Skip to content

Appendix 2 Quality Control Plans and Identity of Interest

B. Production tracking:

HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-07-29 · United States

  1. As part of the annual QC review, MAP Lenders must track all MAP loans presented or processed by individual loan originators and Underwriters. The term loan originator includes mortgage broker, loan correspondent or loan consultant. No later than June 30th of each year, the MAP Lender must submit an electronic copy of its production tracking report to COB. Annual production tracking reports for each Underwriter must include the following information:

    • FHA number;

==> picture [8 x 6] intentionally omitted <==

MAP Guide, March 2021 Go to beginning of Appendix 2

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Appendix 2 Page A2-7

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 2 Quality Control Plans and Identity of Interest A.2.1 Lender Quality Control Plans and Identity of Interest Examples

Go to Table of Contents

==> picture [8 x 9] intentionally omitted <==

  • Project name (identification);

  • Initial/ Final Endorsement Dates;

==> picture [7 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Mortgage Insurance Program (MIP);

  • Original principal balance;

==> picture [8 x 6] intentionally omitted <==

==> picture [6 x 9] intentionally omitted <==

  • Loan Servicer;

  • Loan status;

==> picture [8 x 8] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

Whether the loan has any of the following issues:

  - 1) Waivers 

  - 2) Master Lease 

  - 3) Is located in an Underserved Area 

  - 4) Criterion 5 (debt service) controlled mortgages 

  - 5) Any government housing subsidies (i.e. LIHTC, Section 8, etc.) 
  • C. QC Plan reviews
  1. The QC Plan review must evaluate the Lender’s overall QC Plan for adequacy. It should include an analysis of:

    • The Lender’s operation and its compliance with the QC Plan;

==> picture [8 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Whether the Lender’s QC Plan incorporates a system that is adequate to ensure that FHA underwriting and servicing requirements are followed;

Whether the Lender is following the QC Plan it has adopted;

==> picture [7 x 6] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Whether the Lender has completed the correct number of loan audit reviews; and

  • Whether the Lender is adequately staffed to implement the QC Plan.

==> picture [8 x 6] intentionally omitted <==

  • D. QC loan file and commitment reviews:
  1. The QC review must include reviews of individual loan files and commitments, as follows:

    • For MAP Lenders with a total of 20 or more MAP Firm Commitments in the applicable year of review, reviews must be completed for 5% of all closed loans. The maximum number of required loan reviews will be the lesser of 5% of all closed loans or three reviews.

==> picture [8 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • MAP Lenders with fewer than 20 Firm Commitments in the applicable year of review must perform one QC loan review.

  • The required number of QC reviews will be performed on loans with the greatest Risk Assessment Score as defined below.

==> picture [7 x 7] intentionally omitted <==

  1. MAP Lenders are not required to perform a QC review for each Section of the National Housing Act used.

MAP Guide, March 2021 Go to beginning of Appendix 2

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Appendix 2 Page A2-8

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 2 Quality Control Plans and Identity of Interest A.2.1 Lender Quality Control Plans and Identity of Interest Examples

Go to Table of Contents

  1. MAP Lenders are not required to perform a QC review for each Underwriter, so long as the minimum prescribed number of loans is reviewed. QC reviews shall evaluate the quality of work performed by the MAP originators, Underwriters, and technical staff and/or third-party contractor(s).

  2. All appraisals reviewed must receive a field review performed by either a qualified senior staff member not involved in origination or underwriting or by a review appraiser employed on a contract basis.

  3. For QC reviews involving new construction/substantial rehabilitation projects, the review should provide an analysis of whether MAP construction loan servicing policies and requirements have been met.

  4. The review appraiser or appraisal firm performing the QC appraisal review may not have provided appraisal services for any MAP loans underwritten by the Lender.

  • E. QC loan ranking factors and review selection:
  1. The QC reviewer will assign a risk assessment score to each loan originated in the previous reporting cycle and loan reviews will be targeted to loans with the highest scores that therefore represent the greatest degree of risk to the Department. Points are cumulative and will be assigned for the following risk indicators:
Risk Indicators Scores
Loans that are troubled, defaulted or assigned 20 Points
Mortgage amounts over $15,000,000 15 Points
Mortgage amounts over $10,000,000 10 Points
Mortgage amounts over $5,000,000 5 Points
Mortgage amount over $1,000,000 1 Point
New Construction Loans 15 Points
Substantial Rehabilitation Loans 10 Points
Acquisition Loans 5 Points
Refinance Loans 1 Point
Loans that are not typical in size (low or high 5 Points
number of units)
Loans in which Criterion 5, Debt Service Coverage, 5 Points
established the Maximum Loan Amount
Loans underwritten by MAP Underwriters who were 10 Points
initially approved within the last three years
Loans underwritten by MAP Underwriters with a 10 Points
loan default in the previous three reporting cycles
Loans that have waivers 5 Points

MAP Guide, March 2021 Go to beginning of Appendix 2

Bookmarked Version

Appendix 2 Page A2-9

Go to Acronym and Abbreviation List, Glossary, Index

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 2 Quality Control Plans and Identity of Interest A.2.1 Lender Quality Control Plans and Identity of Interest Examples

Go to Table of Contents

Risk Indicators Scores Unsubsidized, market rate properties 5 Points Properties with a Master Lease 10 Points

  • F. QC Reviews of assigned or problem loans
  1. In addition to the above review requirements, as part of the QC review process, the originating MAP Lender must also undertake a comprehensive review and re-examination of any MAP loan it underwrote that is assigned either during construction or within four years after Final Endorsement. This must be done in all cases, including those in which the MAP Lender no longer has the loan in its portfolio. If the originating Lender does not initiate the review, COB may direct that the review be performed. In addition to all other requirements of a QC review outlined herein, reviews of assigned loans shall include the following:

    • A timeline spanning application engagement to assignment of the loan, and should identify the dates of pertinent actions and events, such as the date of engagement, application submission, firm commitment, initial endorsement and should identify the date of the events that are determined to have contributed to the assignment (for ex, loss of the Management Agent, contractor walk-off, etc.).

==> picture [8 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Identification of all parties or entities involved in preparing and processing the application, including:

      1. Principals of the Borrower, sponsoring entity(ies), and development team members;
      • a) The property Management Agent;

      • b) The Lender’s originator(s) or loan correspondent(s);

      • c) The Lender’s Underwriter(s); and

      • d) Third party contractors that worked on the application.

  • An analysis of the probable cause of the assignment, including identifying all relevant contributory factors. To the extent possible, the reviewer should interview the project’s owner, the originating Lender’s Underwriter and the HUD processing center familiar with the application and include an analysis of each party’s opinion of the probable cause of default, reconciled with the reviewer’s opinion of the cause. The review and re-examination must include a reunderwriting of the loan given the currently known facts and circumstances that contributed to the assignment and discuss the lessons learned from the assignment.

==> picture [7 x 6] intentionally omitted <==

  • G. Specific Requirements for QC Reviews of Loan Underwriting
  1. Each individual loan review must be a written, self-contained analysis whose purpose is to determine the accuracy and completeness of the underwriting conclusions, third-party deliverables and loan documentation. Each portion of the review should contain sufficient information to ascertain the level of analysis performed and the conclusions developed. The appraisal review is to be prepared to USPAP review standards. The underwriting review must provide sufficient documentation to ascertain that the reviewer has evaluated the Underwriter’s identification of the project strengths, weaknesses, risks and mitigants in all technical areas and overall. For the underwriting portion of the

MAP Guide, March 2021 Go to beginning of Appendix 2

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Appendix 2 Page A2-10

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 2 Quality Control Plans and Identity of Interest A.2.1 Lender Quality Control Plans and Identity of Interest Examples

Go to Table of Contents

review, at a minimum, the following requirements must be met for loans underwritten using the MAP procedures:

  • All processing and underwriting must comply with the applicable provisions of the NHA, Title 24 of the Code of Federal Regulations, the MAP Guide and MAP FAQs.

==> picture [8 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • All Identity of Interest certifications were properly filed. Review the loan closing statement to determine if any inappropriate inducements or prohibited IOI disbursements were paid. Confirm that the MAP lender’s loan consultants, correspondents or mortgage brokers have certified to the lender that no Identity of Interest or Conflict of Interest exists with the Borrower/Sponsor.

  • Determine whether each loan file contains all HUD required loan processing, underwriting and legal documents including supporting reports, and that all required documents were provided to HUD with the application.

==> picture [7 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Determine if there was a violation of the Department's prohibition of referral fees paid to a party who is not a loan consultant, loan correspondent or mortgage broker.

  • Determine if anything of value was paid directly or indirectly to any person or entity who has received any other compensation from the mortgagor, seller, builder or any other person for services related to the transaction or related to the purchase or sale of the mortgaged property. Exceptions can be made where services were actually rendered, the name of the broker is furnished and there is no Identity of Interest between the mortgagee and the broker or the mortgagor and the broker. The broker’s fee must be included on the Mortgagee Certificate.

==> picture [8 x 6] intentionally omitted <==

==> picture [6 x 9] intentionally omitted <==

  • Determine if staff allowed third parties to represent the MAP Lender in meeting(s) with the HUD area office to discuss specific MAP project issues.

  • Determine if excess and unallowable fees are being charged to mortgagors. Examples include charging discount points not disclosed on the Mortgagee’s Certificate, form HUD-2434, or at Firm Commitment, or charging higher fees than are permitted by HUD/FHA.

==> picture [8 x 9] intentionally omitted <==

==> picture [8 x 8] intentionally omitted <==

  • If new construction or substantial rehabilitation, did the pre-application submission include an acceptable narrative summary of the market study and the extent of market competition, and describe any features of the proposal which may present issues, such as zoning, ground leases and environmental conditions?

    • Did the Lender’s pre-application submission list the proposed MAP Lender reviewers? Were any proposed reviewers rejected by the Regional Office, and, if so, why?

==> picture [5 x 8] intentionally omitted <==

  • In the application for the Firm Commitment, did the Lender provide a narrative analysis which discussed the characteristics of the project for which mortgage insurance was sought, presenting the reasons that the Lender recommended the loan for mortgage insurance?

==> picture [6 x 11] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Did the Lender’s narrative analysis for the Firm Commitment application discuss the risk factors?

==> picture [5 x 9] intentionally omitted <==

  • Did the narrative analysis for the Firm Commitment application properly evaluate the multifamily housing experience and financial capacity of the principals of the Borrower?

  • If the application is for a refinancing or purchase loan, did the narrative provide a satisfactory description of the property?

==> picture [11 x 7] intentionally omitted <==

MAP Guide, March 2021 Go to beginning of Appendix 2

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Appendix 2 Page A2-11

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 2 Quality Control Plans and Identity of Interest A.2.1 Lender Quality Control Plans and Identity of Interest Examples

Go to Table of Contents

  • Did the Lender’s narrative provide a satisfactory analysis of the market, the rents, expenses and, for new construction projects, the estimated rent-up costs and operating deficit?

==> picture [8 x 7] intentionally omitted <==

Did the Lender determine the adequacy of the reserve for replacement?

==> picture [8 x 7] intentionally omitted <==

  • Did the Underwriter recommend any changes to the appraisal or technical reports’ findings, conclusions and/or recommendations? If so, what were they, what was the justification and was it documented fully and supported by data?

==> picture [8 x 9] intentionally omitted <==

  • At the Lender’s request, were any waivers requested from the HUD field office for any MAP requirements? If so, was the request approved or rejected, what requirements were waived and what were the justifications for the waivers?

==> picture [8 x 9] intentionally omitted <==

  • Did the Lender obtain the necessary certifications from the individual reviewers?

==> picture [7 x 6] intentionally omitted <==

  • Did the Lender certify that the proposed loan represented an acceptable risk to the Department (Section 220, or 221d3, 221d4 or 231) or is economically sound (Section 223(f)), based upon the Lender’s analysis, and that the loan complied with all FHA statutory, regulatory and administrative requirements?

==> picture [7 x 7] intentionally omitted <==

  • Did the Lender prepare a Master HUD 92264 signed by the Lender’s Underwriter?

==> picture [7 x 8] intentionally omitted <==

  • Did the Lender submit an application for a Firm Commitment within 120 days of the date of the invitation letter? If not, did it request an extension and provide justification for the request?

==> picture [8 x 7] intentionally omitted <==

  • Were credit reports obtained on all businesses, individuals and on all required principals who are parties to the transaction?

==> picture [9 x 7] intentionally omitted <==

    1. Determine whether the loan file contains a comprehensive analysis of the borrowing entity to identify the business and individual credit report(s) that are required on the appropriate principals of the borrowing entity, Sponsor, mortgagor and General Contractor, if applicable.
    1. Determine if more than one credit report was ordered on the same principal/company and, if so, whether the most current credit reports were submitted with the loan application.
    1. Determine whether any outstanding judgments shown on the credit report(s) were accompanied by an explanation and supporting documentation. If delinquent Federal debt existed, the Lender must have included a letter from the Federal agency in accordance with Chapter 8, Section 8.3.3 of the MAP Guide.
  • Determine whether verifications of deposit and trade references were sent, received and considered in the project underwriting.

==> picture [12 x 7] intentionally omitted <==

  • Determine whether all conflicting information or discrepancies were reconciled and properly documented in writing.

==> picture [9 x 7] intentionally omitted <==

  • Determine that the loan file contains a financial statement(s) on the principals, Sponsor, and on the mortgagor. If the project involved new construction or substantial rehabilitation, determine if a financial statement was obtained from the General Contractor.

==> picture [9 x 9] intentionally omitted <==

  • Determine that the financial statements were analyzed following generally accepted business practices to determine financial capability.

==> picture [7 x 6] intentionally omitted <==

MAP Guide, March 2021 Go to beginning of Appendix 2

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Appendix 2 Page A2-12

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 2 Quality Control Plans and Identity of Interest A.2.1 Lender Quality Control Plans and Identity of Interest Examples

Go to Table of Contents

  • Verify that the MAP Underwriter determined that the Sponsor and/or General Contractor had a sufficient level of experience for the type and/or size of project that was approved.

==> picture [13 x 7] intentionally omitted <==

==> picture [14 x 9] intentionally omitted <==

  • Determine if all material negative information about the project and individuals or entities involved in the transaction was disclosed to HUD in the Underwriter’s written summary.

  • Determine if the MAP Underwriter performed QC over the work of the MAP Lender’s other staff and/or third-party contractors which participated in underwriting the project, and determine if:

==> picture [12 x 7] intentionally omitted <==

    1. The preparers of the forms/reports/reviews are qualified as required by the MAP Guide, and have insurance, if required by the Guide.
    1. The forms/reports/reviews were prepared in the manner required by the MAP Guide and that the forms/reports/reviews are complete and accurate.
    1. The proposed loan represents an acceptable risk based on the Underwriter’s review and analysis.
    1. The required reports and documentation flowed in a timely manner from one discipline to another.

==> picture [14 x 9] intentionally omitted <==

  • Determine whether the Underwriter analyzed the project’s proposed management plan, including a review of the Management Agent’s past experience, capacity and track record, to assure that the development would be managed in a prudent, efficient and cost-effective manner.

  • Determine if the Underwriter verified that the professional used in the environmental review was qualified for the assigned responsibilities.

==> picture [13 x 7] intentionally omitted <==

==> picture [9 x 9] intentionally omitted <==

  • Determine if the Underwriter provided HUD with a narrative report and supporting documentation that addressed all HEROS (HUD Environmental Review Online System) requirements, including the Phase I Environmental Site Assessment (ESA) and the Phase II ESA, if required.

