12.8.4 Deductive Change Orders
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-07-29 · United States
A. Where the HUD estimated decrease in contract price for any aggregation of change orders remains less than 2-1/2% of the contract price, the Lender must reduce the Contractor’s “Final” Requisition, form HUD92448, by the appropriate amount.
- B. Equals or exceeds 2-1/2% of the contract price and for all subsequent deductive change orders regardless of the amount, the Lender must:
Reflect the decrease in the Contractor’s Requisition, form HUD-92448, item 8.
Reduce the original mortgage amount at cost certification, where required.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)
- Revision March 19, 2021 Office of the Assistant Secretary for …
- Table of Contents
- Index
- Chapter 1 Introduction
- 1.1 Multifamily Accelerated Processing Guide
- 1.2 Purposes of MAP
- 1.3.1 Lender Qualifications and Monitoring
- 1.3.2 Programs Covered by MAP
- 1.3.3 Application Processing
- 1.3.4 Construction Responsibilities
- 1.3.5 Servicing
- 1.4 Regulations, Policies, and the MAP Guide
- 1.5 Workload Management
- Chapter 2 Lender Qualifications and Practices
- 2.1 Introduction
- 2.2 HUD Approval of Lenders
- 2.3 Lender Standards
- 2.4 Loan Consultants, Correspondents, or Mortgage Brokers
- 2.5 Underwriting and Construction Administration 2.5.1 Underwr…
- 2.5.2 Construction Administrator Duties
- 2.5.3 Underwriting and Construction– HUD’s Role
- 2.5.4 Electronic Communications
- 2.6.1 Introduction
- 2.6.2 Definitions
- 2.6.3 Identity of Interest - General
- 2.6.4.1 Lender Owned FHA-Insured Properties
- 2.6.4.2 Secondary Financing Relationships
- 2.6.4.3 Bridge Loans and Balance Sheet Loans
- 2.6.4.4 Lenders with Tax Credit Equity Affiliates
- 2.6.4.5 Lender’s Consultants, Correspondents, or Mortgage Brok…
- 2.6.4.6 Other Lender Conflicts
- 2.6.4.7 Prohibited Practices - Inducements
- 2.6.4.8 Prohibited Practices - Gifts
- 2.6.4.9 Prohibited Practices - Charitable Donations
- 2.6.5.1 In General
- 2.6.5.2 IOI Discovered Before Processing
- 2.6.5.3 IOI Discovered During Processing
- 2.6.5.4 IOI Discovered After Firm Commitment
- 2.6.6 Certification
- 2.6.7 Syndicator or Investor Influence
- 2.7 New MAP Lender Application Package
- 2.8 Limitations and Notices
- 2.9 Quality Control, Records and Monitoring
- 2.10 Underwriters – HUD Approval
- 2.10.1 MAP Underwriters
- 2.10.2 Chief Underwriters
- 2.10.3 Deputy Chief Underwriters
- 2.11 Underwriter Trainees
- 2.12 MAP Underwriter Transfers
- Chapter 3 Programs
- 3.1 General Program Requirements
- 3.1.1 Regulatory Agreement
- 3.1.2 Single Asset Mortgagor Entity
- 3.1.3 Non-Recourse
- 3.1.4 Interest Rate
- 3.1.5 Amortization Plan
- 3.1.6 Loan Terms
- 3.1.7 Prepayment Restrictions
- 3.1.8 HUD Application Fee
- 3.1.9 HUD inspection Fee
- 3.1.10 Mortgage Insurance Premium
- 3.1.11 Lender Fees and Charges
- 3.1.12 Definition of Affordable Housing
- 3.1.13 Fair Housing and Equal Opportunity
- 3.1.14 Previous Participation
- 3.1.15 HUD's Fiscal Procedures
- 3.1.16 Bridge or Gap Financing
- 3.1.17 Secondary Financing
- 3.1.18 Statutory Loan Limits
- 3.1.19 Tax Increment Financing
- 3.1.20 Commercial Space
- 3.1.21 Military Impacted Areas
- 3.1.22 Student Housing
- 3.1.23 Real Estate Requirements
- 3.1.24 Transient Housing/Hotel Services Prohibition
- 3.1.25 Sustaining Occupancy
- 3.1.26 Operating Deficit
- 3.1.27 Short-Term Lease Premiums
- 3.1.28 Replacement Reserve
- 3.1.29 Developer Fees
- 3.1.30 Scattered Sites
- 3.1.31 Condominiums
- 3.1.32 Environmental Review
- 3.1.33 Underwritten Vacancy and Collection Loss
- 3.1.34 Borrower’s Certifications
- 3.1.35 Waivers
- 3.1.36 Opportunity Zones
- 3.2 New Construction/Substantial Rehabilitation Program Requir…
- 3.2.1 Properties
- 3.2.2 Insurance for Construction and Permanent Loan Periods
- 3.2.3 New Construction Transactions
- 3.2.4 Substantial Rehabilitation Transactions
- 3.2.5 Cost Certification
- 3.2.6 Federal Labor Standards
- 3.2.7 Assurance of Completion
- 3.2.8 Absorption Period
- 3.2.9 Marketing and Leasing Plan
- 3.2.10 Working Capital Escrow
- 3.2.11 Furniture, Fixture, and Equipment in Cost Basis
- 3.2.12 Elderly Developments
- 3.2.13 Occupancy Preference
- 3.2.14 Builder and Sponsor Profit and Risk Allowance (BSPRA)
- 3.2.15 Energy Efficiency
- 3.2.16 Cost vs. Value
- 3.3 Section 221(d)(4)–New Construction and Substantial Rehabil…
- 3.3.1 Criterion 1
- 3.3.2 Criterion 3
