03-27-2026 - Added Form 5330 to Forms Affected on Extension Listing for Form 8868.

(97) Exhibit 3.11.20-2, IPU 26U0553 issued 05-21-2026 - Updated title and exhibit information.

(98) Exhibit 3.11.20-2, IPU 26U0553 issued 05-21-2026 - Removed Form 1041-A and Form 5227 information.

(99) Exhibit 3.11.20-3, IPU 26U0553 issued 05-21-2026 - Updated title and exhibit information.

(100) Exhibit 3.11.20-3, IPU 26U0553 issued 05-21-2026 - Added Form 1041-A and Form 5227 information.

(101) Exhibit 3.11.20-4, IPU 26U0365 issued 03-27-2026 - Updated Exhibit Title and Form 5558 to Form 8868 throughout this exhibit. Added Code Section to Section B.

(102) Exhibit 3.11.20-6, IPU 26U0365 issued 03-27-2026 - Updated Exhibit Title. Removed 1st Note as it’s no longer needed.

(103) Exhibit 3.11.20-8, IPU 25U3626 issued 10-06-2025 - Added Wisconsin and Israel Disaster Declarations.

(104) Exhibit 3.11.20-8, IPU 25U3669 issued 11-14-2025 - Added Tribal Nation - Sisseton-Wahpeton Oyate Disaster Declarations.

(105) Exhibit 3.11.20-8, IPU 25U3698 issued 12-05-2025 - Added Alaska and Missouri Disaster Declarations.

(106) Exhibit 3.11.20-8, IPU 26U0041 issued 01-06-2026 - Added Leech Lake Band of Ojibwe Disaster Declaration.

(107) Exhibit 3.11.20-8, IPU 26U0089 issued 01-16-2026 - Added Washington Disaster Declaration.

(108) Exhibit 3.11.20-8, IPU 26U0297 issued 03-09-2026 - Added Louisiana State Disaster Declaration.

(109) Exhibit 3.11.20-8, IPU 26U0559 issued 05-22-2026 - Added Georgia, Hawaii, Mississippi, Montana, Northern Mariana Islands, Tennessee, and Washington Disaster Declarations.

(110) Exhibit 3.11.20-8, IPU 26U0691 issued 07-08-2026 - Added Arizona and Montana Disaster Declarations.

(111) Exhibit 3.11.20-11, IPU 26U0365 issued 03-27-2026 - Updated Form 5558 T-line chart.

(112) Exhibit 3.11.20-12, IPU 26U0365 issued 03-27-2026 - Updated Exhibit Title and Form 5558 to Form 8868 with Return Codes 13 or 14.

(113) Exhibit 3.11.20-12 (Table), IPU 26U0365 issued 03-27-2026 - Updated Form 8868 T-Lines.

(114) Exhibit 3.11.20-14 (Table), IPU 26U0365 issued 03-27-2026 - Updated to include Form 8868 (Rev 1-2025) Part II.

(115) Exhibit 3.11.20-15, IPU 26U0365 issued 03-27-2026 - Removed exhibit. No longer needed.

(116) Exhibit 3.11.20-16, IPU 26U0553 issued 05-21-2026 - Added MFT Codes to Return Codes chart and updated the title.

(117) Exhibit 3.11.20-16, IPU 26U0365 issued 03-27-2026 - Updated the Return Codes chart to include 13 and 14 information.

(118) Various grammatical, editorial, date, and link corrections throughout the IRM.

Exceptions & meaning →

Effect on Other Documents

IRM 3.11.20 dated October 22, 2025, is superseded. This IRM incorporates IRM Procedural Updates (IPU) - 25U3626 issued October 6, 2025, 25U3669 issued November 14, 2025, 25U3698 issued December 5, 2025, 26U0041 issued January 6, 2026, 26U0089 issued January 16, 2026, 26U0297 issued March 9, 2026, 26U0365 issued March 27, 2026, 26U0452 issued April 17, 2026, 26U0553 issued May 21, 2026, 26U0559 issued May 22, 2026, 26U0691 issued July 8, 2026.

Exceptions & meaning →

Audience

Code & Edit and Error Correction employees:Large Business and International Division (LB&I)Small Business/Self-Employed (SB/SE)Tax Exempt/Government Entities (TE/GE)Taxpayer Services (TS)

Exceptions & meaning →

Effective Date

(01-01-2027)

Virginia E. PuddisterActing Director of Shared ServicesTax Exempt and Government Entities

Exceptions & meaning →

Program Scope and Objectives

Purpose - IRM 3.11.20, Exempt Organization and Employee Plan Applications for Extension of Time to File Returns, provides instructions for processing Form 8868 and Form 5558 for Ogden Submission Processing Code and Edit (C&E), Error Resolution System (ERS), and Reject functions. Other IRMs for processing Employee Plan (EP) Returns may cite this IRM. The Ogden Campus is the central processing center for Form 8868, Application for Extension of Time To File an Exempt Organization Return or Excise Taxes Related to Employee Benefit Plans and Form 5558, Application for Extension of Time To File Certain Employee Plan Returns. Unprocessed Form 8868 and Form 5558 received in other Campuses or field offices are routed to the Ogden Submission Processing Campus to be processed. See IRM 3.10.72, Campus Mail and Work Control - Receiving, Extracting, and Sorting.

Audience - Exempt Organization C&E and General Error Resolution Tax Examining Clerk at the Ogden Campus is the primary audience for this IRM.

Policy Owner - The Director, Tax Exempt and Government Entities (TE/GE), Business Systems Planning (BSP).

Program Owner - Submission Processing Programs and Oversight (SPP&O).

Primary Stakeholders - Exempt Organization Headquarters who rely on review and editing of Exempt Organization and Employee Plan returns.

Exceptions & meaning →

Background

This IRM includes instructions for Code & Edit and Error Resolution System for editing and processing Exempt Organizations and Employee Plans returns.

Exceptions & meaning →

Authority

All Policy Statements for Submission Processing are contained in IRM 1.2.1, Servicewide Policies and Authorities, Servicewide Policy Statements.

Exceptions & meaning →

Roles and Responsibilities

Included in IRM 3.11.20 are instructions for editing and correcting errors on Form 8868 and Form 5558.

Instructions in IRM 3.11.20.2, Document Perfection Procedures, through IRM 3.11.20.6.1, Part II Form 5558 for Form 5500 Series and Form 8955-SSA, are procedures specific to the C&E function.

Instructions in IRM 3.11.20.7, Error Resolution/Reject Procedures - General, through IRM 3.11.20.12.17, Group Return TC 460 Procedures (Rejects Only).

Exceptions & meaning →

Program Management and Review

Program volumes and hours are located in Business Objects (BO). Management can access and organize Crystal reports, Web Intelligence documents and other objects. Information can be viewed in a web browser and exported to other business applications, such as Microsoft Excel or PDF. By using analytic tools the business can explore information in detail.

Embedded Quality Submission Processing (EQSP) program. Quality Review conducts a statistical valid sample size review of completed work to ensure IRM guidelines are followed.

Exceptions & meaning →

Program Controls

Embedded Quality Submission Processing (EQSP) program. Quality Review conducts a statistical valid sample size review of completed work to ensure IRM guidelines are followed.

Exceptions & meaning →

Terms and Acronyms

Common terms and acronyms are found throughout the IRM.

Terms

Acronyms

Business Systems Planning

BSP

Check Digit

CD

Code & Edit

C&E

Exempt Organization

EO

Employee Plan

EP

Enhanced-Entity Index File

E-EIF

Error Resolution System

ERS

Internal Revenue Service

IRS

Name Control

NC

Operations Assistance Requests

OAR

Submission Processing Programs and Oversight

SPP&O

Tax Exempt/Government Entities

TE/GE

Taxpayer Advocate Service

TAS

Taxpayer Services

TS

Exceptions & meaning →

Taxpayer Advocate Service (TAS) SLA

The National Taxpayer Advocate (NTA) reached agreements with the Commissioners or Chiefs of the Taxpayer Services (TS) Division, Small Business & Self-Employed (SB/SE) Division, Tax Exempt & Government Entities (TE/GE) Division, Criminal Investigation (CI), Independent Office of Appeals and Large Business and International Division (LB&I) Divisions. This Service Level Agreement (SLA) outlines the procedures and responsibilities for the processing of Taxpayer Advocate Service (TAS) casework when either the statutory or the delegated authority to complete case transactions is outside TAS.

The SLA is located in IRM 25.30.7, Service Level Agreement between the Tax Exempt & Government Entities Division and the Taxpayer Advocate Service.

Exceptions & meaning →

TAS is an Independent Organization

The TAS is an independent organization within the Internal Revenue Service (IRS), led by the National Taxpayer Advocate. Its job is to protect taxpayers’ rights by striving to ensure that every taxpayer is treated fairly and knows and understands their rights under the Taxpayer Bill of Rights (TBOR). TAS offers free help to taxpayers, including when taxpayers face financial difficulties due to an IRS problem, when they are unable to resolve tax problems, when they haven’t been able to resolve on their own, or when they need assistance to address an IRS system, process, or procedure that is not functioning. TAS has at least one taxpayer advocate office located in every state, the District of Columbia, and Puerto Rico.

Taxpayers have the right to expect the tax system to consider facts and circumstances that might affect their underlying liabilities, ability to pay, or ability to provide information timely. Taxpayers have the right to receive assistance from the Taxpayer Advocate Service if they are experiencing financial difficulty or if the IRS has not resolved their tax issues properly and timely through its normal channels.

Taxpayers have the right to receive prompt, courteous, and professional assistance in their dealings with the IRS, to be spoken to in a way they can easily understand, to receive clear and easily understandable communications from the IRS, and to speak to a supervisor about inadequate service.

Exceptions & meaning →

Same Day Resolution

A referral to a TAS office is not necessary even if a TAS case criterion is met if an Operating Division or Function can immediately resolve the issue within 24 hours. All IRS employees must handle potential TAS cases in the taxpayer’s best interest. More information on "24 hour" same day resolution is in IRM 13.1.7, Taxpayer Advocate Case Processing, Taxpayer Advocate Service (TAS) Case Criteria. See the "Same Day Resolution by Operations" subsection.

If you can take action within 24 hours to resolve the taxpayer’s issue and the taxpayer still requests TAS assistance or is not satisfied with the resolution provided, refer the taxpayer to the NTA toll-free number, 877-777-4778. For more information, refer to IRM 21.1.3.18, Taxpayer Advocate Service (TAS) Guidelines.

Exceptions & meaning →

Operations Assistance Requests (OAR)

The TAS uses Form 12412, Operations Assistance Request (OAR), to start the OAR process of referring a case to the TS Division, to affect their solution of the taxpayer’s problem. For more information, refer to IRM 13.1.19, Advocating With Operations Assistance Requests (OARs).

For cases requiring an OAR:

TAS will complete Form 12412 and forward the case to the Operating Division Liaison using Form 3210, Document Transmittal.

The Operating Division Liaison will review the case, assign it to the appropriate area, and monitor the case through its conclusion.

Make every effort to acknowledge and resolve the requested OAR actions within the SLA time frames as listed on Form 12412.

EXPEDITE PROCESSING•When TAS requests expedite processing, the Operating Division (OD) or Functional Liaison acknowledges receipt within one (1) day of receipt of the OAR involving any TAS case that has “EXPEDITE” notated under the Criteria Code in the Criteria Code box on the Form 12412 by using Form 3210, secure e-mail, facsimile, or by telephone to acknowledge receipt and to provide the name and phone number of the IRS employee assigned to work the case.•The OD/Functional Liaison will provide, within three workdays of acknowledging receipt of the OAR, a decision on whether of not they will provide the relief requested. The decision will be in writing and hand delivered or delivered by facsimile or secure email to the TAS Case Advocate.

NON-EXPEDITE PROCESSING•If TAS does not request expedite processing, the OD/Functional Liaison will both acknowledge receipt and provide the name and phone number of the IRS employee assigned to work the case within three (3) workdays of receipt of a non-expedited TAS OAR by using Form 3210, secure email, facsimile, or by telephone.

If necessary, the assigned employee (employee assigned to work the OAR case)/manager may contact the TAS employee and negotiate the completion date for resolving the OAR actions.

Assigned employee: If you cannot resolve a taxpayer’s case within the requested time frame or by a negotiated extension date, immediately notify your manager.

Assigned manager/employee: Work with the TAS contact listed on Form 12412 to agree on time frames based on the case’s facts and circumstances.

Assigned manager/employee: Discuss the findings and final case disposition recommendation with the appropriate TAS contact. The TAS contact communicates the final decision on the case to the taxpayer. However, you may also notify the taxpayer of the decision.

Assigned employee/manager: If you and the TAS contact cannot agree on how to resolve the taxpayer’s problem, elevate the disagreement to your manager. The TAS employee will also elevate this disagreement to their manager who discusses it with the appropriate Operating Division manager.

Upon case resolution, the TE/GE employee to whom the OAR was assigned completes section VI of Form 12412 and returns it to the TAS case advocate. The Form 12412 must be returned within three (3) workdays from the date that all actions are complete and transactions posted.

For more detailed information, refer to IRM 13, Taxpayer Advocate Service.

Exceptions & meaning →

Referral to TAS

If the IRS employee receives taxpayer contact that meets TAS criteria, and the employee cannot initiate action to resolve the taxpayer's inquiry or provide the relief requested by the taxpayer, refer the case to TAS. A taxpayer does not have to request TAS assistance to be referred to TAS. IRS employees advise taxpayers of the option to seek TAS assistance when appropriate. TAS requests documentation from the taxpayer to support the requested relief, or when required by the IRM.

Refer taxpayers to TAS when the contact meets TAS criteria and the issue cannot be resolved the same day. See IRM 13.1.7.

The definition of same day is within 24 hours. Same day cases can be resolved in 24 hours.

Do not refer these cases to TAS unless they meet TAS criteria and the taxpayer asks to be transferred to TAS. See IRM 13.1.7.3 TAS Case Criteria.

When referring cases to TAS, use Form 911, Request for Taxpayer Advocate Service Assistance (And Application for Taxpayer Assistance Order), and forward to TAS in accordance with local procedures.

Exceptions & meaning →

Exceptions to TAS Criteria Cases

Do not refer these types of cases to TAS:

The taxpayer's complaint or inquiry only questions the constitutionality of the tax system.

Cases where the focus of the taxpayer's inquiry is solely to employ frivolous tax strategies to avoid or delay filing federal returns or paying federal taxes.

Exceptions & meaning →

Note:

For additional information on cases TAS will generally not accept, see IRM 13.1.7.4, Exceptions to Taxpayer Advocate Service Criteria.

Exceptions & meaning →

CADE 2

The Customer Account Data Engine (CADE) 2 Program Office in Headquarters has the primary goal of implementing a single, modernized programming solution that provides daily processing of taxpayer accounts.

The overall goal of the CADE 2 program is to modernize the Individual Master File (IMF) software and data. See CADE 2 Modernization Initiative, for more information.

The Business Master File (BMF), Exempt Organization (EO) and Employee Plan Master File (EPMF) campus cycles are:

Campus Cycle: Thursday - Wednesday.

Master File Processing: Friday-Thursday.

Notice Review: Saturday-Monday (8+ days).

BMF, EO and EPMF transaction posting time frames are:

Transactions are viewable using CFOL command codes on Saturday following the weekly Master File processing run on Thursday.

Exceptions & meaning →

Note:

With the acceleration of the Integrated Data Retrieval System (IDRS) weekly analysis occurring the weekend directly after the Master File processing on Thursday, transactions post instead of being in pending status on Monday.

Cycle posting dates reflect a format of YYYYCCDD. YYYY indicates the year. CC indicates the posting cycle. For IMF transactions, the values for DD are:

01 = Friday

02 = Monday

03 = Tuesday

04 = Wednesday

05 = Thursday

Exceptions & meaning →

Note:

BMF, EO and EPMF cycle posting dates on BMFOL continue to reflect YYYYCC. YYYY indicates the year. CC indicates the posting cycle. BMF cycle posting dates in TXMOD reflect a format of YYYYCCDD. The DD value is 08.

Exceptions & meaning →

Document Perfection Procedures

For instructions on processing Exempt Organization and Employee Plan returns in the IRS Processing Center C&E Function, follow IRM 3.11.20.2 through IRM 3.11.20.5.

Exceptions & meaning →

Do Not Math Verify

Document Perfection’s purpose is not to math verify or to validity check the documents being processed. The computer performs this function if the documents are coded and edited as outlined in this manual.

Exceptions & meaning →

Letter Requests

A taxpayer seeking an extension of time for filing a return may submit a letter to the submission processing center where the return is to be filed.

If the letter request is for an Automated Non-Master File (ANMF) form, forward to KCSPC ANMF Accounting. See IRM 3.11.20.2.3, Shipping Extensions, for the list of ANMF forms.

Exceptions & meaning →

Note:

The Automated Non-Master File (ANMF) is an automated system developed to replace the previous Non Master File (NMF) accounting system. See IRM 3.12.38, BMF General Instructions.

The submission processing center may process the letter application in one of two ways. They may input the extension information as a TC 460 directly into IDRS, or they may prepare a "dummy" IRS extension form from the information in the letter and input it to the system as a paper extension form.

Follow normal approval/denial criteria. All information required by a form is also required if the request is made by a letter.

Correspond with the taxpayer about the application’s status and the correct form for future use, unless instructed otherwise in the specific application form instructions.

Exceptions & meaning →

Shipping Extensions

Ship BMF extensions if received in an Individual Master File (IMF) site, and vice versa. See IRM 3.10.72-1, Routing Guide/Local Maildex, if where to route is not displayed in the IRM 3.11.20.2.3, Routing Instructions.

We do not have to process extension requests in the same submission processing center where the return will be processed, but we must ship requests to the appropriate campus for processing when necessary. Unless specified below, process the extension request in the receiving center.

When you receive the following forms, follow the chart below for routing instructions.

Automated Non-Master File (ANMF) extension requests.

Form 6069, Return of Excise Tax on Excess Contributions of Black Lung Benefit Trust, and Other Persons Under Sections 4951, 4952, and 4953.

Form 5558, Application for Extension of Time To File Certain Employee Plan Returns.

Form 8868, Application for Extension of Time To File an Exempt Organization Return or Excise Taxes Related to Employee Benefit Plans.

Form 8868 for Form 8870, Information Return for Transfers Associated With Certain Personal Benefit Contracts, with Return Code 12

Routing Instructions

Form Number

Route to

All ANMF extension requests

KCSPC

8868 for Form 6069

KCSPC

8868

Exceptions & meaning →

Exception:

8868 for Form 6069 (see above)

OSPC

5558

OSPC

8868 for Form 8870 with Return Code 12

OSPC - TE/GE Mail Stop 1110

When shipping extensions to another campus, do not send Letter 0086C, Referring Taxpayer Inquiry/Forms to another office. Extensions are exempted from Policy Statement P-21-3, which requires the Letter 0086C.

Exceptions & meaning →

Six-Month Extension Limit

Under normal circumstances, an extension of time to file can legally be granted for no longer than a total of six months from the due date of the return. IRC 6081(a) and Treas. Reg. 1.6081-1 (a) state that an extension of time to file generally "shall not be granted for more than 6 months" from the due date of the return required to be filed.

OSPC may grant an extension longer than six months for business taxpayers. Process these requests through IDRS using Command Code (CC) REQ77. Enter "60" in the ULC field on line 9 of the FRM77 screen. For input instructions, see IRM 2.4.19, Command Codes REQ77, FRM77 and FRM7A.

Exceptions & meaning →

Reconsiderations/Amendments/Correspondence From the Taxpayer

The IRM 1.10.1, Office of the Commissioner of Internal Revenue, IRS Correspondence Manual, provides guidelines and procedures for all IRS employees about preparing correspondence.

If the taxpayer’s correspondence requests an extension of time to file, see IRM 3.11.20.2.2, Letter Requests.

If an extension request is returned to IRS for reconsideration or if the correspondence requests a reconsideration of a previously denied extension request, route to Accounts Management.

Correspondence Reconsideration

If

Then

the taxpayer indicates the extension attached to correspondence is a copy, or the attached extension is for a prior year tax return,

route the entire submission to Accounts Management.

the taxpayer does not indicate the extension attached to correspondence is a copy, and the extension is for the current year's return,

detach the correspondence, route it to Accounts Management, and process the extension request.

If a taxpayer files an amended application for any reason, route to Accounts Management.

Exceptions & meaning →

Determination of Timely Filing - General

C&E must be careful in determining when the extension request was filed because timely filing is an important requirement for approving the extension request. Erroneously denied extensions affect both the taxpayer and the IRS by resulting in erroneous notices, increased calls to Customer Service lines, and increased volume of reconsiderations.

Process all extensions with a timely postmark date as timely filed, no matter when received.

The received date is the date the extension request was delivered to the IRS. It is unnecessary to review the postmark date if the extension has a timely received date.

All BMF extensions will be stamped with an IRS received date.

Exceptions & meaning →

Exception:

≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡"≡ ≡ ≡ ≡ ≡ ≡ ≡" ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡

Exceptions & meaning →

Example:

≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡

For all extension requests with a late received date, C&E must review the extension form for indications of why the extension may have a later due date.

Exceptions & meaning →

Example:

Disaster, reasonable cause, etc.

If the taxpayer is affected by an official declared disaster that allows for a postponement of the normal due date, the extension request must be postmarked on or before the date the disaster period ends for treatment as a timely filed extension, see Exhibit 3.11.20-8, Disaster Extension Due Dates - Alphabetical by State.

Exceptions & meaning →

Note:

An alert is issued whenever there is a delayed due date because of a declared disaster.

For all extension requests with a late received date, C&E must review for a timely postmark date.

The postmark date is the date the United States Postal Service (USPS) or other designated delivery service has stamped the envelope to indicate the date the item was mailed.

Receipt and Control attaches the envelope to any extension with a late received date. If more than one extension request was included in an envelope, the postmark date is stamped on each additional extension.

IRC 7502 contains the "timely mailing treated as timely filing/paying" rule. This rule says to process any document or payment as timely filed even if it is received after the due date if the postmark date is on or before the due date.

If the request has a postmark date on or before the due date, the extension is timely filed.

Exceptions & meaning →

Caution:

When the due date falls on a weekend or holiday, process the extension request as timely filed if it is postmarked by the next day that is not a weekend or holiday.

Consider any postmark when making this determination.

Process an extension with a timely foreign postmark as timely filed based on Revenue Ruling 2002-23.

Exceptions & meaning →

Note:

Revenue Ruling 2002-23: The IRS will accept, as timely filed, a federal tax return, claim for refund, statement, or other document required or permitted to be filed with the IRS that is mailed from and officially postmarked in a foreign country on or before the last date prescribed for filing, including any extension of time for filing

.

Exception for weekends and holidays - if the due date falls on a Saturday, Sunday, or legal holiday, the legal due date does not change. Process the extension request as timely filed if postmarked by the next day that is not a weekend or holiday.

Exceptions & meaning →

Example:

If the due date is April 15, and April 15 is a Saturday, the extension would be timely filed if postmarked by April 17 (the following Monday).

The due date of the extension request is the Return Due Date (RDD) of the type of return the request covers for the taxpayer's tax year ending. The tax year ending is the Tax Period of the extension.

Form 5558 - See IRM 3.11.20.6, Form 5558 Document Perfection Procedures, for specific instructions.

Form 8868 - See IRM 3.11.20.4, Form 8868 Document Perfection Procedures, for specific instructions.

If you determine the extension request is late based on examination of the received date and postmark date and there is no reasonable cause for late filing extensions attached, the extension will not be approved.