Determine if the loan met the criteria for a reduced MIP for Green Building loans.

==> picture [13 x 9] intentionally omitted <==

==> picture [14 x 8] intentionally omitted <==

  • Determine the scope of any deficiencies that were identified by the HUD review staff. Did the initially submitted Firm Commitment and/or closing package substantially meet HUD’s requirements or were significant revisions required? Did any deficiencies they identified significantly impact the overall processing?

  • H. Specific Requirements for QC Reviews of Appraisals:

  1. For the appraisal review portion of the QC review, the following must be performed:

    • Determine if the appraiser was properly certified in the appropriate jurisdiction where the property is located. (Temporary certifications may be acceptable so long as the appraiser meets all competency requirements).

==> picture [8 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

Provide the review appraiser’s opinion as to the completeness of the material under review.

  • For Section 220, 221(d), 231 or 241 appraisal processing, determine the following:

==> picture [7 x 7] intentionally omitted <==

    1. Does the appraiser meet the qualification and competence requirements outlined in the MAP Guide?

MAP Guide, March 2021 Go to beginning of Appendix 2

Bookmarked Version

Appendix 2 Page A2-13

Go to Acronym and Abbreviation List, Glossary, Index

To return to this page after clicking a link, press ALT + Back Arrow Appendix 2 Quality Control Plans and Identity of Interest A.2.1 Lender Quality Control Plans and Identity of Interest Examples

Go to Table of Contents

    1. Is the appraisal a narrative self-contained report that is inclusive of and supportive of all required HUD form Documentation (forms HUD-92264, HUD-92264-A, HUD-92264-T, HUD92273 and HUD-92274)?
    1. Does the appraisal have an effective date within 120 days before the date of the Firm Commitment?
    1. Does the appraisal include the appraiser’s USPAP required certification?
    1. Did the primary appraiser designated by the Lender perform the property inspection and sign the appraisal report and supporting form documentation?
    1. Did the appraisal include photographs of the subject, the comparable sales and comparable rentals?
    1. Does the appraisal adequately describe and analyze the geographic area, neighborhood, rental competition, sales comparables, the site and the subject improvements?
    1. Does the appraisal establish the project’s “Replacement Cost” in accordance with Chapter 7, Section 7.4 of the MAP Guide, and form HUD-92264?
    1. For Substantial Rehabilitation projects, does the appraisal include a supplemental form HUD92264 that identifies the “As Is” and “As Complete” Values of the improvements, supported by the income and direct sales comparison approaches, as defined in HUD Handbook 4465.1 and the MAP Guide?
    1. For New Construction project, does the appraisal identify the “Warranted Price of Land” as defined in HUD Handbook 4465.1 and the MAP Guide?
    1. Does the appraisal identify the “Estimate of Market Rent by Comparison,” as of the appraisal date, arrayed in the included form HUD-92273 and as defined in the Form’s instructions?
    1. Does the appraisal identify the project’s estimated potential gross income and stabilized occupancy ratio in the included form HUD-92264 ?
    1. If commercial facilities are located within the project, does the appraisal include a separate analysis of the effect the commercial space will have on the project, as outlined in the MAP Guide, and does the commercial space meet the income and floor area limitations outlined in the MAP Guide?
    1. If any comparables have rent concessions, did the appraisal account for them in the market rental analysis as required by the MAP Guide?
    1. Does the appraisal identify the project’s estimated operating expenses, based upon at least three expenses comparables arrayed in the included form HUD-92274 and as required by the Form’s instructions?
    1. Does the appraisal properly update the expense comparables, meet disclosure requirements for the comparables, and have the subject property’s expenses been trended to the date of the appraisal per form HUD-92274 instructions?
    1. Does the appraisal identify the estimated operating deficit and replacement reserve requirements, as defined in the MAP Guide?

MAP Guide, March 2021 Go to beginning of Appendix 2

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Appendix 2 Page A2-14

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 2 Quality Control Plans and Identity of Interest A.2.1 Lender Quality Control Plans and Identity of Interest Examples

Go to Table of Contents

  • I. Specific Requirements for QC Reviews of Section 223(f) appraisals include determination of the following:
  1. Does the appraiser meet the qualification and competence requirements outlined in the MAP Guide?

  2. Is the appraisal a narrative self-contained report that is inclusive of and supportive of all required HUD form Documentation (forms HUD-92264, HUD-92264-A, HUD-92264-T, HUD-92273 and HUD92274)?

  3. Does the appraisal have an effective date within 120 days before the date of the submission of the application?

  4. Does the appraisal include the appraiser’s USPAP certification?

  5. Did the primary appraiser designated by the Lender and approved by HUD perform the property inspection and sign the appraisal report and supporting form documentation?

  6. Did the appraisal include photographs of the subject, the comparable sales and comparable rentals?

  7. Does the appraisal adequately describe and analyze the geographic area, neighborhood, rental competition, sales comparables, the site and the subject improvements?

  8. Does the appraisal establish the project’s fair market value supported by reconciliation of the cost, income and sales comparison approaches in accordance with the MAP Guide and Form HUD-92264?

Does the appraisal establish a total estimated replacement cost (if warranted due to the age of the property) and apply all applicable forms of depreciation for use in the final reconciliation process?

  1. Does the appraisal identify the “Estimate of Market Rent by Comparison,” as of the appraisal date, arrayed in the included form HUD-92273 and as defined in the form’s instructions?

  2. Does the appraisal include the current rent roll, a statement of current occupancy and does it identify the project’s estimated potential gross income and stabilized occupancy ratio in the included form HUD-92264?

  3. If commercial facilities are located within the project, does the appraisal include a separate analysis of the effect the commercial space will have on the project and does the commercial space meet the income and floor area limitations outlined in the MAP Guide?

  4. If any comparables have rent concessions, did the appraisal account for them in the market rental analysis as required by the MAP Guide?

  5. Does the appraisal present at least three years of historic expenses and have the forecasted expenses been based upon the historic operation of the property supported by at least three expense comparables arrayed in the included form HUD-92274 and as required by the form’s instructions?

  6. Does the appraisal properly update the expense comparables, meet disclosure requirements for the comparables, and have the subject property’s expenses been trended to the date of the appraisal per form HUD-92274 instructions?

  7. If applicable, does the appraisal identify the estimated operating deficit and replacement reserve requirements, as defined in the MAP Guide?

  • J. Specific Requirements for QC Reviews of Market Studies:

MAP Guide, March 2021 Go to beginning of Appendix 2

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Appendix 2 Page A2-15

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 2 Quality Control Plans and Identity of Interest A.2.1 Lender Quality Control Plans and Identity of Interest Examples

Go to Table of Contents

  1. For the Market Study review, the review appraiser should provide their opinion as to the completeness of the material under review and determination of the overall compliance with market study processing requirements and determine the following:

    • Does the market analyst meet the qualification and competence requirements outlined in the MAP Guide?

==> picture [8 x 6] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

Is the market study a narrative self-contained report?

  • Does the market study have an effective date within 120 days before the date of submission of the pre-application or, for a refinancing, within 120 days of submission of the application for a Firm Commitment?

==> picture [7 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Does the market study adequately describe and analyze the geographic boundaries and general characteristics of the market area, specific market conditions, characteristics of projects under construction and in the planning stages, and contain a supply and demand estimate and analysis and estimated absorption time (if applicable)?

  • Is the market study prepared in accordance with the information supplied by the MAP Lender as described in the appropriate MAP Guide Appendix?

==> picture [8 x 6] intentionally omitted <==

==> picture [6 x 8] intentionally omitted <==

  • Is the market study prepared in accordance with the format prescribed in the appropriate MAP Guide Appendix?

  • Does the market study include the market analyst’s certification?

==> picture [8 x 9] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Provide the review appraiser’s opinion as to the adequacy and relevance of the market data and the propriety of any adjustments made to the data.

    • Provide the review appraiser’s opinion as to the appropriateness of the analysis methods and techniques used by the market analyst.

==> picture [5 x 8] intentionally omitted <==

Provide the review appraiser’s opinion as to the market analyses, opinions and conclusions.

==> picture [6 x 11] intentionally omitted <==

  • K. Specific Requirements for QC Reviews of the Architectural Review:
  1. For the architectural portion of the QC review of Sections 220, 221(d), 231 or 241, Lender’s Architectural Analyst review report, determine the following:

    • Does the Architectural Analyst meet the qualification and competence requirements outlined in the MAP Guide?

==> picture [8 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Has the Architectural Analyst determined that the mortgagor’s Architect (or other persons or organizations providing architectural services) is qualified to provide the design services to the project and to administer the construction contract?

  • Review the Owner-Architect Agreement (AIA Document B108); indicate if separate Agreements are required for design and construction services.

==> picture [7 x 6] intentionally omitted <==

    1. Are all necessary services included without deletion?
    1. Is the compensation other than a fixed fee?

==> picture [8 x 9] intentionally omitted <==

  • In review of Architectural Standards, does the Lender’s Architectural Analyst review report address:

MAP Guide, March 2021 Go to beginning of Appendix 2

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Appendix 2 Page A2-16

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 2 Quality Control Plans and Identity of Interest A.2.1 Lender Quality Control Plans and Identity of Interest Examples

Go to Table of Contents

    1. HUD minimum property standards?
    1. Applicable building codes?
    1. Accessibility laws: Fair Housing Act; UFAS (if Section 504 is applicable); 2010 ADA Standards (if Title II or III of the ADA are applicable)?
    1. Energy efficiency?

Does the report address the mortgagor’s A&E exhibits?

==> picture [8 x 6] intentionally omitted <==

    1. Are drawings and specs complete and correct?
    1. Are utility services available?

==> picture [6 x 9] intentionally omitted <==

  • In reviewing the experience and qualifications of the General Contractor:

    1. Did the Lender’s Architectural Analyst prepare a written review of the General Contractor?
    1. Does the review indicate acceptance?

Did the Lender’s Architectural Analyst perform an IOI review as required by the MAP Guide?

==> picture [8 x 9] intentionally omitted <==

    1. Is there a description of any and all IOIs that exist between the owner’s Architect or engineer, the owner and the General Contractor?
    1. Is there a description of any and all IOIs that exist between the General Contractor, subcontractor(s) and material supplier(s)?
    1. If no IOIs exist, is this stated?

==> picture [8 x 9] intentionally omitted <==

Does the site visit report address:

    1. Physical features (existing construction, topography, drainage, etc.)?
    1. Unusual site conditions, demolition, offsite construction?
    1. Environmental conditions/hazards?

==> picture [5 x 9] intentionally omitted <==

  • In establishing an architectural liaison with the mortgagor’s Architect:

    1. Is there a processing record of architectural/engineering actions?
    1. Is there an acceptable journal of architectural actions?
    1. Is there an organized file of HUD applications, forms and documents?
    1. Is there a record of meetings and contacts with the mortgagor’s Architect?
    1. Is there clear documentation?
  • Did the liaison with HUD labor relations staff verify the applicable Davis-Bacon wage rates?

==> picture [6 x 10] intentionally omitted <==

==> picture [8 x 8] intentionally omitted <==

  • Was there a liaison established with the Lender’s cost analyst?

==> picture [5 x 9] intentionally omitted <==

  • In reviewing the Firm Commitment architectural/engineering exhibits:

    1. Is there a clear and complete exhibit review list?
    1. Is there a statement indicating that the Firm Commitment architectural exhibits are acceptable without condition, and that all deficiencies have been acceptably corrected?

MAP Guide, March 2021 Go to beginning of Appendix 2

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Appendix 2 Page A2-17

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 2 Quality Control Plans and Identity of Interest A.2.1 Lender Quality Control Plans and Identity of Interest Examples

Go to Table of Contents

    1. Does the report address:
    • a) Completeness of contract documents?

    • b) Conformance to local building codes and HUD standards?

    • c) Accessibility for persons with disabilities?

    • d) Site design?

    • e) Building design?

In reviewing the preparation of the architectural portions of form HUD-92264:

==> picture [11 x 7] intentionally omitted <==

    1. Is there a form HUD-92264 with all architectural portions complete?
    • a) Section A – Architectural portions

    • b) Section B - Architectural portions

    • c) Section C - Unit breakdown with net areas

    • d) Section D - Architectural portions

    1. Has the Architectural Analyst signed the form?
  • In reviewing the report to the Lender’s Underwriter:

==> picture [8 x 6] intentionally omitted <==

    1. Has the Architectural Analyst submitted a report on the project to the Underwriter?
    1. Does the report contain an analysis of the project?
    1. Does the report recommend: acceptance or negotiated changes with the mortgagor or rejection?
  • Did the Lender’s Architectural Analyst submit a Standard Certification (MAP Guide Chapter 11, Section 11.2.3)?

==> picture [8 x 6] intentionally omitted <==

Is there a Design Architect’s Certification (MAP Guide Appendix 5, Section A.5.8)?

==> picture [8 x 8] intentionally omitted <==

For substantial rehabilitation projects:

==> picture [8 x 9] intentionally omitted <==

    1. Has the Lender’s Architectural Analyst submitted a report of the Joint Inspection?
    1. Does the report indicate that a complete and thorough inspection was conducted on all features of the project site and on a sufficient number of living units?
    1. Has the Lender’s Architectural Analyst prepared a report on the mortgagor’s Architect’s Detail Work Write-up?
    1. Does the report address:
    • a) All general or specific work requirements?

    • b) Clarity or vagueness of work requirements?

  • c) Historic requirements?

    1. Has the Lender’s Architectural Analyst indicated whether there are engineering reports?
    1. Has the mortgagor been notified of any requirements?

MAP Guide, March 2021 Go to beginning of Appendix 2

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Appendix 2 Page A2-18

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 2 Quality Control Plans and Identity of Interest A.2.1 Lender Quality Control Plans and Identity of Interest Examples

Go to Table of Contents

  - 7) Has the exact nature of the engineering report been covered? 

  - 8) Were there any special tests, such as seismic resistance in applicable seismic zones? 
  • L. Specific Requirements for QC Reviews of the Lender’s Architectural Analyst review report:
  1. Liaison with Lender’s cost analyst. Is there documentation of contacts regarding:

    • Nature and cost of repairs?

==> picture [8 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

Replacement reserve items?

  1. Lender review of property’s Capital Needs Assessment (CNA). Does the Physical Inspection Report (PIR) address:

Adequacy of number of dwelling units inspected?

==> picture [8 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Condition of project?

  • Repair work write-up?

==> picture [7 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Critical and Non-critical repairs?

  • Expected component replacement and major maintenance needs for the near term, long term and remaining useful life?

==> picture [8 x 7] intentionally omitted <==

==> picture [6 x 9] intentionally omitted <==

  - Compliance with accessibility laws and standards, including the Fair Housing Act (for projects designed and constructed for first occupancy after March 13, 1991 built after 3/13/1991); UFAS (for projects with federal financial assistance); 2010 ADA Standards (for projects that are a program or activity of a state or local government or a place of public accommodation)? 
  1. Statement of Resources and Needs. Does the statement address:

    • Review and possible adjustment to the PIR?

==> picture [8 x 7] intentionally omitted <==

==> picture [9 x 9] intentionally omitted <==

  • Identification of Critical and Non-critical repairs?
  1. Critical repairs. Is there evidence that all Critical repairs have been adequately completed and inspected?