- 3.3.3 Criterion 4
- 3.3.4 Criterion 5
- 3.4 Section 220 Mortgage Insurance for Redevelopment Areas
- 3.4.1 Eligible Areas
- 3.4.2 Commercial Facilities
- 3.4.3 Maximum Loan Ratios and DSCRs
- 3.4.4 Builder and Sponsor Profit and Risk Allowance (BSPRA)
- 3.4.5 Sponsor Profit and Risk Allowance (SPRA)
- 3.4.6 Age Restriction Prohibited
- 3.5 Section 231 Mortgage Insurance
- 3.5.1 Definitions
- 3.5.2 Design and Amenities
- 3.5.3 BSPRA or SPRA allowances
- 3.5.4 Maximum Loan Ratios and DCRs
- 3.6.1 Eligibility
- 3.6.2 Term
- 3.6.3 Equity Requirement and Controlling Mortgage Criteria
- 3.6.3.1 Criterion 3–Loan to Value/Cost
- 3.6.3.2 Criterion 4–Statutory Limits
- 3.6.3.3 Criterion 5–Debt Service Coverage Ratio (DSCR)
- 3.6.4 CNAs, Plans and Cost Estimates
- 3.6.5 Davis-Bacon Act Applicability
- 3.6.6 Insurance of Advances or Insurance upon Completion
- 3.6.7 Environmental Review
- 3.6.8 Working Capital and Operating Deficit Reserves
- 3.6.9 Management Exhibits
- 3.6.10 Multiple Lenders
- 3.6.11 MIP
- 3.7.1 General Requirements
- 3.7.2 Eligible Properties
- 3.7.3 Ineligible properties
- 3.7.4 Additional Section 223(f) Requirements
- 3.7.5 Repairs
- 3.7.6 Accessibility Requirements
- 3.7.7 Age Restricted Projects
- 3.7.8 Defaults, Claims, or Enforcement Referrals
- 3.7.9 Labor Standards
- 3.7.10 Prepayment Provisions and Prohibition
- 3.7.11 Maximum Loan and Debt Service Coverage Ratios (DSCR)
- 3.7.11.1 Section 223(f) Refinance and Acquisition Processing
- 3.7.12 For Cash Out/Equity Out Proceeds When Repairs are Defer…
- 3.7.13 Capitalization Rates and Determination of Value
- 3.7.14 Statutory Loan Limits
- 3.7.15 Cost Not Attributable to Dwelling Space
- 3.7.16 Reserve for Replacements (RfR)
- 3.7.17 Secondary Financing
- 3.7.18 Commercial Space
- 3.7.19 Real Estate Requirements
- 3.7.20 Mortgage Term
- 3.7.21 Firm Commitment Processing Only
- 3.7.22 Market Study
- 3.7.23.1 Discounts and/or Costs of Issuance
- 3.7.23.2 Defeasance Costs Associated with Underlying Bond Fina…
- 3.8 Section 223(a)(7) Refinancing
- 3.8.1 Eligibility
- 3.8.2 Terms
- 3.8.3 Controlling Mortgage Criteria
- 3.8.4 Lender Fees
- 3.8.5 Borrower Fees
- 3.8.6 CNA
- 3.8.7 Other Issues
- 3.9.1 Insurance During Construction
- 3.9.2 Permanent Insurance
- 3.9.2.1 Public Liability Insurance
- 3.9.2.2 Vehicle Liability Insurance
- 3.9.2.3 Flood insurance
- 3.9.2.4 Casualty Insurance
- 3.9.3 Other Insurance Requirements
- 3.10.1 Purpose
- 3.10.2 Underwriting Ratios for Large Loans
- 3.10.3 Increased Reserves for Large Loans
- Loan size Reserve amount shall be the greater of
- 3.10.4 Extended Lease-Up Period
- 3.10.5 Higher Net Worth and Liquidity
- 3.11.1 Restrictions Authorized by Statute
- 3.11.1.1 Restrictions Allowed by HUD Statutory Authority
- 3.11.1.2 Housing for Persons Age 55+ (55+ Exemption)
- 3.11.1.3 Housing Restricted to Persons Age 62+
- 3.11.1.4 Other Fair Housing Act Exemptions
- 3.11.2 Age Restriction in Certain Projects and Programs
- 3.11.2.1 Market Rate Projects
- 3.11.2.2 Affordable Projects and 55+ Exemption
- 3.11.2.3 Section 231 Projects, both Market Rate and Affordable…
- 3.11.3.1 Services
- 3.11.3.2 Meals Service Exceptions
- 3.11.3.3 Prohibition on Founder’s Fees
- 3.11.3.4 Guest Suites
- 3.12.1 Relocation-General
- 3.12.2 Projects with Federal Assistance
- 3.12.3 Projects with No Federal Assistance
- 3.12.4 Relocation Costs on HUD Forms
- Chapter 4 Application Processing
- 4.1 Introduction/General
- 4.1.1 Approval of Lender's Reviewers
- 4.2.1.1 Concept Meetings
- 4.2.1.2 HUD Response
- 4.2.1.3 Firm Commitment Application Submissions
- 4.2.1.4 Firm Commitment Issuance
- 4.2.1.5 Firm Commitment Acceptance and Rate Lock
- 4.2.1.6 Closing
- 4.2.2.1 Concept Meetings
- 4.2.2.2 Pre-Application Stage
- 4.2.2.3 Invitation Letters
- 4.2.2.4 Firm Commitment
- 4.2.2.5 Closing
- 4.2.2.6 Construction Period
- 4.2.3 Appeals
- 4.3.1 General Requirements
- 4.3.2 Processing
- 4.4.1 General Requirements
- 4.4.2 Processing
- 4.4.3 Construction Period Responsibilities
- 4.4.4 Servicing
- Chapter 5 Architectural and Construction Analysis
- 5.1 Eligible Construction Activities
- 5.1.1 New Construction
- 5.1.2 Substantial Rehabilitation
- 5.1.3 Class of Work
- 5.1.4 Defining Construction Activities
- 5.1.5 Eligible Construction by Program
- 5.2 Consultant Due Diligence Responsibilities
- 5.2.1 General
- 5.2.2.1 Needs Assessor Qualifications
- 5.2.2.2 Needs Assessor Responsibilities