Exceptions & meaning →

Error Resolution System Coding (ERS)

Form 8868 and Form 5558 are processed on the ERS.

C&E assigns Action Codes for ERS returns. They are transcribed into the record and used to suspend the case for correspondence and for routing within the campus. Descriptions for each action code are generally sufficient with no further explanation except for "Other Research" when an explanation about the missing information must be attached to the return.

The Modernized e-File (MeF) system also generates Action Codes for Form 8868 only. Process the MeF extensions using the same procedures used for paper extensions in IRM 3.11.20.8.3 Action Codes.

The presence of a valid Action Code will send the record to the Rejects Suspense Inventory, either workable or unworkable.

If the Action Code assigned by document perfection is invalid or incomplete, assign the record to the Error Inventory for correction or deletion of the code. Only one Action Code may be assigned at one time to a record. The priority of the Action Codes will be 310, 4XX, 6XX, 3XX, 2XX.

Exceptions & meaning →

Error Resolution System Action Codes

A complete list of ERS Action Codes is shown on Exhibit 3.11.20-15, Action Codes Chart. This displays which codes are valid for Error Resolution, and which codes are not. Use the suspense period for controlling suspense documents, not for determining which code to assign.

Exceptions & meaning →

Undeliverables

When a approval or denial notification or correspondence is returned to the IRS because of an erroneous address, and there is another address included on the returned documents, re-send the correspondence to that address.

Exceptions & meaning →

Note:

Do not research undeliverable CP 211A, Application for Extension of Time to File an Exempt Organization Return - Approved, and CP 216F, Application for Extension of Time to File an Employee Plan Return - Approved. Give to your manager or lead for proper preparation of documents for destruction.

If no new or better address is included in the correspondence returned to the IRS, research IDRS for a new or better address. See IRM 3.11.20.2.15, Research Command Codes.

Research If/Then

If research

Then

indicates a new or better address,

re-send the letter to that address.

does not indicate a new or better address or if the "resent" letter comes back undeliverable,

give to your manager or lead for proper preparation of documents to be destroyed.

Do not input address changes based on address changes on the extension. The taxpayer is instructed to file Form 8822, Change of Address. If the taxpayer has attached a Form 8822, detach and forward to the Entity function.

Exceptions & meaning →

Erroneous & Unidentified Documents

If an original tax return is attached to an extension request with no explanation, and both documents are for the same taxpayer, Master File Tax (MFT) Code and Tax Period, leave the extension attached to the back of the tax return and batch the tax return for processing.

If you receive a schedule or other form attached to a tax return and it is stapled to the extension request, leave it attached to the back of the extension and continue processing.

If Form 9465, Installment Agreement Request, is attached to the extension document, refer to IRM 3.11.20.2.12, Installment Agreement.

If additional information is needed (i.e., whether a first extension was filed, or an explanation for the delay), research or correspond with the taxpayer, unless instructions for a specific extension form specify otherwise. See IRM 3.11.20.2.16, C&E Correspondence, for instructions.

If correspondence is necessary, allow 10 business days for a response:

When a reply is received, process the extension.

If no reply is received after 10 business days, process the extension as denied.

Exceptions & meaning →

Note:

If the Taxpayer Identification Number (TIN) and taxpayer's name are missing or illegible and the extension cannot be processed nor correspondence issued, give it to your manager or lead for preparation for destruction.

Exceptions & meaning →

Erroneously Detached Copies of Extension Forms

If the extension form appears to be a copy that may have been detached from the taxpayer's return in error and it is more than one month delinquent, examine the extension form for any of the following:

The word "copy" or "photocopy"

No received date

Signature is not original ink or stamp.

If any of the above indications are present, research IDRS for TC 460 posted to the account for the same MFT and Tax Period as the extension. If research indicates a TC 460 is present, pull from batch and give to your manager or lead for proper preparation of documents to be destroyed.

If no TC 460 indicated, process as an original request per instructions outlined in IRM 3.11.20.

Exceptions & meaning →

Installment Agreement

If a Form 9465 or letter requesting an installment agreement is attached to an extension, route the Form 9465 or letter to Collections. Notate on the transmittal the extension form that was attached to Form 9465. Before routing the Form 9465 to Collections, verify that the taxpayer(s) name, Social Security Number (SSN), form number and Tax Period are on both the installment agreement and the extension. Continue processing the extension request using established procedures.

Exceptions & meaning →

Access to IDRS

When using IDRS, access only those accounts required in your official duties. Unauthorized accesses or browsing of tax accounts by employees to satisfy personal curiosity or for fraudulent reasons are prohibited by IRS and subject to disciplinary actions.

Exceptions & meaning →

Notification to Taxpayer

Notification of disapproved extension request must be returned to the taxpayer within 10 days of the day the extension is disapproved.

On BMF Form 5558 (MFT 76), all Forms 8868, and on EPMF Form 5558 (MFT 74), a notice is automatically sent to the taxpayer based on the edited notice code when the extension transaction posts.

Exceptions & meaning →

Research Command Codes

Command Code INOLE definer S (INOLES) with the taxpayer's Employer Identification Number (EIN) or SSN is used to find:

Taxpayer's name and address.

Taxpayer's name control.

Filing requirements (for BMF and EPMF taxpayers).

Fiscal Year Month (FYM) - this is the month the taxpayer's tax year ends.

Exceptions & meaning →

Example:

If the taxpayer's FYM is 12, the tax year ends in December.

See IRM 2.3.47, Command Codes INOLE, EOGEN and SPARQ, for more information on the use of this command code.

Command Code BMFOL definer I (BMFOLI) with the taxpayer's EIN or SSN (the SSN must be followed by a "V" ) is used to find the following information for a BMF taxpayer:

Taxpayer's name control.

Taxpayer's filing history. Command Code BMFOLI will list the Tax Periods on the Master File and whether a return has posted to the Tax Period. A "Y" under RET PST column indicates that a return (TC 150) has posted to that module.

Exceptions & meaning →

Note:

Use definer "T" to display information from a specific Tax Period.

See IRM 2.3.59, Command Codes BMFOL and BMFOR, for more information on the use of this command code.

Command Code ENMOD with the taxpayer's EIN or SSN is used to find:

Taxpayer name and address.

Taxpayer's name control.

Pending entity transactions such as TC000 that establishes the taxpayer's account, name changes (TC013) that may change the Name Control, or transactions that may change the taxpayer's tax year (such as TC053).

See IRM 2.3.15, Command Code ENMOD, for more information on the use of this command code.

Command Codes NAMEE, NAMES, NAMEI, NAMEB, FINDS, and FINDE are used for:

Research for a taxpayer's EIN or SSN on the BMF or EPMF using the taxpayer's name (and any known address information).

Research for a taxpayer's SSN on the IMF by entering the taxpayer's name (and address information if known).

The most efficient search uses the taxpayer's name and ZIP Code.

Exceptions & meaning →

Note:

If researching for an SSN and the taxpayer is using a foreign address, enter the fully spelled country name or a double asterisk (**) in the country field of CC NAMES to access the International Account Profile.

Command Code NAMEI is used to research for the taxpayer's SSN.

Command Code NAMEB is used to research for the taxpayer's EIN or SSN for a BMF entity.

Command Codes FINDS (SSN) and FINDE (EIN) are used to find a name and address for a TIN.

See IRM 2.3.60, Command Codes NAMES, NAMEE, NAMEI, NAMEB, FINDS, FINDE and TPIIP, for more information on the use of these command codes.

Exceptions & meaning →

C&E Correspondence

On BMF extensions of time to file, use Letter 3699C, Extension of Time to File - BMF, when corresponding about the following.

Notifying the taxpayer of the correct extended due date.

The correct extension form to use.

The extension is disapproved.

When sending Letter 3699C, prepare Form 3696, Correspondence Action Sheet, or other local-use correspondence action sheet.

Enter the taxpayer's name, address, and TIN.

Exceptions & meaning →

Exception:

If the extension indicates that the taxpayer wants notification or correspondence to be sent to a name and address other than the taxpayer's, enter that name and address on the correspondence action sheet.

Enter the number of the letter to be used and list the appropriate paragraphs and fill-ins for the letter.

Notate on the extension form the letter that was sent. For example, "Letter 3699C sent" .

Reject the extension document by entering Action Code 211 in the bottom left corner of the form and leave the form in the batch.

Use Form 6513, Extension of Time to File, in place of a correspondex letter, when appropriate. It is unnecessary to reject the document when this form is used.

When notifying the taxpayer that the extension request is approved, always check the first box on Form 6513.

When notifying the taxpayer that the extension request is not approved, always check the second box on Form 6513 and check the appropriate box to indicate the reason for disapproval.

When using Form 6513, you must either photocopy the extension request or attach a label with the name and address to which the form will be mailed. It is the option of the campus to decide how this is done.

Form 6401, Request for Missing Information, may also be used in place of a correspondex letter when appropriate. It is not necessary to reject the document when this form is used. Enter the current date in the date block at the top of the form and check the appropriate box(es) to indicate what is missing.

Exceptions & meaning →

Acceptable Signature

A signature is required on Form 8868 extension for Form 5330, Return of Excise Taxes Related to Employee Benefit Plans.

A signature can either be an original signature (including printed signature), rubber stamped, mechanical device or signed by a software program.

Tax examiners are not expected to be handwriting experts. Treas. Reg. 301.6064-1 allows us to presume that the signature is the true signature of the person whose name it appears to be.

Exceptions & meaning →

Document Perfection - General

For general document perfection information, follow the next sections for general instructions for processing all extension requests, unless the procedures for a specific form contain different instructions. In that case, the specific instructions take precedence.

Exceptions & meaning →

Name Control

Underline the Name Control of the taxpayer. The ampersand (&) and hyphen (-) are the only special characters allowed in the Name Control.

If the name is not present on the name line but can be determined from elsewhere on the extension or on attachments, edit the Name Control to the name line. If it is undetermined:

On a numbered request, take no action;

On an unnumbered request, research for the taxpayer's name using the TIN.

If name, address and TIN are all missing, process the document as unable to be processed. Give to your manager or lead for preparation for destruction.

For Form 5558 filed for Form 5500, Annual Return/Report of Employee Benefit Plan (MFT 74), always perfect the Name Control by underlining or editing the first four characters of the name as follows:

Exceptions & meaning →

Note:

The Name Control for these returns must ALWAYS be the first four characters of the name of the filer, plan administrator, or plan sponsor listed on Form 5558, Part 1, Section A.

If the plan belongs to an individual, use the first four characters of the individual's first name.

Exceptions & meaning →

Note:

IRS accepts the primary name line information received if there is no impact to the filer. Do not change the EPMF primary name line based on BMF name line rules. Process the posting as filer's intent.

If the plan belongs to a partnership, LLC or corporation, use the first four characters of the partnership, LLC or corporation name.

If the plan belongs to a Trust or 401K, use the first four characters of the Trust or 401K.

Disregard the word "The" in the Name Control only when more than one word follows.

Exceptions & meaning →

Example:

The Orange Tree, Name Control: ORAN.

Include the word "The" when it is only followed by one word.

Exceptions & meaning →

Example:

Name: The Hawk, Name Control: THEH.

Employee Plans specific Name Control examples to be used are:

Example

Name Control

1

Jim black Profit Sharing Plan - Edit JIMB

2

Retirement Plan for a Tree Inc - Edit RETI

3

Jane Brown Trust - Edit JANE

4

John Gray 401K Plan - Edit JOHN

If unable to determine the Name Control by following the instructions above, route to Entity Control.

For Form 8868:

The Name Control consists of four alpha or numeric or both characters.

The Name Control can have fewer than, but no more than, four characters.

Blanks may only be present at the end of a Name Control (i.e. no character may follow a blank).

The Name Control for an Estate (indicated by "Estate" or "Est." in the name line) is the first four characters of the last name of the decedent.

Exceptions & meaning →

Example:

Estate of Fred Maple - Name Control MAPL. Janice Elm Est.- Name Control ELM.

The Name Control for a Trust is edited in this priority:

Individuals - the first four characters of an individual's last name. Robert Maltese Trust.

Businesses - the first four characters of the business name if the name of the trust is a business instead of an individual. Maple Corporation Employee Benefit Trust.

GNMA Pools - the first four digits of the trust number. Disregard any leading zeroes or trailing alphas or both. If there are fewer than four numbers, use the letters GNMA to complete the Name Control.

Exceptions & meaning →

Example:

  1. 0000941 GNMA Pool - Name Control 941G. 2) GNMA Pool No. 00100A - Name Control 100G.

For Form 1041-A and Form 5227, Return Codes 08 or 10, trust Name Control rules apply even if Fund or Foundation is in the organization's name.

See IRM 3.11.12, Returns and Documents Analysis, Exempt Organization Returns, for more examples.

Exceptions & meaning →

Taxpayer Identification Number (TIN)

Follow these instructions, unless the specific form instructs otherwise.

When the TIN is illegible, other than nine digits, or missing, check attachments.

TIN If/Then

If TIN is not found or there are multiple TINs and extension is

Then

Numbered,

Take no action.

Unnumbered,

Send to Entity for assignment of EIN.

Exceptions & meaning →

Tax Period

The Tax Period is four digits (YYMM) indicating the year and month in which the taxpayer's tax year ends (e.g., if the tax year ending is September 30, 2025, edit Tax Period 2509). The Integrated Submission and Remittance Processing (ISRP) program generates the beginning of the year (24) when the extension document is input through Data Conversion.

Edit the Tax Period in YYMM format in the upper right portion of the form unless otherwise indicated in specific instructions for the form.

Exceptions & meaning →

Exception:

It is not necessary to edit the Tax Period if the taxpayer's year end is the current calendar year (2025).

Determine the Tax Period from:

The taxpayer's entry on Form 8868, Part II, Line 1 check box.

Exceptions & meaning →

Exception:

On extensions for Form 1041-A, U.S. Information Return Trust Accumulation of Charitable Amounts, and Form 5227, Split-Interest Trust Information Return, the Tax Period is always calendar year (no editing is necessary).

The taxpayer's entry on Form 5558, Part I, Section E, Plan Year End field.

Exceptions & meaning →

Note:

If the taxpayer filed an extension listing a prior year during the current filing season, and all other information points to an extension request for this season (received date, postmark date, DLN Julian date, signature date), process it as being for the current calendar year.

The Tax Period will end on the last day of a month and must be for 12 months or fewer, unless otherwise specified below (ignore a minor discrepancy such as October 30 instead of October 31). If the ending date is other than as specified, follow subsequent actions.

A calendar year is 12 months that ends in December (Tax Period 2512 - unnecessary to edit).

A fiscal year is 12 months that ends in any month other than December (edited Tax Period could be 2501 through 2511).

52-53 Week Rule - Tax Periods reported under the 52-53 Week Rule end on a particular day of the week nearest to the last day of that month. This Tax Period may end not more than six days before, and not more than three days after, the end of a month.

When editing these Tax Periods, use the numeric designation of the month, the last day of which is closest to the actual ending date.

Exceptions & meaning →

Example:

If the ending date is October 3, use the numeric designation for September (2509). If the ending date is October 25, use the numeric designation for October (2510).

If the Tax Period is for more than 12 months or 53 weeks, see IRM 3.11.20.3.3, Tax Period Format.

Short tax year - This is a tax year shorter than 12 months.

If the taxpayer indicates that a Final short period tax return ("Final return" box is checked and a short year is indicated) will be filed, the tax year ends on the date the taxpayer went out of business and may be any day of the month.

Edit the short Tax Period, as indicated by the taxpayer, in YYMM format.

If the date the taxpayer went out of business is indeterminable, use the calendar month that precedes the received date.

Exceptions & meaning →

Exception:

Extensions for Form 1041-A, and Form 5227 are always calendar year.

Edit the Computer Condition Code (CCC) "W" on Form 8868. See IRM 3.11.20.3.5, Computer Condition Code, for more information.

If the taxpayer indicates that an initial short period tax return will be filed, edit the short period as indicated by the taxpayer, in YYMM format.

The following examples are of the Tax Period Format:

Tax Period Format

Tax Period Ends

Numeric Designation

Dec. 31, 2025

2512 (do not edit)

Nov. 30, 2025

2511

Feb. 28, 2025

2502

Oct. 3, 2025 (52-53 week document)

2509

Oct. 3, 2025 (Final Short period)

2510

Oct. 25, 2025 (52-53 week document)

2510

Oct. 25, 2025 (Final Short period)

2510

If the Tax Period is missing, illegible, invalid, or is longer than one year, process the Tax Period to be the current calendar year if the form is timely.

If the Tax Period is missing, illegible, invalid, or is longer than one year, and the extension is not timely filed for the current calendar year:

Request research to determine correct FYM.

If determined, edit the correct Tax Period on the extension form. If this causes the form to be untimely, follow normal denial procedures for that form.

If the Tax Period is undetermined through IDRS research, correspond with the taxpayer. See IRM 3.11.20.2.16, C&E Correspondence. Do not send the application back to the taxpayer.

Replies to Tax Period correspondence - edit the Tax Period indicated by the taxpayer and continue processing.

No replies to Tax Period correspondence - follow local procedures to destroy the document.

Exceptions & meaning →

Received Date

Every extension request form received by the IRS must be date stamped or edited in MMDDYY or MMDDYYYY format on the front of the first page by the receiving area (usually Receipt and Control) indicating the date it was received.

The received date is used to determine if the extension request was timely filed. The IRS Received Date may or may not be stamped or edited on the face of the return. See IRM 3.11.20.3.4(6) below for more information.

If more than one received date is stamped on the form, circle all but the earliest received date.

A valid IRS Received Date Stamp may consist of the following:

The word "Received"

Month (alpha or numeric)

Day (for example "1" or "01" )

Year - two or four digits

"Area Office" , Campus, "Field Office" , "Taxpayer Assistance Center (TAC)" , plus the "City" location or a functional area within one of these sites (e.g. Compliance Services Collection Operations (CSCO), Examination, Image Control Team (ICT). Correspondence Imaging System (CIS), Accounts Management (AM), etc.

Exceptions & meaning →

Exception:

Not all IRS offices are designated places for filing, and not all IRS employees are authorized to accept a tax return for processing. If a return contains a received date stamp from other than a Taxpayer Assistance Center (TAC), Lockbox, or IRS campus (Compliance, Accounts Management (AM), or Submission Processing (SP)), circle out the invalid received date and edit the correct received date according to instructions below. For example, returns received by the Taxpayer Advocate Service (TAS) or the IRS Office of Chief Counsel, are not properly filed and a received date by that office is not the "IRS Received Date" .

If the received date makes the extension delinquent, and the postmark date is timely, circle the received date and edit the received date to agree with the postmark or shipment date. See IRM 3.11.20.2.6, Determination of Timely Filing - General.

Exceptions & meaning →

Note:

A timely foreign postmark also makes the extension timely.

If the date stamping area has failed to date stamp or edit the form or the date is illegible, and an Area Office date stamp is not present, determine and edit the received date in MMDDYY or MMDDYYYY format in the center of the form. Determine the received date using this priority:

Legible USPS postmark date, private meter postmark, or date from a designated private delivery service.

Revenue Officer's signature date.

Service Center Automated Mail Processing System (SCAMPS) Date - the IRS SCAMPS machine date generated on the envelope.

Signature date.

DLN control (Julian) date minus 10 days.

Current date minus 10 days.

If the extension request was addressed and mailed to a state agency by the taxpayer, accept only the IRS received date on the return. If the extension request was addressed to the IRS by the taxpayer, but was incorrectly delivered to a state agency, use the postmark on the envelope as the received date.

The IRS accepts the filing if a Form 5558 is received from Employee Benefits Security Administration (EBSA), Department of Labor (DOL), or Other Government Agencies that deal with the Form 5500.

If the Form 5558 is timely filed based on the postmark date, approve the extension.

If the Form 5558 is not timely filed based on the postmark date, deny the extension.

If a non-Governmental organization such as the gas company, phone company, etc., received a Form 5558, deny the extension.

Exceptions & meaning →

Computer Condition Code

A Computer Condition Code (CCC) may be used on Form 8868.

The only valid code for Form 8868 is W edited in the top middle margin.

CCC

CODE

FORMS

USAGE

W

8868

Edit when form covers a Short Tax Period. This bypasses the ERS check on Tax Period mismatches.

A CCC is not edited on Form 5558.

Exceptions & meaning →

Extended Due Dates

The Extended Due Date is the date the extension period ends. It is only edited on Form 5558 extensions for Form 5500 series or Form 8955-SSA, Annual Registration Statement Identifying Separated Participants With Deferred Vested Benefits.

On all approved Form 5558 and Form 8868 extensions, the extended due date is generated by the Master File when the extension transaction posts.

On approved Forms 8868 with Return Codes 01, 03-12, or 15, the extended due date is generated as return due date plus six months when Notice Code 1 is edited.

On approved Forms 8868 for Form 5330 with Return Codes 13 or 14, the extended due date is generated as return due date plus the appropriate number of months per Exhibit 3.11.20-4, Due Dates - Form 8868 for MFT 76 (Form 5330), when Notice Code 3 is edited.

On approved Forms 5558 for Form 5500 series and/or 8955-SSA, the extended due date is generated as return due date plus 2 1/1 months when Notice Code 1 is edited.

Exceptions & meaning →

Form 8868 Document Perfection Procedures

This subsection contains instructions for Forms 8868.

Exceptions & meaning →

General Information

Form 8868 filer enters a two-digit return code indicating the return to be extended. C&E will no longer edit the Return Code, unless it was not entered by the filer or is illegible. For a complete list of Return Codes, see Exhibit 3.11.20-16, Return Code, for all forms listed below.

Exceptions & meaning →

Caution:

A return code must be present. The MFT code and extended return due date are generated based on the return code (Edited below the name and address section on prior versions).

Form 8868 is filed to request an extension for the following forms and is processed in the Ogden Service Processing Center (OSPC).

Form 990, Return of Organization Exempt From Income Tax

Form 990-EZ, Short Form Return of Organization Exempt From Income Tax

Form 990-PF, Return of Private Foundation or Section 4947(a)(1) Trust Treated as Private Foundation

Form 990-T, Exempt Organization Business Income Tax Return

Form 1041-A, U.S. Information Return Trust Accumulation of Charitable Amounts

Form 4720, Return of Certain Excise Taxes Under Chapters 41 and 42 of the Internal Revenue Code

Form 5227, Split-Interest Trust Information Return

Form 5330, Return of Excise Taxes Related to Employee Benefit Plans

Form 6069, Return of Certain Excise Taxes on Mine Operators, Black Lung Trusts, and Other Persons Under Sections 4951, 4952, and 4953.

Form 8870, Information Return for Transfers Associated With Certain Personal Benefit Contracts

Exceptions & meaning →

Note:

If Form 8868 is received for Form 8870, with Return Code "12" , forward to TE/GE Mail Stop 1110.

Form 8868 extension request for Form 6069, Return Code 11 is edited, then routed and processed in ANMF in KCSPC. See IRM 3.11.20.4.2(11) for editing instructions.

Form 8868 is for requesting an automatic six-month extension for all forms.

Extensions on Form 8868 may not be granted for more than six-months.

If duplicate Forms 8868 are received (same EIN, name, type of return, and Tax Period), do not process separately. Cross out ("X" ) the duplicate and attach to the back of the original.

If the filer attached a Form SS-4, Application for Employer Identification Number, to the Form 8868, route both forms to Entity to have an EIN assigned before determining approval or denial.

Exceptions & meaning →

Document Perfection

Perfect Form 8868 as follows: See Exhibit 3.11.20-10, Form 8868 T-Lines.