  2. Mortgagor’s exhibits. Note evidence of the following:

    • Has Lender’s Architectural Analyst prepared a review report of mortgagor’s exhibits?

==> picture [8 x 6] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Does the report indicate whether exhibits are complete and correct?
  1. Preparation of architectural portions of form HUD-92264. Note whether the following were addressed:

Is there a form HUD-92264 with all architectural portions complete, including:

==> picture [8 x 7] intentionally omitted <==

    1. Section A – Architectural portions;
    1. Section B - Architectural portions;
    1. Section C - Unit breakdown with net areas; and
    1. Section D - Architectural portions.

==> picture [8 x 9] intentionally omitted <==

  • Has the Architectural Analyst signed the form?

MAP Guide, March 2021 Go to beginning of Appendix 2

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Appendix 2 Page A2-19

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 2 Quality Control Plans and Identity of Interest A.2.1 Lender Quality Control Plans and Identity of Interest Examples

Go to Table of Contents

  1. Report to the Lender’s Underwriter. Note whether the following were addressed:

    • Has the Architectural Analyst submitted a report on the project to the Lender’s Underwriter?

==> picture [8 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Does the report contain an analysis of the project?

  • Does the report recommend acceptance, negotiated changes with the mortgagor or rejection?

==> picture [7 x 6] intentionally omitted <==

  1. Has the Lender’s Architectural Analyst submitted a Standard Certification (Chapter 11, Section 11.2.4)
  • M. Specific Requirements for QC Reviews of the Cost Review.
  1. For the Cost Review of Sections 220, 221(d), 231 or 241 loans, Lender’s Cost Analyst review report: Did the Lender hire a qualified construction cost estimator with experience in multifamily cost estimating?

  2. A detailed independent cost estimate must provide the following:

Documentation of the method of estimation and data source.

==> picture [8 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

To be summarized on form HUD-92326:

    1. Detailed structure(s) and land improvement cost estimates, and costs of any unusual site development
    1. Contractor’s general requirements
    1. Contractor’s general overhead
    1. Contractor’s profit (for non-BSPRA cases)
    1. Architect’s design and supervision fees
    1. Bond premium and mortgagor’s and contractor’s Other Fees
    1. Onsite demolition costs
    1. Offsite improvements costs
    1. Project’s Cost Not Attributable (CNA) to dwelling use
    1. For sub rehab projects, complete Rehab CNA Worksheet (MAP Guide Appendix 5, Section A.5.10).
  1. Preparation of cost portions of form HUD-92264:

Is there a form HUD-92264 with all cost portions completed?

==> picture [8 x 7] intentionally omitted <==

    1. Section G – Cost portions
    1. Section M

==> picture [8 x 9] intentionally omitted <==

Has the cost analyst signed the form?

  1. Review of form HUD-2328, Contractor’s and/or Mortgagor’s Cost Breakdown:

    • Is form HUD-2328 complete and signed by all parties?

==> picture [8 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Has Lender’s cost reviewer prepared a comparison of HUD-2328 and the independent cost estimate on form HUD-92326?

MAP Guide, March 2021 Go to beginning of Appendix 2

Bookmarked Version

Appendix 2 Page A2-20

Go to Acronym and Abbreviation List, Glossary, Index

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 2 Quality Control Plans and Identity of Interest A.2.1 Lender Quality Control Plans and Identity of Interest Examples

Go to Table of Contents

  - 1) Line item comparison on form FHA-2331-B? 

  - 2) Written documentation of resolution of significant differences in Lender’s form HUD-92326 and contractor’s form HUD-2328 cost estimates? 

  - 3) Has Lender’s cost reviewer prepared a written recommendation of approval or disapproval of contractor’s form HUD-2328? 
  1. Review of the Property Insurance Schedule, form HUD-92329:

    • Has form HUD-92329 been prepared and signed?

==> picture [8 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Is there a backup worksheet indicating how the Insurable Value(s) of the project structure(s) were determined?

N. Specific Requirements for QC Reviews of the Identity of Interest (IOI) Review should determine the following:

  1. Has the Lender’s cost reviewer been supplied with IOI information by Lender’s architectural reviewer?

  2. For an identified General Contractor:

Does the cost estimate indicate “BSPRA” under Builder’s Profit?

==> picture [8 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Has the 50-75% rule been applied to determine whether the contractor qualifies for general overhead and profit or BSPRA, or should it be replaced by the dominant subcontractor?
  1. For identified subcontractors and/or material suppliers:

    • Is there documentation that the IOI subcontract(s) were submitted to HUD for prior approval of overhead and profit?

==> picture [8 x 6] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • If any subcontract(s) were not submitted, has overhead and profit been deleted from the accepted contract amount?

Have letter(s) of approval/disapproval been prepared for the mortgagor and General Contractor?

==> picture [7 x 6] intentionally omitted <==

O. Specific Requirements for QC Reviews of the Report to the Underwriter should determine the following:

  1. Has the cost analyst submitted a report on the project to the Lender’s Underwriter?

  2. Did the report contain an analysis of the project costs?

  3. Did the report recommend acceptance, negotiated changes with the mortgagor or rejection?

  4. Did the Lender’s cost analyst submit a Standard Certification (Chapter 11, Section 11.2.3)?

  • P. Specific Requirements for QC Reviews of Substantial Rehabilitation projects should include the following:
  1. Joint Inspection Report and Architect’s detailed work write-up, which should determine the following:

    • Does the Lender’s cost analyst have a copy of the Joint Inspection report?

==> picture [8 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Does the Lender’s cost analyst have a copy of the mortgagor’s Architect’s Detailed Work Writeup?

MAP Guide, March 2021 Go to beginning of Appendix 2

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Appendix 2 Page A2-21

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 2 Quality Control Plans and Identity of Interest A.2.1 Lender Quality Control Plans and Identity of Interest Examples

Go to Table of Contents

  • Do the Joint Inspection Report and Architect’s Detailed Work Write-up include Reserve for Replacement (R4R) items?

==> picture [7 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Is there an itemized breakdown of R4R items?

Does the breakdown indicate the age and remaining useful life of the R4R items?

==> picture [8 x 6] intentionally omitted <==

  1. Detailed Cost Estimate, which should ascertain if the Lender’s cost analyst’s detailed cost estimate clearly reflect all the scope of work items in the Detailed Work Write-up.:

  2. Reserve for Replacement estimate:, which should determine the following:

    • Has the Lender’s cost analyst provided an R4R cost estimate?

==> picture [8 x 6] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Is the R4R cost estimate itemized and incorporate the remaining useful life for the R4R items?

  • Is there a replacement schedule for the R4R items?

==> picture [7 x 6] intentionally omitted <==

  • Q. Specific Requirements for QC Reviews of Section 223(f) loans should answer or include the following:
  1. Are the qualifications of the Cost Analyst and Needs Assessor acceptable?

  2. Is there documentation of contacts regarding the CNA?

  3. Summary of cost estimate for hypothetical “as new” building:

    • Documentation of method of estimation and data source.

==> picture [8 x 7] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Summary “bottom-line” cost estimate:

      1. Structure(s) and land improvement cost estimates, for hypothetical “as new” building;
      1. Contractor’s General Requirements
      1. Contractor’s General Overhead
      1. Contractor’s Profit
      1. Architect’s Design and Supervision fees; and
      1. Bond premium and Mortgagor’s and Contractor’s Other Fees.
  1. Preparation of cost portions of form HUD-92264:

    • Is there a form HUD-92264 with all cost portions complete?

==> picture [8 x 7] intentionally omitted <==

    1. Section G – Cost portions (hypothetical “as new” costs).
    1. Section M must be blank.
    1. Are Critical and Non-critical repair costs summarized in Section O?
    1. Has the cost analyst signed the form?
  1. Review of CNA.

Did the Lender’s cost analyst prepare a written report reviewing:

==> picture [8 x 6] intentionally omitted <==

    1. Cost portions of Project Inspection Report (PIR), including the costs of Critical and Noncritical repairs?

MAP Guide, March 2021 Go to beginning of Appendix 2

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Appendix 2 Page A2-22

To return to this page after clicking a link, press ALT + Back Arrow Appendix 2 Quality Control Plans and Identity of Interest A.2.1 Lender Quality Control Plans and Identity of Interest Examples

Go to Table of Contents

    1. For all deferred non-Critical repairs, estimate the required escrow amount.

==> picture [8 x 9] intentionally omitted <==

Expected cost of expected component replacement and major maintenance needs for:

    1. Near term; and
    1. Long term.

Statement of Resources and Needs recommending:

==> picture [7 x 7] intentionally omitted <==

  - 1) Initial Deposit to the Reserve for Replacement, if any; 

  - 2) Annual (or monthly) deposit to the Reserve for Replacement (RfR) account; and 

  - 3) Near term replacement schedule indicating annual deposits, itemized expenditures and remaining funds at the end of each year. 
  1. Documented advice to Lender concerning the PCNA, which should include:

    • The Lender’s cost analyst must provide opinions and recommendations for acceptance or change to the PCNA regarding cost items:

==> picture [8 x 7] intentionally omitted <==

  - 1) Critical and Non-critical repairs; and 

  - 2) Funding schedules in near Term and long-Term items in the Reserve for Replacement account. 
  1. Property Insurance Schedule, form HUD-9232:

    • Has the Lender’s cost analyst prepared and signed form HUD-92329?

==> picture [8 x 6] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Is there a backup worksheet indicating how the Insurable Value(s) of the project structure(s) were determined?
  1. Report to Lender’s Underwriter.

Did the cost analyst submit a report on the project to the Underwriter?

==> picture [8 x 6] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

Does the report contain an analysis of the CNA?

Does the report recommend acceptance, negotiated changes with the mortgagor or rejection?

==> picture [7 x 6] intentionally omitted <==

  1. Has the Lender’s cost analyst submitted a Standard Certification (Chapter 11, Section 11.2.4)?
  • R. Specific Requirements for QC Reviews of Construction Loan Administration
  1. The QC review of the Lender’s construction loan administration must, at a minimum, meet the following requirements:

    • Analyze loans for general compliance with the construction loan administration requirements found in the MAP Guide and MAP FAQs.

==> picture [8 x 6] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Analyze escrow administration to assure that the escrows are properly funded and that the funds are only used for their intended purposes.

  • Analyze procedures for collection and recordation of payment receipts, escrow bills, disbursements from escrow and claim submissions.

==> picture [7 x 6] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Analyze procedures that were used for handling any letters of credit.

MAP Guide, March 2021 Go to beginning of Appendix 2

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Appendix 2 Page A2-23

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 2 Quality Control Plans and Identity of Interest A.2.2 Identity of Interest Examples

Go to Table of Contents

Analyze procedures that were used for handling the investment of construction loan escrows.

==> picture [7 x 7] intentionally omitted <==

==> picture [6 x 9] intentionally omitted <==

  • Analyze the procedures for processing construction loan advances, change orders and notification of surety, cost certifications and post endorsement escrows.

  • Analyze any delinquent loans and loans in foreclosure to determine compliance with HUD-FHA fiscal requirements and procedures, such as timely assignments and extension requests, property preservation requirements and inspections.