- 5.2.2.3 Construction Analysts Qualifications
- 5.2.2.4 Construction Analyst Responsibilities
- 5.2.3.1 Project Architect Qualifications
- 5.2.3.2 Project Architect Duties and Responsibilities
- 5.2.3.3 Owner-Architect Agreement for Services
- 5.2.3.4 Project Architect as Owner’s Representative
- 5.2.4 Other Technical Specialists
- 5.2.5 HUD Approval of Qualifications
- 5.3 Requirements by Construction Activity and Program
- 5.3.1 General
- 5.3.2.1 Scope of Work
- 5.3.2.2 Construction Costs
- 5.3.2.3 Schedule
- 5.3.3.1 When Project Architects are Required
- 5.3.3.2 When General Contractors are Required
- 5.3.3.3 Licensed Trades
- 5.3.3.4 Scope of Work
- 5.3.3.5 Construction Costs
- 5.3.3.6 Schedule
- 5.3.4.1 Scope of Work
- 5.3.4.2 Construction Costs
- 5.3.4.3 Schedule
- 5.4 Architectural and Other Building Standards
- 5.5.1 New Construction and Substantial Rehabilitation
- 5.5.2 Section 223(f) Transactions
- 5.6.1 Eligibility for Streamlined Processing
- 5.6.2 Section 223(f) with new LIHTC Applications
- 5.6.3 Documentation at Firm Commitment
- 5.6.4 Requirements for Issuing a Firm Commitment
- 5.6.5 Modifications to the Firm Commitment
- 5.6.6 Risks Related to Deferred Document Submission
- 5.7.1 Concept Meeting
- 5.7.2 Pre-Application
- 5.7.3 Firm Commitment Application
- 5.7.4 Special Considerations for Industrialized Housing
- 5.8.1 Plans and Specifications Revisions
- 5.8.2 Major Changes
- 5.8.3 Construction Documents
- 5.8.4 Recommendation for Initial Endorsement
- 5.8.5 Distribution of Drawings and Specifications
- 5.8.6 Early Start of Construction
- 5.9 Substantial Rehabilitation Processing through Initial Endo…
- 5.9.1 Concept Meeting
- 5.9.2 Pre-Application
- 5.9.3 Firm Commitment Application
- 5.9.4 Firm Commitment to Initial Endorsement
- 5.10 Standard Processing for Section 223(a)(7) and 223(f)
- 5.10.1 Architectural Standards
- 5.10.2 Concept Meetings
- 5.10.3 Capital Needs Assessment
- 5.10.4 Lender’s Review of Costs
- 5.10.5 Certification
- 5.10.6 Firm Commitment
- 5.10.7 Time for Completion of Repairs
- 5.10.8 Escrow Agreement for Deferred Repairs
- 5.10.9 Completion of Repairs and Alterations
- 5.11.1 Supplemental Loan for New Construction
- 5.11.2 Supplemental Loan for Existing Structures
- 5.12 Cost Estimating for Lenders
- 5.12.1 Estimation Method
- 5.12.2 Cost Categories
- 5.12.3 Allowances and Fees
- 5.12.4 Builder’s and Sponsor’s Profit and Risk Allowance (BSPRA)
- 5.12.5 Construction Time
- 5.13 CNAs are Required for All Applications
- 5.14.1 Detailed Cost Estimate
- 5.14.2 Substantial Rehabilitation Costs
- 5.14.3 Refinance/Acquisition Costs
- 5.15.1 HUD Underwriting Assignment
- 5.15.2 CNA e-Tool and HUD Underwriting
- 5.15.3 Instructions and Training for Users
- 5.15.4 Consultation and Review Timeliness
- Chapter 6 Energy and Water Conservation
- 6.1 Purpose and Summary Requirements
- 6.1.1 New Construction and Substantial Rehabilitation Standards
- 6.1.2 Incentives for Improved Building Performance
- 6.2 Statutes and Regulations
- 6.3 Green Building Certifications Specifications Recognized fo…
- 6.3.1 New Construction and Substantial Rehabilitation Certific…
- 6.3.2 Certifications for Existing Buildings
- 6.3.3 Certifications Not Recognized by HUD
- 6.4 General Requirements for Green MIP
- 6.4.1 Continuing Performance Required under Green MIP
- 6.4.2 ENERGY STAR® Appliances and High-Performance Components
- 6.4.3 HUD Forms – Borrower’s Certifications
- 6.4.4 Regulatory Agreement Rider 5 Required for Green MIP
- 6.4.5 Data Collection Plan
- 6.4.6 Real-Time Consumption Monitoring, Smart Home Tools
- 6.4.7 Design and Construction Team Qualifications
- 6.4.8 Energy Professionals Qualifications
- 6.4.9 Energy Modeling and Modeling Software
- 6.4.10 Change Orders Modifying Energy Measures
- 6.5 Requirements for Section 223(a)(7) Applications
- 6.5.1 Existing Green MIP Mortgages
- 6.5.2 Proving Continuing Performance Under ENERGY STAR® Existi…
- 6.5.3 Delivery of ENERGY STAR® Existing Building Certification
- 6.5.4 Recording Baseline Data - CNA
- 6.6 Green MIP Requirements for Section 223(f) Applications
- 6.6.1 Properties with Previously Earned Certifications
- 6.6.2 Newly Built Properties with No Prior Certification
- 6.6.3 Existing Properties with No Prior HUD Recognized Green B…
- 6.7 Green MIP Requirements for Sections 220, 221(d)(4), 231-Ne…
- 6.7.1 ENERGY STAR® Appliances and Systems Required
- 6.7.2 Project Architect’s Green MIP Responsibilities