The taxpayer will receive a six-month extension for a timely filed Form 8868.

If Form 8868 is filed for a form other than those listed in IRM 3.11.20.4.1(2) above, take this action:

Exceptions & meaning →

Exception:

If there is an indication Form 8868 is being filed to extend Form 990-N, Electronic Notice (e-Postcard) for Tax-Exempt Organizations Not Required to File Form 990 or Form 990-EZ, process the extension as a Form 990 and edit Return Code "01".

Form 8868 Other Forms Attached

If

Then

Unnumbered

Remove from the batch and follow local procedures to ensure the return is re-batched correctly.

Numbered

Edit ERS Action Code "610" to Reject Correction and attach Form 4227, Intra-SC Reject or Routing Slip, to Form 8868. Notate "Renumber" on Form 4227.

Perfect the Name Control, EIN, Tax Period, and received date as outlined in IRM 3.11.20.3 Document Perfection - General.

Perfect the two-digit return code entered in the boxes below the name and address section only if blank or illegible.

If the taxpayer indicates the Form 8868 is for the "45R Credit Only" and the return code is blank, enter 07 in the return code box, otherwise DO NOT change the return code.

If you are unable to determine the return code, research for the organization's filing requirement and enter the return code that corresponds to the filing requirement. See Exhibit 3.11.20-16 to determine the organization’s filing requirement return code.

Exceptions & meaning →

Note:

A return code MUST be present. The MFT code and extended return due date are generated based on the return code. Always convert prior year return revisions using the current year T-Lines; see Exhibit 3.11.20-9, Prior Year MFT and Return Code Conversion Chart.

If the taxpayer has indicated multiple return codes, and research shows only one filing requirement, enter the Return Code that corresponds to the filing requirement.

If the taxpayer has indicated multiple return types, and research shows they have matching multiple filing requirements, a "dummy" extension must be prepared for each Return Code.

Photocopy the Form 8868.

Edit one return code per copy.

Make additional photocopies if necessary, so there is a separate Form 8868 for each Return Code.

If, after research, you are unable to determine the organization's filing requirement, route to Entity. Entity determines the Return Code and routes to C&E to continue processing.

Extension requests for Form 6069, must be processed to ANMF in KCSPC. See IRM 3.11.20.4.1(3).

Follow normal approval and denial procedures.

Extensions for Forms 6069 are due on or before the 15th day of the fifth month after the end of the Tax Period (05/15/2025 for Tax Period 202412).

A copy of the approved or denied extension will be mailed to the taxpayer.

The IRS original must be forwarded to ANMF Accounting.

Exceptions & meaning →

Group Return

Process Form 8868 as a group return when indicated on the extension and any of the following apply:

A GEN is present.

The whole group box is checked.

The part of the group box is checked.

A list of subordinates is attached.

Exceptions & meaning →

Note:

A group return can only be filed on Form 990. If other than the Form 990 box is checked, and any of a) through d) above apply, research for the organization's filing requirements. If the filing requirement is other than "03" , do not process the extension as a group return and do not edit a group code or follow group return processing instructions. If the filing requirement is "03" , change the return code to 01 and process the extension as a Form 990 group return.

If the extension is a Group Return, in addition to normal editing of the return, edit Group Code "7 or 8" in the middle right margin, as follows:

Group Returns

If

And

Edit Group Code

Then

the GEN is present,

no boxes are checked and no list of subordinates is attached,

do not edit a group code,

continue processing.

the GEN is present,

whole group box is checked,

7,

continue processing.

the GEN is 0229,

no boxes are checked and no list of subordinates is attached,

do not edit a group code,

continue processing.

the GEN is 0229,

the whole group box is checked and no list of subordinates is attached,

do not edit a group code,

continue processing.

the GEN is 0229,

the whole group box is checked and a list of subordinates is attached,

8,

edit Action Code 320, attach Form 4227, notate Group Return to route to Entity to input the TC 460, leave in batch and continue processing.

the GEN is 0229,

the part of the group box is checked and no list of subordinates is attached,

do not edit a group code,

continue processing.

the GEN is 0229,

the part of the group box is checked and a list of subordinates is attached,

8,

edit Action Code 320, attach Form 4227, notate Group Return to route to Entity to input the TC 460, leave in batch and continue processing.

the GEN is present,

the whole group box is not checked and a list of subordinates is attached,

8,

edit Action Code 320, attach Form 4227, notate Group Return to route to Entity to input the TC 460, leave in batch and continue processing.

the GEN is not present,

the whole group box is checked and a list of subordinates is attached or not,

7,

continue processing.

the GEN is present,

the part of the group box is checked and a list of subordinates is attached,

8,

edit Action Code 320, attach Form 4227, notate Group Return to route to Entity to input the TC 460, leave in batch and continue processing.

the GEN is present,

the part of the group box is checked and a list of subordinates is not attached,

do not edit a group code,

continue processing.

the GEN is not present,

the part of the group box is checked and a list of subordinates is attached,

8,

edit Action Code 320, attach Form 4227, notate Group Return to route to Entity to input the TC 460, leave in batch and continue processing.

the GEN is not present,

the part of the group box is checked and a list of subordinates is not attached,

do not edit a group code,

continue processing.

Exceptions & meaning →

Exception:

Form 8868 with Return Code 01, 03-12, or 15 - Approval Criteria

A request for an automatic six-month extension of time to file an exempt organization return will be approved if there is a timely postmark or the received date is on or before the return due date ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡.

A request for extension received on Form 8868 with revision date of January 2014 will be approved if there is a timely postmark or the received date is on or before the return due date. See Exhibit 3.11.20-14, Form 8868 - Part II Conversion chart.

Rejected electronically filed extension request. If there is an indication that the taxpayer attempted to file the extension electronically and it was rejected, consider the paper request timely if postmarked by the regular due date or five calendar days after the date the taxpayer was notified that the electronic submission was rejected, whichever is later.

For additional Form 8868 dues dates, see Exhibit 3.11.20-2, Due Dates - Form 8868 Extensions Other than Form 990-T Sec. 401(a) or 408(a) Trusts and Federal Agencies and Tribal Governments EPE Credit and Exhibit 3.11.20-3, Due Dates - Form 8868 Extensions Form 990-T Sec. 401(a) or 408(a) Trusts, to determine whether the extension is timely.

Exceptions & meaning →

Approval/Denial Notice Code

Edit a notice code on Forms 8868 to indicate whether the application is approved or denied.

The notice code causes a notice to generate to the taxpayer and generates the appropriate extended due date.

If the extension request is denied, the generated notice explains the reason for the denial based on the notice code.

Exceptions & meaning →

Example:

Notice Code 2 generates a notice explaining that the extension request was denied because it was not filed by the due date.

Edit the notice code in the top middle margin of Form 8868 according to whether the application is approved or disapproved.

Edit only one notice code:

1 - Approved extension - timely.

Exceptions & meaning →

Note:

This notice code generates a six-month extension.

2 - Disapproved extension - not timely.

Exceptions & meaning →

Form 8868 - Approval Actions

If the request is timely filed, edit Notice Code 1.

When the extension transaction posts to the Master File, Notice Code 1 generates a six-month extension of time to file for all return types.

Exceptions & meaning →

Note:

It is not necessary to take any other action if the taxpayer has requested more than six-month extension. The notice will notify the taxpayer of the length of the extension.

A request for extension received on Form 8868 with revision date of January 2014 will be approved if there is a timely postmark or the received date is on or before the return due date. See Exhibit 3.11.20-14, Form 8868 - Part II Conversion, chart.

Exceptions & meaning →

Form 8868 - Disapproval Criteria

Disapprove a request for an automatic six-month extension of time if the received date is after the return due date ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡, unless timely postmarked. See Exhibit 3.11.20-2.

A request for extension received on Form 8868 with revision date of January 2014 will be approved if there is a timely postmark or the received date is on or before the return due date. See Exhibit 3.11.20-14.

Exceptions & meaning →

Form 8868 - Disapproval Actions

If the extension request is not approved, edit Notice Code 2.

Notice Code 2 generates a notice to be sent to inform the taxpayer the extension has been denied because the application was not filed on time.

Exceptions & meaning →

Form 8868 (Rev 1-2024 and Subsequent) with Return Codes 13 or 14 for Form 5330

Form 8868 for Form 5330 with Return Codes 13 or 14 is for requesting an automatic six-month extension.

Follow IRM 3.11.20.5.1, Form 8868 Part III for Form 5330 - Approval/Disapproval Criteria and Action, for editing procedures.

The Batching unit will sort and batch Form 8868, Part III for Form 5330 under program code 15540.

If batched under an incorrect program code, pull and give to your lead or manager to be re-batched.

If a Form 8868 requests an extension for both Part II and Part III, a “dummy” of the original extension must be prepared. Forms must be processed separately following the specific instructions for each type.

Photocopy Form 8868.

Form 8868, Part III for Form 5330 must have an acceptable signature. See IRM 3.11.20.2.17, Acceptable signature, for more information.

Cross out (X) Part II on the original and Part III on the photocopy or photocopies.

Both forms must be processed separately following the specific instructions for each type.

For Form 8868, Part II, see IRM 3.11.20.4, Form 8868 Document Perfection Procedures.

Form 8868 is processed under program code 15540 for paper returns.

Exceptions & meaning →

Form 8868 Part III for Form 5330 - Approval/Disapproval Criteria and Action

Approve the extension up to six months if it meets all these conditions.

Extension is timely

An acceptable reason for the extension is given, and

The extension request is signed.

Determine if the extension was timely filed.

The IRC section imposing the tax entered on Form 8868, Part III, line 1a determines the return due date of Form 8868 filed for Form 5330.

If no Code section is entered or is not valid, edit Action Code 211 in left bottom margin and initiate correspondence for the code section using Letter 3938C, Form 5330 Incomplete for Processing.

Exceptions & meaning →

Exception:

Do not correspond for the Code section if there is no signature or no acceptable reason. Follow Disapproval Codes for Part III chart procedures below.

If the due date falls on a weekend or holiday, process the extension timely filed if the extension is postmarked on or before the next business day. See Exhibit 3.11.20-4, Due Dates - Form 8868 for MFT 76 (Form 5330), to determine whether the extension is timely.

≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡

Approval Action - edit Notice Code 3 in the top middle margin of the Form 8868.

Disapproval Criteria - Deny requests for extension of time to file if all the requirements for approval in paragraph (1) are not met. See the Disapproval Codes for Part III chart below to determine the notice code.

Disapproval actions - Only one notice code may be edited. If the request meets more than one of the disapproval criteria, choose the notice code in the order listed below.

Disapproval Codes for Part III

Extension

Edit Notice Code

Isn’t timely

4

Isn’t signed

8

Doesn’t have an Acceptable Reason

9

Editing Form 8868 for Form 5330:

Underline or edit the Name Control. See IRM 3.11.20.3.1, Name Control.

Edit the Tax Period. See IRM 3.11.20.3.3, Tax Period.

Check for valid TIN. See IRM 3.11.20.3.2, Taxpayer Identification Number (TIN). If the TIN is an SSN, edit a 0 (zero) at the end of the SSN.

Ensure there is a three-digit plan number on Form 8868, Part I, "Plan number" field. It cannot be 000 or blank. If plan number is 000, blank, or it is more or fewer than three digits, edit Action Code 320 on left bottom margin. Attach Form 4227, notate "Plan Number" , and route to Entity Control.

If there are more than one plan number present, a dummy extension must be prepared for each additional plan number. Photocopy the original Form 8868 for each additional plan number. Circle all but one plan number on each copy, then continue to document perfect for processing.

Ensure a IRS received date is present. See IRM 3.11.20.3.4, Received Date.

Edit the notice code per IRM 3.11.20.5.1(3) & (5) above.

Exceptions & meaning →

Form 5558 Document Perfection Procedures

Form 5558 is processed at Ogden Submission Processing Center (OSPC) only. If received in another center, ship to OSPC.

Processing of extensions must be completed within 16 calendar days of the initial received date as outlined in IRM 3.30.123, Processing Timeliness: Cycles, Criteria and Critical Dates.

Extension requests for Form 5500 Series and Form 8955-SSA are processed and posted to the EPMF as MFT 74. The MFT is not edited on this form; see Exhibit 3.11.20-11, Form 5558 T-Lines for Form 5500 Series and 8955-SSA.

Extension requests received on Form 5558 (Rev 9-2018), Part III for Form 5330, must be converted to a Form 8868 and batched under Program 15540. They are processed and posted to the BMF as MFT 76. The MFT is not edited on this form. See Exhibit 3.11.20-12, Form 8868 T-Lines for Form 5330.

Form 5558 extensions are processed through on-line ERS.

Form 5558 (Rev 9-2018), Box B, contains fields for an EIN and SSN. Form 5558 (Rev 1-2024 and subsequent), Box B, contains an EIN field only.

Exceptions & meaning →

Note:

An SSN can be entered by the filer filing an extension for Part III only. If Form 5558 (Rev 9-2018), Part III for Form 5330 is completed, it must be converted to Form 8868 and batched under Program 15540. See Exhibit 3.11.20-12 , Form 8868 T-Lines for Form 5330

EIN/SSN Procedures

If

Then

an SSN is present and only Part II has an entry,

send to Entity. Entity determines the EIN and routes to C&E to continue processing.

both an EIN and SSN are present and only Part II has an entry,

circle out the SSN and continue processing.

both an EIN and SSN are present and only Part III has an entry,

send to Entity. Entity determines the correct TIN and routes to C&E to continue processing.

Use the following criteria to determine the type of extension:

If

Then

Part II has an entry on line 2 and line 3,

Exceptions & meaning →

Note:

On form version 06-2011 use Part II Lines 1 and 2.

process the extension for a Part II Form 5500 Series and Form 8955–SSA.

unable to determine,

process as an extension for Part II Form 5500 Series and Form 8955-SSA. See IRM 3.11.20.6.1IRM 3.11.20.6.2.

On form version 06-2011, the filer may include up to three plans on one Form 5558; if there is more than one plan number on the Form 5558, a "dummy" extension must be prepared for each of the additional plan numbers.

Photocopy Form 5558 and circle all but one plan number. Make additional photocopies if necessary so there is a separate Form 5558 for each plan number.

If unable to determine Plan Number, attach Form 4227, notate "plan number" , and route to Entity. Entity determines the plan number and routes to C&E to continue processing.

≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡

If the taxpayer attaches a list, leave attached and continue processing the Form 5558.

If correspondence is necessary and there is no address for the filer on the Form 5558, correspondence will be sent to the taxpayer's address of record.

Exceptions & meaning →

Form 5558 Part II for Form 5500 Series and Form 8955-SSA

All Forms 5558 for Form 5500 Series or 8955-SSA are processed and posted to the EPMF.

Determine if the extension request was received timely.

The return due date for Forms 5558 for Form 5500 Series and Form 8955-SSA is the last day of the seventh month after the end of the plan year.

≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ See Exhibit 3.11.20-5 Due Dates - Form 5558 for Form 5500 Series and Form 8955-SSA, to determine whether the extension is timely.

On form version 06-2011, employers may request extensions for up to three plans on one Form 5558. If all the plan years end on the same date, follow the approval/denial criteria as outlined in IRM 3.11.20.5(7) through (12) above.

Exceptions & meaning →

Note:

"Dummy" extensions must be prepared so each has only one EIN and plan number, see IRM 3.11.20.6(8)

.

Extensions cannot be amended. Process any extensions marked "amended" as a reconsideration and follow procedures in IRM 3.11.20.2.5 (4).

Route miscellaneous forms and attachments using Form 12634, OIRSC Campus Document Transmittal.

Leave the Schedules A, B, C, D, E, F, G, H, I, MB, P, R, SB, SSA, or T (these schedules are filed with Form 5500) attached to the Form 5558.

If Form 8955-SSA is attached, detach and route to Extracting.

Route correspondence concerning penalties, returned Letter 3699C, Extension of Time to File - BMF, reconsideration of denied extensions, or timeliness to EP Accounts.

Detach Form 8822 and route to Entity.

Detach original Form 2848, Power of Attorney and Declaration of Representative, edit a received date, and route to the POA (Power of Attorney) Unit.

If there is a request for forms attached to the extension, copy the Form 5558. Detach the correspondence request and attach it to the photocopy of the Form 5558. Route to CRX and continue to process the original Form 5558.

Route the Form 5558 to Entity Control using Form 4227, Intra-SC Reject or Routing Slip, if:

There is a name change.

There is an EIN change.

The EIN is missing and the Form 5558 is not timely.

The filer attached a Form SS-4 to the Form 5558, route both forms to have an EIN assigned before determining approval or denial.

There is no three-digit plan number on Form 5558, Section C, Plan number box, or it is more or fewer than three digits.

Exceptions & meaning →

Note:

On form version 06-2011, if there is more than one plan number present, see IRM 3.11.20.6, Form 5558 Document Perfection Procedures.

Part II Line 1 check box is checked, route to establish the account before determining approval or denial.

When a Form 5558 for Form 5500 Series and Form 8955-SSA is received, review the table below, for required actions.

Required

Approve

Denied

Determine due date. See Exhibit 3.11.20-5.

Timely filed

Not timely filed

Name control. See IRM 3.11.20.3.1.

Underline or edit

Underline or edit

Tax period. See IRM 3.11.20.3.3.

Edit

Edit

TIN. See IRM 3.11.20.3.2.

Ensure valid

Ensure valid

Plan number. See IRM 3.11.20.6.1 (6)(e) above.

Ensure 3 digits

Ensure 3 digits

Received date. See IRM 3.11.20.3.4.

Ensure present

Ensure present

Signature

Not required

Not required

Notice Code edit in the upper center margin of the form.

1

2

Exceptions & meaning →

Error Resolution/Reject Procedures - General

IRM 3.11.20.7, Error Resolution/Reject Procedures - General, through IRM 3.11.20.12, Error Codes for Form 8868, includes instructions to correct errors on applications for extensions of time to file.

Use IRM 3.11.20.7, Error Resolution/Reject Procedures - General, through IRM 3.11.20.12, Error Codes for Form 8868, in conjunction with Document Perfection IRM 3.11.20.1, Program Scope and Objectives, through IRM 3.11.20.6, Form 5558 Document Perfection Procedures, above.

Included are instructions for ERS.

The instructions in IRM 3.11.20 cover the processing of the following forms.

Form 5558, Application for Extension of Time To File Certain Employee Plan Returns

Form 8868, Application for Extension of Time To File an Exempt Organization Return or Excise Taxes Related to Employee Benefit Plans.

Form 5558 extensions for Form 5330 (MFT 76) are processed on ERS using program code 15560.

Exceptions & meaning →

Note:

Form 8868 (Rev 1-2024 and subsequent), Part III for Form 5330, will be converted to Form 5558, Part III for Form 5330 and processed using program code 15560.

Form 5558 is numbered with Tax Class 4 in the DLN. Document Code is 04, Blocking Series is 000-499, Transaction Code is 620.

The MFT 76 is generated for each record based on the program 15560.

A notice code is edited on each Form 5558 by C&E to indicate whether the extension request has been approved or not and if not, the reason for denial. See IRM 3.11.20.5.1 (5), Disapproval Codes for Part III.

When the extension transactions posts to the BMF, the notice code causes a notice to generate to the taxpayer and explains the denial; no manual response to the taxpayer is required.

The notice code also causes the generation of the extended due date. The extended due date is not edited or input.

Form 5558 extensions for Form 5500 Series and Form 8955-SSA (EPMF MFT 74) are processed on ERS with program code 72880.

Form 5558 is numbered with Tax Class 0 in the DLN, Document Code is 55, Blocking Series is 100-699, Transaction Code is 460.

The MFT 74 is generated for each record based on the program 72880.

The extension will automatically be approved unless it is not timely filed.

A notice code is edited on each Form 5558 by C&E to indicate whether the extension request has been approved or denied.

When the extension transaction posts to the EPMF, the notice code causes a notice to generate to the taxpayer and explains the denial; no manual response to the taxpayer is required.

The notice code also causes the generation of the extended due date. The extended due date is not edited or input.

Form 8868 is processed on ERS using Program 15540 for paper returns and Program 15550 for returns filed electronically through the MeF system. MeF returns can be identified by a File Location Code of 93 or 92 in the DLN.

Form 8868 is numbered with Tax Class 4 in the DLN. Document Code is 04, Blocking Series is 500-999, Transaction Code is 620.

The return code is edited and transcribed on each record. The MFT is generated based on the return code.

A notice code is edited on each Form 8868 by C&E to indicate whether the extension request has been approved or not.

When the extension transactions posts to the BMF, the notice code causes a notice to generate to the taxpayer and explains the denial; no manual response to the taxpayer is required.

All money amount fields are transcribed in dollars and cents.

Exceptions & meaning →

Note:

The Form 8161 (C) is systemically generated by ERS for suspended returns.

13482

Letter 3699C Extension Correspondence Action Sheet

To initiate correspondence to the taxpayer using Letter 3699C.

Exceptions & meaning →

ERS Inventories

Records will be placed either in the error inventory or the workable suspense inventory for correction. Once the ERS tax examiner accesses the record and it displays on the screen, either fully correct it, place it in suspense for additional information, or reject it from pipeline processing. Corrections include correcting errors in editing or transcription.

IRM 3.20.12, Exempt Organization and Employee Plan Applications of Extension of Time to File, is the main source of information to correct the record on the screen and the related return. Procedures are also in IRM 3.12.38, BMF General Instructions, which contains general instructions for correcting records on the screen, document control, inventories, and management reports.

Exceptions & meaning →

Error Inventory Report

Each day the Error Inventory Report is provided showing the blocks by the block control number and block Document Locator Number (DLN) in DLN order. Each batch is on a separate page. Blocks received from Block Out of Balance (BOB) Correction are also listed separately.

A copy of the Error Inventory Report can be placed on a cart of documents and used as a charge-out. This helps determine when a cart is completed.

The first line of the Error Inventory Report shows the number of working days the records on that page have been in the Error Inventory to assign priority.

Exceptions & meaning →

Workable Suspense Inventory Report

Each day the Workable Suspense Inventory Report is furnished showing the records by program in DLN order for various statuses. Separate pages for each program with totals are provided.

The first line of the report will show the number of working days that the records have been in the workable suspense inventory. This assigns priority to the older work.

Exceptions & meaning →

Unprocessable Documents

Error Resolution System (ERS) - When perfection of a document is not possible because it is necessary to correspond, perform research or refer the document to another area of the Campus, suspend the unable-to-be-processed record by entering Command Code SSPND followed by the appropriate action code.

Error Register - Any time a document is unable to be processed, enter an Action Code 3 to the left of Section 01 on the Error Register and charge the document out of the block, indicating "Rejecting U" , and date. Attach and prepare Form 3696, Correspondence Action Sheet or Form 4227.

Exceptions & meaning →

Automated Non-Master File Extensions

When an ERS document is for a Non-ADP (Automated Data Processing) period (prior to 1962) or is extending the time to file an Automated Non-Master File (ANMF) return (Forms 6069), the record must be rejected from ERS.

Exceptions & meaning →

Note:

The Automated Non-Master File (ANMF) is an automated system developed to replace the previous Non Master File (NMF) accounting system. See IRM 3.12.38.

For non-remittance ANMF items, SSPND 620. If necessary, Rejects suspends with CC RJECT.

For the ANMF item with payment, follow instructions in IRM 3.12.38, by first SSPND 343 to Accounting for research before rejecting from ERS and transferring to ANMF or Unidentified, as instructed from Accounting.

When an Error Register document is found to be Non-ADP, charge it out of the block as "Non-ADP" with the date. Prepare a Form 4227, attach it to the document and enter Action Code 3 to the left of Section 01 on the error register.