==> picture [8 x 9] intentionally omitted <==

==> picture [8 x 9] intentionally omitted <==

  • Review any claim submissions on projects that have not reached final endorsement to assure that all efforts have been exhausted to “work-out” the loan and that all claims are properly documented, supported and filed in accordance with HUD-FHA requirements.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)
  1. Revision March 19, 2021 Office of the Assistant Secretary for …
  2. Table of Contents
  3. Index
  4. Chapter 1 Introduction
  5. 1.1 Multifamily Accelerated Processing Guide
  6. 1.2 Purposes of MAP
  7. 1.3.1 Lender Qualifications and Monitoring
  8. 1.3.2 Programs Covered by MAP
  9. 1.3.3 Application Processing
  10. 1.3.4 Construction Responsibilities
  11. 1.3.5 Servicing
  12. 1.4 Regulations, Policies, and the MAP Guide
  13. 1.5 Workload Management
  14. Chapter 2 Lender Qualifications and Practices
  15. 2.1 Introduction
  16. 2.2 HUD Approval of Lenders
  17. 2.3 Lender Standards
  18. 2.4 Loan Consultants, Correspondents, or Mortgage Brokers
  19. 2.5 Underwriting and Construction Administration 2.5.1 Underwr…
  20. 2.5.2 Construction Administrator Duties
  21. 2.5.3 Underwriting and Construction– HUD’s Role
  22. 2.5.4 Electronic Communications
  23. 2.6.1 Introduction
  24. 2.6.2 Definitions
  25. 2.6.3 Identity of Interest - General
  26. 2.6.4.1 Lender Owned FHA-Insured Properties
  27. 2.6.4.2 Secondary Financing Relationships
  28. 2.6.4.3 Bridge Loans and Balance Sheet Loans
  29. 2.6.4.4 Lenders with Tax Credit Equity Affiliates
  30. 2.6.4.5 Lender’s Consultants, Correspondents, or Mortgage Brok…
  31. 2.6.4.6 Other Lender Conflicts
  32. 2.6.4.7 Prohibited Practices - Inducements
  33. 2.6.4.8 Prohibited Practices - Gifts
  34. 2.6.4.9 Prohibited Practices - Charitable Donations
  35. 2.6.5.1 In General
  36. 2.6.5.2 IOI Discovered Before Processing
  37. 2.6.5.3 IOI Discovered During Processing
  38. 2.6.5.4 IOI Discovered After Firm Commitment
  39. 2.6.6 Certification
  40. 2.6.7 Syndicator or Investor Influence
  41. 2.7 New MAP Lender Application Package
  42. 2.8 Limitations and Notices
  43. 2.9 Quality Control, Records and Monitoring
  44. 2.10 Underwriters – HUD Approval
  45. 2.10.1 MAP Underwriters
  46. 2.10.2 Chief Underwriters
  47. 2.10.3 Deputy Chief Underwriters
  48. 2.11 Underwriter Trainees
  49. 2.12 MAP Underwriter Transfers
  50. Chapter 3 Programs
  51. 3.1 General Program Requirements
  52. 3.1.1 Regulatory Agreement
  53. 3.1.2 Single Asset Mortgagor Entity
  54. 3.1.3 Non-Recourse
  55. 3.1.4 Interest Rate
  56. 3.1.5 Amortization Plan
  57. 3.1.6 Loan Terms
  58. 3.1.7 Prepayment Restrictions
  59. 3.1.8 HUD Application Fee
  60. 3.1.9 HUD inspection Fee
  61. 3.1.10 Mortgage Insurance Premium
  62. 3.1.11 Lender Fees and Charges
  63. 3.1.12 Definition of Affordable Housing
  64. 3.1.13 Fair Housing and Equal Opportunity
  65. 3.1.14 Previous Participation
  66. 3.1.15 HUD's Fiscal Procedures
  67. 3.1.16 Bridge or Gap Financing
  68. 3.1.17 Secondary Financing
  69. 3.1.18 Statutory Loan Limits
  70. 3.1.19 Tax Increment Financing
  71. 3.1.20 Commercial Space
  72. 3.1.21 Military Impacted Areas
  73. 3.1.22 Student Housing
  74. 3.1.23 Real Estate Requirements
  75. 3.1.24 Transient Housing/Hotel Services Prohibition
  76. 3.1.25 Sustaining Occupancy
  77. 3.1.26 Operating Deficit
  78. 3.1.27 Short-Term Lease Premiums
  79. 3.1.28 Replacement Reserve
  80. 3.1.29 Developer Fees
  81. 3.1.30 Scattered Sites
  82. 3.1.31 Condominiums
  83. 3.1.32 Environmental Review
  84. 3.1.33 Underwritten Vacancy and Collection Loss
  85. 3.1.34 Borrower’s Certifications
  86. 3.1.35 Waivers
  87. 3.1.36 Opportunity Zones
  88. 3.2 New Construction/Substantial Rehabilitation Program Requir…
  89. 3.2.1 Properties
  90. 3.2.2 Insurance for Construction and Permanent Loan Periods
  91. 3.2.3 New Construction Transactions
  92. 3.2.4 Substantial Rehabilitation Transactions
  93. 3.2.5 Cost Certification
  94. 3.2.6 Federal Labor Standards
  95. 3.2.7 Assurance of Completion
  96. 3.2.8 Absorption Period
  97. 3.2.9 Marketing and Leasing Plan
  98. 3.2.10 Working Capital Escrow
  99. 3.2.11 Furniture, Fixture, and Equipment in Cost Basis
  100. 3.2.12 Elderly Developments
  101. 3.2.13 Occupancy Preference
  102. 3.2.14 Builder and Sponsor Profit and Risk Allowance (BSPRA)
  103. 3.2.15 Energy Efficiency
  104. 3.2.16 Cost vs. Value
  105. 3.3 Section 221(d)(4)–New Construction and Substantial Rehabil…
  106. 3.3.1 Criterion 1
  107. 3.3.2 Criterion 3
  108. 3.3.3 Criterion 4
  109. 3.3.4 Criterion 5
  110. 3.4 Section 220 Mortgage Insurance for Redevelopment Areas
  111. 3.4.1 Eligible Areas
  112. 3.4.2 Commercial Facilities
  113. 3.4.3 Maximum Loan Ratios and DSCRs
  114. 3.4.4 Builder and Sponsor Profit and Risk Allowance (BSPRA)
  115. 3.4.5 Sponsor Profit and Risk Allowance (SPRA)
  116. 3.4.6 Age Restriction Prohibited
  117. 3.5 Section 231 Mortgage Insurance
  118. 3.5.1 Definitions
  119. 3.5.2 Design and Amenities
  120. 3.5.3 BSPRA or SPRA allowances
  121. 3.5.4 Maximum Loan Ratios and DCRs
  122. 3.6.1 Eligibility
  123. 3.6.2 Term
  124. 3.6.3 Equity Requirement and Controlling Mortgage Criteria
  125. 3.6.3.1 Criterion 3–Loan to Value/Cost
  126. 3.6.3.2 Criterion 4–Statutory Limits
  127. 3.6.3.3 Criterion 5–Debt Service Coverage Ratio (DSCR)
  128. 3.6.4 CNAs, Plans and Cost Estimates
  129. 3.6.5 Davis-Bacon Act Applicability
  130. 3.6.6 Insurance of Advances or Insurance upon Completion
  131. 3.6.7 Environmental Review
  132. 3.6.8 Working Capital and Operating Deficit Reserves
  133. 3.6.9 Management Exhibits
  134. 3.6.10 Multiple Lenders
  135. 3.6.11 MIP
  136. 3.7.1 General Requirements
  137. 3.7.2 Eligible Properties
  138. 3.7.3 Ineligible properties
  139. 3.7.4 Additional Section 223(f) Requirements
  140. 3.7.5 Repairs
  141. 3.7.6 Accessibility Requirements
  142. 3.7.7 Age Restricted Projects
  143. 3.7.8 Defaults, Claims, or Enforcement Referrals
  144. 3.7.9 Labor Standards
  145. 3.7.10 Prepayment Provisions and Prohibition
  146. 3.7.11 Maximum Loan and Debt Service Coverage Ratios (DSCR)
  147. 3.7.11.1 Section 223(f) Refinance and Acquisition Processing
  148. 3.7.12 For Cash Out/Equity Out Proceeds When Repairs are Defer…
  149. 3.7.13 Capitalization Rates and Determination of Value
  150. 3.7.14 Statutory Loan Limits
  151. 3.7.15 Cost Not Attributable to Dwelling Space
  152. 3.7.16 Reserve for Replacements (RfR)
  153. 3.7.17 Secondary Financing
  154. 3.7.18 Commercial Space
  155. 3.7.19 Real Estate Requirements
  156. 3.7.20 Mortgage Term
  157. 3.7.21 Firm Commitment Processing Only
  158. 3.7.22 Market Study
  159. 3.7.23.1 Discounts and/or Costs of Issuance
  160. 3.7.23.2 Defeasance Costs Associated with Underlying Bond Fina…
  161. 3.8 Section 223(a)(7) Refinancing
  162. 3.8.1 Eligibility
  163. 3.8.2 Terms
  164. 3.8.3 Controlling Mortgage Criteria
  165. 3.8.4 Lender Fees
  166. 3.8.5 Borrower Fees
  167. 3.8.6 CNA
  168. 3.8.7 Other Issues
  169. 3.9.1 Insurance During Construction
  170. 3.9.2 Permanent Insurance
  171. 3.9.2.1 Public Liability Insurance
  172. 3.9.2.2 Vehicle Liability Insurance
  173. 3.9.2.3 Flood insurance
  174. 3.9.2.4 Casualty Insurance
  175. 3.9.3 Other Insurance Requirements
  176. 3.10.1 Purpose
  177. 3.10.2 Underwriting Ratios for Large Loans
  178. 3.10.3 Increased Reserves for Large Loans
  179. Loan size Reserve amount shall be the greater of
  180. 3.10.4 Extended Lease-Up Period
  181. 3.10.5 Higher Net Worth and Liquidity
  182. 3.11.1 Restrictions Authorized by Statute
  183. 3.11.1.1 Restrictions Allowed by HUD Statutory Authority
  184. 3.11.1.2 Housing for Persons Age 55+ (55+ Exemption)
  185. 3.11.1.3 Housing Restricted to Persons Age 62+
  186. 3.11.1.4 Other Fair Housing Act Exemptions
  187. 3.11.2 Age Restriction in Certain Projects and Programs
  188. 3.11.2.1 Market Rate Projects
  189. 3.11.2.2 Affordable Projects and 55+ Exemption
  190. 3.11.2.3 Section 231 Projects, both Market Rate and Affordable…
  191. 3.11.3.1 Services
  192. 3.11.3.2 Meals Service Exceptions
  193. 3.11.3.3 Prohibition on Founder’s Fees
  194. 3.11.3.4 Guest Suites
  195. 3.12.1 Relocation-General
  196. 3.12.2 Projects with Federal Assistance
  197. 3.12.3 Projects with No Federal Assistance
  198. 3.12.4 Relocation Costs on HUD Forms
  199. Chapter 4 Application Processing
  200. 4.1 Introduction/General
  201. 4.1.1 Approval of Lender's Reviewers
  202. 4.2.1.1 Concept Meetings
  203. 4.2.1.2 HUD Response
  204. 4.2.1.3 Firm Commitment Application Submissions
  205. 4.2.1.4 Firm Commitment Issuance
  206. 4.2.1.5 Firm Commitment Acceptance and Rate Lock
  207. 4.2.1.6 Closing
  208. 4.2.2.1 Concept Meetings
  209. 4.2.2.2 Pre-Application Stage
  210. 4.2.2.3 Invitation Letters
  211. 4.2.2.4 Firm Commitment
  212. 4.2.2.5 Closing
  213. 4.2.2.6 Construction Period
  214. 4.2.3 Appeals
  215. 4.3.1 General Requirements
  216. 4.3.2 Processing
  217. 4.4.1 General Requirements
  218. 4.4.2 Processing
  219. 4.4.3 Construction Period Responsibilities
  220. 4.4.4 Servicing
  221. Chapter 5 Architectural and Construction Analysis
  222. 5.1 Eligible Construction Activities
  223. 5.1.1 New Construction
  224. 5.1.2 Substantial Rehabilitation
  225. 5.1.3 Class of Work
  226. 5.1.4 Defining Construction Activities
  227. 5.1.5 Eligible Construction by Program
  228. 5.2 Consultant Due Diligence Responsibilities
  229. 5.2.1 General
  230. 5.2.2.1 Needs Assessor Qualifications
  231. 5.2.2.2 Needs Assessor Responsibilities
  232. 5.2.2.3 Construction Analysts Qualifications
  233. 5.2.2.4 Construction Analyst Responsibilities
  234. 5.2.3.1 Project Architect Qualifications
  235. 5.2.3.2 Project Architect Duties and Responsibilities
  236. 5.2.3.3 Owner-Architect Agreement for Services
  237. 5.2.3.4 Project Architect as Owner’s Representative
  238. 5.2.4 Other Technical Specialists
  239. 5.2.5 HUD Approval of Qualifications
  240. 5.3 Requirements by Construction Activity and Program
  241. 5.3.1 General
  242. 5.3.2.1 Scope of Work
  243. 5.3.2.2 Construction Costs
  244. 5.3.2.3 Schedule
  245. 5.3.3.1 When Project Architects are Required
  246. 5.3.3.2 When General Contractors are Required
  247. 5.3.3.3 Licensed Trades
  248. 5.3.3.4 Scope of Work
  249. 5.3.3.5 Construction Costs
  250. 5.3.3.6 Schedule
  251. 5.3.4.1 Scope of Work
  252. 5.3.4.2 Construction Costs
  253. 5.3.4.3 Schedule
  254. 5.4 Architectural and Other Building Standards
  255. 5.5.1 New Construction and Substantial Rehabilitation
  256. 5.5.2 Section 223(f) Transactions
  257. 5.6.1 Eligibility for Streamlined Processing [12]
  258. 5.6.2 Section 223(f) with new LIHTC Applications
  259. 5.6.3 Documentation at Firm Commitment
  260. 5.6.4 Requirements for Issuing a Firm Commitment
  261. 5.6.5 Modifications to the Firm Commitment
  262. 5.6.6 Risks Related to Deferred Document Submission
  263. 5.7.1 Concept Meeting
  264. 5.7.2 Pre-Application
  265. 5.7.3 Firm Commitment Application
  266. 5.7.4 Special Considerations for Industrialized Housing
  267. 5.8.1 Plans and Specifications Revisions
  268. 5.8.2 Major Changes
  269. 5.8.3 Construction Documents
  270. 5.8.4 Recommendation for Initial Endorsement
  271. 5.8.5 Distribution of Drawings and Specifications
  272. 5.8.6 Early Start of Construction
  273. 5.9 Substantial Rehabilitation Processing through Initial Endo…
  274. 5.9.1 Concept Meeting
  275. 5.9.2 Pre-Application
  276. 5.9.3 Firm Commitment Application
  277. 5.9.4 Firm Commitment to Initial Endorsement
  278. 5.10 Standard Processing for Section 223(a)(7) and 223(f)
  279. 5.10.1 Architectural Standards
  280. 5.10.2 Concept Meetings
  281. 5.10.3 Capital Needs Assessment
  282. 5.10.4 Lender’s Review of Costs
  283. 5.10.5 Certification
  284. 5.10.6 Firm Commitment
  285. 5.10.7 Time for Completion of Repairs
  286. 5.10.8 Escrow Agreement for Deferred Repairs
  287. 5.10.9 Completion of Repairs and Alterations
  288. 5.11.1 Supplemental Loan for New Construction
  289. 5.11.2 Supplemental Loan for Existing Structures
  290. 5.12 Cost Estimating for Lenders
  291. 5.12.1 Estimation Method
  292. 5.12.2 Cost Categories
  293. 5.12.3 Allowances and Fees
  294. 5.12.4 Builder’s and Sponsor’s Profit and Risk Allowance (BSPRA)
  295. 5.12.5 Construction Time
  296. 5.13 CNAs are Required for All Applications
  297. 5.14.1 Detailed Cost Estimate
  298. 5.14.2 Substantial Rehabilitation Costs
  299. 5.14.3 Refinance/Acquisition Costs
  300. 5.15.1 HUD Underwriting Assignment
  301. 5.15.2 CNA e-Tool and HUD Underwriting
  302. 5.15.3 Instructions and Training for Users
  303. 5.15.4 Consultation and Review Timeliness
  304. Chapter 6 Energy and Water Conservation
  305. 6.1 Purpose and Summary Requirements
  306. 6.1.1 New Construction and Substantial Rehabilitation Standards
  307. 6.1.2 Incentives for Improved Building Performance