- 6.7.3 Recording Baseline Data-CNA
- 6.8 Green MIP Requirements for Section 241(a)
- 6.9 Underwriting Owner’s Utility Cost as Part of Operating Exp…
- 6.9.1 Methods for Underwriting Owner’s Utility Costs Changes
- 6.9.2 Underwriting Owner Utility Operating Expense for New Pro…
- 6.9.3 CAUTION: Changed Energy Use Not Proportionate to Resulti…
- Chapter 7 Valuation & Market Analysis
- 7.1 Introduction
- 7.2 Selection of Appraisers and Market Analysts
- 7.3.1 Appraiser Qualifications
- 7.3.2 Market Analyst Qualifications
- 7.4 Valuation Reviews of Third-Party Reports
- 7.5.1 Purpose and Focus of the Study
- 7.5.2 Effective Date
- 7.5.3 Forecast Period for Market Study
- 7.5.4 Project Rents Used in Market Study
- 7.5.5 HUD as an Intended User
- 7.5.6 Executive Summary
- 7.5.7 Description of the Proposed Project
- 7.5.8 Primary Market Area
- 7.5.9 Economic Context
- 7.5.10 Demographic Analysis
- 7.5.11 Current Housing Market Conditions
- 7.5.12 Rental Units in the Pipeline
- 7.5.13.1 Net Demand Analysis
- 7.5.13.2 Effective Demand
- 7.5.13.3 Evaluation of Net Demand and Effective Demand
- 7.5.13.4 Demand for LIHTC Projects
- 7.5.14 Findings and Conclusions
- A. According to USPAP Advisory Opinion 14:
- 7.5.16 Data, Estimates, and Forecasts
- 7.6 Appraisal Requirements
- 7.6.1 Effective Date
- 7.6.2 Brevity
- 7.6.3 Complex or Unusual Appraisal Assignments
- 7.6.4 HUD Forms to Include in the Report
- 7.6.5 USPAP Jurisdictional Exception Rule
- 7.6.6 Occupancy Percentage
- 7.6.7 Sections 220, 221(d)(4), and 231
- 7.6.8 Section 223(f)
- 7.6.8.1 Value for Rent Controlled Properties
- 7.6.8.2 Cost/ Summation Approach
- 7.6.8.3 Sales Comparison Approach
- 7.6.8.4 Income Approach
- 7.6.9 Reconciliation of the Approaches to Value
- 7.6.10 Section 231 Substantial Rehabilitation
- 7.6.11 Remaining Economic Life (REL)
- 7.6.12 Confidentiality Rule of USPAP
- 7.6.13 Appraiser’s Certification
- 7.6.14 Inspection of the Subject and Comparables
- 7.6.15 Required Appraisal Report Exhibits
- 7.6.16 Market Analysis
- 7.7.1 Rental Estimates
- 7.7.1.1 Rent Comparables
- 7.7.2 Adjustments
- 7.7.3 Final Rent Estimate
- 7.7.4 LIHTC and/or Bond Financed Projects
- 7.7.5 Trending of Rents
- 7.7.6 Equipment Included in Rent
- 7.7.7 Occupancy/Vacancy and Collection Losses
- Property Type
- 7.7.8 Project Rent Concessions
- 7.7.9 Occupancy
- 7.7.10 Utilities/Services
- 7.7.11 Project Location, Amenities, and Other Factors
- 7.7.12.1 Ancillary Income
- 7.7.12.2 Resale/Submetering of Utilities
- 7.7.12.3 Resale of Internet and Media Services
- 7.7.12.4 Cell Tower Income
- 7.7.12.5 Short-Term Lease Premiums
- 7.7.12.6 Corporate Leases
- 7.7.12.7 Pool and Pet Fees
- 7.7.12.8 Ineligible Income
- 7.7.12.9 Commercial Income
- income collected under the contract if it is a fixed monthly p…
- Commercial Space and Income Limitations
- 7.7.13 Limited Waiver of Commercial Income and Space Limits
- 7.7.14 Commercial Space Valuation
- 7.8.1 Purpose
- 7.8.2 Sources of Expense Data
- 7.8.3 General
- 7.8.4 Estimate of Operating Expenses by Units of Comparison
- 7.8.5 Expense Comparables
- 7.8.6 Expense Adjustments
- 7.8.7 Updating Procedures
- 7.8.8 Consistent Expense Line Items
- 7.8.9 Underwritten NOI and Program Guidance
- 7.9 Site Analysis
- 7.9.1 Analysis of Location
- 7.9.2 Specific Location
- 7.9.3 Civic, Social, and Commercial Centers
- 7.9.3.1 Schools
- 7.9.3.2 Neighborhood Shopping
- 7.9.3.3 Religious and Recreation Centers
- 7.9.4 Transportation
- 7.9.5 Special Hazards and Nuisances
- 7.9.6 Parking Facilities
- 7.9.7 Site Suitability
- 7.9.8 Land/Site Valuation
- 7.9.9 Warehousing of “Excess” Land Area
- 7.10.1 Lender’s Responsibilities
- 7.11.1 Lender’s Responsibilities
- 7.11.2 HUD Review
- 7.12.1 Lender’s Responsibilities
- 7.13.1 General
- 7.13.2 Completing Form HUD-92264
- 7.13.3 Applicable Approaches for "As Is" Value
- 7.13.4 Valuation for 220 and 221(d)(4)
- 7.13.5 Valuation for Section 231 Substantial Rehabilitation
- 7.13.6 Valuation for RAD Transactions
- 7.13.7 Contingency Reserves
- 7.13.8 Interest During Construction
- 7.13.9 Inspection Fee
- 7.13.10 Offsite Costs
- 7.13.11 Rehabilitation Cost not Attributable to Residential Use
- 7.13.12 Developer’s Fee, when Applicable
- 7.13.13 Exclusions to Estimated Replacement Cost
- 7.14.1 Estimate of a Project’s Operating Deficit
- 7.15 Leaseholds/Ground Leases
- 7.15.1 Definitions
- J. Operating Expenses. See Section 7.7.