For international returns with and without remittance, refer to instructions in IRM 3.12.38.

Exceptions & meaning →

Perfection of Attachments

When reviewing attachments not related to extensions and any of the following is present, detach or photocopy and route to the appropriate area.

Unrelated taxpayer correspondence

Unanswered taxpayer correspondence

Questions are attached or written on the document

No action has been taken

If unanswered taxpayer correspondence relating to the extension application forms is attached, make a photocopy of the attachment and forward it to the appropriate area.

Be sure that any attachment or photocopy of an attachment routed elsewhere contains name, address, TIN, received date, and an audit trail is noted on the extension form.

Exceptions & meaning →

Research

Command Code (CC) INOLE definer S (INOLES) with the taxpayer's EIN or SSN is used to find:

Taxpayer's name and address.

Taxpayer's name control.

Filing requirements (for BMF and EPMF taxpayers).

FYM - the month the taxpayer's tax year ends.

Exceptions & meaning →

Example:

If the taxpayer's FYM is 12, his tax year ends in December.

See IRM 2.3.47, Command Codes INOLE, EOGEN and SPARQ, for more information on using this command code.

Command Code BMFOL definer I (BMFOLI) with the taxpayer's EIN or SSN is used to find:

Taxpayer's name control.

Taxpayer's filing history. BMFOLI lists the Tax Periods on the Master File and whether a return has posted to the Tax Period.

See IRM 2.3.59, Command Codes BMFOL and BMFOR, for more information on using this command code.

Command Code ENMOD with the taxpayer's EIN or SSN is used to find:

Taxpayer’s name and address.

Taxpayer's name control.

Pending entity transactions such as Transaction Code (TC) 000 that establishes the taxpayer's account, name changes (TC 013) that may change the Name Control, or transactions that may change the taxpayer's tax year (such as TC 053).

See IRM 2.3.15, Command Code ENMOD, for more information on using this command code.

Command Codes NAMEE, NAMES, NAMEB, NAMEI, FINDE, and FINDS.

Research a taxpayer's EIN or SSN on the BMF or EPMF using the taxpayer's name (and address information if known).

Research a taxpayer's SSN on the IMF by entering the taxpayer's name (and address information if known).

The most efficient search uses the taxpayer's name and ZIP Code.

Command Code NAMEI is used to research the taxpayer's SSN.

Command Code NAMEB is used to research the taxpayer's EIN or SSN for a BMF entity.

Command Codes FINDS (SSN) and FINDE (EIN) are used to find a name and address for a TIN.

See IRM 2.3.60, Command Codes NAMES, NAMEE, NAMEI, NAMEB, FINDS, FINDE, and TPIIP, for more information on using these command codes.

Exceptions & meaning →

Error Resolution System (ERS)

The following extension forms are processed on ERS:

Form 5558, Application for Extension of Time To File Certain Employee Plan Returns

Form 8868, Application for Automatic Extension of Time To File an Exempt Organization Return or Excise Taxes Related to Employee Benefit Plans

Exceptions & meaning →

Type of Errors

ERS will identify errors according to type and priority. The record heading shows the type of error.

IRM 3.11.20.9, Form 5558 Error Correction MFT 74 through IRM 3.11.20.12.17, Group Return TC 460 Procedures (Rejects Only), will furnish the solution for the errors. There may be records where the tax examiner finds that programming has not provided a necessary section to correct an error. The tax examiner can use CC GTSEC. Report this to the National Office to correct the display.

Action Code Error - (Priority I)

Section Error - (Priority II) ISRP problem code

Validity Error - (Priority III)

Math/Consistency Error (Error Codes) - (Priority IV)

Exceptions & meaning →

Status Codes

Records for the documents in ERS are controlled by status codes. The status is updated when the records are placed in specific inventory.

Below is a list of the status codes and brief explanation:

Status Codes and Explanations

Status

Explanations

100

An error awaiting correction and records are in the error inventory.

2XX

A record awaiting information and records are in the suspense error inventory.

3XX

Used when the suspense period expired without a response and records are in the workable suspense inventory.

4XX

A record with information awaiting correction and records are in the workable suspense inventory.

900

When the record is on the unselected inventory.

The final two positions of the Status Code consist of the first two positions of the action code. This groups similar work on the workable suspense inventory.

Exceptions & meaning →

Example:

321 - Suspense period expired, no response to taxpayer correspondence. If a record was selected for Quality Review, the positions 2 and 3 are "QA" .

Exceptions & meaning →

Action Codes

The ERS Action Code indicates that specific information is missing or that the record will be rejected from processing. The code indicates if sending correspondence to the taxpayer or the specific in-house research or action required.

Exceptions & meaning →

Note:

For a completed list of ERS Action Codes, see Exhibit 3.11.20-15.

For paper returns, C&E employees assign action codes to numbered returns when they determine that the document is unable to be processed because it needs either additional information or some required manual intervention. This code will be entered on the bottom of the extension.

Correspondence Action sheets (Form 3696 and Form 13482) used for initiating correspondence are attached by Document Perfection. For routing within the campus (in-house research), an explanation of the missing information needs to be attached to the return.

The action code assigned by C&E is transcribed into the record of the document.

For MeF returns, take the following action for MeF-generated action codes:

Action Codes If/And/Then

If Action Code

And

Then

320

Form 8868 check box InitialFinal or Change in Accounting is checked,

route to Entity.

420

Return Code is 12 (Form 8870),

send Form 8870 to TE/GE, Mail Stop 1110.

430

Partial Group check box is checked and a list of subordinates is attached,

follow Group Return procedures in IRM 3.11.20.4.2.1, SSPND 360 and send to Rejects. Rejects will input a TC 460 for each subordinate organization on the list.

460

Return Code is 11 (Form 6069),

complete Form 13538, Consolidated Shipping Transmittal, and route to Kansas City IRS for ANMF processing.

The presence of a valid action code other than 001 will place the record in the Suspense Inventory, either workable or unworkable.

Form 8161 (C), ERS Return Charge-Out, is computer generated for all new suspense items. The charge-out is used for pulling documents, routing and controlling documents while the record is in suspense, and for use in associating the document with the workable suspense inventory when the record becomes workable.

When a record appears on the workable suspense inventory with the action code as first priority:

Add information received to the record or follow the IRM instructions for the "no reply" , see IRM 3.11.20.12.7.3.4.1, Reply or No Reply to Letter, and clear the action code by entering a "C" in the Clear Field and transmitting.

Once the action code is cleared, any validity, section or math/consistency errors will be displayed for correction.

Records may have been unable to be processed and again require suspension for additional information. A charge-out will not be generated for resuspended items. Notate the action code and date on the charge-out in the appropriate block.

Some action codes may not be resuspended. If this occurs, the charge-out must be noted in the appropriate block by entering the correct action code and date.

When perfection is not possible, the record may be rejected from ERS and action initiated to have the DLN voided. If remittance is involved, the remittance may have to be transferred to the "Unidentified Remittance File" .

Perfection may be possible, but the record may require renumbering or uncorrectable fields may need correcting and the record will require rejecting for reinput. Reject the record by entering the CC RJECT followed by the Action Code 630 (reinput) or 640 (void). If a new DLN will be assigned, select CC NWDLN with the appropriate Action Code and new DLN Master File ID Code, if required.

A charge-out generates for all rejected records. The charge-out will remain in the campus files for future reference.

Exceptions & meaning →

Note:

If the DLN was incorrectly transcribed and is wrong on the screen, the DLN appearing on the charge-out is erroneous. Notate the correct DLN on the charge-out used to pull the document. Tell your manager or lead the block involved, and physical location of the document.

ERS automatically controls most of the adjustments to Service Center Control File (SCCF). If you need manual adjustment, use Form 4028, Service Center Control File (SCCF) Adjustment Record (Format Code 216).

Only one action code at a time may be assigned to a record. The priority of the action code will be 310, 4XX, 6XX, 3XX, 2XX. An ERS tax examiner may enter an action code on a record, delete or correct an invalid code or overlay the present action code with another to either resuspend or reject from ERS. This is done by entering the valid action code with the Command Codes RJECT, SSPND, or NWDLN.

An ERS tax examiner entering a valid action code with SSPND will be clearing the record from the screen and places the record in either workable suspense or unworkable suspense.

For Suspense Correction, a tax examiner entering a valid action code with CC RJECT deletes the record from ERS. Generally SCCF will automatically update for the rejected records.

Exceptions & meaning →

Clear Code "C" and "000"

Clear Code "C" is used for Error Codes when the error condition does not require a change or correction to the displayed record. The screen display will include a clear field labeled "CL" to indicate the possible need of a clear code.

Error Codes are cleared by either correcting the condition or entering a "C" in Field CL to indicate no correction is needed.

Code "C" is also used to clear the action code from the screen after corrections are complete or, as with Action Codes 410 and 700, the action code must be cleared initially so other errors in the record can be resolved. The presence of the "C" with a priority I error indicates that you have made the corrections to the action code and now wish to have any other errors on the record displayed.

The "000" is also used as a Clear Code when deleting action codes. It is used only for erroneous action codes when there is no reason to suspend the record. The "000" cannot be used in suspense correction.

Programming erases all "C" Clear Codes for Error Codes when a record is suspended with the CC SSPND.

Programming erases all "C" Clear Codes for Error Codes and Action Codes for the new day's Error Inventory and Workable Suspense Inventory. Unfinished records from the previous day will contain none of the "C" Clear Codes assigned to a record that was not completely worked.

Error Codes (including the ones that may require a "C" Clear Code) are numbered consecutively for correcting.

There may be instances when you are correcting errors at the terminal and create an Error Code with a higher priority than the one(s) you have cleared with a "C" Clear Code. If this occurs, programming erases all "C" Clear Codes for Error Codes with a lower priority than the one created.

Beginning with the higher priority Error Code you created, programming continues displaying Error Codes for the record. Screen displays with the corrected data may often be different from those previously displayed.

There may be instances when you will make a correction erasing an Error Code you previously cleared with a "C" and now the error condition no longer exists. If this happens, the "C" Clear code for this error and for all subsequent errors in the record are deleted.

If after deleting the "C's" , errors remain on the record, they are displayed for resolution whether they were previously displayed.

The "C" Clear code will prevent any other record corrections. If a correction must be entered but you have already transmitted the "C" Clear Code, and the error is no longer displayed, then use CC GTRECW to make any corrections.

Exceptions & meaning →

ERS Correspondence

Correspondence may be necessary, if C&E has not already corresponded for missing or contradictory information.

This table shows the available IDRS Correspondex Letters to be used, if corresponding to the taxpayer is necessary.

Letter Type

Title:

Letter 320C

FTD Payment Information/Verification Requested

Letter 3699C

Extension of Time to File - BMF

Letter 3938C

Form 5330 Incomplete for Processing

Exceptions & meaning →

Note:

Use when the Code section is missing from Form 5558 (Rev. September 2018), Part III, line 4a or Form 8868 (Rev. January 2024 and subsequent), Part III, line 1a.

Exceptions & meaning →

Note:

Use other letters or forms for correspondence, if appropriate.

When the taxpayer replies to correspondence, enter the correct information provided.

When there is no reply from the taxpayer for correspondence requesting information needed to process the extension, follow the no reply instructions for the Error Code, and ensure an Audit Trail is notated on the extension form. If the document carries a remittance, reinput the form as a non-remittance document and prepare Form 3244, Payment Posting Voucher, with TC 670 to post the payment to the appropriate account. If unable to determine the appropriate account, send payment to Unidentified Remittance Unit.

Undeliverable correspondence - when correspondence is returned as undeliverable, research attachments and IDRS for another address. If found, send the correspondence to the new address. If no new address is found, do the following:

If the correspondence was

Then

requesting information,

follow "no reply" procedures. See IRM 3.11.20.12.7.3.4.1.

a notification to the taxpayer that the extension request was not approved,

destroy the correspondence.

Exceptions & meaning →

Field Errors

Any field that does not meet requirements for that field appears as a field error. Some reasons for this error are:

Non alphabetical character in an alpha field.

Blank space in a numeric field.

Blank in the first position of an alpha field.

All fields with a field error display in the order found in the record. The action code never displays as a field error.

Exceptions & meaning →

ERS Error Codes General

An error code is computer generated to a record and assigned in numerical order.

Error codes display in ascending numerical order.

Error codes require you to take one of three actions:

Correct the invalid field/math error.

Verify and enter a "C" in the Clear Code Field.

Suspend the document with the appropriate action code.

Exceptions & meaning →

Form 5558 Error Correction MFT 74

See instructions in the subsequent sections for correcting ERS screens for Form 5558 extension requests MFT 74.

Exceptions & meaning →

Transaction Code -01TC

TRANS-CD - This 3-digit numeric field must be present and must be 460.

Exceptions & meaning →

Validity Check for Transaction Code - 01TC

Correction Procedures for Transaction Code - 01TC

Name Control — 01NC

Name Control - This four-position alpha numeric field must be present.

Exceptions & meaning →

Validity Check for Name Control - 01NC

This field must contain one to four characters, (alpha, numeric, hyphen, ampersand) and may contain one to three blanks.

The first position must be alpha or numeric.

The remaining positions may be alpha, numeric, hyphen, ampersand or blank. No character may follow a blank.

Exceptions & meaning →

Correction Procedures for Name Control - 01NC

Correct the Name Control using this table:

Name Control

If the

Then

Name Control is invalid or blank,

check for transcription errors and bring up under printed Name Control in 01NC and enter the correct data.

Name Control was edited and transcribed correctly,

determine if the filer has changed the order of the name but there was no name change. Bring up the underprint Name Control in 01NC and correct to what is on Master File using the first four characters.

Name Control has not been edited or transcribed correctly from Part I section C and the correct Name Control matches the under printed Name Control,

edit the correct Name Control in Part I section C and bring up the under printed Name Control in 01NC.

Name Control was edited and transcribed correctly and the filer changed the order of the name, but there was no name change,

bring up the underprint Name Control in 01NC.

filer did not change the order of his name and there was no name change input and the underprint Name Control matches the Name Control in Part I section A; (Name of filer, plan administrator, or plan sponsor),

edit the Name Control in Part I section A (Name of filer, plan administrator, or plan sponsor) and bring up the under printed Name Control in 01NC.

Name Control cannot be determined,

research using IDRS CC’s INOLE, NAMEE, NAMEB, and ENMOD.

If correct Name Control is found, bring up the under printed Name Control in 01NC.

If you still cannot determine the Name Control, SSPND 320, attach Form 4227 and route to Entity Control for further research.

If IDRS is not available, SSPND 351.

The below INOLE screens with definer codes display the BMF and/or EPMF entity information of the requested EIN.

INOLE

INOLE Format:

Description:

INOLESNN-NNNNNNNP

CC INOLES with a P at the end of the TIN, displays the current EPMF plan information: the filer name, address and plans established for the TIN.

INOLETNN-NNNNNNN

Displays the name line and address information for all accounts with the same TIN.

INOLEPNN-NNNNNNN

Displays the EPMF plan information. A total of ten plan names can be shown on one screen.

Exceptions & meaning →

Taxpayer Identification Number/Employer Identification Number - 01EIN

See instructions in the subsequent sections for Employer Identification Number 01EIN.

Exceptions & meaning →

Validity Check for Taxpayer Identification Number/Employer Identification…

The EIN is located in Box B, Employer Identification Number (EIN) on the form.

This field must contain nine numerics and cannot begin with 07, 08, 09, 17, 18, 19, 28, 29, 49, 78, 79, or 89. Field 01EIN cannot be all zeroes or nines.

Exceptions & meaning →

Correction Procedures for Taxpayer Identification Number/Employer Identification…

If Field 01EIN is invalid or missing, check for transcription errors and enter the correct EIN in Field 01EIN.

If no transcription error, examine the form or attachments for another (presumed valid) EIN. If found, enter in Field 01EIN.

If another EIN cannot be found, correct per Error Code 004 instructions. IRM 3.11.20.12.3 Error Code 004 - EIF/NAP Mismatch.

If EIN is determined but plan number has not been established, SSPND 320 and notate "Plan Number" on Form 4227 and route to Entity Control for plan number establishment.

Exceptions & meaning →

Tax Period - 01PYD

The following subsections give validity check and perfection procedures for Plan Year End Field 01PYD.

Plan year end is the date in the "Plan year ending" column in section C.

Exceptions & meaning →

Validity Check for Tax Period—01PYD

C&E will not edit the plan year end on current calendar-year extensions (i.e., 202512).

The Plan Year End cannot be later than the current processing date.

Field 01PYD must be 6 numeric digits.

The last two digits (the month) must be 01-12.

Exceptions & meaning →

Correction Procedures for Tax Period Ending—01PYD

If the correct plan year ending is indeterminable through research, take this action:

If the request is

Then

timely for the current calendar year,

enter 202512 in Field 01PYD.

not timely for the current calendar year

SSPND 211 and correspond for clarification of the Tax Period (plan year ending).

Suspense Correction Procedures: Change the plan year end on the extension form and in Field 01PYD to agree with the taxpayer's response to correspondence.

If no reply or reply is inconclusive, enter 202512 in Field 01PYD. If this makes the request late filed and 01NOT is 1, change 01NOT to 2.

Exceptions & meaning →

Master File Tax Code-01MFT

The MFT Code is a two-position field that indicates the type of tax return the extension is for.

MFT 74 is automatically generated for program 72880 (Form 5500).

Exceptions & meaning →

Validity Checks for Master File Tax Code-01MFT

Correction Procedures for Master File Tax Code-01MFT

If extension is for Form 5500 Series or Form 8955-SSA, enter 74 in Field 01MFT.

Exceptions & meaning →

Plan Number - 01PL

Plan number is entered by the filer under the "Plan number" column in section C on Form 5558 (Rev 9-2018) or section D on Form 5558 (Rev 1-2024 and subsequent) and must be present.

Exceptions & meaning →

Validity Checks for Plan Number - 01PL

Note:

If Plan number is 000, see IRM 3.11.20.9.7.2(2), Correction Procedures for Plan Number - 01PL.

Exceptions & meaning →

Correction Procedures for Plan Number - 01PL

Check the form for transcription or coding errors and correct.

If the Plan Number is blank, Plan Number is 000, or is more or fewer than three digits, research INOLE, INOLEP, EMFOL, NAMEE or ENMOD. If no determination can be made, SSPND 320 for research. Notate "plan number" on Form 4227 and route to Entity Control.

Exceptions & meaning →

Note:

If Entity is unable to make a determination, default the Plan Number to 001.

The filer may include up to three plans on one Form 5558 (version 06-2011). If there is more than one plan number on the Form 5558, a dummy extension must be prepared for each additional plan number.

Photocopy the Form 5558 for each additional plan number and circle all but one plan number on the copies. Make sure each copy lists a different plan number.

Circle all but one plan number on the original Form 5558. Make sure it has a different plan number than the copies.

Exceptions & meaning →

Example:

Original Form 5558 has plan numbers 001, 021, and 023. Make two copies. Circle all plan numbers except 001 on the original, and all but 021 on one copy and all but 023 on the other copy.

Enter SSPND 351, attach Form 4227 and send the photocopies to the Rejects function for processing as original documents.

Enter the plan number for the original Form 5558 in Field 01PL.

Exceptions & meaning →

Note:

If Plan Number is 000, see #2 above for correction procedures.

If the taxpayer writes "see attached list" or something similar; leave attached and continue processing the Form 5558.

Exceptions & meaning →

Received Date - (YYYYMMDD) 01RCD

The following subsections give validity check and perfection procedures for Received Date Field 01RCD.

Exceptions & meaning →

Validity Checks for Received Date - 01RCD

The field must be blank or eight numerics.

Valid format is YYYYMMDD.

The fifth and sixth digits must be valid month designations (01-12).

The seventh and eighth digits must be a valid day designation and a valid day for the month.

Exceptions & meaning →

Example:

31 is invalid for month 06, because June has only 30 days.

The date cannot be later than the current processing date.

The date cannot be earlier than 01/01/1983.

Exceptions & meaning →

Correction Procedures for Received Date - 01RCD

Check the form for transcription or coding errors and correct.

If the date is invalid, and the date stamp on the extension is missing, invalid, illegible, or later than the processing date, determine the received date using the instructions in IRM 3.11.20.3.4, Received Date.

If the date is before 01/01/1983, SSPND 620, attach Form 4227, and notate "Non-ADP record" and route to ANMF.

Exceptions & meaning →

Note:

For further information, refer to IRM 3.10.72, Receiving, Extracting, and Sorting, and IRM 3.11.20.2, Document Perfection Procedures.

Exceptions & meaning →

Notice Code - 01NOT

This is a one-digit numeric field that must be present.

Exceptions & meaning →

Validity Checks for Notice Code - 01NOT

Must be 1 or 2.

Only one Notice Code may be present.

Exceptions & meaning →

Correction Procedures for Notice Code - 01NOT

If no Notice Code is edited, review the extension for approval criteria.

Will be approved if it is timely. See IRM 3.11.20.6.1, Part II Form 5558 for Form 5500 Series and Form 8955-SSA.

Enter the correct Notice Code in Field 01NOT:

Notice Codes

If

Then enter notice code

Approved

1

Denied

2

Exceptions & meaning →

Computer Condition Codes — 01CCC

Validity check:

Must be blank.

Correction procedures:

Delete any entry in Field 01CCC.

Exceptions & meaning →

Error Codes for Form 5558

See instructions in the subsequent sections for resolving specific error codes for Form 5558 MFT 74.

Exceptions & meaning →

Error Code 002 - Name Control Mismatch

The following subsections provide instructions for Error Code 002.

Exceptions & meaning →

Screen Display - Error Code 002

Screen display for Error Code 002 follows:

Screen Display Error Code 002

AFD

Field Name

CL

Clear Code

01NC

Name Control/Check Digit

Name Control Underprint

01EIN

Employer Identification Number

01PYD

Plan Year End

Plan Year End Underprint

Exceptions & meaning →

Invalid Condition - Error Code 002

The Name Control mismatched against the National Account Profile (NAP) or the Entity Index File (ElF).

Exceptions & meaning →

Correction Procedures - Error Code 002

Before performing additional research, go to the bottom of the screen and transmit. This ensures that any prior changes to the Name Control have posted to the NAP. If Error Code 002 reappears, continue with the following correction procedures.

Compare the displayed fields with the extension. If incorrect, overlay the screen with the correct information.

If the Name Control transcribed in Field 01NC and the Name Control on the document are the same, but differ from the underprint in Field 01NC, research Command Codes INOLE, NAMEE, NAMEB or ENMOD (for pending TC 000 or 013) to determine the correct Name Control/TIN.

Exceptions & meaning →

Note:

When corrections are made to Field 01NC or Field 01TIN, the computer will re-validate the entries with the NAP and reset the One-Line Entity (OLE) indicators as appropriate on transmitting the ERS screen. If Error Code 002 reappears, an unpostable condition may still exist. Re-verify the entries and refer to the remainder of the correction procedures.

Name Control Research

If

Then

the Name Control on the document matches the Name Control at Master File, with no name change,

enter "C" in the Clear Code Field and transmit.

a Name Control displays in field 01NC which is different from the name shown on Form 5558, Part I, Section A, Plan Name,

verify the Name Control on CC INOLE.

If they agree, enter the INOLE Name Control in Field 01NC.

If they disagree, research CC NAMEB or NAMEE for a different EIN.

the Name Control found during research agrees with Name Control on document,

enter the INOLE Name Control Field 01NC.