  308. 6.2 Statutes and Regulations
  309. 6.3 Green Building Certifications Specifications Recognized fo…
  310. 6.3.1 New Construction and Substantial Rehabilitation Certific…
  311. 6.3.2 Certifications for Existing Buildings
  312. 6.3.3 Certifications Not Recognized by HUD
  313. 6.4 General Requirements for Green MIP
  314. 6.4.1 Continuing Performance Required under Green MIP
  315. 6.4.2 ENERGY STAR® Appliances and High-Performance Components
  316. 6.4.3 HUD Forms – Borrower’s Certifications
  317. 6.4.4 Regulatory Agreement Rider 5 Required for Green MIP
  318. 6.4.5 Data Collection Plan
  319. 6.4.6 Real-Time Consumption Monitoring, Smart Home Tools
  320. 6.4.7 Design and Construction Team Qualifications
  321. 6.4.8 Energy Professionals Qualifications
  322. 6.4.9 Energy Modeling and Modeling Software
  323. 6.4.10 Change Orders Modifying Energy Measures
  324. 6.5 Requirements for Section 223(a)(7) Applications
  325. 6.5.1 Existing Green MIP Mortgages
  326. 6.5.2 Proving Continuing Performance Under ENERGY STAR® Existi…
  327. 6.5.3 Delivery of ENERGY STAR® Existing Building Certification
  328. 6.5.4 Recording Baseline Data - CNA
  329. 6.6 Green MIP Requirements for Section 223(f) Applications
  330. 6.6.1 Properties with Previously Earned Certifications
  331. 6.6.2 Newly Built Properties with No Prior Certification
  332. 6.6.3 Existing Properties with No Prior HUD Recognized Green B…
  333. 6.7 Green MIP Requirements for Sections 220, 221(d)(4), 231-Ne…
  334. 6.7.1 ENERGY STAR® Appliances and Systems Required
  335. 6.7.2 Project Architect’s Green MIP Responsibilities
  336. 6.7.3 Recording Baseline Data-CNA
  337. 6.8 Green MIP Requirements for Section 241(a)
  338. 6.9 Underwriting Owner’s Utility Cost as Part of Operating Exp…
  339. 6.9.1 Methods for Underwriting Owner’s Utility Costs Changes
  340. 6.9.2 Underwriting Owner Utility Operating Expense for New Pro…
  341. 6.9.3 CAUTION: Changed Energy Use Not Proportionate to Resulti…
  342. Chapter 7 Valuation & Market Analysis
  343. 7.1 Introduction
  344. 7.2 Selection of Appraisers and Market Analysts
  345. 7.3.1 Appraiser Qualifications
  346. 7.3.2 Market Analyst Qualifications
  347. 7.4 Valuation Reviews of Third-Party Reports
  348. 7.5.1 Purpose and Focus of the Study
  349. 7.5.2 Effective Date
  350. 7.5.3 Forecast Period for Market Study
  351. 7.5.4 Project Rents Used in Market Study
  352. 7.5.5 HUD as an Intended User
  353. 7.5.6 Executive Summary
  354. 7.5.7 Description of the Proposed Project
  355. 7.5.8 Primary Market Area
  356. 7.5.9 Economic Context
  357. 7.5.10 Demographic Analysis
  358. 7.5.11 Current Housing Market Conditions
  359. 7.5.12 Rental Units in the Pipeline
  360. 7.5.13.1 Net Demand Analysis
  361. 7.5.13.2 Effective Demand
  362. 7.5.13.3 Evaluation of Net Demand and Effective Demand
  363. 7.5.13.4 Demand for LIHTC Projects
  364. 7.5.14 Findings and Conclusions
  365. A. According to USPAP Advisory Opinion 14:
  366. 7.5.16 Data, Estimates, and Forecasts
  367. 7.6 Appraisal Requirements
  368. 7.6.1 Effective Date
  369. 7.6.2 Brevity
  370. 7.6.3 Complex or Unusual Appraisal Assignments
  371. 7.6.4 HUD Forms to Include in the Report
  372. 7.6.5 USPAP Jurisdictional Exception Rule
  373. 7.6.6 Occupancy Percentage
  374. 7.6.7 Sections 220, 221(d)(4), and 231
  375. 7.6.8 Section 223(f)
  376. 7.6.8.1 Value for Rent Controlled Properties
  377. 7.6.8.2 Cost/ Summation Approach
  378. 7.6.8.3 Sales Comparison Approach
  379. 7.6.8.4 Income Approach
  380. 7.6.9 Reconciliation of the Approaches to Value
  381. 7.6.10 Section 231 Substantial Rehabilitation
  382. 7.6.11 Remaining Economic Life (REL)
  383. 7.6.12 Confidentiality Rule of USPAP
  384. 7.6.13 Appraiser’s Certification
  385. 7.6.14 Inspection of the Subject and Comparables
  386. 7.6.15 Required Appraisal Report Exhibits
  387. 7.6.16 Market Analysis
  388. 7.7.1 Rental Estimates
  389. 7.7.1.1 Rent Comparables
  390. 7.7.2 Adjustments
  391. 7.7.3 Final Rent Estimate
  392. 7.7.4 LIHTC and/or Bond Financed Projects
  393. 7.7.5 Trending of Rents
  394. 7.7.6 Equipment Included in Rent
  395. 7.7.7 Occupancy/Vacancy and Collection Losses
  396. Property Type
  397. 7.7.8 Project Rent Concessions
  398. 7.7.9 Occupancy
  399. 7.7.10 Utilities/Services
  400. 7.7.11 Project Location, Amenities, and Other Factors
  401. 7.7.12.1 Ancillary Income
  402. 7.7.12.2 Resale/Submetering of Utilities
  403. 7.7.12.3 Resale of Internet and Media Services
  404. 7.7.12.4 Cell Tower Income
  405. 7.7.12.5 Short-Term Lease Premiums
  406. 7.7.12.6 Corporate Leases
  407. 7.7.12.7 Pool and Pet Fees
  408. 7.7.12.8 Ineligible Income
  409. 7.7.12.9 Commercial Income
  410. income collected under the contract if it is a fixed monthly p…
  411. Commercial Space and Income Limitations
  412. 7.7.13 Limited Waiver of Commercial Income and Space Limits
  413. 7.7.14 Commercial Space Valuation
  414. 7.8.1 Purpose
  415. 7.8.2 Sources of Expense Data
  416. 7.8.3 General
  417. 7.8.4 Estimate of Operating Expenses by Units of Comparison
  418. 7.8.5 Expense Comparables
  419. 7.8.6 Expense Adjustments
  420. 7.8.7 Updating Procedures
  421. 7.8.8 Consistent Expense Line Items
  422. 7.8.9 Underwritten NOI and Program Guidance
  423. 7.9 Site Analysis
  424. 7.9.1 Analysis of Location
  425. 7.9.2 Specific Location
  426. 7.9.3 Civic, Social, and Commercial Centers
  427. 7.9.3.1 Schools
  428. 7.9.3.2 Neighborhood Shopping
  429. 7.9.3.3 Religious and Recreation Centers
  430. 7.9.4 Transportation
  431. 7.9.5 Special Hazards and Nuisances
  432. 7.9.6 Parking Facilities
  433. 7.9.7 Site Suitability
  434. 7.9.8 Land/Site Valuation
  435. 7.9.9 Warehousing of “Excess” Land Area
  436. 7.10.1 Lender’s Responsibilities
  437. 7.11.1 Lender’s Responsibilities
  438. 7.11.2 HUD Review
  439. 7.12.1 Lender’s Responsibilities
  440. 7.13.1 General
  441. 7.13.2 Completing Form HUD-92264
  442. 7.13.3 Applicable Approaches for "As Is" Value
  443. 7.13.4 Valuation for 220 and 221(d)(4)
  444. 7.13.5 Valuation for Section 231 Substantial Rehabilitation
  445. 7.13.6 Valuation for RAD Transactions
  446. 7.13.7 Contingency Reserves
  447. 7.13.8 Interest During Construction
  448. 7.13.9 Inspection Fee
  449. 7.13.10 Offsite Costs
  450. 7.13.11 Rehabilitation Cost not Attributable to Residential Use
  451. 7.13.12 Developer’s Fee, when Applicable
  452. 7.13.13 Exclusions to Estimated Replacement Cost
  453. 7.14.1 Estimate of a Project’s Operating Deficit
  454. 7.15 Leaseholds/Ground Leases
  455. 7.15.1 Definitions
  456. J. Operating Expenses. See Section 7.7.
  457. 7.15.2 Legal Requirements
  458. 7.15.3.1 Acceptable Form of Ground Rent Computation
  459. 7.15.3.2 Unacceptable Lease Payments (Ground Rent)
  460. 7.15.3.3 Ground Rent During Construction
  461. 7.15.4 Valuation of the Leasehold Estate
  462. 7.15.5 Rehabilitation of an Existing Project
  463. 7.15.6 Maximum Mortgage Amount for Criterion 3
  464. 7.15.7 Fee-Joinders
  465. 7.16.1 General Comments and Exceptions
  466. 7.16.2 Full Term Tax Abatement
  467. 7.16.3 Partial Term or Variable Tax Abatement
  468. 7.16.4 Deferral of Real Estate Taxes
  469. 7.17.1 For Section 223(f)
  470. 7.17.1.1 Criterion 3 Market Value
  471. 7.17.1.2 Criterion 5 Debt Service Analysis
  472. 7.17.1.3 Form HUD-92264T for LIHTC Projects without Section 8
  473. 7.17.1.4 Form HUD-92264T for Section 8 Project-Based Assistanc…
  474. 7.17.1.5 Form HUD-92264T for Section 8 Project-Based Assistanc…
  475. 7.17.2 Fee Income
  476. 7.17.3 Income Limits
  477. 7.17.4 Expenses/Fees
  478. 7.18.1 Scope of Work
  479. 7.18.2 Jurisdictional Exception Rule
  480. 7.18.3 Record Keeping Rule
  481. 7.18.4 Loan Committee
  482. 7.18.5 Workload Sharing
  483. 7.18.6 Consultations with Other Staff
  484. 7.18.7 Environmental Processing
  485. 7.18.8 Technical Appraisal Review Requirements
  486. 7.18.9 Documentation of the Appraisal Review
  487. Chapter 8 Mortgage Credit
  488. 8.1 Introduction
  489. 8.2 Borrower Types – Single Asset Borrower Entity
  490. 8.3 Reviewing Principals and Other Parties in Control
  491. 8.3.1 Determining Principals and Who is in Control
  492. B. “Principals” may include any of the following:
  493. 8.3.2 Underwriting Active Principals and Those with Control
  494. 8.3.3 Previous Participation Certification Requirements
  495. 8.3.4 Nonprofit Principals
  496. 8.3.5 Foreign National Participation in FHA-Insured Multifamil…
  497. Definition of Principal for Regulatory Agreement Section 50
  498. 8.4 Investigating Credit and Character
  499. 8.4.1 Use of Credit Reports and Credit Investigation
  500. 8.4.2 Lender’s Review of the Credit Report
  501. 8.4.3 Delinquent Federal Debt, Judgments and Pending Litigation
  502. 8.4.4 Trade and Credit References
  503. 8.4.5 Rejection Due to Unacceptable Character and Credit
  504. 8.5.1 Financial Statement Analysis
  505. 8.5.1.1 Submission of Financial Statements–New Construction
  506. 8.5.1.2 Existing Project Financial Statements
  507. 8.5.1.3 Review of Financial Statements and Other Documents
  508. B. Exceptions:
  509. 8.5.1.4 Letters and Lines of Credit
  510. 8.5.1.5 Sponsor’s Continuing Commitments
  511. 8.5.1.6 General Contractor with Adequate Capital
  512. 8.5.1.7 LIHTC, Historic Tax Credit or New Market Tax Credit Tr…
  513. 8.5.1.8 Real Estate Owned Schedule and Mortgage Debt Schedule
  514. 8.6.1.1 Purpose
  515. 8.6.2 Principal Types
  516. 8.6.3 Threshold
  517. 8.6.4 Threshold Applies to Current and Expected Balance
  518. 8.6.5 Effective Date and Duration
  519. 8.6.6 Lender Submission and Procedure
  520. 8.7 Secondary Financing
  521. 8.7.1 Public Sources
  522. 8.7.2 Private Sources – Section 223(f)
  523. NOTE: Project-specific exceptions or waivers to these policies…
  524. 8.7.3 Private Source – New Construction/Substantial Rehab
  525. 8.7.4 Section 223(a)(7) Refinance Program
  526. 8.7.5 Condition for Repayment of Secondary Financing
  527. 8.7.6 Secured Public Secondary Financing Conditions
  528. 8.7.7 Unsecured Private Secondary Financing Conditions
  529. 8.7.8 Tax Credit Equity Bridge Loans
  530. 8.8 Application Exhibits and Responsibilities
  531. 8.8.1 General Responsibilities of Lender’s Underwriter
  532. 8.8.2 Additional Exhibits Required of Project Participants
  533. 8.8.3 Evaluating Nonprofit Sponsors and Borrowers
  534. 8.8.4 Credit Review of a Nonprofit Sponsor and Borrower
  535. 8.8.5 Nonprofit Developer Fees
  536. 8.8.6 Consultant Fees
  537. 8.8.7 Establishing a Profit-Motivated Borrower Entity
  538. 8.8.8 Lender’s Review and Recommendation
  539. 8.8.9 Mortgage Credit Duties of HUD
  540. 8.9.1 Sections 220, 221(d)(4), 241(a) and 231 Projects
  541. 8.9.2 Section 207 Pursuant to 223(f) Projects
  542. 8.9.3 Section 223(a)(7) Projects
  543. 8.10.1 Mortgage Amounts and Cash Requirements
  544. 8.11.1 Determining Mortgage Amounts, Cash Requirements, and Re…
  545. B. Identity of Interest Purchase Transaction . Refer to Chapte…
  546. 8.12.1 General
  547. 8.12.2 Application for Mortgage Insurance
  548. 8.12.3.1 Firm Commitment
  549. 8.12.3.2 Initial Endorsement
  550. 8.12.3.3 Grant and Loan Proceeds Must be Advanced
  551. 8.12.4 Grants and Loans from a Non-Governmental Source
  552. B. Initial Endorsement.
  553. 8.13 Insurance Upon Completion
  554. 8.14 Determining Cash Requirements for Completion
  555. 8.15.1 Review of Financing Documents
  556. 8.15.2 Loan Rates
  557. 8.15.3 Tax-Exempt Loans and/or Bonds
  558. 8.15.4 Itemized Statement of Costs
  559. 8.15.5.1 Prepayment of Note
  560. 8.15.5.2 State/Local Occupancy Use and/or Rent Restrictions
  561. 8.15.6 Pre-Cost Certification Conference Information
  562. Chapter 9 Environmental Review and Requirements
  563. 9.1 Introduction
  564. 9.1.1 Legal Authorities, Guidance, Standards, and Documentation
  565. 9.1.2 Project Description, Aggregation, and Extent of Review
  566. 9.1.3 Levels of Environmental Review
  567. 9.1.4 Local, State, Tribal or Federal Requirements
  568. 9.2.1 Lender Responsibilities and Limitations
  569. 9.2.2 HUD Responsibilities
  570. 9.2.3 Timing Considerations
  571. 9.2.4 Verifying Qualifications of Professionals
  572. 9.2.5 Consulting with Regional or Satellite Offices
  573. 9.3 HEROS Environmental Reports
  574. 9.4 Contamination and Toxic Substances
  575. 9.4.1 Phase I Environmental Site Assessment Requirements
  576. 9.4.2 Phase II Environmental Site Assessment Requirements
  577. 9.4.3 Remediation Response Planning
  578. 9.4.4 Remediation Plans with Complete Removal of Contamination
  579. 9.4.5 Remediation Plans with Incomplete Removal of Contamination
  580. 9.4.6 Monitoring Wells, Flushing Wells, and Testing Wells 9.4.…
  581. 9.4.6.2 Monitoring Well Protocols
  582. 9.4.6.3 Monitoring Wells for Off-site Contamination
  583. 9.4.6.4 Flushing Wells
  584. 9.4.6.5 Testing or Monitoring Wells Ordered by LSTF