- 7.15.2 Legal Requirements
- 7.15.3.1 Acceptable Form of Ground Rent Computation
- 7.15.3.2 Unacceptable Lease Payments (Ground Rent)
- 7.15.3.3 Ground Rent During Construction
- 7.15.4 Valuation of the Leasehold Estate
- 7.15.5 Rehabilitation of an Existing Project
- 7.15.6 Maximum Mortgage Amount for Criterion 3
- 7.15.7 Fee-Joinders
- 7.16.1 General Comments and Exceptions
- 7.16.2 Full Term Tax Abatement
- 7.16.3 Partial Term or Variable Tax Abatement
- 7.16.4 Deferral of Real Estate Taxes
- 7.17.1 For Section 223(f)
- 7.17.1.1 Criterion 3 Market Value
- 7.17.1.2 Criterion 5 Debt Service Analysis
- 7.17.1.3 Form HUD-92264T for LIHTC Projects without Section 8
- 7.17.1.4 Form HUD-92264T for Section 8 Project-Based Assistanc…
- 7.17.1.5 Form HUD-92264T for Section 8 Project-Based Assistanc…
- 7.17.2 Fee Income
- 7.17.3 Income Limits
- 7.17.4 Expenses/Fees
- 7.18.1 Scope of Work
- 7.18.2 Jurisdictional Exception Rule
- 7.18.3 Record Keeping Rule
- 7.18.4 Loan Committee
- 7.18.5 Workload Sharing
- 7.18.6 Consultations with Other Staff
- 7.18.7 Environmental Processing
- 7.18.8 Technical Appraisal Review Requirements
- 7.18.9 Documentation of the Appraisal Review
- Chapter 8 Mortgage Credit
- 8.1 Introduction
- 8.2 Borrower Types – Single Asset Borrower Entity
- 8.3 Reviewing Principals and Other Parties in Control
- 8.3.1 Determining Principals and Who is in Control
- B. “Principals” may include any of the following:
- 8.3.2 Underwriting Active Principals and Those with Control
- 8.3.3 Previous Participation Certification Requirements
- 8.3.4 Nonprofit Principals
- 8.3.5 Foreign National Participation in FHA-Insured Multifamil…
- Definition of Principal for Regulatory Agreement Section 50
- 8.4 Investigating Credit and Character
- 8.4.1 Use of Credit Reports and Credit Investigation
- 8.4.2 Lender’s Review of the Credit Report
- 8.4.3 Delinquent Federal Debt, Judgments and Pending Litigation
- 8.4.4 Trade and Credit References
- 8.4.5 Rejection Due to Unacceptable Character and Credit
- 8.5.1 Financial Statement Analysis
- 8.5.1.1 Submission of Financial Statements–New Construction
- 8.5.1.2 Existing Project Financial Statements
- 8.5.1.3 Review of Financial Statements and Other Documents
- B. Exceptions:
- 8.5.1.4 Letters and Lines of Credit
- 8.5.1.5 Sponsor’s Continuing Commitments
- 8.5.1.6 General Contractor with Adequate Capital
- 8.5.1.7 LIHTC, Historic Tax Credit or New Market Tax Credit Tr…
- 8.5.1.8 Real Estate Owned Schedule and Mortgage Debt Schedule
- 8.6.1.1 Purpose
- 8.6.2 Principal Types
- 8.6.3 Threshold
- 8.6.4 Threshold Applies to Current and Expected Balance
- 8.6.5 Effective Date and Duration
- 8.6.6 Lender Submission and Procedure
- 8.7 Secondary Financing
- 8.7.1 Public Sources
- 8.7.2 Private Sources – Section 223(f)
- NOTE: Project-specific exceptions or waivers to these policies…
- 8.7.3 Private Source – New Construction/Substantial Rehab
- 8.7.4 Section 223(a)(7) Refinance Program
- 8.7.5 Condition for Repayment of Secondary Financing
- 8.7.6 Secured Public Secondary Financing Conditions
- 8.7.7 Unsecured Private Secondary Financing Conditions
- 8.7.8 Tax Credit Equity Bridge Loans
- 8.8 Application Exhibits and Responsibilities
- 8.8.1 General Responsibilities of Lender’s Underwriter
- 8.8.2 Additional Exhibits Required of Project Participants
- 8.8.3 Evaluating Nonprofit Sponsors and Borrowers
- 8.8.4 Credit Review of a Nonprofit Sponsor and Borrower
- 8.8.5 Nonprofit Developer Fees
- 8.8.6 Consultant Fees
- 8.8.7 Establishing a Profit-Motivated Borrower Entity
- 8.8.8 Lender’s Review and Recommendation
- 8.8.9 Mortgage Credit Duties of HUD
- 8.9.1 Sections 220, 221(d)(4), 241(a) and 231 Projects
- 8.9.2 Section 207 Pursuant to 223(f) Projects
- 8.9.3 Section 223(a)(7) Projects
- 8.10.1 Mortgage Amounts and Cash Requirements
- 8.11.1 Determining Mortgage Amounts, Cash Requirements, and Re…
- B. Identity of Interest Purchase Transaction . Refer to Chapte…
- 8.12.1 General
- 8.12.2 Application for Mortgage Insurance
- 8.12.3.1 Firm Commitment
- 8.12.3.2 Initial Endorsement
- 8.12.3.3 Grant and Loan Proceeds Must be Advanced
- 8.12.4 Grants and Loans from a Non-Governmental Source
- B. Initial Endorsement.
- 8.13 Insurance Upon Completion
- 8.14 Determining Cash Requirements for Completion
- 8.15.1 Review of Financing Documents
- 8.15.2 Loan Rates
- 8.15.3 Tax-Exempt Loans and/or Bonds
- 8.15.4 Itemized Statement of Costs
- 8.15.5.1 Prepayment of Note
- 8.15.5.2 State/Local Occupancy Use and/or Rent Restrictions
- 8.15.6 Pre-Cost Certification Conference Information
- Chapter 9 Environmental Review and Requirements
- 9.1 Introduction
- 9.1.1 Legal Authorities, Guidance, Standards, and Documentation
- 9.1.2 Project Description, Aggregation, and Extent of Review
- 9.1.3 Levels of Environmental Review
- 9.1.4 Local, State, Tribal or Federal Requirements
- 9.2.1 Lender Responsibilities and Limitations
- 9.2.2 HUD Responsibilities
- 9.2.3 Timing Considerations
- 9.2.4 Verifying Qualifications of Professionals
- 9.2.5 Consulting with Regional or Satellite Offices
- 9.3 HEROS Environmental Reports
- 9.4 Contamination and Toxic Substances
- 9.4.1 Phase I Environmental Site Assessment Requirements
- 9.4.2 Phase II Environmental Site Assessment Requirements
- 9.4.3 Remediation Response Planning
- 9.4.4 Remediation Plans with Complete Removal of Contamination
- 9.4.5 Remediation Plans with Incomplete Removal of Contamination
- 9.4.6 Monitoring Wells, Flushing Wells, and Testing Wells 9.4.…
- 9.4.6.2 Monitoring Well Protocols
- 9.4.6.3 Monitoring Wells for Off-site Contamination
- 9.4.6.4 Flushing Wells
- 9.4.6.5 Testing or Monitoring Wells Ordered by LSTF
- 9.4.6.6 Non-operating Wells
- 9.4.7 Off-Site Contamination
- 9.4.8 Escrow
- 9.4.9 Waivers
- 9.4.10 LSTF Approvals and Reviews
- 9.4.11 Superfund Sites
- 9.4.11.1 Superfund National Priority List (NPL) Sites
- 9.4.11.2 Superfund Sites Not on the NPL
- 9.4.11.3 EC/IC Put in Place by EPA
- 9.4.12 Unacceptable Sites
- 9.4.13 Underground Storage Tanks Not Regulated by the LSTF