CC INOLE Name Control differs from the Name Control on document,

do the following research:

Research CC ENMOD for a pending TC 013. If the Name Control agrees with the transcribed Name Control, enter a "C" in the Clear Code Field.

Research attachments and NAMEB for a different EIN.

If a different EIN is found on the attachment, or a cross-reference EIN on INOLE or BRTVU, verify the EIN on INOLE for presence on Master File.

Ensure that the entity information matches the taxpayer on the extension. If these conditions are met, overlay Field 01TIN with the new EIN found on Master File.

the Name Control on Master File is not correct and the entity on Master File needs to be corrected,

SSPND 320, attach Form 4227, notate why the return is being suspended and route the return to Entity Control for additional research.

the Name Control has not been edited or transcribed correctly from Form 5558, Part I, Section A and the correct Name Control matches the under printed Name Control,

edit the correct Name Control in Form 5558, Part I, Section A and bring up the underprinted Name Control in 01NC.

the Name Control was edited and transcribed correctly and the filer changed the order of the name but there was no name change,

bring up the underprint Name Control in 01NC.

the filer did not change the order of the name and there was no name change input and the underprint Name Control matches the Name Control in Form 5558, Part I, Section C (Plan Name),

Edit the Name Control in Form 5558, Part I Section C (Plan Name) and bring up the under printed Name Control in 01NC.

a name change has occurred,

SSPND 320, attach Form 4227, request a name change (TC 013) and route the return to Entity Control.

IDRS research is not available,

SSPND 351 or 355.

the Name Control still cannot be determined,

SSPND 320, attach Form 4227, notate why the return is being suspended and route the return to Entity Control for additional research.

research indicates that there are multiple EINs,

SSPND 320, attach Form 4227, notate why the return is being suspended and route to Entity Control.

Exceptions & meaning →

Error Code 004 — Name Control

This subsection provides instructions for Error Code 004.

Exceptions & meaning →

Screen Display - Error Code 004

Screen Display for Error Code 004 follows:

Screen Display Error Code 004

AFD

Field Name

CL

Clear Code Field

01NC

Name Control/Check Digit

Name Control Underprint

01EIN

Employer Identification Number

Exceptions & meaning →

Invalid Conditions - Error Code 004

The EIN was not present on the NAP. An "XXXX" underprint indicates there is no account on the Master File matching this EIN.

A blank underprint indicates that the EIF and the NAP were not accessed or were not operational.

Exceptions & meaning →

Correction Procedures - Error Code 004

Before performing other research, go to the bottom of the screen and transmit. This ensures that any prior changes to the Name Control/TIN have posted to the NAP. If Error Code 004 reappears, continue with the following correction procedures.

Compare the displayed fields with the extension. If incorrect, overlay the screen with the correct information.

If the Name Control transcribed in Field 01NC and the Name Control on the document are the same but differ from the underprint in Field 01NC, research to determine the correct Name Control/TIN using CCs INOLE, NAMEE, NAMEB and ENMOD.

Follow these research instructions:

Name Control Research

If research indicates

Then

CC ENMOD displays a pending transaction (TC 000 or TC 013) or CC NAMEB displays a Name Control that agrees with the transcribed Name Control,

enter a "C" in the Clear Code Field.

the Name Control on the document matches the Name Control at Master File with no name change,

enter "C" in the Clear Code Field.

a different Name Control than what is in Field 01NC but is the same as shown on the document (Part I Section C, Plan Name),

verify the Name Control on CC INOLE. If they agree, enter the INOLE Name Control in Field 01NC. If they disagree, research CC NAMEB or NAMEE for a different EIN.

a different EIN is found on an attachment, or on CC INOLE or BMFOL,

verify the EIN on CC INOLE for presence on Master File. Ensure the entity information matches what the taxpayer is using on the extension.

If these conditions are met, overlay Field 01TIN with the new EIN found on Master File.

If the EIN is determined, but a Plan Number has not been established, SSPND 320, notate "Plan Number" on Form 4227 and route to Entity Control for Plan Number establishment.

the Name Control has not been edited or transcribed correctly from Form 5558, Part I section C and the correct Name Control matches the underprinted Name Control,

edit the correct Name Control in Part I section C and bring up the underprinted Name Control in 01NC.

the Name Control was edited and transcribed correctly and the filer changed the order of the name but there was no name change,

bring up the underprint Name Control in 01NC.

the filer did not change the order of his name and there was no name change input and the underprint Name Control matches the Name Control in Form 5558, Part I section A; (Name of filer, plan administrator, or plan sponsor),

edit the Name Control in Part I section A (Name of filer, plan administrator, or plan sponsor) and bring up the underprinted Name Control in 01NC.

If you determine the Name Control on Master File is not correct and the entity on Master File needs correction, SSPND 320, attach Form 4227, notate why the extension is being suspended and route to Entity Control for additional research.

When there is no account, SSPND 320, attach Form 4227, notate "no account" and route to Entity Control.

When IDRS is not available, SSPND 351 (TIN Research) or 355 (Other MFTRA Research).

Exceptions & meaning →

Error Code 005 - Missing Received Date

This subsection includes the instruction for Error Code 005.

Exceptions & meaning →

Screen Display - Error Code 005

Screen display for Error Code 005 follows:

Screen Display Error Code 005

AFD

Field Name

01PYD

Plan Year End

Plan Year End Underprint

01RCD

Received Date

Exceptions & meaning →

Invalid Condition - Error Code 005

Invalid condition occurs when the processing date is later than the plan year end date by more than seven months and the received date is not present in Field 01RCD.

Exceptions & meaning →

Correction Procedures - Error Code 005

Compare the information in Field 01PYD and Field 01RCD with the plan year end and the received date on the extension. If the displayed information doesn't match the document, overlay the screen with the correct information.

If the plan year end is seven months before the processing date, review the received date:

Received Date

If

Then

the date stamp is missing, illegible or later than the processing date,

determine the date as shown in IRM 3.11.20.7.8, Research. Enter the correct Received Date in Field 01RCD.

multiple received dates are on the document,

use the earliest date and circle out the others.

Exceptions & meaning →

Error Code 007 - Received Date

This subsection provides instructions for Error Code 007.

Exceptions & meaning →

Screen Display - Error Code 007

Screen Display for Error Code 007 follows:

Screen Display Error Code 007

AFD

Field Name

CL

Clear Screen

01PYD

Plan Year End

Plan Year End Underprint

01RCD

Received Date

Exceptions & meaning →

Invalid Conditions - Error Code 007

The year and month of the received date are earlier than the year and month of the plan year end.

Exceptions & meaning →

Correction Procedures - Error Code 007

Compare the displayed fields with the information on the extension. If the displayed fields do not match the extension, overlay the screen with the correct information.

If the displayed fields match what is on the extension, see IRM 3.11.20.3.4, Received Date, for instructions to determine the correct received date.

If the received date was mailed timely, delete the received date from 01RCD.

If this caused EC005 to display, enter the timely postmark date for the plan year end; see Exhibit 3.11.20-5.

If the extension is early filed, SSPND 480.

Exceptions & meaning →

Error Code 026 - Plan Year End

This subsection provides instructions for Error Code 026.

Exceptions & meaning →

Screen Display - Error Code 026

Screen display for Error Code 026 follows:

Screen Display Error Code 026

AFD

Field Name

CL

Clear Code

01EIN

Employer Identification Number

01PYD

Plan Year End

Underprint

Exceptions & meaning →

Invalid Conditions - Error Code 026

Tax period is greater than the process date plus 11 months.

Exceptions & meaning →

Correction Procedures - Error Code 026

Check for coding and transcription errors and make any necessary corrections.

If the Tax Period is greater than the processing date plus 11 months, process using the current year.

If field 01PYD is blank, use current year to determine the year end from the Plan Year End Date; see Exhibit 3.11.20-5.

Exceptions & meaning →

Error Code 100 - Incorrect Extended Due Date

This subsection provides instructions for the Error Code 100.

Exceptions & meaning →

Screen Display - Error Code 100

Screen display for Error Code 100 follows:

Screen Display Error Code 100

AFD

Field Name

CL

Clear Code

01PYD

Plan Year End

Plan Year End Underprint

01RCD

Received Date

01NOT

Notice Code

Exceptions & meaning →

Invalid Conditions - Error Code 100

Received date is less than seven months after the plan year end and the extended due date is the Notice Code 2.

Exceptions & meaning →

Correction Procedures - Error Code 100

Check for coding and transcription errors and make any necessary corrections.

If the received date is greater than seven months after the Plan Year End and 01NOT is 1, change 01NOT to 2.

If the received date is less than seven months before the Plan Year End and 01NOT is 2, change 01NOT to 1.

Exceptions & meaning →

Note:

See Exhibit 3.11.20-5 for more information.

Exceptions & meaning →

Error Code 999 - End of Year Format

This subsection provides instructions for Error Code 999 - End of Year Format.

Exceptions & meaning →

Screen Display - Error Code 999

Screen Display for Error Code 999 follows:

Screen Display Error Code 999

AFD

Field Name

01PYD

Plan Year End

Exceptions & meaning →

Invalid Condition - Error Code 999

Error Code 999 generates for all extensions on ERS in error status at the end of the processing year.

Exceptions & meaning →

Correction Procedures - Error Code 999

Form 8868 Error Correction

See instructions below for correcting ERS screens for Form 8868 extension requests.

Form 8868 may be filed electronically via the MeF System.

Forms filed electronically are corrected using the same procedures as a manually transcribed document.

Electronically filed Forms 8868 can be identified by File Location Code (first two digits of the DLN) 93 or 92. Program code is 15550.

Refer to IRM 3.42.4, Electronic Tax Administration, IRS e-file for Business Tax Returns, for viewing forms filed on MeF.

On Form 8868, one split box is provided for the filer to enter a two-digit return code indicating the return to be extended. C&E will not edit a return code unless it is missing or illegible.

The MFT Code generates based on the transcribed return code.

Exceptions & meaning →

Erroneously Filed Forms

Use the instruction in this subsection of the IRM for working extensions when the taxpayer filed Form 7004, Application for Automatic Extension of Time to File Certain Business Income Tax, Information, and Other Returns, instead of Form 8868.

Exceptions & meaning →

Form 7004 With Remittance

If Form 7004 with remittance is filed instead of Form 8868 and Deposit Activity has "green-rockered" a remittance on the document, SSPND 611 to void the DLN and post the remittance to the appropriate account.

Exceptions & meaning →

Suspense Correction Form 7004 With Remittance

Suspense Correction prepares Form 3244 with TC 670 to post the money to the appropriate account; attach Form 3244 to Form 8161 (C) with instructions for re-numbering as a payment only, or follow local campus instructions.

Suspense Correction blacks out all editing marks including "green-rocker" amount, received date, and DLN on the incorrect extension form and returns the form to the taxpayer.

Suspense Correction encloses a blank Form 8868, the incorrect extension form, a return envelope, and Form 6401 or letter to inform the taxpayer to complete and return the correct extension by the response date.

Suspense Correction determines the response date and assigns as follows:

Response Date

If the current date is

Then

Monday, Tuesday, or Wednesday,

use 21 days from the following Monday date.

Thursday or Friday,

use 28 days from the following Monday date.

Notate the response date on Form 6401 and in the blank area below the OMB number on Form 8868.

Exceptions & meaning →

Note:

A response date is necessary for C&E to determine if the extension was timely filed.

Exceptions & meaning →

Form 7004 Non-Remittance

If Form 7004 with no remittance is filed instead of Form 8868, SSPND 640 to void the DLN.

Exceptions & meaning →

Suspense Correction for Form 7004 Non-Remittance

Suspense Correction inputs CC RJECT "640" to void the DLN and notate on Form 8161 (C) in remarks area "RJECT 640-Form 7004 returned to taxpayer" , or follow local campus procedures.

Suspense Correction blacks out all editing marks including the DLN and received date on the incorrect extension and returns the form to the taxpayer.

Suspense Correction encloses a blank Form 8868, the incorrect extension form, a return envelope, and Form 6401, or letter to inform the taxpayer to complete and return the correct extension by the response date.

Suspense Correction determines the response date and assigns as follows:

Response Date

If the current date is

Then

Monday, Tuesday, or Wednesday,

use 21 days from the following Monday date.

Thursday or Friday,

use 28 days from the following Monday date.

Notate the response date on Form 6401 and in the blank area below the OMB date on Form 8868.

Exceptions & meaning →

Note:

A response date is necessary for C&E to determine if the extension was timely filed.

Exceptions & meaning →

Remittance—RMIT

Form 8868 may carry a remittance.

This field is blank for non-remittance forms.

Exceptions & meaning →

Name Control—01NC

This subsection gives instructions for Name Control Field 01NC.

Exceptions & meaning →

Validity Check for Name Control

This field must contain one to four characters, (alpha, numeric, hyphen, ampersand) and may contain one to three blanks.

The first position must be alpha or numeric.

The remaining positions may be alpha, numeric, hyphen, ampersand or blank. No character may follow a blank.

Exceptions & meaning →

Correction Procedures for Name Control

Correct the Name Control using this table:

Correct Name Control

If the

Then

Name Control is invalid or blank,

check for transcription errors and bring up underprinted Name Control in 01NC and enter the correct data.

Name Control was edited and transcribed correctly,

determine if the filer has changed the order of the name and no name change. Bring up the underprint Name Control in 01NC and correct to match Master File using the first four characters.

Name Control has not been edited or transcribed correctly from Form 8868, Part I, and the correct Name Control matches the underprinted Name Control,

edit the correct Name Control on Form 8868, Part I, and bring up the underprinted Name Control in 01NC.

Name Control was edited and transcribed correctly and the filer changed the order of the name and there was no name change,

bring up the underprint Name Control in 01NC.

filer did not change the order of his name and there was no name change input and the underprint Name Control matches the Name Control in Form 8868, Part I; (Name of exempt organization, employer, or other filer),

edit the Name Control in Form 8868, Part I, (Name of exempt organization, employer, or other filer) and bring up the underprinted Name Control in 01NC.

Name Control cannot be determined,

research using IDRS CCs INOLE, NAMEE, NAMEB, and ENMOD.

If correct Name Control is found, bring up the underprinted Name Control in 01NC.

If you still cannot determine the name control, SSPND 320, attach Form 4227 and route to Entity control for additional research.

If IDRS is not available, SSPND 351.

The INOLE screens with definer codes shown below displays the BMF entity information of the requested EIN.

INOLE

INOLE Format

Description

INOLESNN-NNNNNNN

Displays name line, address, tax year, name controls, cross reference and other information specific to the type of account being requested.

INOLETNN-NNNNNNN

Displays the name line and address information for all accounts with the same TIN.

After reviewing the research, if you still cannot determine the Name Control, SSPND 320, attach Form 4227 and to Entity Control for further research.

If IDRS is not available, SSPND 351.

Exceptions & meaning →

TIN-Type - 01TNT

A "2" always generates on Form 8868, unless ISRP transcribes a 0 (zero). This indicates the TIN is an SSN.

Exceptions & meaning →

Validity Checks for TIN-Type - 01TNT

Correction Procedures for TIN-Type - 01TNT

Review the document for transcription and coding errors.

If the TIN entered is a Social Security Number, enter a 0 in the Field 01TNT.

If an TIN entered is an EIN, enter a "2" in Field 01TNT.

Exceptions & meaning →

Taxpayer Identification Number - 01TIN

This subsection gives instructions for Employer Identification Number or Social Security Number for Field 01TIN.

Exceptions & meaning →

Validity Check for Taxpayer Identification Number - 01TIN

The TIN is located on Form 8868, Part I, Taxpayer identification number (TIN) field and may contain an EIN or SSN.

If the TIN is an EIN, this field must contain nine numerics and cannot begin with 07, 08, 09, 17, 18, 19, 28, 29, 49, 78, 79, or 89. Field 01TIN cannot be all zeroes or nines.

If the TIN is an SSN, this field must be all numeric, and cannot be all zeroes or all nines.

Exceptions & meaning →

Correction Procedures for Taxpayer Identification Number - 01TIN

If Field 01TIN is invalid or missing, check for transcription errors and enter the correct TIN in Field 01TIN.

If no transcription error, examine the form or attachments for another valid TIN. If found, enter in Field 01TIN.

If an SSN is entered, Field 01TNT must be "0" (zero). Use CC GTSEC01 and correct Field 01TNT, if necessary.

If another TIN cannot be found, correct per Error Code 004 instructions. See IRM 3.11.20.12.3, Error Code 004 - EIF/NAP Mismatch.

Exceptions & meaning →

Tax Period - 01TXP

This subsection gives validity check and perfection procedures for Tax Period Field 01TXP.

This field contains the ending month and year of the Tax Period of the extension. The Tax Period is printed in year-month (YYYYMM) format, (i.e. December 31, 2025 is printed 202512).

For Form 8868 for Form 5330 extensions, the tax period is located on Form 8868, Part I, Plan Year Ending (MM/DD/YYYY) field.

Exceptions & meaning →

Validity Check for Tax Period - 01TXP

C&E will not edit the Tax Period on current calendar year extensions (i.e., 202512).

The Tax Period cannot be later than the current processing date.

Field 01TXP must be six numeric digits in YYYYMM format.

The last two digits (the month) must be 01-12.

Exceptions & meaning →

Correction Procedures for Tax Period Ending - 01TXP

Check for coding and transcription errors and correct Field 01TXP as needed.

Exceptions & meaning →

Note:

The Tax Period is determined from the taxpayer's entry on Form 8868, Part II, line 1. If there is no entry, the Tax Period will be 202512 and no Tax Period would be edited by C&E.

If the Tax Period is indeterminable from the document or attachments, and the name and a valid TIN are present, research and enter the correct data in Field 01TXP.

Extensions for Form 1041-A (MFT 36) and Form 5227 (MFT 37) must always be calendar year (202512).

If the correct Tax Period is indeterminable from research (i.e. no filing requirements present for the form on the extension or no account), SSPND 320 for Entity research.

If the Form 8868 for Form 5330 extensions correct plan year ending is indeterminable through research, take the following actions.

IF/Then Plan Year Ending

If the request is

Then

timely for the current calendar year,

enter 202512 in Field 01TXP

not timely for the current calendar year,

SSPND 211 and correspond for clarification of the Tax Period (plan year ending)

Suspense Correction Procedures: Change the Tax Period on the extension form and in Field 01TXP to agree with the taxpayer's response to correspondence.

If no reply or reply is inconclusive, enter 202512 in Field 01TXP - if this makes the request late filed, GTSEC01 and enter 2 in Field 01NOT.

If the extension form is early filed, do the following:

Early File Extensions for Tax Period Ending

If

Then

the taxpayer indicates "Final Return" ,

SSPND 480, attach 4227 and notated "Early filed final extension" .

the extension is not a Final Return,

research to determine the correct Tax Period.

the month of the Tax Period the taxpayer is using is different than the FYM found on Master File,

follow correction procedures for Error Code 026, see Exhibit 3.11.20-7.

the taxpayer is using the same month as the FYM found on Master File and the Tax Period is later than the current year/month by one year or more,

change the Tax Period to the current fiscal or calendar year.

the taxpayer is using the same month as the FYM found on Master File and the Tax Period is later than the current year/month by less than one year,

SSPND 480, attach Form 4227 notating the extension will be held and processed after the end of the Tax Period.

Exceptions & meaning →

Master File Tax Code - 01MFT

The MFT Code is a two-position field that indicates what type of tax return the extension is for.

MFT 01 is not a correctable field for Form 8868 (Programs 15540 and 15550). The MFT is generated based on the return code.

Exceptions & meaning →

Validity Checks for Master File Tax Code - 01MFT

Invalid if other than the MFT’s listed in this chart

Form 8868 Return Code and MFT List

Form

Return Code

MFT

990 or 990-EZ

01

67

4720 (individual)

03

50

990-PF

04

44

990-T (sec. 401(a) or 408(a) trust)

05

34

990-T (trust other than above)

06

34

990-T (corporation)

07

34

1041-A

08

36

4720 (other than individual)

09

50

5227

10

37

6069

11

57

8870

12

N/A

5330 (individual)

13

76

5330 (other than individual)

14

76

990-T (governmental entities)

15

34

Exceptions & meaning →

Correction Procedures for Master File Tax Code - 01MFT

Enter the MFT based on the return code in Field 01MFT.

Exceptions & meaning →

Plan Number - 01PL

A Plan Number is entered by the filer on Form 8868 Part I, located under the Return Codes and must be present when Return Codes 13 or 14 are selected.

Exceptions & meaning →

Validity Checks for Plan Number - 01PL

Validity checks for Plan Numbers, must be 001-999 for return codes 13 and 14. It cannot be blank or 000.

Exceptions & meaning →

Note:

If Plan Number is blank, 000, or is more or fewer than three numerics, see IRM 3.11.20.11.9.2 (2), Correction Procedures for Plan Number - 01PL.

Exceptions & meaning →

Correction Procedures for Plan Number - 01PL

Check the form for transcription or coding errors and correct.

If the Plan Number is blank, Plan Number is 000, or is more or fewer than three numerics, research CCs INOLE, INOLEP, EMFOL, NAMEE or ENMOD. If no determination can be made, SSPND 320, attach Form 4227, notate Plan Number, and route to Entity Control for further research.

Exceptions & meaning →

Note:

If Entity is unable to make a determination, default the Plan Number to 001.

If there are multiple plan numbers, a dummy extension must be prepared for each additional plan number. Photocopy the original Form 8868 for each additional plan number. Circle all but one plan number on each copy. Make sure each copy has a different plan number.

If there is more than one plan number on this Form 8868, a dummy extension must be prepared for each additional plan number.

Make a photocopy of Form 8868 for each additional plan number and circle all but one plan number on the copies. Make sure each copy has a different plan number.

Circle all but one plan number on the original Form 8868. Make sure it has a different plan number than the copies.

Exceptions & meaning →

Example:

Original Form 5558 has plan numbers 001, 021, and 023. Make two copies. Circle all plan numbers except 001 on the original, and all but 021 on one copy and all but 023 on the other copy.

Enter SSPND 351, attach Form 4227 and send the photocopies to the Rejects function for processing as original documents.

Enter the plan number for the original Form 8868 in Field 01PL.

Exceptions & meaning →

Note:

If the Plan Number is 000, see #2 above for correction procedures.

Exceptions & meaning →

Received Date (YYYYMMDD) - 01RCD

This subsection gives instructions for Received Date Field 01RCD.

Exceptions & meaning →

Validity Checks for Received Date - 01RCD

The field must be blank or eight numerics.

Valid format is YYYYMMDD.

The fifth and sixth digits must be valid month designations (01-12).

The seventh and eighth digits must be a valid day for the designated month.

Exceptions & meaning →

Example:

31 is invalid for month 06 because June has only 30 days.

The date cannot be later than the current processing date.

The date cannot be earlier than 01/01/1983 Form 8868 (Tax Class 4).

Exceptions & meaning →

Correction Procedures for Received Date - 01RCD

Check the form for transcription or coding errors and correct.

If the date is invalid, and the date stamp on the extension is missing, invalid, illegible, or later than the process date, determine the received date. See IRM 3.11.20.3.4, Received Date.

If the date is before 01/01/1983, SSPND 620, attach Form 4227 and notate "Non-ADP record" and route to ANMF.

For further information, refer to IRM 3.10.72, Campus Mail and Work Control, Receiving, Extracting, and Sorting, and IRM 3.11.20.2, Document Perfection Procedures.

Exceptions & meaning →

Computer Condition Codes - 01CCC

The entry for Field 01CCC is transcribed from the top center margin of the form.

Exceptions & meaning →

Validity Check for Computer Condition Codes - 01CCC

Only one CCC may be present.