  585. 9.4.6.6 Non-operating Wells
  586. 9.4.7 Off-Site Contamination
  587. 9.4.8 Escrow
  588. 9.4.9 Waivers
  589. 9.4.10 LSTF Approvals and Reviews
  590. 9.4.11 Superfund Sites
  591. 9.4.11.1 Superfund National Priority List (NPL) Sites
  592. 9.4.11.2 Superfund Sites Not on the NPL
  593. 9.4.11.3 EC/IC Put in Place by EPA
  594. 9.4.12 Unacceptable Sites
  595. 9.4.13 Underground Storage Tanks Not Regulated by the LSTF
  596. 9.5.1 General Responsibilities
  597. 9.5.2 Projects with Complete Removal of Site Contamination 9.5…
  598. 9.5.2.2 Architecture/Engineering and Cost
  599. 9.5.2.3 Mortgage Credit
  600. 9.5.3 Projects with Incomplete Removal of Site Contamination
  601. 9.5.4 Insurance and Guarantee Requirements
  602. 9.5.5 Management, Coordination, and Communication
  603. 9.6.1 Lead-Based Paint (24 CFR Part 35.115(a))
  604. 9.6.2 Asbestos (24 CFR 50.3(i))
  605. 9.6.3.1 Background
  606. A. Radon Report :
  607. B. Radon Professionals :
  608. C. Exceptions to a Radon Report :
  609. D. Testing Protocols :
  610. E. Occupant Notification :
  611. F. Mitigation Standards :
  612. G. Mitigation Timing :
  613. H. Certificate of completion :
  614. I. Operation and Maintenance Plans :
  615. J. Existing Mitigation Systems :
  616. K. Cost estimates :
  617. 9.6.3.3 Requirements for Section 223(f) Projects
  618. 9.6.3.4 Requirements for Substantial Rehabilitation and Conver…
  619. 9.6.3.5 Requirements for New Construction
  620. 9.6.4 Historic Preservation (24 CFR 50.4(a))
  621. 9.6.5 Floodplain Management (24 CFR 50.4(b)(2))
  622. 9.6.6 Flood Insurance (24 CFR 50.4(b)(1))
  623. 9.6.7 Wetlands Protection (24 CFR 50.4(b)(3))
  624. 9.6.8 Noise Abatement and Control (24 CFR Part 51, Subpart B)
  625. 9.6.9 Explosive and Flammable Hazards (24 CFR Part 51 Subpart C)
  626. 9.6.10 Air Quality (24 CFR 50.4(h))
  627. 9.6.11 Airport Hazards (24 CFR Part 51 Subpart D)
  628. 9.6.12 Coastal Barrier Resources (24 CFR 50.4(c)(1))
  629. 9.6.13 Coastal Zone Management (24 CFR 50.4(c)(2))
  630. Endangered Species (24 CFR 50.4(e))
  631. 9.6.15 Farmlands Protection (24 CFR 50.4(j))
  632. 9.6.16 Sole Source Aquifers (24 CFR 50.4(d))
  633. 9.6.17 Wild and Scenic Rivers (24 CFR 50.4(f))
  634. 9.6.18 Environmental Justice (24 CFR 50.4(l))
  635. 9.6.19 Additional Nuisances and Hazards
  636. 9.6.20 Environmental Assessments (24 CFR 50 Subpart E)
  637. 9.6.21 Operation and Maintenance Plans
  638. Chapter 10 Management Analysis
  639. 10.1 Introduction
  640. 10.2 Exhibits Required for Firm Commitment
  641. G. Marketing, Leasing, and (if applicable) Relocation Plan :
  642. 10.3 Lender Review of Management Documents
  643. 10.4 HUD Asset Management Review
  644. 10.5 Review of Previous Participation
  645. 10.6 Bonding Requirements for Agents
  646. 10.7.1 Applicability
  647. 10.7.2 Required Contents
  648. 10.7.3 Length/term of the Agreement
  649. 10.7.4 Management Fee
  650. 10.8 Approval of Proposed Management Agent
  651. 10.9 Affirmative Fair Housing Marketing
  652. 10.10 Management Agents and Escrow Administration
  653. Chapter 11 Lender Underwriting, HUD Review and Closing
  654. 11.1 General
  655. 11.2 Lender Underwriting
  656. 11.2.1 Pre-application
  657. 11.2.2 Firm Commitment Application
  658. 11.2.3 Third-Party Report Certifications
  659. 11.2.4 HUD Forms Submission
  660. 11.3.1 HUD Underwriter Responsibilities
  661. 11.3.2 Pre-Application and Firm Commitment Processing
  662. 11.3.3 Underwriting Recommendation
  663. 11.3.4 Firm Commitment Issuance, Extensions, Amendments and Re…
  664. 11.3.5 Waivers
  665. 11.3.6 Interest Rate Lock
  666. 11.4 Program Closing Provisions
  667. 11.5 Loan Fees
  668. 11.5.1 Deferred Fee Collection
  669. 11.5.2 Broker’s Fees
  670. 11.6.1 Preliminary Title Report
  671. 11.6.2 Air Rights and Other Shared Interest Projects
  672. 11.7 Borrower Entity’s Organizational Documents
  673. 11.8.1 Term
  674. 11.8.2 Prepayment Provisions
  675. 11.8.3 Conditions for Including Lockouts and/or Penalties
  676. 11.8.4 Late Charge Provisions
  677. 11.8.5 Override of Prepayment Lockout
  678. Chapter 12 Construction Period
  679. 12.1.1 General
  680. 12.1.2 HUD Construction Analyst (CA)
  681. 12.1.3 HUD Inspector
  682. 12.2.1 General Requirements
  683. 12.2.2 Contract Administration
  684. 12.2.3 Cost Certification
  685. 12.3.1 Purpose of Inspection
  686. 12.3.2 Access
  687. 12.3.3.1 Assignment
  688. 12.3.3.2 Offsite Fabricated Construction
  689. 12.3.3.3 Trip Report Review
  690. 12.3.3.4 HUD Inspector Oversight
  691. 12.3.4 HUD Inspector’s Duties
  692. 12.3.4.1 Orientation
  693. 12.3.4.2 Facilities
  694. 12.3.4.3 Inspections
  695. 12.3.4.4 Start of Construction Date
  696. 12.3.4.5 Shop Drawings and Other Data
  697. 12.3.4.6 Work Stoppage
  698. 12.3.4.7 Occupancy
  699. 12.3.4.8 Additional Duties of the Inspector
  700. 12.3.4.9 Construction Record
  701. 12.3.4.10 Projects Insured Upon Completion
  702. 12.3.4.11 Off-Site Inspection
  703. 12.3.5 Construction Progress Meetings (monthly meetings)
  704. 12.3.6 Reporting Serious Construction Problems
  705. 12.4.1 General Requirements
  706. 12.4.2 Architect's Supplemental Instructions
  707. 12.4.3 Architect Administering the Construction Contract
  708. 12.5 Architect’s Adequacy
  709. 12.5.1 Deficient Administration
  710. 12.5.2 Reasons for Termination of Services
  711. 12.5.3 HUD Office Actions
  712. 12.5.4 Request for Contract Termination
  713. 12.5.5 Contract Termination
  714. 12.6.1 Substantial Completion
  715. 12.6.2 Final 100% Draw Completion Inspection
  716. 12.6.3 Warranty Inspections
  717. 12.7.1 General
  718. 12.7.2 Lender’s Role in Processing Application for Insurance o…
  719. 12.7.3 Stages of Advances
  720. 12.7.4 Approval of Initial/Interim Advances
  721. 12.7.5 Contractor’s Monthly Requisition and Related Matters
  722. 12.7.6 Next to Final Advance
  723. 12.7.7 Final Advance
  724. 12.7.8 Keeping the Mortgage in Balance
  725. 12.8.1 General Requirements
  726. 12.8.2 Change Order Classification
  727. 12.8.3 Additive change Orders
  728. 12.8.4 Deductive Change Orders
  729. 12.8.5 Changes that Adversely Affect Property Income
  730. 12.8.6 Extension of Contract Time
  731. 12.8.7 Changes to Items of Delayed Completion
  732. 12.8.8 Emergency Changes
  733. 12.8.9 Insurance Upon Completion
  734. 12.8.10 Changes to Offsite Construction
  735. 12.8.11 Other Changes
  736. 12.9.1 General Procedure
  737. 12.9.2 Voiding Changes
  738. 12.9.3 Unapproved Changes
  739. 12.10.1 Architectural
  740. 12.10.2 Cost
  741. B. Approved time extensions:
  742. 12.11.1 Appraisal Reconsideration, When Required
  743. A. Processing:
  744. 12.12.1 Wages
  745. 12.12.2 Labor Violations
  746. 12.12.3 FHEO Noncompliance
  747. 12.12.4 Compliance with Any Applicable Relocation Plan
  748. 12.13 Surveys
  749. 12.14 Permission to Occupy
  750. 12.14.1 Physical Completion
  751. 12.14.2 Signatures, Approval and Permission
  752. 12.14.3 Submission Documents
  753. 12.14.4 Partial Occupancy Approval
  754. 12.15.1 Application for Disbursement of Escrowed Funds
  755. 12.15.2 Release of Letters of Credit
  756. 12.15.3 Working Capital Deposit
  757. D. Final Release of Escrow.
  758. 12.15.4 Initial Operating Deficit Deposit
  759. 12.15.5 Amount of Contractor's Retainage and Release
  760. E. Early partial release of retainage.
  761. 12.15.6 Cash-Out Escrow from Land Equity
  762. 12.16 Insurance Upon Completion (IUC)
  763. 12.17.1 Repairs and Alterations
  764. 12.17.1.1 Completion of Repairs and Alterations
  765. 12.17.1.2 Payment for Repairs
  766. 12.17.1.3 Release of Cash-Out/ Equity from Loan Proceeds
  767. 12.17.1.4 Funds Remaining in the Escrow
  768. 12.17.2 Inspection
  769. 12.17.3 Schedule of Values for Reimbursement from the Repair E…
  770. 12.17.4 Final Report
  771. 12.17.5 Change Orders
  772. 12.17.6 Warranty Inspections
  773. 12.17.7 Projects in Difficulty
  774. 12.18 Casualty Events During Construction
  775. Chapter 13 Cost Certification
  776. 13.1 Projects that Must Certify
  777. 13.2 Projects Exempt from Cost Certification
  778. 13.2.1 Low Income Housing Tax Credits
  779. 13.2.1.1 Audit Fee Not Applicable
  780. 13.2.1.2 Establishing Substantial Completion Date
  781. 13.2.1.3 Treatment of Operating Income Generated During Constr…
  782. 13.2.1.4 Copy of Final Sources and Uses Statement
  783. 13.2.1.5 Modification to Form HUD-92580
  784. 13.3 Types of Cost Certification
  785. 13.4 Entities That Must Cost Certify
  786. 13.5 Cost Certification Sequence of Events
  787. 13.6 Project Completion and Cut-Off Dates
  788. 13.7 Administrative Completion Date
  789. 13.8 Submission Date
  790. 13.9 Required Forms
  791. 13.10 Required Statements and Certifications
  792. 13.10.1 Simplified Form of Cost Certification
  793. 13.10.2 Long Form Cost Certification
  794. 13.10.3 Section 223(f) Projects
  795. 13.11 Deficiencies in Cost Certification Submission
  796. 13.12 Mortgage Credit Limited Review
  797. 13.13 Mortgage Credit Detailed Review
  798. 13.14.1 Construction Contract
  799. 13.14.2 Architect’s Fee(s)
  800. 13.14.3 Interest Accrued
  801. 13.14.4 Taxes Accrued
  802. 13.14.5 Property Insurance Accrued
  803. 13.14.6 Mortgage Insurance Premium
  804. 13.14.7 HUD Application, Commitment, and Inspection Fees
  805. 13.14.8 Financing Expenses
  806. Exclude:
  807. 13.14.9 Title and Recording Expenses
  808. 13.14.10 Legal, Organization, and Audit Expenses
  809. 13.14.11 Offsite Costs
  810. NOTE:
  811. 13.14.12 Other Costs
  812. 13.14.13 Builder’s and Sponsor’s Profit and Risk Allowance
  813. 13.14.14 Non-Profit Developer Fee
  814. 13.15.1 Actual Costs
  815. 13.15.2 Mortgage Increase or Detailed Review Not Requested
  816. 13.15.3 Cost Review
  817. 13.15.4 Lump Sum Construction Contract Cost Certification
  818. 13.15.5 Summary of Cost Certification Review (on Form HUD92331)
  819. 13.16 Non-Profit Borrower’s Initial Equity Investment
  820. 13.17 Determine the Borrower’s Initial Investment
  821. 13.18 Section 223(f) Modified Form of Cost Certification
  822. 13.19 Special Instructions for Substantial Rehabilitation
  823. 13.20 Mortgage Reduction after Cost Certification
  824. 13.21 Increase in Mortgage Amount
  825. 13.22 Restrictions on Mortgage Increases
  826. 13.23 Processing a Mortgage Increase
  827. 13.24 Authorization to Reopen Mortgage Transaction
  828. 13.25 Deferment of Principal Payments
  829. 13.26 Document Distribution
  830. 13.27 Office of Inspector General
  831. 13.28 Cost Certification Incontestability
  832. 13.29 Post-Closing Escrows
  833. 13.30.1.1 Advance Amortization Requirements
  834. 13.30.1.2 Income and Expense Statement Requirement
  835. 13.30.1.2.1 Agreement of Borrower
  836. 13.30.1.2.2 Treatment of Items in Statement
  837. 13.30.1.3 Amount of Required Prepayment
  838. 13.30.1.4 Excess (Unused) Mortgage Loan Proceeds
  839. 13.30.2.1 Preparing Form HUD-92580, Maximum Insurable Mortgage
  840. 13.30.2.2 Decrease in Loan Amount
  841. 13.30.2.3 Increase in Loan Amount
  842. 13.30.2.4 Statement of Status of Escrows
  843. 13.30.2.5 Borrower’s Investment
  844. 13.30.3 Final Closing – Insurance Upon Completion
  845. Chapter 14 LIHTC and Other Tax Credit Programs
  846. 14.1 Introduction
  847. 14.2 LIHTC Underwriting Guidance
  848. MAP Guide Section Number Content
  849. MAP Guide Section Number Content
  850. Content
  851. 14.3 Historic and New Markets Tax Credits
  852. 14.4 Subsidy Layering Review
  853. 14.5 Evidence of Tax Credit Allocations
  854. 14.6 HAP Contract Renewals for Section 8 Projects
  855. 14.7 Application/Submission Requirements
  856. 14.8 Architecture and Engineering
  857. 14.9 Identities of Interest in Tax Credit Transactions
  858. 14.10 Mortgage Amounts, Contingency and Escrow
  859. 14.11 Structuring of Secondary Debt
  860. 14.12.1 Treatment of Developer Fee
  861. 14.12.2 Deferred Developer Fee (DDF)
  862. 14.13 Tax Credit Equity Pay-In Schedule
  863. Benchmarks for Equity Installments
  864. 67,68
  865. 14.14 Definition of “Net Equity”
  866. Net Equity = (Total Equity) – (Equity Pay In 1) – (Allowed Ded…
  867. Sample Owner’s Proposed Reductions:
  868. Total $1,900,000
  869. 14.15 Equity Bridge Loans in Tax Credit Projects
  870. 14.16 Syndicator and Investor Fees from Operations
  871. 14.17 Mark to Market (M2M) Transactions
  872. 14.18 Firm Commitment Additional Conditions
  873. 14.19 Other Matters
  874. 14.19.1 Bond-Financed Projects in New York City
  875. 14.19.2 Lien Priority
  876. 14.19.3 Tax Credit Regulatory Agreements
  877. 14.19.4 Tax Exempt Bonds - FHA Insured Permanent Debt
  878. 14.19.5 Refinancing of M2M Properties
  879. 14.19.6 Income Averaging
  880. 14.20 FHA Tax Credit Pilot Program Expansion
  881. Chapter 15 Oversight of MAP Program Requirements
  882. 15.1 Oversight of MAP Lenders
  883. 15.2.1 Functions
  884. 15.2.2 Data and Reports
  885. 15.2.3 Timing of MAP Lender Reviews