- 9.5.1 General Responsibilities
- 9.5.2 Projects with Complete Removal of Site Contamination 9.5…
- 9.5.2.2 Architecture/Engineering and Cost
- 9.5.2.3 Mortgage Credit
- 9.5.3 Projects with Incomplete Removal of Site Contamination
- 9.5.4 Insurance and Guarantee Requirements
- 9.5.5 Management, Coordination, and Communication
- 9.6.1 Lead-Based Paint (24 CFR Part 35.115(a))
- 9.6.2 Asbestos (24 CFR 50.3(i))
- 9.6.3.1 Background
- A. Radon Report :
- B. Radon Professionals :
- C. Exceptions to a Radon Report :
- D. Testing Protocols :
- E. Occupant Notification :
- F. Mitigation Standards :
- G. Mitigation Timing :
- H. Certificate of completion :
- I. Operation and Maintenance Plans :
- J. Existing Mitigation Systems :
- K. Cost estimates :
- 9.6.3.3 Requirements for Section 223(f) Projects
- 9.6.3.4 Requirements for Substantial Rehabilitation and Conver…
- 9.6.3.5 Requirements for New Construction
- 9.6.4 Historic Preservation (24 CFR 50.4(a))
- 9.6.5 Floodplain Management (24 CFR 50.4(b)(2))
- 9.6.6 Flood Insurance (24 CFR 50.4(b)(1))
- 9.6.7 Wetlands Protection (24 CFR 50.4(b)(3))
- 9.6.8 Noise Abatement and Control (24 CFR Part 51, Subpart B)
- 9.6.9 Explosive and Flammable Hazards (24 CFR Part 51 Subpart C)
- 9.6.10 Air Quality (24 CFR 50.4(h))
- 9.6.11 Airport Hazards (24 CFR Part 51 Subpart D)
- 9.6.12 Coastal Barrier Resources (24 CFR 50.4(c)(1))
- 9.6.13 Coastal Zone Management (24 CFR 50.4(c)(2))
- Endangered Species (24 CFR 50.4(e))
- 9.6.15 Farmlands Protection (24 CFR 50.4(j))
- 9.6.16 Sole Source Aquifers (24 CFR 50.4(d))
- 9.6.17 Wild and Scenic Rivers (24 CFR 50.4(f))
- 9.6.18 Environmental Justice (24 CFR 50.4(l))
- 9.6.19 Additional Nuisances and Hazards
- 9.6.20 Environmental Assessments (24 CFR 50 Subpart E)
- 9.6.21 Operation and Maintenance Plans
- Chapter 10 Management Analysis
- 10.1 Introduction
- 10.2 Exhibits Required for Firm Commitment
- G. Marketing, Leasing, and (if applicable) Relocation Plan :
- 10.3 Lender Review of Management Documents
- 10.4 HUD Asset Management Review
- 10.5 Review of Previous Participation
- 10.6 Bonding Requirements for Agents
- 10.7.1 Applicability
- 10.7.2 Required Contents
- 10.7.3 Length/term of the Agreement
- 10.7.4 Management Fee
- 10.8 Approval of Proposed Management Agent
- 10.9 Affirmative Fair Housing Marketing
- 10.10 Management Agents and Escrow Administration
- Chapter 11 Lender Underwriting, HUD Review and Closing
- 11.1 General
- 11.2 Lender Underwriting
- 11.2.1 Pre-application
- 11.2.2 Firm Commitment Application
- 11.2.3 Third-Party Report Certifications
- 11.2.4 HUD Forms Submission
- 11.3.1 HUD Underwriter Responsibilities
- 11.3.2 Pre-Application and Firm Commitment Processing
- 11.3.3 Underwriting Recommendation
- 11.3.4 Firm Commitment Issuance, Extensions, Amendments and Re…
- 11.3.5 Waivers
- 11.3.6 Interest Rate Lock
- 11.4 Program Closing Provisions
- 11.5 Loan Fees
- 11.5.1 Deferred Fee Collection
- 11.5.2 Broker’s Fees
- 11.6.1 Preliminary Title Report
- 11.6.2 Air Rights and Other Shared Interest Projects
- 11.7 Borrower Entity’s Organizational Documents
- 11.8.1 Term
- 11.8.2 Prepayment Provisions
- 11.8.3 Conditions for Including Lockouts and/or Penalties
- 11.8.4 Late Charge Provisions
- 11.8.5 Override of Prepayment Lockout
- Chapter 12 Construction Period
- 12.1.1 General
- 12.1.2 HUD Construction Analyst (CA)
- 12.1.3 HUD Inspector
- 12.2.1 General Requirements
- 12.2.2 Contract Administration
- 12.2.3 Cost Certification
- 12.3.1 Purpose of Inspection
- 12.3.2 Access
- 12.3.3.1 Assignment
- 12.3.3.2 Offsite Fabricated Construction
- 12.3.3.3 Trip Report Review
- 12.3.3.4 HUD Inspector Oversight
- 12.3.4 HUD Inspector’s Duties
- 12.3.4.1 Orientation
- 12.3.4.2 Facilities
- 12.3.4.3 Inspections
- 12.3.4.4 Start of Construction Date
- 12.3.4.5 Shop Drawings and Other Data
- 12.3.4.6 Work Stoppage
- 12.3.4.7 Occupancy
- 12.3.4.8 Additional Duties of the Inspector
- 12.3.4.9 Construction Record
- 12.3.4.10 Projects Insured Upon Completion
- 12.3.4.11 Off-Site Inspection
- 12.3.5 Construction Progress Meetings (monthly meetings)
- 12.3.6 Reporting Serious Construction Problems
- 12.4.1 General Requirements
- 12.4.2 Architect's Supplemental Instructions
- 12.4.3 Architect Administering the Construction Contract
- 12.5 Architect’s Adequacy
- 12.5.1 Deficient Administration
- 12.5.2 Reasons for Termination of Services
- 12.5.3 HUD Office Actions
- 12.5.4 Request for Contract Termination
- 12.5.5 Contract Termination
- 12.6.1 Substantial Completion
- 12.6.2 Final 100% Draw Completion Inspection
- 12.6.3 Warranty Inspections
- 12.7.1 General
- 12.7.2 Lender’s Role in Processing Application for Insurance o…
- 12.7.3 Stages of Advances
- 12.7.4 Approval of Initial/Interim Advances
- 12.7.5 Contractor’s Monthly Requisition and Related Matters
- 12.7.6 Next to Final Advance
- 12.7.7 Final Advance
- 12.7.8 Keeping the Mortgage in Balance
- 12.8.1 General Requirements
- 12.8.2 Change Order Classification
- 12.8.3 Additive change Orders
- 12.8.4 Deductive Change Orders
- 12.8.5 Changes that Adversely Affect Property Income
- 12.8.6 Extension of Contract Time
- 12.8.7 Changes to Items of Delayed Completion
- 12.8.8 Emergency Changes
- 12.8.9 Insurance Upon Completion
- 12.8.10 Changes to Offsite Construction
- 12.8.11 Other Changes
- 12.9.1 General Procedure
- 12.9.2 Voiding Changes
- 12.9.3 Unapproved Changes
- 12.10.1 Architectural
- 12.10.2 Cost
- B. Approved time extensions:
- 12.11.1 Appraisal Reconsideration, When Required
- A. Processing:
- 12.12.1 Wages
- 12.12.2 Labor Violations
- 12.12.3 FHEO Noncompliance
- 12.12.4 Compliance with Any Applicable Relocation Plan
- 12.13 Surveys
- 12.14 Permission to Occupy
- 12.14.1 Physical Completion
- 12.14.2 Signatures, Approval and Permission
- 12.14.3 Submission Documents
- 12.14.4 Partial Occupancy Approval
- 12.15.1 Application for Disbursement of Escrowed Funds
- 12.15.2 Release of Letters of Credit
- 12.15.3 Working Capital Deposit
- D. Final Release of Escrow.