Only CCC W is valid for Form 8868, Part II.

Form 8868, Part III, for Form 5330 extensions 01CCC must be blank.

CCC

Code

Condition

W

Short period and an acceptable reason is provided. This causes the Tax Period to bypass the Error Code 026 check on ERS.

Exceptions & meaning →

Note:

Use of CCC W will not bypass Unpostable checks on Tax Period unless TC 054 or TC 055 is posted in the entity.

Y

Reserved

Exceptions & meaning →

Correction Procedures for Computer Condition Codes - 01CCC

Check for transcription errors and correct Field 01CCC and the form as appropriate.

If any code other than W is present, delete the entry in Field 01CCC.

If a CCC is present on Form 8868, Part III, for Form 5330 extensions, delete any entry in Field 01CCC.

Exceptions & meaning →

Group Code - 01RGC

The Group Code is only edited on Form 8868 extending a Form 990, when the form is being filed for a group.

If the "whole group" box is checked on Form 8868, a Group Code will not be present.

If the "part of the group" box is checked on Form 8868, Group Code 8 will be present.

Exceptions & meaning →

Validity Check for Group Code - 01RGC

Only valid for Form 8868 (Tax Class 4).

This field must be 8 or blank.

Exceptions & meaning →

Correction Procedure for Group Code - 01RGC

Check the form for coding and transcription errors.

The Group Code for Form 8868 is edited in the middle right margin of the form.

Process the Form 8868 as a group return when indicated on the extension and any of the following apply:

A "GEN" is present

The whole group box is checked

The part of the group box is checked

A list of subordinates is attached

If none of the conditions are present on the extension, blank Field 01RGC.

If one or more of the group return conditions is present, correct Field 01RGC as follows:

If the whole group box is checked, delete the entry in Field 01RGC.

If the part of the group box is checked, enter 8 in Field 01RGC.

Exceptions & meaning →

Return Code - 01RTC

Field 01RTC is used for the Return Code for Form 8868.

The Return Code must be present for the MFT Code to generate on Form 8868. See Exhibit 3.11.20-16 Return Codes Chart.

The return code is used by the Master File computer program to determine the correct return due date for generating the extension date and MFT Code.

Exceptions & meaning →

Validity Check for Return Code - 01RTC

Form 8868 (Tax Class 4) - the Field 01RTC must be 01 or 03 through 15.

Exceptions & meaning →

Correction Procedure for Return Code - 01RTC

Check the form for coding or transcription errors.

The two-digit return code for Form 8868 is transcribed from the return code box below the name and address section. See Exhibit 3.11.20-16 , for Return Codes chart.

Exceptions & meaning →

CAF Indicator - 01CAF

The CAF Indicator is no longer edited by Document Perfection. If an entry displays in Field 01CAF, delete the entry.

Exceptions & meaning →

Notice Code - 01NOT

The Notice Code is a one-position numeric code that is edited on the top center margin.

The Notice Code indicates whether the extension request is approved or denied and if denied, the reason.

When the extension posts to the BMF, the Notice Code automatically generates the appropriate notice to the taxpayer.

When a Notice Code 1 or 3 is used, the extended due date generates when the extension transaction posts to the BMF.

Exceptions & meaning →

Validity Checks for Notice Code—01NOT

Notice Code is only valid with Form 8868 (DLN Tax Class must be 4).

Notice Code must be 1 or 2 on Form 8868 with Return Codes 01, 03-12, or 15.

Notice Code must be 3, 4, 8, or 9 on Form 8868 with Return Codes 13 or 14.

Only one Notice Code may be present.

Exceptions & meaning →

Correction Procedures for Notice Code - 01NOT

If no Notice Code is edited, review the extension to determine if it meets all the approval criteria. See IRM 3.11.20.4.2.3, Approval/Denial Notice Code or IRM 3.11.20.5.1, Form 8868 Part III for Form 5330 - Approval/Disapproval Criteria and Action.

If Form 8868, Part III, line 1a Code section is missing from the extension request, C&E is instructed to correspond for the missing code section. See the "Missing Code Section" chart below.

Form 8868 for Form 5330 extension is approved if it is timely, signed, and has an acceptable reason for the extension. See Exhibit 3.11.20-6, Guidelines for Acceptable Reason for Needing an Extension of Time to File - Used for Form 8868 (MFT 76) only.

Correspondence for missing code section:

Missing Code Section

If

And

Then enter Notice Code

the reply provides the code section,

extension is timely based on the code section, see Exhibit 3.11.20-12,

3 in Field 01NOT.

Exceptions & meaning →

Note:

C&E will not correspond for the code section if there was no signature or acceptable reason.

the reply provides the code section,

extension is NOT timely based on the code section, see Exhibit 3.11.20-12,

4 in Field 01NOT.

no reply, or reply doesn't supply a valid code section,

the due date is the last day of the seventh month after the end of the Tax Period (if Tax Period is 202512 use 20260731), process the extension as filed timely based on this due date,

3 in Field 01NOT.

no reply, or reply doesn't supply a valid code section,

the due date is the last day of the seventh month after the end of the Tax Period, process the extension as NOT filed timely based on this due date,

4 in Field 01NOT.

Enter the correct Notice Code in Field 01NOT based on the return codes. Only one Notice Code may be used for each document.

Notice Codes for Form 8868 with Return Codes 01, 03-12, or 15

If

Then enter Notice Code

Approved extension - timely

1

Denied extension - not timely

2

Notice Codes for Form 8868 with Return Codes 13 or 14

If

Then enter Notice Code

Approved extension - timely

3

Denied extension - not timely

4

Denied extension - isn’t signed

8

Denied extension - doesn’t have an acceptable reason.

9

Exceptions & meaning →

Error Codes Form 8868 with Return Codes 01, 03-15

See instructions for resolving specific Error Codes related to Form 8868.

Exceptions & meaning →

Error Code 002 - Name Control Mismatch

This subsection provides instructions for Error Code 002.

Exceptions & meaning →

Screen Display - Error Code 002

Screen Display for Error Code 002 follows:

Screen Display Error Code 002

AFD

Field Name

CL

Clear Code

01NC

Name Control/Check Digit

Name Control Underprint

01TIN

TIN (Taxpayer Identification Number)

01TXP

Tax Period

Exceptions & meaning →

Invalid Condition - Error Code 002

The Name Control mismatched against the NAP or the ElF.

Exceptions & meaning →

Correction Procedures - Error Code 002

Before performing additional research, go to the bottom of the screen and transmit. This ensures any prior changes to the Name Control have posted to the NAP. If Error Code 002 reappears, continue with the following correction procedures.

Compare the displayed fields with the extension. If incorrect, overlay the screen with the correct information.

If the Name Control transcribed in Field 01NC and the Name Control on the document are the same but differ from the underprint in Field 01NC, research CCs INOLE, NAMEE, NAMEB or ENMOD (for pending TC 000 or 013) to determine the correct Name Control/TIN.

Exceptions & meaning →

Note:

When corrections are made to Field 01NC or Field 01TIN, the computer re-validates the entries with the NAP and resets the OLE indicators as appropriate upon transmitting the ERS screen. If Error Code 002 reappears, an unpostable condition may still exist. Re-verify the entries and refer to the remainder of the correction procedures.

Name Control Research

If

Then

the Name Control on the document matches the Name Control on Master File, with no name change,

enter C in the Clear Code Field and transmit.

a different Name Control than what is in Field 01NC is the same as shown on the document (Name of Exempt Organization),

verify the Name Control on CC INOLE.

If they agree, enter the INOLE Name Control in Field 01NC.

If they disagree, research CC NAMEB or NAMEE for a different EIN.

the Name Control found during research agrees with Name Control on document,

enter the INOLE Name Control Field 01NC.

INOLE Name Control differs from the Name Control on the document,

do additional research:

Research CC ENMOD for a pending TC 013. If the Name Control agrees with the transcribed Name Control, enter a "C" in the Clear Code Field.

Research attachments and NAMEB for a different EIN.

If a different EIN is found on the attachment, or a cross-reference EIN on INOLE or BRTVU, verify the EIN on INOLE for presence on Master File.

Ensure that the entity information matches the taxpayer on the extension. If these conditions are met, overlay Field 01TIN with the new EIN found on Master File.

the Name Control on Master File is not correct and the entity on Master File needs correction,

SSPND 320, attach Form 4227, notating why the return is being suspended and route to Entity Control for additional research.

a name change has occurred,

SSPND 320, attach Form 4227 requesting a name change (TC 013) and route to Entity Control.

IDRS research is not available,

SSPND 351 or 355.

there are multiple EINs,

SSPND 320 and route to Entity for further action.

Exceptions & meaning →

Error Code 003 - Invalid Check Digit

This subsection provides instructions for Error Code 003.

Exceptions & meaning →

Screen Display - Error Code 003

Screen Display for Error Code 003 follows:

Screen Display Error Code 003

AFD

Field Name

01NC

Name Control/Check Digit

01TIN

Taxpayer Identification Number

Exceptions & meaning →

Invalid Condition - Error Code 003

The Check Digit is present and is invalid for the TIN.

The letters E, G or M are invalid in the Check Digit.

The first two positions of the field are not blank.

The last two positions are not alpha characters.

Exceptions & meaning →

Correction Procedures - Error Code 003

If the Check Digit is invalid, enter the Name Control from the extension in Field 01NC.

If the taxpayer used the wrong EIN, follow the procedures for EIN correction:

EIN Correction

If

Then

the EIN on the extension is illegible,

research using CC NAMEB or NAMEE for a valid EIN. If IDRS is not available, SSPND 351.

unable to locate the EIN,

SSPND 320, attach Form 4227, notating why the return is being suspended and refer to Entity Control.

the EIN and Check Digit are both legible but do not match,

research for a valid EIN.

another EIN is found for the entity on the return or through research,

change Field 01TIN to the correct EIN.

Exceptions & meaning →

Error Code 004 - EIF/NAP Mismatch

This subsection provides instructions for Error Code 004.

Exceptions & meaning →

Screen Display - Error Code 004

Screen Display for Error Code 004 follow:

Screen Display Error Code 004

AFD

Field Name

CL

Clear Code

01NC

Name Control/Check Digit

Name Control Underprint

01TIN

Taxpayer Identification Number

Exceptions & meaning →

Invalid Conditions - Error Code 004

The TIN was not present at the NAP. An "XXXX" underprint indicates there is no account on the Master File matching this TIN.

A blank underprint indicates that the EIF and the NAP has not been accessed or was not operational.

Exceptions & meaning →

Correction Procedures - Error Code 004

Before performing other research, go to the bottom of the screen and transmit. This ensures that any prior changes to the Name Control/TIN have posted to the NAP. If Error Code 004 reappears, continue with the following correction procedures.

Compare the displayed fields with the extension. If incorrect, overlay the screen with the correct information.

Field 01TNT must be 2, indicating that the TIN is an EIN. Use CC GTSEC01 and enter "2" in Field 01TNT.

If the Name Control transcribed in Field 01NC and the Name Control on the document are the same, but differ from the underprint in Field 01NC, research to determine the correct Name Control/TIN using CCs INOLE, NAMEE, NAMEB and ENMOD.

Follow these research instructions:

Name Control Research

If

Then

a pending transaction (TC 000 or TC 013) on CC ENMOD or NAMEB, with a Name Control that agrees with the transcribed Name Control,

enter a C in the Clear Code Field.

the Name Control on the document matches the Name Control on Master File with no name change,

enter C in the Clear Code Field.

a different Name Control than what is in Field 01NC is the same as shown on the document (Name of filer, exempt organization or individual),

verify the Name Control using CC INOLE.

If they agree, enter the INOLE Name Control in Field 01NC.

If they disagree, research CC NAMEB or NAMEE for a different EIN.

a different EIN is found on an attachment, or CC INOLE or BMFOL,

verify the EIN on CC INOLE for presence on Master File. Ensure the entity information matches what the taxpayer is using on the extension.

If these conditions are met, overlay Field 01TIN with the new EIN found on Master File.

after researching, you determine that the Name Control on Master File is not correct and the entity on Master File needs correction,

SSPND 320, attach Form 4227, notate why the extension is being suspended and route to Entity Control for additional research.

If you determine the Name Control on Master Filed is not correct and the entity on Master File needs correction, SSPND 320, attach Form 4227, notate why the extension is being suspended and route to Entity Control for additional research.

When there is no account present or pending, SSPND 320, attach Form 4227 and notate "no account" and route to Entity Control.

When IDRS is not available, SSPND 351 or 355.

Exceptions & meaning →

Error Code 005 - Missing Received Date

This subsection provides instruction for Error Code 005.

Exceptions & meaning →

Screen Display - Error Code 005

Screen Display for Error Code 005 follows:

Screen Display Error Code 005

AFD

Field Name

01TXP

Tax Period

01RCD

Received Date

Exceptions & meaning →

Invalid Condition - Error Code 005

Invalid condition occurs when the processing date is later than the Tax Period ending by more than six months and the received date is not present in Field 01RCD.

Exceptions & meaning →

Correction Procedures - Error Code 005

Compare the information in Field 01TXP and Field 01RCD with the Tax Period and the received date on the extension. If the displayed information doesn't match the document, overlay the screen with the correct information.

If the Tax Period is truly six months before the processing date, review the received date:

If

Then

the date stamp is missing, illegible or later than the processing date,

determine the date as shown in IRM 3.11.20.7.8, Research. Enter the correct Received Date in Field 01RCD.

multiple received dates are on the document,

use the earliest date and circle out the others.

Exceptions & meaning →

Error Code 006 Remittance with No Received Date

This subsection provides instructions for Error Code 006.

Exceptions & meaning →

Screen Display - Error Code 006

Screen Display for Error Code 006 follows:

Screen Display Error Code 006

AFD

Field Name

RMIT

Remittance

01RCD

Received Date

Exceptions & meaning →

Invalid Condition - Error Code 006

An invalid condition occurs when remittance is present and the received date is not present.

Exceptions & meaning →

Correction Procedures - Error Code 006

When a remittance is present on the form, do the following:

If

Then

there is a remittance on the form,

the received date must be present. Compare the displayed fields with the information on the extension.

any of the information is incorrect,

overlay the screen with the correct information.

the received date is missing, illegible or later than the processing date,

determine the date as shown in IRM 3.11.20.2.6, Determination of Timely Filing - General.

multiple received dates are on the document,

use the earliest date and circle the others.

Exceptions & meaning →

Error Code 007 - Received Date

This subsection provides instructions for Error Code 007.

Exceptions & meaning →

Screen Display - Error Code 007

Screen Display for Error Code 007 follow:

AFD

Field Name

CL

Clear Screen

01TXP

Tax Period

Tax Period Underprint

01RCD

Received Date

Exceptions & meaning →

Invalid Conditions - Error Code 007

The year and month of the received date are earlier than the year and month of the plan year end.

Exceptions & meaning →

Correction Procedures - Error Code 007

Compare the displayed fields with the information on the extension. If the displayed fields do not match the extension, overlay the screen with the correct information.

If the displayed fields match what is on the extension, see IRM 3.11.20.3.4, Received Date, for instructions to determine the correct received date.

If the received date was mailed timely, delete the received date from 01RCD.

If this caused EC005 to display, enter the timely postmark date fro the plan year end; see Exhibit 3.11.20-4, Due-Dates - Form 8868 for MFT 76 (Form 5330).

If the extension is early field, SSPND 480.

Exceptions & meaning →

Error Code 026 - FYM Mismatch Form 8868

This subsection provides instructions for Error Code 026. See Exhibit 3.11.20-7, Error Code 026 - Form 8868, Part II.

Exceptions & meaning →

Screen Display - Error Code 026

Screen Display for Error Code 026 follows:

Screen Display Error Code 026

AFD

Field Name

CL

Clear Code

01TIN

Taxpayer Identification Number

01TXP

Tax Period

Tax Period Underprint

01MFT

MFT Code

01CCC

Computer Condition Code

Exceptions & meaning →

Invalid Condition - Error Code 026

The Tax Period underprints because the month of the transcribed Tax Period does not agree with the current FYM or prior FYM on the Entity Index File (EIF) or NAP, and CCC "W" is not present.

Exceptions & meaning →

Correction Procedures - Error Code 026

Before performing other research, go to the bottom of the screen and transmit. If Error Code 026 reappears, continue with the following correction procedures (2) through (6).

If you determine that Field 01TXP needs changing during correction of Error Code 026, before making any correction to Field 01TXP, you must review the received date and postmark date to determine timeliness of extension based on the corrected Tax Period. See IRM 3.11.20.7.8, Research.

If the extension is timely filed based on the corrected Tax Period, and the Notice Code edited is other than "1" , use CC GTSEC01 and change Field 01NOT to "1" and make the same change on the document.

If the extension is timely filed based on the corrected Tax Period, and Notice Code "2" is edited, use CC GTSEC01 and change Field 01NOT to Notice Code "1" and make the same change on the document.

Compare the information in the displayed fields with the extension to ensure the Tax Period was edited and transcribed correctly. See IRM 3.11.20.11.7.2, Correction Procedures For Tax Period Ending—01TXP.

The Tax Period will be edited in YYMM format and represent the end of the taxable year.

C&E will not edit the Tax Period on a current calendar year extension (i.e. 2512).

If the Tax Period was not transcribed or coded correctly, change the document and/or Field 01TXP to the correct Tax Period.

Some entities file 52-53 week returns. Their tax year ends on the same day of the week each year (e.g., the last Friday in December). Tax Periods reported under the 52-53 week rule may end not more than 6 days before, and not more than 3 days after, the end of a month. When determining the Tax Period for these accounts, use the numeric designation of the month in which the last day is closest to the actual ending date.

If the tax year ends up to three days after the end of the month, use the previous month in the Tax Period.

Exceptions & meaning →

Example:

If the end of the tax year is May 2, 2025, the Tax Period should be 2504.

If the tax year ends up to six days before the end of the month, use that month in the Tax Period.

Exceptions & meaning →

Example:

If the end of the tax year is April 26, 2025, the Tax Period should be 2504.

Form 8868 for MFT 36 or 37, the month of the Tax Period must be 12. If it is other than 12, change the Tax Period month to 12.

Exceptions & meaning →

Compare TIN

Compare the entry in Field 01TIN with the TIN on the document. If the TIN does not match, change Field 01TIN to match the document and transmit.

Whenever Field 01TIN is changed, Error Code 026 re-validates using the new TIN.

Exceptions & meaning →

Short Period Form 8868

If Line 1 indicates a period less than one year, check Line 2 for an indication the extension is being filed for a short period because of an Initial, Final, or Change in accounting period. A return will be filed.

If any of those boxes are checked, enter "W" in 01CCC.

If none of the boxes are checked, look for an attached explanation for the change (e.g. IRC Section or Rev. Proc. quoted). If found, enter "W" in 01CCC.

Exceptions & meaning →

Research CC INOLES

Research using CC INOLES for the FYM of the MFT that matches the return being extended.

If the FYM on INOLES matches the month of the Tax Period on the extension, enter a "C" in the Clear Code Field.

If the FYM does not match the month of the Tax Period of the extension, follow instructions in IRM 3.11.20.12.7.3.3.1, FYM Does Not Match Tax Period of the Extension.

Exceptions & meaning →

FYM Does Not Match Tax Period of the Extension

Research CC ENMOD to see if a transaction to change the FYM is pending. Look for any of the following pending transaction codes:

TC 016 - change of Fiscal Year Ending.

TC 052 - Reversal of TC 053, TC 054 and TC 055.

TC 053 - an approved Form 1128, Application to Adopt, Change, or Retain a Tax Year, is on file.

TC 054 - an approved Form 1128 is on file to retain or change to a fiscal year under Revenue Procedure 87-32.

TC 055 - an approved Form 8716, Election To Have a Tax Year Other Than a Required Tax Year, is on file to change, retain, or adopt a fiscal year under Section 444.

If one of the above transactions is pending and will change the FYM to the month of the Tax Period on the extension when it posts, enter a "C" in the Clear Code Field.

If no pending transaction is present, follow instructions in IRM 3.11.20.12.7.3.4, Research CC BMFOLI.

Exceptions & meaning →

Research CC BMFOLI

Research using CC BMFOLI for prior filing pattern.

Exceptions & meaning →

Note:

If working on an extension for a prior year that was originally processed incorrectly (i.e., the extension is denied and taxpayer has shown proof of timely filing or a denied extension was covered under a disaster declaration), process the extension request as being the Tax Period of the return based on the date the extension was received.

If research shows no returns (TC 150) posted to prior tax modules for the MFT of the extension being processed, then process as an initial filing. Enter CCC "W" in Field 01CCC.

Form 8868 - Review the posting pattern of returns (TC 150) posted to prior year Tax Periods before the Tax Period on the extension.

Posting Return

If

Then

the returns posted are for various FYM,

initiate correspondence to the taxpayer requesting clarification of the accounting period.

Exceptions & meaning →

Note:

Don't correspond on disapproved extensions. Follow No Reply instructions. See IRM 3.11.20.12.7.3.4.1.

the returns posted are all for the same FYM, and a TC 150 posted for the current year,

SSPND 351 to Rejects. Rejects researches for posted TC 460 for current year.

If TC 460 posted to current year, SSPND 480 as early filed extension.

If no TC 460 is posted, change FYM to current year and bring up the underprint month. If this makes the extension late filed, use CC GTSEC01 and change entry in Field 01NOT to 2

the returns posted are all for the same FYM, is different from the FYM on the extension, and there is no TC 150 posted for the current year,

change 01TXP to current processing year and bring up the underprint month. If this makes the extension late filed:

Use CC GTSEC01 and change entry in Field 01NOT to 2.

If the extension was originally disapproved for late filing, and after following the correction procedures the extension is now found to be timely filed, take the following action:

Form 8868 - use CC GTSEC01 and change the entry in Field 01NOT to Notice Code 1. See IRM 3.11.20.11.15.2 (5), Correction Procedures for Notice Code—01NOT.

Exceptions & meaning →

Reply or No Reply to Letter

If the taxpayer's reply displays the correct Tax Period and the month matches the Tax Period underprint, enter the correct Tax Period in Field 01TXP and on the document.

If the taxpayer replies with an approved copy of Form 1128 or Form 8716, or with a date the accounting period change was approved, SSPND 320, attach Form 4227 and notate "update the FYM on Master File" , and route documents to Entity Control.

If the taxpayer quotes an IRC Section or Rev. Proc. to explain the change, enter CCC "W" in Field 01CCC.

Form 8868 - no reply or reply is inconclusive:

If BMFOLT shows a TC 460 posted for the current year, SSPND 480 and hold as early filed extension for the next year.

Exceptions & meaning →

Example:

TC 460 posted to Tax Period 202209 and extension shows Tax Period 202212. FYM underprint is 09. SSPND 480 and hold as early filed extension for 202209.

If BMFOLT does not show a TC 460 posted for the current year, change Field 01TXP and the document to agree with the Tax Period Underprint month in the current year.

Exceptions & meaning →

Example:

Tax Period Underprint is 12, extension shows Tax Period 202206. BMFOLI shows no extension posted for 202212. Received date is 03/12/2022. Change 01TXP to 202212.

If this change in the Tax Period makes the extension late-filed, enter Notice Code 2 in Field 01NOT and on the document.

Exceptions & meaning →

Error Code 100 - Return Code 03

This subsection provides instructions for Error Code 100.

Exceptions & meaning →

Screen Display - Error Code 100

Screen Display for Error code 100 follows:

Screen Display Error Code 100

AFD

Field Name

01TNT

TIN Type

01RTC

Return Code

Exceptions & meaning →

Invalid Condition - Error Code 100

Error Code 100 generates, if the 01RTC is 03 or 13 and 01TNT is not 0.