  886. 15.3.1 General
  887. 15.4 Administrative Record
  888. 15.5 Settlement Agreements
  889. 15.6 Letters of Caution, Warning Letters or Sanctions
  890. 15.7 Warning Letters and Targeted Enforcement Measures
  891. 15.7.1 Warning letter
  892. 15.7.2 Targeted Enforcement Measures
  893. 15.8 MAP Probation
  894. 15.9 MAP Suspension
  895. 15.10 MAP Termination
  896. 15.11 MAP Lender Review Board
  897. 15.12 MAP Lender Review Board: Staff Responsibilities
  898. 15.13 MAP Lender Review Board: Procedures
  899. 15.14 Notice of Violation
  900. 15.15 Notice of Action
  901. 15.16 Appeal Conference and Procedures
  902. 15.17 Suspension, Debarment or LDP
  903. 15.17.1 Parties subject to a suspension, debarment or LDP
  904. 15.17.2 Limited Denial of Participation
  905. 15.17.3 Suspension and debarment
  906. 15.17.4 Procedures to refer a suspension, debarment or LDP
  907. 15.18 Referral to Mortgagee Review Board or OIG
  908. 15.19 Other Enforcement Actions
  909. Chapter 16 Master Leases with Market Tax Credits
  910. 16.1 Introduction
  911. 16.2 Background
  912. 16.3 General Programmatic Requirements
  913. A. Firm Commitment Special Conditions:
  914. 16.5 Cost Certification and Final Endorsement
  915. Chapter 17 Section 207: Refinancing Cooperative Housing Projects
  916. 17.1 Introduction and Background
  917. 17.2 Program Eligibility
  918. 17.3 Program Requirements
  919. 17.3.1 Loan Parameters
  920. 17.3.2 General Operating Reserve (GOR)
  921. 17.3.3 Model Forms and Closing Documents
  922. 17.4 Application Processing
  923. 17.5.1 Architectural and Cost Processing
  924. 17.5.2 Valuation Processing: Appraisal Scope-of-Work
  925. 17.5.3 Environmental Processing
  926. 17.5.4 Mortgage Credit Processing
  927. 17.5.5 Asset Management Processing
  928. 17.6 Loan Closing Procedures
  929. Chapter 18 Section 223(a)(7)
  930. 18.1 Introduction
  931. 18.2 Purpose of Section 223(a)(7)
  932. 18.3.1 Standard Processing Time
  933. 18.3.2 Inapplicable Mortgages
  934. 18.3.3 Maximum Mortgage
  935. 18.3.4 Mortgage Term
  936. Loan Data
  937. Loan Requirements
  938. Loan Data
  939. 18.3.5 Mortgage Insurance Premium
  940. 18.3.6 Environmental Review Requirements
  941. 18.3.7 Fees
  942. 18.3.8 Project Numbering
  943. 18.3.9 Regulatory Agreement
  944. 18.3.10 Cost Certification
  945. 18.3.11 Commencement of Amortization
  946. 18.3.12 Source of Funds for Prepayment Penalty Costs
  947. 18.3.13 Refinancing Partial Payment of Claim (PPC) Properties
  948. 18.3.14 Commitment, Regulatory Agreement and Closing
  949. 18.4 Processing
  950. 18.4.1 Project Analysis
  951. B. The following is an example of a sample transaction – the d…
  952. C. The following is an example of a sample transaction – the d…
  953. D. The following is an example of a sample transaction – the d…
  954. 18.4.2 Verification of Existing Borrower Debt
  955. 18.4.3 CNA Requirement
  956. 18.4.4 Site Visits
  957. 18.4.5 Section 202 Mortgage Refinancing
  958. Loan Requirements Section of the Act
  959. 18.4.6 Ownership and Property Management Changes
  960. 18.5 Application Requirements Checklist
  961. Chapter 19 Closing Guide
  962. Part I: Introduction and Procedures
  963. 19.1.1 Applicability
  964. 19.1.1.1 Objective
  965. 19.1.1.2 Defined Terms
  966. 19.1.2.1 General
  967. 19.1.2.2 Firm Application
  968. 19.1.2.3 After Firm Commitment Issuance and Prior to Package S…
  969. B. Lender’s Introductory Response and Interim Communication:
  970. 19.1.2.4 HUD Review of Closing Packages
  971. 19.1.2.5 Changes to Tentative or Confirmed Closing Dates
  972. 19.1.3.1 Administrative Clearance to Close
  973. 19.1.3.2 HUD Signature Page
  974. 19.1.3.3 Note Endorsement
  975. 19.1.3.4 Circulation and Submission of Recordable Documents
  976. 19.1.3.5 Form of Closing Docket Submission
  977. 19.1.3.6 Restriction on Post-Closing Revision to Closing Docket
  978. 19.1.3.7 Closing Type: Mail or In-Person
  979. 19.1.4 Post-Closing Handling of Closing Dockets
  980. 19.2.1 Initial Endorsement Activities
  981. 19.2.2.1 Davis Bacon Labor Standards (DBLS) Clearance Required
  982. 19.2.2.2 Procedures for Firm Application, Issuance, and Initia…
  983. 19.2.2.3 Early Start of Construction
  984. 19.2.2.4 Procedures for Final Closings
  985. 19.2.3 Early Start of Construction
  986. 19.2.4.1 HUD Prior Written Approval Needed
  987. 19.2.4.2 Prior Document Review by HUD Counsel.
  988. 19.2.4.3 Implementation
  989. 19.3.1.1 Definitions
  990. 19.3.1.2 Assurance of Completion
  991. 19.3.1.3 Commencement of Preparation for Final Closing
  992. 19.3.1.4 Prerequisites for Final Closing
  993. 19.3.1.5 Final Closing Procedures
  994. 19.3.1.6 Internal Closing Forms
  995. 19.3.2.1 Request for Final Endorsement
  996. 19.3.2.2 Final Endorsement of the Note
  997. 19.3.2.3 Release of Final Advance
  998. 19.3.2.4 Release of Working Capital Deposit
  999. 19.3.3.1 Requirements for Final Advance
  1000. 19.3.3.2 Application for Insurance of Advance of Mortgage Proc…
  1001. 19.3.4.1 Disputes
  1002. 19.3.4.2 Relevant Issues for HUD’s Consideration
  1003. 19.3.4.3 Closing Without Full Participation of the Contractor.
  1004. 19.3.5.1 Introduction
  1005. 19.3.5.2 Workouts
  1006. Part II: Closing Documents and Program-Specific Requirements
  1007. 19.4.1.1 Required Use of HUD Forms and Closing Protocols
  1008. 19.4.1.2 Completion of HUD’s OMB-approved Forms
  1009. 19.4.1.3 Date of Documents
  1010. 19.4.1.4 Closing Checklists
  1011. 19.4.1.5 Submission of Closing Documents
  1012. 19.4.1.6 Changes to Form Documents and Deviations from Closing…
  1013. 19.4.1.7 Multi-Tiered Review of Requests for Substantive Changes
  1014. 19.4.2.1 General Requirements
  1015. 19.4.2.2 Permitted Modifications for State Requirements and Pr…
  1016. 19.4.2.3 Supplemental, Consolidated, Amended or Restated Loan
  1017. 19.4.2.4 Ground Lease
  1018. 19.4.2.5 Fee-Joinders
  1019. 19.4.3.1 General Requirements
  1020. 19.4.3.2 Description of Collateral
  1021. 19.4.4.1 General Requirements
  1022. 19.4.4.2 Prepayment Provisions
  1023. 19.4.4.3 Endorsement Panel
  1024. 19.4.4.4 Late Charge Provision
  1025. 19.4.4.5 Changes to Loan Interest Rates
  1026. 19.4.4.6 Change(s) to Permanent Financing After Initial Closing
  1027. 19.4.4.7 Supplemental, Consolidated, Amended or Restated Loan
  1028. 19.4.5.1 Form
  1029. 19.4.5.2 Notice Address for HUD
  1030. 19.4.5.3 Section 50
  1031. 19.4.5.4 Section 30 - Additional Occupancy Restrictions and Po…
  1032. 19.4.5.5 Residual Receipts Rider
  1033. 19.4.5.6 Additional Riders
  1034. 19.4.6.1 General
  1035. 19.4.6.2 Borrower’s Counsel Legal Review and Opinion
  1036. 19.4.6.3 Required Organizational Documents for Borrower
  1037. 19.4.6.4 Tax Credit Transactions
  1038. 19.4.6.5 Final Closings
  1039. 19.4.7.1 Logistics
  1040. 19.4.7.2 Title and Survey Review Standards
  1041. 19.4.7.3 Pro Forma Title Policy Submission
  1042. 19.4.7.4 Title Policy Requirements
  1043. 19.4.7.5 Title Policy Issuance and Escrow Services
  1044. 19.4.7.6 Survey, Survey Map/Plat and Surveyor’s Report.
  1045. 19.4.8.1 General
  1046. 19.4.8.2 Supplemental Opinions
  1047. 19.4.8.3 Litigation Disclosure
  1048. 19.4.9.1 General
  1049. 19.4.9.2 Unsecured Secondary Financing
  1050. 19.4.9.3 Secured Secondary Financing – Public Sources
  1051. E. Instructions for submission to the HUD Closing Attorney.
  1052. 19.4.9.4 Secured Secondary Financing – Private
  1053. 19.4.9.5 Restrictive Covenants and Use Agreements for Secondar…
  1054. 19.4.9.6 Equity Bridge Loans (EBL) for Tax Credit Projects
  1055. 19.4.9.7 Deferred Developer Fees (DDF) for Low Income Housing …
  1056. 19.4.9.8 Secondary Financing That Is Unavailable at Initial Cl…
  1057. 19.4.10.1 General
  1058. 19.4.10.2 Firm Commitment
  1059. 19.4.10.3 Lender’s Certificate
  1060. 19.4.10.4 Tax-Exempt Bond/IRS Code 142(d) Projects
  1061. 19.4.10.5 Restrictive Covenants/Tax Regulatory Agreement
  1062. 19.4.10.6 Borrower’s Counsel Opinion
  1063. 19.4.10.7 Bond Counsel’s Opinion
  1064. 19.4.10.8 HUD Note – Prepayment Prohibitions
  1065. 19.4.10.9 HUD-Required Language for Trust Indenture/Funding Lo…
  1066. 19.4.10.10 Bond Disbursement Agreement and Bond Loan Agreement
  1067. 19.4.10.11 Bond Note
  1068. 19.4.10.12 Supremacy of HUD Requirements and Conflicts
  1069. 19.4.11.1 Firm Commitment Condition
  1070. 19.4.11.2 Subordination of Restrictive Covenants
  1071. 19.4.11.3 Borrower's Attorney's Opinion (Tax Credits)
  1072. 19.4.11.4 LIHTC Equity Pay-In
  1073. 19.4.11.5 Equity Investor Certification
  1074. 19.4.11.6 LIHTC Rider
  1075. 19.4.11.7 Pre-Approval of Special Limited Partners
  1076. 19.4.11.8 Determinative Criteria for SLP Pre-Approval
  1077. 19.4.11.9 Post-Closing Requirements for HUD Pre-Approval of SLP
  1078. 19.4.12.1 General Requirements
  1079. 19.4.12.2 Escrow Agreement for Deferred Repairs (Form HUD-9247…
  1080. 19.4.12.3 Escrow Agreement for Operating Deficits (Form HUD-92…
  1081. 19.4.12.4 Escrow Agreement for Working Capital (Form HUD-92412M)
  1082. 19.4.12.5 Escrow Agreement for Incomplete Construction (Form H…
  1083. 19.4.12.6 Escrow Agreement for Latent Defects (Form HUD-92414M)
  1084. 19.4.12.7 Escrow Agreement of Sponsor to Furnish Additional Fu…
  1085. 19.4.13.1 Permits and Governmental Approvals
  1086. 19.4.13.2 Zoning and Building Code Compliance
  1087. 19.4.13.3 Evidence of Utility Access and Service
  1088. 19.4.13.4 Property Insurance
  1089. 19.4.13.5 UCC Searches
  1090. 19.4.13.6 Certifications
  1091. 19.4.13.7 Certified Closing Statement
  1092. 19.5.1.1 General
  1093. 19.5.2 Project Completion Funds
  1094. 19.5.3 Disbursement Agreement
  1095. 19.5.4.1 General Requirements
  1096. 19.5.4.2 HUD Amendment to AIA Document B108 (Form HUD-92408M) …
  1097. 19.5.4.3 Professional Liability Insurance
  1098. 19.5.5.1 Construction Contract
  1099. 19.5.5.2 Prevailing Wage Rates
  1100. 19.5.5.3 Identity of Interest Disclosure
  1101. 19.5.5.4 Cost Breakdown
  1102. 19.5.5.5 Completion of Forms
  1103. 19.5.5.6 Liquidated Damages
  1104. 19.5.5.7 Cost Certification
  1105. 19.5.5.8 Side Agreements
  1106. 19.5.6.1 General Requirements
  1107. 19.5.6.2 Surety Requirements
  1108. 19.5.6.3 Letters of Credit
  1109. 19.5.6.4 Assurance of Completion for Off-Site Improvements
  1110. 19.5.7.1 Introduction
  1111. 19.5.7.2 HUD-Insured Advance Requirements for Building Compone…
  1112. 19.5.8 Lender’s Certificate for New Construction or Substantia…
  1113. 19.5.9.1 General Requirements
  1114. 19.5.9.2 Maximum Insurable Mortgage Form
  1115. 19.5.9.3 Modifications to Original Loan Terms
  1116. 19.5.9.4 Modification Documents
  1117. 19.5.9.5 Borrower’s Attorney’s Opinion
  1118. 19.5.9.6 Title Evidence at Final Endorsement
  1119. 19.5.9.7 Final As-Built Survey & Surveyor’s Report
  1120. 19.5.9.8 Updated Organizational Documents of Borrower
  1121. 19.5.9.9 Lender’s Current Payment Letter and Certification
  1122. 19.5.9.10 Guarantee Following Completion
  1123. 19.5.10.1 Conditions for Approval of Final Advance of Mortgage…
  1124. 19.5.10.2 Exceptions to General Rule
  1125. 19.5.10.3 Application for Insurance of Advance of Mortgage Pro…
  1126. 19.5.10.4 Approval of a Final Advance
  1127. 19.5.10.5 Escrow for Completion
  1128. 19.5.11.1 General Rule
  1129. 19.5.11.2 Exception to General Rule
  1130. 19.6.1.1 General
  1131. 19.6.1.2 Promissory Note (Form HUD-94001M)
  1132. 19.6.1.3 Evidence of Zoning and Building Code Compliance
  1133. 19.6.1.4 Utilities
  1134. 19.6.1.5 Request for Endorsement of Credit Instrument (Form HU…
  1135. 19.6.1.6 Short-Form Cost Certification
  1136. 19.6.1.7 Repairs and Alterations
  1137. 19.6.1.8 Latent Defects Guarantee
  1138. 19.6.1.9 Projects with Expanded Work
  1139. 19.6.2.1 General
  1140. 19.6.2.2 Five-Year Lockout
  1141. 19.6.2.3 Refinances of Second Mortgages.
  1142. 19.6.2.4 Differences from Section 223(f) Procedures
  1143. 19.6.3.1 Introduction
  1144. 19.6.3.2 Effect on Existing Financing
  1145. 19.6.3.3 Additional Requirements for 241(a) Supplemental FHA L…
  1146. 19.6.3.4 HUD Form Documents for 241(a) Supplemental Loans
  1147. 19.6.4 Section 213 Cooperative Housing Loans
  1148. 19.6.5.1 General
  1149. 19.6.5.2 Firm Commitment
  1150. 19.6.5.3 Construction Requirements
  1151. 19.6.5.4 Closing
  1152. Part III: Sample Language, Certifications, and Riders
  1153. 19.7 HUD-Required Provisions for Borrower’s Organizational Doc…
  1154. 19.8 Rider to Security Instrument – LIHTC Projects
  1155. LENDER
  1156. 19.9 Rider to Regulatory Agreement for Residual Receipts Requi…
  1157. BORROWER
  1158. 19.10 Survey Affidavit of No Change
  1159. AFFIANT:
  1160. 19.11 Certification of Architectural/Engineering Fees
  1161. 19.12 Building Code Verification
  1162. 19.13 Zoning Letter
  1163. 19.14 Third Party Obligee Certification
  1164. 19.15 HUD [Rider / Amendment] To Restrictive Covenants