- 12.15.4 Initial Operating Deficit Deposit
- 12.15.5 Amount of Contractor's Retainage and Release
- E. Early partial release of retainage.
- 12.15.6 Cash-Out Escrow from Land Equity
- 12.16 Insurance Upon Completion (IUC)
- 12.17.1 Repairs and Alterations
- 12.17.1.1 Completion of Repairs and Alterations
- 12.17.1.2 Payment for Repairs
- 12.17.1.3 Release of Cash-Out/ Equity from Loan Proceeds
- 12.17.1.4 Funds Remaining in the Escrow
- 12.17.2 Inspection
- 12.17.3 Schedule of Values for Reimbursement from the Repair E…
- 12.17.4 Final Report
- 12.17.5 Change Orders
- 12.17.6 Warranty Inspections
- 12.17.7 Projects in Difficulty
- 12.18 Casualty Events During Construction
- Chapter 13 Cost Certification
- 13.1 Projects that Must Certify
- 13.2 Projects Exempt from Cost Certification
- 13.2.1 Low Income Housing Tax Credits
- 13.2.1.1 Audit Fee Not Applicable
- 13.2.1.2 Establishing Substantial Completion Date
- 13.2.1.3 Treatment of Operating Income Generated During Constr…
- 13.2.1.4 Copy of Final Sources and Uses Statement
- 13.2.1.5 Modification to Form HUD-92580
- 13.3 Types of Cost Certification
- 13.4 Entities That Must Cost Certify
- 13.5 Cost Certification Sequence of Events
- 13.6 Project Completion and Cut-Off Dates
- 13.7 Administrative Completion Date
- 13.8 Submission Date
- 13.9 Required Forms
- 13.10 Required Statements and Certifications
- 13.10.1 Simplified Form of Cost Certification
- 13.10.2 Long Form Cost Certification
- 13.10.3 Section 223(f) Projects
- 13.11 Deficiencies in Cost Certification Submission
- 13.12 Mortgage Credit Limited Review
- 13.13 Mortgage Credit Detailed Review
- 13.14.1 Construction Contract
- 13.14.2 Architect’s Fee(s)
- 13.14.3 Interest Accrued
- 13.14.4 Taxes Accrued
- 13.14.5 Property Insurance Accrued
- 13.14.6 Mortgage Insurance Premium
- 13.14.7 HUD Application, Commitment, and Inspection Fees
- 13.14.8 Financing Expenses
- Exclude:
- 13.14.9 Title and Recording Expenses
- 13.14.10 Legal, Organization, and Audit Expenses
- 13.14.11 Offsite Costs
- NOTE:
- 13.14.12 Other Costs
- 13.14.13 Builder’s and Sponsor’s Profit and Risk Allowance
- 13.14.14 Non-Profit Developer Fee
- 13.15.1 Actual Costs
- 13.15.2 Mortgage Increase or Detailed Review Not Requested
- 13.15.3 Cost Review
- 13.15.4 Lump Sum Construction Contract Cost Certification
- 13.15.5 Summary of Cost Certification Review (on Form HUD92331)
- 13.16 Non-Profit Borrower’s Initial Equity Investment
- 13.17 Determine the Borrower’s Initial Investment
- 13.18 Section 223(f) Modified Form of Cost Certification
- 13.19 Special Instructions for Substantial Rehabilitation
- 13.20 Mortgage Reduction after Cost Certification
- 13.21 Increase in Mortgage Amount
- 13.22 Restrictions on Mortgage Increases
- 13.23 Processing a Mortgage Increase
- 13.24 Authorization to Reopen Mortgage Transaction
- 13.25 Deferment of Principal Payments
- 13.26 Document Distribution
- 13.27 Office of Inspector General
- 13.28 Cost Certification Incontestability
- 13.29 Post-Closing Escrows
- 13.30.1.1 Advance Amortization Requirements
- 13.30.1.2 Income and Expense Statement Requirement
- 13.30.1.2.1 Agreement of Borrower
- 13.30.1.2.2 Treatment of Items in Statement
- 13.30.1.3 Amount of Required Prepayment
- 13.30.1.4 Excess (Unused) Mortgage Loan Proceeds
- 13.30.2.1 Preparing Form HUD-92580, Maximum Insurable Mortgage
- 13.30.2.2 Decrease in Loan Amount
- 13.30.2.3 Increase in Loan Amount
- 13.30.2.4 Statement of Status of Escrows
- 13.30.2.5 Borrower’s Investment
- 13.30.3 Final Closing – Insurance Upon Completion
- Chapter 14 LIHTC and Other Tax Credit Programs
- 14.1 Introduction
- 14.2 LIHTC Underwriting Guidance
- MAP Guide Section Number Content
- MAP Guide Section Number Content
- Content
- 14.3 Historic and New Markets Tax Credits
- 14.4 Subsidy Layering Review
- 14.5 Evidence of Tax Credit Allocations
- 14.6 HAP Contract Renewals for Section 8 Projects
- 14.7 Application/Submission Requirements
- 14.8 Architecture and Engineering
- 14.9 Identities of Interest in Tax Credit Transactions
- 14.10 Mortgage Amounts, Contingency and Escrow
- 14.11 Structuring of Secondary Debt
- 14.12.1 Treatment of Developer Fee
- 14.12.2 Deferred Developer Fee (DDF)
- 14.13 Tax Credit Equity Pay-In Schedule
- Benchmarks for Equity Installments
- 67,68