If 01RTC is 01, 04-12, 14, and 15 and 01TNT is not 2.

Exceptions & meaning →

Correction Procedures - Error Code 100

Correct coding and transcription errors.

If

And

And

Then

01RTC is 03,

an SSN displays in the TIN field,

01TNT is 2,

change 01TNT to 0.

01RTC is 09

an SSN displays in the TIN field,

01TNT is 0,

change 01RTC to 03.

01RTC is 13,

an SSN displays in the TIN field,

01TNT is 2,

change 01TNT to 0.

01RTC is 14,

an SSN displays in the TIN field,

01TNT is 0,

change 01RTC to 13.

01RTC is 03,

an EIN displays in the TIN field,

01TNT is 2,

change 01RTC to 09.

01RTC is 13,

an EIN displays in the TIN field,

01TNT is 2,

change 01RTC to 14,

01RTC is 01, 04-12, 14, and 15,

an EIN displays in the TIN field,

01TNT is other than 2,

change 01TNT to 2.

Exceptions & meaning →

Error Code 609 - Prior Year Extension

This subsection provides instructions for Error Code 609.

Prior-year extension requests are normally denied when not received by the due date, but extensions for previous years may need to be processed for various reasons:

When the taxpayer has requested a reconsideration of a previously denied extension for a prior year and has supplied evidence that the extension should be approved.

When there was a delay in shipping an extension request and it was processed after it was originally filed.

When the taxpayer's original extension request was denied in error and the request must be reprocessed correctly to generate an abatement of the failure to file penalties on the taxpayer's account.

Exceptions & meaning →

Screen Display - Error Code 609

Screen Display for Error Code 609 follows:

Screen Display Error Code 609

AFD

Field Name

CL

Clear Code

01TXP

Tax Period

01RCD

Received Date

Exceptions & meaning →

Invalid Condition - Error Code 609

Tax Period is more than one year before the current processing date.

Exceptions & meaning →

Correction Procedures - Error Code 609

Review the form for coding and transcription errors, and correct.

The Tax Period in 01TXP must match the taxpayer's entry on line 1, box 2.

If it appears that the taxpayer has entered the wrong year in error and all other information (received date, envelope postmark date, tax year begin date) indicates that the extension is for the current tax year, and there is no indication that this is truly a prior year extension, change the year of the Tax Period to the current year.

Exceptions & meaning →

Example:

On line 1, box 2, the taxpayer entered a tax year beginning June 1, 2025 and ending May 31, 2025. Tax Period appears to be 202505, but should be 202505.

If the Tax Period is before the current date by more than one year, enter a "C" in the Clear Code Field.

Exceptions & meaning →

Error Code 612 - Early Filed Extension

This subsection provides instructions for Error Code 612.

Exceptions & meaning →

Screen Display - Error Code 612

Screen Display for Error Code 612 follows:

Screen Display Error Code 612

AFD

Field Name

01RTC

Return Code

01TXP

Tax Period

01RCD

Received Date

Exceptions & meaning →

Invalid Condition - Error Code 612

If 01RTC is 01, 03, 04, 05, 06, 07, 09, 13, 14 or 15, then the year and month of received date in Field 01RCD cannot be earlier than the year and month of the Tax Period in Field 01TXP (the extension was filed before the end of the Tax Period).

Exceptions & meaning →

Correction Procedures - Error Code 612

Compare the displayed fields with the information on the extension. If the displayed fields do not match the extension, overlay the screen with the correct information.

If the displayed fields match what is on the extension, see IRM 3.11.20.7.8, Research for instructions to determine the correct Received Date.

If the extension was received timely, delete the Received Date from 01RCD.

Exceptions & meaning →

Error Code 613 - Early Filed Extension MFT 36 and 37

This subsection provides instructions for Error Code 613.

Exceptions & meaning →

Screen Display - Error Code 613

Screen Display for Error Code 613 follows:

Screen Display Error Code 613

AFD

Field Name

01RTC

Return Code

01TXP

Tax Period

01RCD

Received Date

Exceptions & meaning →

Invalid Condition - Error Code 613

01RTC is 08 or 10, and Field 01TXP has an entry more than one year later than the processing date.

Exceptions & meaning →

Correction Procedures - Error Code 613

Review the form for coding and transcription errors, and correct.

If the Tax Period in Field 01TXP matches the document, SSPND 480 as early filed.

Exceptions & meaning →

Error Code 614 - Group Code

This subsection provides instructions for Error Code 614.

Exceptions & meaning →

Screen Display - Error Code 614

Screen Display for Error Code 614 follows:

Screen Display Error Code 614

AFD

Field Name

01RTC

Return Code

01RGC

Group Code

Exceptions & meaning →

Invalid Condition - Error Code 614

Correction Procedures - Error Code 614

Review the form for coding and transcription errors, and correct.

The return code is located in the "split" box below and to the right of the name and address section. Edit only if missing or illegible. See Exhibit 3.11.20-9 or Exhibit 3.11.20-16, to determine the Return Code.

If the return code is not 01, delete the entry in 01RGC.

If the return code is 01, see IRM 3.11.20.11.12.2, Correction Procedure For Group Code - 01RGC, for instructions to determine the correct group code.

Exceptions & meaning →

Error Code 615 - MFT 37 FYM

See instructions in the subsequent sections for Error Code 615.

Exceptions & meaning →

Screen Display - Error Code 615

Screen Display for Error Code 615 follows:

Screen Display Error Code 615

AFD

Field Name

01MFT

MFT Code

01RTC

Return Code

01TXP

Tax Period

Exceptions & meaning →

Invalid Condition - Error Code 615

01RTC is 08 or 10, and month of Field 01TXP is not 12.

Exceptions & meaning →

Correction Procedures - Error Code 615

Review the form for coding and transcription errors, and correct.

If the Return Code is correct in Field 01RTC, change the entry in Field 01TXP to 12.

Exceptions & meaning →

Error Code 619 - Timely Filed Extension With Notice Code 2, 4, 8, or 9

Error Code 619 check is performed on Form 8868 only.

Exceptions & meaning →

Screen Display - Error Code 619

Screen Display for Error Code 619 follows:

Screen Display Error Code 619

AFD

Field Name

01TXP

Tax Period

01RTC

Return Code

01RCD

Received Date

01NOT

Notice Code

Exceptions & meaning →

Invalid Condition - Error Code 619

Return Code is 01, 03, 04, 06, 07, 09, or 15, Field 01NOT is "2" (denied late filed extension) and Field 01RCD contains a timely received date≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡.

Return Code is 05, 08 or 10, Field 01NOT is "2" (denied late filed extension) and Field 01RCD contains a timely received date ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡.

Return Code is 13 or 14, Field 01NOT is 4 (denied late filed extension) and Field 01RCD contains a timely received date≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡.

Return Code is 13 or 14, Field 01NOT is 8 (denied isn’t signed) and Field 01RCD contains a timely received date≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡.

Return Code is 13 or 14, Field 01NOT is 9 (denied doesn’t have an acceptable reason) and Field 01RCD contains a timely received date≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡.

Exceptions & meaning →

Correction Procedures - Error Code 619

Review for coding and transcription errors in Field 01RTC and Field 01TXP. Correct the field entry as needed.

See IRM 3.11.20.11.13.1, Validity Check for Return Code - 01RTC, for instructions to determine the RTC.

See IRM 3.11.20.11.7.2, Correction Procedures for Tax Period Ending - 01TXP, for instructions on 01TXP.

Exceptions & meaning →

Note:

The month of the Tax Period for Return Codes "08" and "10" must always be 12.

Review the received date and postmark date on the document.

If the Received Date on the document is after the due date ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡and the postmark date is after the due date, enter the received date from the document in Field 01RCD. See Exhibit 3.11.20-2, Due Dates - Form 8868 Extensions Other than Form 990-T Sec. 401(a) or 408(a) Trusts and Federal Agencies and Tribal Governments EPE Credit.

If Form 8868 with Return Codes 01, 03-12, or 15 was received and/or postmarked timely, change the entry in Field 01NOT to "1" (approved extension).

If Form 8868 with Return Codes 13 or 14 was received and/or postmarked timely, change the entry in Field 01NOT to "3" (approved extension).

Exceptions & meaning →

Error Code 680

This subsection provides instructions for Error Code 680.

Exceptions & meaning →

Screen Display - Error Code 680

Screen Display for Error Code 680 follows:

Screen Display Error Code 680

AFD

Field Name

01MFT

MFT Code

01PL

Plan Number

01NOT

Notice Code

01CCC

Computer Condition Code

01RTC

Return Code

01RGC

Group Code

Exceptions & meaning →

Invalid Condition - Error Code 680

Error Code 680 generates on Form 8868 when the Return Code is blank.

MFT is 76 and Field 01PL is not 001-999.

MFT is 76 and Field 01NOT is not 3, 4, 8, or 9.

MFT is 76 and Field 01CCC has an entry.

MFT is 76 and Field 01RTC has an entry.

MFT is 76 and Field 01RGC is not blank.

Exceptions & meaning →

Correction Procedures - Error Code 680

Review the document for coding and transcription errors and correct.

If the document is Form 8868, enter the correct Return Code in Field 01RTC and delete any entry in Field 01PL on Return Codes 01, 03-12, and 15 only. See IRM 3.11.20.4.2, Document Perfection, for Form 8868 RTC determination and instructions.

Exceptions & meaning →

Note:

If the Form 8868 is a prior revision, use the appropriate Return Code in Exhibit 3.11.20-9.

Return Codes 13 and 14 required a plan number 01PL. See Error Code 680 Correction (MFT 76) chart below.

If the document is a Form 8868 extension for Form 5330, do the following:

Error Code 680 Corrections (MFT 76)

If

Then

01MFT is not 76,

enter 76 in Field 01MFT.

01PL is blank or Plan Number is 000, more or fewer than three-digits,

see IRM 3.11.20.11.9.2, Correction Procedures for Plan Number - 01PL.

Exceptions & meaning →

Note:

If Entity is unable to make a determination, default the Plan Number to 001.

01NOT is not 3, 4, 8, or 9,

see IRM 3.11.20.11.15.2 Correction Procedures for Notice Code - 01NOT.

01CCC is not blank,

delete the entry in Field 01CCC.

01RTC contains an entry,

delete the entry in Field 01RTC.

01RGC contains an entry,

delete the entry in Field 01RGC.

If the document is a Form 5558 extension for a Form 5500 series and/or Form 8955-SSA, the DLN must be a Document Code 55, SSPND 610 for renumbering.

Exceptions & meaning →

Error Code 999 - End of Year Format

This subsection provides instructions for Error Code 999, End of Year Format.

Exceptions & meaning →

Screen Display - Error Code 999

Screen Display for Error Code 999 follows:

Screen Display Error Code 999

AFD

Field Name

01TXP

Tax Period

Exceptions & meaning →

Invalid Condition - Error Code 999

Error Code 999 generates for all extensions on ERS in error status at the end of the processing year.

Exceptions & meaning →

Correction Procedures - Error Code 999

Group Return TC 460 Procedures (Rejects Only)

Input a TC 460 and extended due date using CC REQ77 for each subordinate EIN listed on the attached list.

Group Return TC 460 Procedures

If

Then

an error message is received after TC 460 is transmitted on the CC REQ77 screen,

research IDRS for correct account information; see IRM 3.11.20.2.15, Research Command Codes.

correct account information is undetermined from research,

do the following:

Print the IDRS error message screen and notate reason for error (e.g., FYM mismatch, account not establish, etc.).

Continue processing rest of list.

SSPND 320, attach Form 4227 and include print(s) to the original document and route to Entity Control.

Entity corrects account(s), inputs the TC 460 on the subordinates in error, and routes the documents to Rejects.

Finish working the original document.

Exceptions & meaning →

Extensions Listing

Extension Form

Type

Period of Extension

Forms Affected

5558

EPMF

2 1/1 months from Return Due Date

Form 5500 Series and/or Form 8955-SSA

8868

BMF

Automatic six months from Return Due Date

Form 990 or Form 990-EZ

Form 4720 (individual)

Form 990-PF

Form 990-T (sec. 401(a) or 408(a) trust)

Form 990-T (trust other than above)

Form 990-T (corporation)

Form 1041-A

Form 4720 (other than individual)

Form 5227

Form 5330

Form 6069

Form 8870

Form 990-T (governmental entities

Exceptions & meaning →

Due Dates - Form 8868 Extensions for Return Codes 01, 03, 04, 06, 07, 09, 11, and 15

Form 8868 Extensions for Return Codes 05, 08, and 10, see Exhibit 3.11.20-3 for more information.

Form 8868 Extensions for Return Codes 13 and 14, see Exhibit 3.11.20-4.

Exceptions & meaning →

Note:

Return Code 12, forward to TE/GE at M/S 1110.

The return due date is the 15th day of the fifth month after the Tax Period. Consider these as timely postmarked.

Exceptions & meaning →

Note:

When the return due date or extension date falls on the weekend, holiday or both, the return due date and extension date will be the next business day.

Tax Period

Return Due Date (Adjusted for weekends and holidays)

≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡

Approval Extension Date (Adjusted for weekends and holidays)

202511

04/15/26

≡ ≡ ≡ ≡ ≡ ≡ ≡

10/15/26

202512

05/15/26

≡ ≡ ≡ ≡ ≡ ≡ ≡

11/16/26

202601

06/15/26

≡ ≡ ≡ ≡ ≡ ≡ ≡

12/15/26

202602

07/15/26

≡ ≡ ≡ ≡ ≡ ≡ ≡

01/15/27

202603

08/17/26

≡ ≡ ≡ ≡ ≡

02/16/27

202604

09/15/26

≡ ≡ ≡ ≡ ≡ ≡ ≡

03/15/27

202605

10/15/26

≡ ≡ ≡ ≡ ≡

04/15/27

202606

11/16/26

≡ ≡ ≡ ≡ ≡

05/17/27

202607

12/15/26

≡ ≡ ≡ ≡ ≡

06/15/27

202608

01/15/27

≡ ≡ ≡ ≡ ≡

07/15/27

202609

02/16/27

≡ ≡ ≡ ≡ ≡

08/16/27

202610

03/15/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

09/15/27

202611

04/15/27

≡ ≡ ≡ ≡ ≡

10/15/27

202612

05/17/27

≡ ≡ ≡ ≡ ≡ ≡

11/15/27

202701

06/15/27

≡ ≡ ≡ ≡ ≡ ≡

12/15/27

202702

07/15/27

≡ ≡ ≡ ≡ ≡

01/18/28

202703

08/16/27

≡ ≡ ≡ ≡ ≡ ≡

02/15/28

202704

09/15/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

03/15/28

202705

10/15/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

04/18/28

202706

11/15/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

05/15/28

202707

12/15/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

06/15/28

202708

01/18/28

≡ ≡ ≡ ≡ ≡ ≡

07/17/28

Exceptions & meaning →

Due Dates - Form 8868 Extensions for Return Codes 05, 08, and 10

Form 8868 Extensions for Return Codes 13 and 14, see Exhibit 3.11.20-4 for more information.

Form 8868 Extensions for all other return codes, see Exhibit 3.11.20-2.

The return due date is the 15th day of the fourth month after the Tax Period. Consider these as timely postmarked.

Exceptions & meaning →

Note:

When the return due date or extension date falls on the weekend, holiday or both, the return due date and extension date will be the next business day.

Tax Period

Return Due Date (Adjusted for weekends and holidays)

≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡

Approval Extension Date (Adjusted for weekends and holidays)

202512*

04/15/26

≡ ≡ ≡ ≡ ≡ ≡

10/15/26

202601

05/15/26

≡ ≡ ≡ ≡ ≡ ≡

11/16/26

202602

06/15/26

≡ ≡ ≡ ≡ ≡ ≡ ≡

12/15/26

202603

07/15/26

≡ ≡ ≡ ≡ ≡

01/15/27

202604

08/17/26

≡ ≡ ≡ ≡ ≡

02/16/27

202605

09/15/26

≡ ≡ ≡ ≡ ≡ ≡

03/15/27

202606

10/15/26

≡ ≡ ≡ ≡ ≡ ≡ ≡

04/15/27

202607

11/16/26

≡ ≡ ≡ ≡ ≡ ≡ ≡

05/17/27

202608

12/15/26

≡ ≡ ≡ ≡ ≡ ≡

06/15/27

202609

01/15/27

≡ ≡ ≡ ≡ ≡

07/15/27

202610

02/16/27

≡ ≡ ≡ ≡ ≡ ≡

08/16/27

202611

03/15/27

≡ ≡ ≡ ≡ ≡ ≡

09/15/27

202612*

04/15/27

≡ ≡ ≡ ≡ ≡ ≡

10/15/27

202701

05/17/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

11/15/27

202702

06/15/27

≡ ≡ ≡ ≡ ≡

12/15/27

202703

07/15/27

≡ ≡ ≡ ≡ ≡

01/18/28

202704

08/16/27

≡ ≡ ≡ ≡ ≡

02/15/28

202705

09/15/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

03/15/28

202706

10/15/27

≡ ≡ ≡ ≡ ≡

04/17/28

202707

11/15/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

05/15/28

202708

12/15/27

≡ ≡ ≡ ≡ ≡ ≡

06/15/28

*Extensions for Form 1041-A and Form 5227 are always calendar year (i.e., 202512). Form 5227 Final return may be fiscal year.

Exceptions & meaning →

Due Dates - Form 8868 for Form 5330 (MFT 76)

The following Due Date charts for Form 8868 MFT 76 are based on the Code Section(s) imposing the tax on Form 8868, Part III, line 1a. The charts are in section order according to Form 5330, Part I.

Exceptions & meaning →

Note:

If due date falls on Saturday, Sunday, or holiday, the due date is the next business day.

Due date for Form 5330, Part I, Section A, for Code Sections 4972, 4973(a)(3), 4975(a)/(b), 4976, 4978 and 4979A is the last day of the seventh month after the end of the Tax Year month.

Tax Year Month

Return Due Date (Adjusted for weekends and holidays)

≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡

202606

02/01/27

≡ ≡ ≡ ≡ ≡ ≡

202607

03/01/27

≡ ≡ ≡ ≡ ≡

202608

03/31/27

≡ ≡ ≡ ≡ ≡

202609

04/30/27

≡ ≡ ≡ ≡ ≡ ≡

202610

06/01/27

≡ ≡ ≡ ≡ ≡

202611

06/30/27

≡ ≡ ≡ ≡ ≡ ≡

202612

08/02/27

≡ ≡ ≡ ≡ ≡ ≡

202701

08/31/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202702

09/30/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202703

11/01/27

≡ ≡ ≡ ≡ ≡ ≡

202704

11/30/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202705

01/03/28

≡ ≡ ≡ ≡ ≡

Due date for Form 5330, Part I, Section B, for Code Sections 4971(a)/(b), 4971(f)(1)/(2), 4971(g)(2)/(3)/(4), and 4971(h) is the 15th day of the 10th month after the last day of the plan year:

Exceptions & meaning →

Note:

Calculate the due date using the plan year end on Form 8868, Part I below the return codes.

Plan Year Month

Return Due Date (Adjusted for weekends and holidays)

≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡

202605

03/15/27

≡ ≡ ≡ ≡ ≡

202606

04/15/27

≡ ≡ ≡ ≡ ≡ ≡

202607

05/17/27

≡ ≡ ≡ ≡ ≡

202608

06/15/27

≡ ≡ ≡ ≡ ≡ ≡

202609

07/15/27

≡ ≡ ≡ ≡ ≡ ≡

202610

08/16/27

≡ ≡ ≡ ≡ ≡

202611

09/15/27

≡ ≡ ≡ ≡ ≡

202612

10/15/27

≡ ≡ ≡ ≡ ≡ ≡

202701

11/15/27

≡ ≡ ≡ ≡ ≡ ≡

202702

12/15/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202703

01/18/28

≡ ≡ ≡ ≡ ≡ ≡ ≡

202704

02/15/28

≡ ≡ ≡ ≡ ≡ ≡

The due date for Form 5330, Part I, Section B1, for Code Section 4977 is the last day of the seventh month after the end of the calendar year. The due 07/31/YYYY of the following year.

Tax Year Month

Return Due Date (Adjusted for weekends and holidays)

≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡

202606

02/01/27

≡ ≡ ≡ ≡ ≡ ≡

202607

03/01/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202608

03/31/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202609

04/30/27

≡ ≡ ≡ ≡ ≡

202610

06/01/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202611

06/30/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202612

08/02/27

≡ ≡ ≡ ≡ ≡ ≡

202701

08/31/27

≡ ≡ ≡ ≡ ≡ ≡

202702

09/30/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202703

11/01/27

≡ ≡ ≡ ≡ ≡

202704

11/30/27

≡ ≡ ≡ ≡ ≡

202705

01/03/28

≡ ≡ ≡ ≡ ≡ ≡ ≡

Due date for Form 5330, Part I, Section C, for Code Section 4979 is the last day of the 15th month after the end of the plan year month:

Plan Year Month

Return Due Date (Adjusted for weekends and holidays)

≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡

202510

02/01/27

≡ ≡ ≡ ≡ ≡

202511

03/01/27

≡ ≡ ≡ ≡ ≡ ≡

202512

03/31/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202601

04/30/27

≡ ≡ ≡ ≡ ≡ ≡

202602

06/01/27

≡ ≡ ≡ ≡ ≡

202603

06/30/27

≡ ≡ ≡ ≡ ≡ ≡

202604

08/02/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202605

08/31/27

≡ ≡ ≡ ≡ ≡

202606

09/30/27

≡ ≡ ≡ ≡ ≡

202607

11/01/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202608

11/30/27

≡ ≡ ≡ ≡ ≡ ≡

202609

01/03/28

≡ ≡ ≡ ≡ ≡

Due dates for Form 5330, Part I, Sections D, for Code Section 4980 or 4980F are computed by the last day of the month following the month after the reversion/amendment date from Form 8868, Part III, line 1c:

Month of reversion/amendment date

Return Due Date (Adjusted for weekends and holidays)

≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡

202511

12/31/25

≡ ≡ ≡ ≡ ≡ ≡ ≡

202512

02/02/26

≡ ≡ ≡ ≡ ≡

202601

03/02/26

≡ ≡ ≡ ≡ ≡

202602

03/31/26

≡ ≡ ≡ ≡ ≡ ≡ ≡

202603

04/30/26

≡ ≡ ≡ ≡ ≡ ≡

202604

06/01/26

≡ ≡ ≡ ≡ ≡ ≡ ≡

202605

06/30/26

≡ ≡ ≡ ≡ ≡ ≡ ≡

202606

07/31/26

≡ ≡ ≡ ≡ ≡ ≡

202607

08/31/26

≡ ≡ ≡ ≡ ≡ ≡

202608

09/30/26

≡ ≡ ≡ ≡ ≡ ≡

202609

11/02/26

≡ ≡ ≡ ≡ ≡

202610

11/30/26

≡ ≡ ≡ ≡ ≡

Due dates for Form 5330, Part I, Section F, for Code Section 4965 is the 15th day of the fifth month following the close of the entity manager’s tax year during which the plan became a party to a prohibited tax shelter transaction.