  1165. Note: This document has been submitted to OMB for PRA approval…
  1166. 19.16 Equity Bridge Loan Rider – LIHTC Projects
  1167. Section 213 Cooperative Program Rider to Regulatory Agreement …
  1168. Appendix 2 Quality Control Plans and Identity of Interest
    Overview
    1. A.2.1.1.1 Background
    2. A.2.1.1.2 Submission and Compliance
    3. A.2.1.1.3 Policy Objectives
    4. A.2.1.1.4 General Requirements of a QC Plan
    5. A.2.1.1.5 Required Notifications and Certifications
    6. A.2.1.1.6 Suspension, Debarment, and Limited Denial of Partici…
    7. A.2.1.1.7 Independence of QC Reviews and Reviewers
    8. A.2.1.1.8 QC Reviews
    9. A.2.1.1.9 Specific Requirements of a QC Plan
    10. A.2.1.1.10 Quality Control Reviews
    11. B. Production tracking:
    12. A.2.2.1 MAP Lender’s and Borrower’s Team
    13. A.2.2.1.1 Secondary Financing Relationships
    14. A.2.2.1.2 Bridge Loans and Balance Sheet Loans
    15. A.2.2.1.3 Inducements
    16. A.2.2.1.4 Gifts
    17. A.2.2.1.5 Charitable Donations
    18. A.2.3.1 Instructions for Representations when the Lender and S…
    19. A.3.1.1 New Construction/Substantial Rehabilitation
    20. A.3.1.2 Refinance/Acquisitions
    21. To return to this page after clicking a link, press ALT + Back…
    22. A.3.2.1 Section 223(f) Program
    23. A.3.2.2 New Construction/Substantial Rehabilitation Programs
    24. Go to Table of Contents
    25. Certification of Compliance with the Fair Housing Act
    26. 2. Substantial Rehabilitation
    27. A.3.4 Senior’s Housing: Definitions
    28. A.3.5.1 Qualifications of Relocation Consultant
    29. A.3.5.2 Relocation Plans
    30. A.3.5.3 Resident Relocation Budget and Escrow
    31. A.3.5.4 Resident Relocation – Implementation & Reporting
    32. A.3.6 Tenant Relocation Escrow Agreement (guide form)
    33. W I T N E S S E T H:
    34. [SIGNATURE PAGE]
    35. INTENTIONALLY LEFT BLANK
    36. A.3.7 Opportunity Zone Map Locations
    37. A.3.8.1 General
    38. A.3.8.2 Broadly Affordable Housing
    39. A.3.8.3 Affordable Housing
    40. A.3.8.4 Green and Energy Efficient Housing
    41. A.3.8.5 Calculating Upfront or Capitalized MIP
    42. A.3.8.6 Documentation Requirements
    43. A.3.8.7 Other Considerations
    44. Appendix 4 Application Processing Documents
    45. A.4.1.1 Application Submission Instructions
    46. A.4.1.2 Application Exhibit Checklists
    47. A.4.1.2.1 Instructions for Using the Checklists
    48. A.4.1.2.2 Tabs and File Names
    49. A.4.1.3 Concept Meeting Checklists
    50. A.4.2.1 Concept Meetings
    51. A.4.2.2 Firm Applications
    52. Section 223(f) Refinance/Acquisition Firm Application Exhibit …
    53. Section 223(f) Refinance/Acquisition Firm Application Exhibit …
    54. Section 223(f) Refinance/Acquisition Firm Application Exhibit …
    55. A.4.3.1 Concept Meetings
    56. A.4.3.2 Firm Applications
    57. Section 223(a)(7) Refinance Firm Application Exhibit Checklist
    58. A.4.4.1 Concept Meetings
    59. A.4.4.2 Pre-Applications
    60. New Construction/Substantial Rehabilitation–Section 221(d)(4),…
    61. New Construction/Substantial Rehabilitation–Section 221(d)(4),…
    62. New Construction/Substantial Rehabilitation–Section 221(d)(4),…
    63. A.4.4.3 Firm Applications
    64. New Construction/Substantial Rehabilitation–Section 221(d)(4),…
    65. New Construction/Substantial Rehabilitation–Section 221(d)(4),…
    66. New Construction/Substantial Rehabilitation–Section 221(d)(4),…
    67. A.4.5 Sample MAP Invitation Letter
    68. A.4.6 Firm Commitment Templates
    69. A.4.7.1 Requesting an FHA Project Number
    70. A.4.7.2 Paying Multifamily Fees on Pay.gov
    71. A.4.7.2.1 Creating a User Account
    72. A.4.7.2.2 Completing the Payment Form
    73. A.5.1.1 Minimum Property Standards (HUD Handbook 4910.1)
    74. A.5.1.2 Commercial Use and Daycare Facilities
    75. A.5.1.3 Equipment
    76. A.5.1.4 Ineligible Equipment
    77. A.5.1.5 Air Conditioning
    78. A.5.1.6 Water and Sewer
    79. A.5.1.7 Duplicate Water and Sewerage Systems
    80. A.5.1.8 Individual Septic or Sewerage Systems
    81. A.5.1.9 Privately Owned Offsite Water and Sewerage Systems
    82. A.5.1.10 Subsurface Exploration
    83. A.5.1.11 ALTA Survey General Requirements (see Chapter 19)
    84. A.5.2.1 Statutory Requirements
    85. Summary requirements for Insured Multifamily Properties
    86. A.5.2.2 Implementing and Applying Accessibility Requirements
    87. A.5.2.3.1 Fair Housing Act Design and Construction Requirements
    88. A.5.2.3.2 HUD Recognized Safe Harbors
    89. A.5.2.3.3 Resources for Fair Housing Act Requirements
    90. A.5.2.4.1 Definition of Assisted Housing
    91. A.5.2.4.2 Section 504 Requirements for Assisted Housing
    92. A.5.2.4.3 When Both Section 504 and the Fair Housing Act Apply
    93. A.5.2.4.4 ADA 2010 Standards as an Alternative to UFAS
    94. A.5.2.4.5 Section 504 and UFAS Resources
    95. A.5.2.5.1 Title III
    96. A.5.2.5.2 Title II
    97. A.5.2.6.1 Definition of Accessible
    98. A.5.2.6.2 Accessible Routes
    99. A.5.2.6.3 Accessible Units
    100. A.5.2.6.4 Adaptability
    101. A.5.3.1.1 General
    102. A.5.3.1.2 Exempt Properties
    103. A.5.3.1.3 Fire Protection
    104. A.5.4.1 Required Exhibits for New Construction
    105. A.5.4.2 Required Exhibits for Substantial Rehabilitation
    106. A.5.4.3 Required Exhibits for Refinance or Acquisition
    107. A.5.5.1 New Construction and Substantial Rehabilitation
    108. J. Elevations:
    109. A.5.6 HUD Architectural Review Report Format
    110. A.5.6.1 Pre-Application Exhibits
    111. A.5.6.2.1 New Construction
    112. A.5.6.2.2 Substantial Rehabilitation
    113. NOTE: The following summary of Section 504 applies to any hous…
    114. A.5.6.2.3 Section 223(f)
    115. A.5.7.1.1 General
    116. A.5.7.1.2 CNA e-Tool
    117. A.5.7.2.1 Applications for New Construction or Substantial Reh…
    118. A.5.7.2.2 Applications for Refinancing or Acquisition of Exist…
    119. A.5.7.2.3 10-Year Updates or Other CNAs Required by Asset Mana…
    120. A.5.7.3 Guidance for Key Values on CNA e-TOOL Entries
    121. A.5.7.3.1 CNA Summary and Scope Information
    122. A.5.7.3.2 Buildings – Year Built
    123. A.5.7.3.3 Buildings – Building/Construction Types & Replacemen…
    124. A.5.7.3.4 Standard Estimated Useful Life (EUL)
    125. A.5.7.3.5 Assessed Remaining Useful Life
    126. A.5.7.3.6 Components with EUL or RUL Longer than the Estimate …
    127. A.5.7.3.7 Repair Replace Recommendation – When, Duration, and …
    128. A.5.7.3.8 Repair Replace Recommendation for Existing Components
    129. A.5.7.3.9 Repair Replace Recommendation for Accessibility Defi…
    130. A.5.7.3.10 Scope of Repair or Alteration
    131. A.5.7.3.11 Repair Replace Recommendation for Time to Complete
    132. A.5.7.3.12 Needs Assessor’s Narrative and Attachments
    133. A.5.7.4.1 Capital Costs vs. Operating Expense
    134. A.5.7.4.2 Lender’s General Review and Underwriting Duty
    135. A.5.7.4.3 Lender’s Financial Plan - the Financial Factors Screen
    136. A.5.7.4.4 Validation and Submission of CNAs
    137. A.5.7.5 Documents for Firm Commitment
    138. A.5.8 Design Professional Certifications A.5.8.1 Certification…
    139. A.5.8.2 Project Architect’s Certification for Refinancing
    140. A.5.8.3 Certificate of Professional Liability Insurance
    141. A.5.9 HUD Cost Reviewer Reports Format
    142. A.5.9.1 Cost Review Report for Pre-Application
    143. Reviewer
    144. Concurrence
    145. A.5.9.2.1 New Construction and Substantial Rehabilitation
    146. A.5.9.2.2 Section 223(f) & 223(a)(7)
    147. A.5.10.1 Cost Not Attributable for New Construction
    148. A.5.10.2 Example: Calculating Cost Not Attributable--New Const…
    149. B. Unit quantities:
    150. C. Unit costs:
    151. E. Patio:
    152. F. Playground:
    153. G. Cost Calculations:
    154. M.10–Parking
    155. A.5.11.1 Instructions for Cost Not Attributable for Existing P…
    156. 2. Rehab/Repairs Cost Not Attributable :
    157. A.5.11.2 Example of Calculating Cost Not Attributable for Subs…
    158. Residential Structure
    159. Residential Structure Rehab/Repair Costs
    160. A.5.11.2.1 STEP A: “B” over “A” Test
    161. B. Step 2. Rehab/Repairs Cost Not Attributable:
    162. C. Step 3. Ratio of Not Attributable :
    163. Project Structures Not Attributable Square Feet
    164. WORKSHEET FOR SUM OF COSTS OF REPAIRS & ALTERATIONS IN 223(f) …
    165. Go to Table of Contents
    166. Go to Table of Contents
    167. Appendix 6 Energy Modeling and Water Conservation
    168. A.7.1 HUD Review Appraiser Scope of Work
    169. A.7.1.1 Purpose
    170. A.7.1.2 USPAP Background
    171. A.7.1.3 Applicability of USPAP to HUD/FHA
    172. A.7.1.3.1 Ethics Rule
    173. A.7.1.3.2 Record Keeping Rule
    174. A.7.1.3.3 Competency Rule
    175. A.7.1.3.4 Scope of Work Rule
    176. A.7.1.3.5 Jurisdictional Exception Rule
    177. A.7.1.4 USPAP Standards
    178. A.7.1.4.1 Standard 1
    179. A.7.1.4.2 Standard 2
    180. A.7.1.4.3 Standard 3
    181. A.7.1.5 Conclusion
    182. A.7.2.1.1 Pre-Application Section 220, 221(d)(4), and 231
    183. SAMPLE APPRAISAL REVIEW FORMAT
    184. Project:
    185. Work under review:
    186. As part of the review process the following has occurred:
    187. Go to Table of Contents
    188. Market Strengths:
    189. Market Weaknesses:
    190. Valuation Strengths:
    191. Valuation Weaknesses:
    192. Go to Table of Contents
    193. Environmental Strengths:
    194. Environmental Weaknesses:
    195. [Type mitigants here, if applicable.]
    196. A.8.1 Required Loan Application Documents
    197. A.8.2 How to Analyze Financial Statements
    198. A.8.3.1 Determination
    199. A.8.3.2 Lender’s Analysis and Scope of Review
    200. A.8.3.3 Signatures for Prior Approval Decisions
    201. A.8.3.4 Maximum Insured Balance Limit
    202. A.8.3.5 Submission
    203. A.8.3.6 Authority, Conditions and Duration of Prior Approval
    204. A.8.3.7 Process for Prior Approval
    205. A.8.3.8 Decision
    206. A.8.3.9 Project Applications after Prior Approval
    207. A.8.3.10 Prior Approval and Loan Committee Actions
    208. A.8.3.11 Lender Fees for Prior Approval
    209. A.8.3.12 Lender Appeals of Prior Approval Decisions
    210. A.8.3.13 Detailed Guidance for Exhibits and Analysis
    211. Table A8-1. FHA/MAP Mortgage Credit documentation Matrix
    212. Table A8-2. Mortgage Credit Underwriting Documentation Matrix …
    213. A.8.4.1 Mortgage Credit Underwriting Documentation Matrix Legend
    214. A.8.5 Payoff Letter for Existing Mortgage
    215. A.8.6.1 Purpose and Applicability
    216. A.8.6.2 Background
    217. A.8.6.3 Implementation
    218. A.8.6.4 Approval
    219. SUBORDINATION, NON-DISTURBANCE AND ATTORNMENT AGREEMENT
    220. WITNESETH:
    221. OPERATOR (or LESSEE)
    222. FHA LENDER
    223. A.8.7 Financial & Performance Metrics for Concentrated Risk RE…
    224. A.8.8 Addendum: Identification and Certification of Limited Li…
    225. A.9.1 Baseline Pipeline Impact Radius Tables
    226. A.9.1.1 High-Pressure Pipelines Transferring Flammable and Com…
    227. Table A9-3. Crude Oil Thermal Radiation ASDs (feet)
    228. Table A9-4. Natural Gas Pipeline Thermal Radiation ASDs (feet)
    229. Table A9-5. Hydrogen Pipeline Thermal Radiation ASDs (feet)
    230. Table A9-6. Ethane Pipeline Thermal Radiation ASDs (feet)
    231. Table A9-7. Natural Gas Blast Overpressure ASDs (feet)
    232. A.9.2 Section 106 Delegation Memo
    233. A.12.1 Approval of Advances
    234. A.12.1.1 Approving Advances
    235. A.12.1.2 Architect’s Fees
    236. A.12.1.3 Interim Insurance of Advances
    237. C. Taxes.
    238. H. Organizational Fees:
    239. J. Title and Recording.
    240. A.12.1.4 Allocation of Cash Available to the Borrower
    241. B. New Construction .
    242. A.12.1.5 Restricted Excess Mortgage Proceeds
    243. A.12.1.6 MAP Lender Duties for Processing Form HUD-92403
    244. A.12.1.7 Certificate of Mortgage Insurance
    245. A.12.1.8 HUD Monitoring of Interim Draws
    246. A.12.2 Contractor’s Monthly Requisition
    247. D. The HUD Inspector:
    248. A.12.3.1 Eligible Building Components
    249. A.12.3.2 Basic Requirements for Insured Advances
    250. A.12.3.3 MAP Lender’s Responsibilities
    251. A.12.3.4 General Contractors’ Responsibilities
    252. A.12.3.5 Contractor’s Requisition
    253. A.12.3.6 Offsite Construction
    254. A.12.4 Amendment to the Construction Contract for Payment for …
    255. A.12.5.1 General
    256. A.12.5.2 Problems Leading to Default
    257. A.12.5.3 Defaults During Construction
    258. A.12.5.4 Remedies to Cure Defaults
    259. A.12.5.5 Reporting
    260. A.12.5.6 Foreclosure
    261. A.12.5.7 Other Matters
    262. A.13.1 Agreement Authorizing Reopening of Mortgage Transaction
  1169. A.13.2 Agreement Authorizing Deferment of Principal Payments f…

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.