Taxable Year Month

Return Due Date (Adjusted for weekends and holidays)

≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡

202511

04/15/26

≡ ≡ ≡ ≡ ≡

202512

05/15/26

≡ ≡ ≡ ≡ ≡ ≡

202601

06/15/26

≡ ≡ ≡ ≡ ≡

202602

07/15/26

≡ ≡ ≡ ≡ ≡

202603

08/17/26

≡ ≡ ≡ ≡ ≡ ≡ ≡

202604

09/15/26

≡ ≡ ≡ ≡ ≡ ≡ ≡

202605

10/15/26

≡ ≡ ≡ ≡ ≡ ≡ ≡

202606

11/16/26

≡ ≡ ≡ ≡ ≡ ≡ ≡

202607

12/15/26

≡ ≡ ≡ ≡ ≡ ≡

202608

01/15/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202609

02/16/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202610

03/15/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202611

04/15/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202612

05/17/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

Exceptions & meaning →

Due Dates - Form 5558 for Form 5500 Series and Form 8955-SSA

The Return Due date is the last day of the seventh month after the Plan Year Ending date.

Exceptions & meaning →

Note:

When the return due date falls on the weekend or holiday or both, the return due date will be the next business day.

Plan Year Ending

Return Due Date (Adjusted for weekends and holidays)

≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡ ≡

202606

02/01/27

≡ ≡ ≡ ≡ ≡

202607

03/01/27

≡ ≡ ≡ ≡ ≡ ≡

202608

03/31/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202609

04/30/27

≡ ≡ ≡ ≡ ≡

202610

06/01/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202611

06/30/27

≡ ≡ ≡ ≡ ≡ ≡ ≡

202612

08/02/27

≡ ≡ ≡ ≡ ≡ ≡

202701

08/31/27

≡ ≡ ≡ ≡ ≡ ≡

202702

09/30/27

≡ ≡ ≡ ≡ ≡

202703

11/01/27

≡ ≡ ≡ ≡ ≡ ≡

202704

11/30/27

≡ ≡ ≡ ≡ ≡ ≡

202705

01/03/28

≡ ≡ ≡ ≡ ≡ ≡ ≡

Exceptions & meaning →

Guidelines for Acceptable Reason for Needing an Extension of Time to File - Used for…

Unavoidable absence of the taxpayer or of the individual having sole authority to sign or execute the return.

Exceptions & meaning →

Note:

Taxpayer planning a vacation at the time the return is due is not an acceptable reason.

Taxpayer needs additional time to file a complete and accurate return or is unable to obtain records necessary to prepare the return for reasons beyond their control.

Exceptions & meaning →

Note:

Taxpayer cannot pay tax due at this time is not an acceptable reason.

Taxpayer is unable to obtain one or more Forms W-2 from an employer and has no other available records for wages and tax withheld.

Business changes such as merger, dissolution, bankruptcy, etc. which have raised complicated issues which cannot be resolved in time to permit filing by the due date.

Erroneous information was given to the taxpayer, or their tax practitioner, by an IRS employee resulting in a need for additional time to file.

The taxpayer's records are not available due to an IRS audit examination.

Death or serious illness of the taxpayer or an immediate family member, or the practitioner or key member of the staff, or the business individual having sole authority to sign or execute the return.

Exceptions & meaning →

Note:

Inability of the practitioner to secure competent help in sufficient time to cope with the planned workload is not an acceptable reason.

Destruction of the taxpayer's records by fire, flood, hurricane, earthquake, or other natural disaster.

Civil disturbance (war or disturbance governed by martial law).

Taxpayer (organization) is working with software vendor(s) in order to file their return electronically.

Exceptions & meaning →

Error Code 026 - Form 8868, Part II

Note:

If you determine the Field 01TXP needs changing, before making any correction, you must determine timeliness based on the corrected Tax Period.

If

Then

the Tax Period is not transcribed and/or edited correctly,

enter the correct information in 01TXP.

the MFT is 36 or 37 (Form 1041-A and Form 5227),

the Tax Period must be 12 in 01TXP.

the TIN is not transcribed correctly,

make necessary corrections to Field 01TIN.

the extension is for a short period with the initial, final or change of accounting period box checked or there is an acceptable explanation (IRC Section or Rev. Proc.) quoted,

enter W in Field 01CCC.

researching INOLES and ENMOD shows the FYM agrees with the FYM on the extension,

enter Clear Code C.

there is a pending TC 016, 052, 053, 054, or 055 that will change the FYM to agree with the FYM on the extension,

enter Clear Code C.

researching BMFOLI shows no returns posted to tax module(s) prior to the extension,

this is an initial filing, enter W in Field 01CCC.

researching BMFOLI shows returns posted to various FYMs,

correspond for clarification of the accounting period.

Exceptions & meaning →

Note:

Do not correspond on disapproved extensions. Follow No Reply Instructions in IRM 3.11.20.12.7.3.4.1.

the extension has prior posting for the same FYM, and a TC 150 is posted for the current year,

SSPND 351, attach Form 4227 and route to Reject Correction. Rejects will check for posted TC 460 for current year.

If posted, SSPND 480 as early filed.

If not posted, change FYM to match underprint.

the postings are for the same FYM that is different from the FYM on the extension, and there is no TC 150 posted for the current year,

change the 01TXP to the current year and bring up the underprint month. If this makes the extension late, enter "2" in Field 01NOT and bring up the underprint for 01TXP.

NOTE: For 8868 Only. If the extension was originally disapproved for late filing, and after following the correction procedures the extension is now found to be timely filed, refer to IRM 3.11.20.12.7.3.4 (4)(a) for correction procedures.

Replies to Correspondence

If reply

Then

agrees with the FYM underprint and the extension is timely for the underprinted Tax Period,

change 01TXP and the Tax Period on the document to agree with the reply.

does not agree with the FYM underprint and the reply includes an approved Form 1128 or a date the accounting period changed was approved,

SSPND 320 to Entity to update the FYM on Master File.

does not agree with the FYM underprint and the reply quotes an IRC Section or Rev. Proc. to explain the change or indicate the extension is for a final return,

enter W in Field 01CCC.

is inconclusive,

work as a No Reply.

No Replies to Correspondence

If

Then

BMFOLT shows a TC 460 posted for the Tax Period of the extension,

change 01TXP to next processing year. SSPND 480 and hold as Early Filed.

changing the FYM to the current processing year will make the extension late filed,

Enter "2" in Field 01NOT.

Change 01TXP to the current processing year and bring up the underprint.

changing the FYM to the current processing year will not make the extension late filed,

change the FYM to the current processing year and bring up the underprint.

Exceptions & meaning →

Disaster Extension Due Dates - Alphabetical by State

If the extension request is due on or after the disaster period begin date and on or before the disaster end date, consider the request timely filed if postmarked on or before the end date if the address on the extension is from the state listed, or the applicable FEMA number or disaster designation is notated on the extension or an attachment. Follow normal timely extension procedures for processing.

Exceptions & meaning →

Note:

Emergency Measures (EM) Declaration and Disaster Relief (DR) Declaration both constitute federally declared disasters and can result in postponed deadlines. For FEMA disaster events that are expired or removed from the chart, see FEMA for IRS Disaster Memos & Declarations by Calendar Year.

State

Begin Date

End Date

FEMA #

Designation

Alabama

09/22/2024

05/01/2025

3618-EM

Alabama/Hurricane Helene

Alaska

10/08/2025

05/01/2026

4893-DR

Alaska/Severe Storms, Flooding and remnants of Typhoon Halong

Alaska

08/05/2024

05/01/2025

4836-DR

Alaska/Flooding

Arizona

10/10/2025

09/28/2026

4911-DR

Arizona/Severe Storms and Flooding

Arizona*

08/22/2024

02/03/2025

4840-DR

Arizona/Flooding

Arizona*

07/10/2024

02/03/2025

4833-DR

Arizona/Watch Fire

Arkansas

04/02/2025

11/03/2025

3627-EM

Arkansas/Severe Storms, Tornadoes, and Flooding

California

01/07/2025

10/15/2025

4856-DR

California/Wildfires & Straight-line Winds

Florida*

09/23/2024

05/01/2025

4828-DR

Florida/Hurricane Helene

Florida*

10/05/2024

05/01/2025

3623-EM

Florida/Hurricane Milton

Florida*

10/05/2024

05/01/2025

3622-EM

Florida/Hurricane Milton

Florida*

09/23/2024

05/01/2025

3615-EM

Florida/Tropical Storm Helene

Georgia

04/18/2026

08/20/2026

SD-0009-DR

Georgia/Wildfires

Georgia*

09/24/2024

05/01/2025

3616-EM

Georgia/Hurricane Helene

Hawaii

03/10/2026

08/20/2026

SD-0007-DR

Hawaii/Flooding and Mudslides

Illinois

07/13/2024

02/03/2025

4819-DR

Illinois/Severe Storms, Tornadoes, Straight-line Winds, and Flooding

Israel*

10/07/2023

09/30/2026

SecT-0001-DR

Israel/Terrorist Attacks

Israel*

10/07/2023

09/30/2025

SecT-0001-DR

Israel/Terrorist Attacks

Israel*

10/08/2024

09/30/2026

SecT-0002-DR

Israel/Terrorist Attacks

Israel*

09/30/2024

09/30/2025

SecT-0002-DR

Israel/Terrorist Attacks

Israel*

09/30/2025

09/30/2026

SecT-0003-DR

Israel/Terrorist Attacks

Kentucky*

05/16/2025

11/03/2025

4875-DR

Kentucky/Severe Storms, Straight-line Winds, and Tornadoes

Kentucky*

04/02/2025

11/03/2025

4864-DR

Kentucky/Severe Storms, Straight-line Winds, Tornadoes, Flooding, Landslides, and Mudslides

Kentucky*

02/14/2025

11/03/2025

3624-EM

Kentucky/Severe Storms, Straight-line Winds, Flooding, and Landslides

Leech Lake Band of Ojibwe (Tribal Nation)

06/21/2025

02/02/2026

4894-DR

Leech Lake Band of Ojibwe/Severe Storms and Straight

Louisiana

01/22/2026

03/31/2026

SD-0004-DR

Louisiana/Cold Weather

Louisiana

09/10/2024

02/03/2025

3614-EM

Louisiana/Tropical Storm Francine

Mississippi

01/23/2026

06/08/2026

4899-DR

Mississippi/Severe Winter Storm

Mississippi

05/14/2025

11/03/2025

4874-DR

Mississippi/Severe Storms, Straight-line Winds, Tornadoes, and Flooding

Missouri*

03/30/2025

03/30/2026

4872-DR

Missouri/Severe Storms, Straight-line Winds, Tornadoes, and Flooding

Missouri*

05/16/2025

11/03/2025

4877-DR

Missouri/Severe Storms, Straight-line Winds, Tornadoes, and Flooding

Missouri*

03/14/2025

11/03/2025

4867-DR

Missouri/Severe Storms, Straight-line Winds, Tornadoes, and Wildfires

Montana*

12/17/2025

09/28/2026

4914-DR

Montana/Severe Winter and Straight-line Winds

Montana*

12/17/2025

09/28/2026

4915-DR

Montana/Severe Winter and Straight-line Winds

Montana*

12/10/2025

05/01/2026

3630-EM

Montana/Severe Storms and Flooding

Montana (Tribal Nation: Crow Tribe of Montana)

08/06/2024

02/03/2025

4847-DR

Crow Tribe of Montana/Severe Storm and Straight-line Winds

New Mexico*

06/23/2025

02/02/2026

4886-DR

New Mexico/Severe Storms, Flooding, and Landslides

New Mexico*

06/23/2025

02/02/2026

3628-EM

New Mexico/Severe Storms, Flooding, and Landslides

New Mexico

10/19/2024

05/01/2025

4843-DR

New Mexico/Severe Storms and Flooding

New York* (Tribal Nation: Saint Regis Mohawk Tribe)

08/08/2024

02/03/2025

4818-DR

Saint Regis Mohawk Tribe/Severe Storms and Flooding

North Carolina*

09/25/2024

09/25/2025

4827-DR

North Carolina/Hurricane Helene

North Carolina*

09/25/2024

05/01/2025

3617-EM

North Carolina/Hurricane Helene

Northern Mariana Islands

04/11/2026

11/02/2026

4910-DR

Northern Mariana Islands/Super Typhoon Sinlaku

Oklahoma

03/14/2025

11/03/2025

4866-DR

Oklahoma/Wildfires and Straight-line Winds

Pennsylvania

08/09/2024

02/03/2025

4815-DR

Pennsylvania/Tropical Storm Debby

Sisseton-Wahpeton Oyate (Tribal Nation)

06/12/2025

02/02/2026

4890-DR

Sisseton-Wahpeton Oyate/Severe Storms and Flooding

South Carolina*

09/25/2024

05/01/2025

4829-DR

South Carolina/Hurricane Helene

South Carolina*

09/25/2024

05/01/2025

3619-EM

South Carolina/Hurricane Helene

South Dakota (Tribe Nation: Cheyenne River Sioux Tribe)

07/13/2024

02/03/2025

4842-DR

Cheyenne River Sioux Tribe/Severe Storms, Straight-line Winds, and Flooding

Tennessee

01/22/2026

06/08/2026

SD-0005-DR

Tennessee/Winter Storm Fern or Winter Storm

Tennessee*

04/02/2025

11/03/2025

3625-EM

Tennessee/Severe Storms, Straight-line Winds, Tornadoes, and Flooding

Tennessee*

09/26/2024

05/01/2025

4832-DR

Tennessee/Tropical Storm Helene

Tennessee*

09/26/2024

05/01/2025

3620-EM

Tennessee/Tropical Storm Helene

Texas*

07/02/2025

02/02/2026

4879-DR

Texas/Severe Storms, Straight-line Winds, and Flooding

Texas*

03/26/2025

11/03/2025

4871-DR

Texas/Severe Storms and Flooding

Virginia*

02/10/2025

11/03/2025

4863-DR

Virginia/Severe Winter Storms and Flooding

Virginia*

09/25/2024

05/01/2025

4831-DR

Virginia/Tropical Storm Helene

Virginia*

09/25/2024

05/01/2025

3621-EM

Virginia/Post-Tropical Cyclone Helene

Washington

12/05/2025

08/05/2026

4906-DR

Washington/Severe Storms, Straight-line Winds, Flooding, Landslides, and Mudslides

Washington

12/09/2025

05/01/2026

3629-EM

Washington/Severe Storms, Straight-line Winds, Flooding, Landslides, and Mudslides

Washington

06/22/2024

02/03/2025

4823-DR

Washington/Confederated Tribes and Bands of the Yakama Nation Wildfires

West Virginia*

06/14/2025

02/02/2026

4884-DR

West Virginia/Severe Storms, Straight-line Winds, Flooding, Landslides, and Mudslides

West Virginia*

09/25/2024

05/01/2025

4851-DR

West Virginia/Post-Tropical Storm Helene

West Virginia*

02/15/2025

11/03/2025

4861-DR

West Virginia/Severe Storm, Straight-line Winds, Flooding, Landslides, and Mudslides

Wisconsin

08/09/2025

02/02/2026

4892-DR

Wisconsin/Severe Storms, Straight-line Winds, Flooding, and Mudslides

Disaster periods may sometimes overlap if there are multiple disasters that occur in a state. Process the extension request as timely if postmarked on or before the last end date for that state. Overlapping dates are indicated with an asterisk () by the state's name.

Exceptions & meaning →

Prior Year MFT and Return Code Conversion Chart

This is a conversion chart of the prior year MFT and Return Codes on Form 8868.

Prior Year MFT/Return Code Chart

Form

MFT

Return Code

Form 990 or Form 990-EZ

67

01

Form 990-BL

56

02

Form 4720 (individual)

50

03

Form 990-PF

44

04

Form 990-T (sec. 401(a) or 408(a) trust)

34

05

Form 990-T (trust other than above)

34

06

Form 990-T (corporation)

34

07

Form 1041-A

36

08

Form 4720 (other than individual)

50

09

Form 5227

37

10

Form 6069

57

11

Form 8870

N/A

12*

*Note: If Return Code is 12, send to TE/GE Mail Stop 1110.

Exceptions & meaning →

Form 8868 T-Lines

These are the T-Lines and locations on Form 8868 with return codes 01, 03-12 or 15.

T-LINE

LOCATION

Notice Code

Middle top margin

1 Approved

2 Denied (not timely)

Tax Period (YYMM)

Top margin, right of form title

Name Control

Name of exempt organization or other filer

Employer Identification Number (EIN)

Taxpayer identification number (TIN) box

Return Code

Return Code Box (edited in the right margin next to the type of return to be filed on prior versions)

Exceptions & meaning →

Note:

If return code is 12, send to TE/GE, Mail Stop 1110.

Received Date (MMDDYY)

Middle of Form

Group Code

Exceptions & meaning →

Note:

Form 990 Filers only

Right Margin by Line 1

Action Code

Bottom Left Margin

Exceptions & meaning →

Form 5558 T-Lines for Form 5500 Series and Form 8955-SSA

These are Form 5558 T-Lines and Locations for Form 5500 Series and Form 8955-SSA.

T-LINE

LOCATION

Notice Code

Middle Top Margin

1 Approved

2 Denied (not timely)

Tax Period (YYMM)

Top Margin, right of Form Title

EIN

Part I, Box B

Name Control

Part I, Section A

Plan Number

Part I, Section D, Three-digit Plan Number (PN) box. If the plan # is missing, or is more or less than 3 digits, edit Action Code 320, attach Form 4227 and route to Entity Control.

Action Code

Bottom Left Margin

Exceptions & meaning →

Form 8868 T-Lines for Form 5330

This is Form 8868 T-Lines for Form 5330 with return codes 13 or 14 only.

T-LINE

LOCATION

Notice Code

Middle Top Margin

3 Approved

4 Not timely

8 Timely Filed but not signed

9 Timely Filed & Signed, but No Reason

Determine timeliness by the code indicated on Part III, Line 1a. If NO code is entered, edit Action Code 211 and initiate correspondence for the code section using Letter 3938C, Form 5330 Incomplete for Processing.

Tax Period (YYMM)

Top margin, right of form title.

TIN Type

Edit right of Taxpayer Identification Number box

"0" if SSN is present

Plan Number

Part I, Plan number, located below return code boxes. The plan number cannot be blank or 000. If it meets this criteria, edit Action Code 320, attach Form 4227 and route to Entity Control.

Received Date (MMDDYY)

Middle of Form

Remittance

Part III, Line 1b

Action Code

Bottom Left Margin

Exceptions & meaning →

Form 5558 Conversion for Form 5500 series and Form 8955-SSA

This conversion chart is for Form 5558 (Rev 9-2018) and prior year.

Convert Form 5558 (Rev 9-2018) and prior year

To

Line C, Plan Number

Line D

Exceptions & meaning →

Form 8868 - Part II Conversion

This is Form 8868 (Rev January 2014), Part II Conversion chart.

Form 8868 Revision January 2014 Part II

Change to Form 8868 (Rev 1-2025) Part II Line:

Line 4 and 5

Line 1

Line 6

Line 2

Line 7

Not Applicable

Line 8a

Line 3a

Exceptions & meaning →

Action Codes

for Error Resolution are used for the following:

Valid and invalid codes

An indication specific information is missing

A record will be rejected from processing

Sending correspondence to the taxpayer

A specific in-house research or action is required

Exceptions & meaning →

Note:

Function abbreviations are as follows: EC= Error Correction, CE=Code and Edit, S=Suspense Correction, and GEN=Computer Generated.

Action Codes Chart

Action Codes:

Description:

Suspense Period:

Function Used In:

001

Input Document

0

EC

211

First Correspondence

40

CE, EC, S

212

Second Correspondence

25

CE, EC, S

213

Correspondence to other

40

CE, EC, S

215

International Correspondence

45

CE, EC, S

220

Correspondence Input

21

CE, EC, S

225

Signature Only-Domestic

40

CE, EC, S

226

Signature Only-International

45

CE, EC, S

300

Fuel Tax Credit

10

CE, EC, S

310

Statute Control

10

CE, EC, S

320

Entity Control

10

CE, EC, S

331

Frivolous Filer Review

3

CE, EC

332

QRDT Review

3

CE, EC

333

Prompt Audit

10

CE, EC, S

334

Joint Committee

10

CE, EC, S

335

Frivolous Filer Case

10

CE, EC, S

336

QRDT

10

CE, EC, S

337

Other CID

10

CE, EC, S

341

Manual Refund

10

CE, EC, S

342

Credit Verification

10

CE, EC, S

343

Other Accounting

10

CE, EC, S

344

Manual Refund by ERS

0

EC

351

TIN Research

0

EC, S

352

Name Research

3

CE, EC, S

353

Address Research

3

CE, EC, S

354

Filing Requirement Research

3

CE, EC, S

355

Other MFTRA Research

5

CE, EC, S

360

Other In-House Research

10

CE, EC, S

370

Examination

10

CE, EC, S

380

Amended-Consolidated

30

CE, EC, S

383

1040EZ Audit Code

0

CE

410

Technical Assistance

0

EC

420

Management Suspense—A

5

CE, EC, S

430

Management Suspense—B

10

CE, EC, S

440

Management Suspense—C

15

CE, EC, S

450

Management Suspense—D

20

CE, EC, S

460

Management Suspense—E

25

CE, EC, S

470

Complex Error Codes

0

EC, S

480

Early Filed

150

CE, EC, S

490

System Problem

5

EC, S

510

Missing Document

0

CE

511

Missing Document 1st Suspense

25

EC, S

512

Missing Document 2nd Suspense

20

S

513

Missing Document 3rd Suspense

20

S

515

Missing Document Short Term

5

EC, S

550

Mag Tape Attachments

3

CE

551

Mag Tape Inconsistent Data

3

CE

610

Renumber

0

CE, EC

611

Renumber with-remit

0

CE, EC

620

ANMF/Non-ADP

0

CE, EC

630

Reinput

0

EC

640

Void

0

CE, EC

650

International

0

CE, EC

651

International-AUSPC

0

CE, EC

660

Data Control Delete (TEP Delete)

0

CE, EC, GEN

670

Rejected Missing Documents

0

EC, S

700

Duplicate Block DLN

0

GEN

711

Duplicate Document DLN from CE

NA

GEN

712

Duplicate Document DLN from Error

NA

GEN

713

Duplicate Document DLN from Unpostables

NA

GEN

714

Duplicate Document DLN from Unworkable Suspense

NA

GEN

715

Duplicate Document DLN from Workable Suspense

NA

GEN

900

Unpostable Record

0

GEN

Exceptions & meaning →

Return Codes and MFT Codes

The Organization’s filing requirement is determined by the form they file below. The two-digit return code for Form 8868 is transcribed from the return code box below the name and address section.

Exceptions & meaning →

Note:

A return code

MUST be present. The MFT code and extended return due date are generated based on the return code. Always convert prior-year-return revisions using the current year T-Lines; see Exhibit 3.11.20-9, Prior Year MFT/Return Code Conversion Chart.

Return Codes and MFT Codes

Return

Return Code

MFT Code

Return

Return Code

MFT Code

Form 990 or Form 990-EZ

01

67

Form 4720 (other than individual)

09

50

Form 4720 (individual)

03

50

Form 5227

10

37

Form 990-PF

04

44

Form 6069

11

57

Form 990-T (sec. 401(a) or 408(a) trust)

05

34

Form 8870)

12*

N/A

Form 990-T (trust other than above)

06

34

Form 5330 (individual)

13

76

Form 990-T (corporation)

07

34

Form 5330 (other than individual)

14

76

Form 1041-A

08

36

Form 990-T (Governmental Entities)

15

34

Exceptions & meaning →

Note:

*If Return Code is 12, send to TE/GE Mail Stop 1110.

More Internal Revenue Manual

Share

Facebook

Twitter

Linkedin

Print

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Internal Revenue Manual Part 3. Submission Processing

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.