- 14.14 Definition of “Net Equity”
- Net Equity = (Total Equity) – (Equity Pay In 1) – (Allowed Ded…
- Sample Owner’s Proposed Reductions:
- Total $1,900,000
- 14.15 Equity Bridge Loans in Tax Credit Projects
- 14.16 Syndicator and Investor Fees from Operations
- 14.17 Mark to Market (M2M) Transactions
- 14.18 Firm Commitment Additional Conditions
- 14.19 Other Matters
- 14.19.1 Bond-Financed Projects in New York City
- 14.19.2 Lien Priority
- 14.19.3 Tax Credit Regulatory Agreements
- 14.19.4 Tax Exempt Bonds - FHA Insured Permanent Debt
- 14.19.5 Refinancing of M2M Properties
- 14.19.6 Income Averaging
- 14.20 FHA Tax Credit Pilot Program Expansion
- Chapter 15 Oversight of MAP Program Requirements
- 15.1 Oversight of MAP Lenders
- 15.2.1 Functions
- 15.2.2 Data and Reports
- 15.2.3 Timing of MAP Lender Reviews
- 15.3.1 General
- 15.4 Administrative Record
- 15.5 Settlement Agreements
- 15.6 Letters of Caution, Warning Letters or Sanctions
- 15.7 Warning Letters and Targeted Enforcement Measures
- 15.7.1 Warning letter
- 15.7.2 Targeted Enforcement Measures
- 15.8 MAP Probation
- 15.9 MAP Suspension
- 15.10 MAP Termination
- 15.11 MAP Lender Review Board
- 15.12 MAP Lender Review Board: Staff Responsibilities
- 15.13 MAP Lender Review Board: Procedures
- 15.14 Notice of Violation
- 15.15 Notice of Action
- 15.16 Appeal Conference and Procedures
- 15.17 Suspension, Debarment or LDP
- 15.17.1 Parties subject to a suspension, debarment or LDP
- 15.17.2 Limited Denial of Participation
- 15.17.3 Suspension and debarment
- 15.17.4 Procedures to refer a suspension, debarment or LDP
- 15.18 Referral to Mortgagee Review Board or OIG
- 15.19 Other Enforcement Actions
- Chapter 16 Master Leases with Market Tax Credits
- 16.1 Introduction
- 16.2 Background
- 16.3 General Programmatic Requirements
- A. Firm Commitment Special Conditions:
- 16.5 Cost Certification and Final Endorsement
- Chapter 17 Section 207: Refinancing Cooperative Housing Projects
- 17.1 Introduction and Background
- 17.2 Program Eligibility
- 17.3 Program Requirements
- 17.3.1 Loan Parameters
- 17.3.2 General Operating Reserve (GOR)
- 17.3.3 Model Forms and Closing Documents
- 17.4 Application Processing
- 17.5.1 Architectural and Cost Processing
- 17.5.2 Valuation Processing: Appraisal Scope-of-Work
- 17.5.3 Environmental Processing
- 17.5.4 Mortgage Credit Processing
- 17.5.5 Asset Management Processing
- 17.6 Loan Closing Procedures
- Chapter 18 Section 223(a)(7)
- 18.1 Introduction
- 18.2 Purpose of Section 223(a)(7)
- 18.3.1 Standard Processing Time
- 18.3.2 Inapplicable Mortgages
- 18.3.3 Maximum Mortgage
- 18.3.4 Mortgage Term
- Loan Data
- Loan Requirements
- Loan Data
- 18.3.5 Mortgage Insurance Premium
- 18.3.6 Environmental Review Requirements
- 18.3.7 Fees
- 18.3.8 Project Numbering
- 18.3.9 Regulatory Agreement
- 18.3.10 Cost Certification
- 18.3.11 Commencement of Amortization
- 18.3.12 Source of Funds for Prepayment Penalty Costs
- 18.3.13 Refinancing Partial Payment of Claim (PPC) Properties
- 18.3.14 Commitment, Regulatory Agreement and Closing
- 18.4 Processing
- 18.4.1 Project Analysis
- B. The following is an example of a sample transaction – the d…
- C. The following is an example of a sample transaction – the d…
- D. The following is an example of a sample transaction – the d…
- 18.4.2 Verification of Existing Borrower Debt
- 18.4.3 CNA Requirement
- 18.4.4 Site Visits
- 18.4.5 Section 202 Mortgage Refinancing
- Loan Requirements Section of the Act
- 18.4.6 Ownership and Property Management Changes
- 18.5 Application Requirements Checklist
- Chapter 19 Closing Guide
- Part I: Introduction and Procedures
- 19.1.1 Applicability
- 19.1.1.1 Objective
- 19.1.1.2 Defined Terms
- 19.1.2.1 General
- 19.1.2.2 Firm Application
- 19.1.2.3 After Firm Commitment Issuance and Prior to Package S…
- B. Lender’s Introductory Response and Interim Communication:
- 19.1.2.4 HUD Review of Closing Packages
- 19.1.2.5 Changes to Tentative or Confirmed Closing Dates
- 19.1.3.1 Administrative Clearance to Close
- 19.1.3.2 HUD Signature Page
- 19.1.3.3 Note Endorsement
- 19.1.3.4 Circulation and Submission of Recordable Documents
- 19.1.3.5 Form of Closing Docket Submission
- 19.1.3.6 Restriction on Post-Closing Revision to Closing Docket
- 19.1.3.7 Closing Type: Mail or In-Person
- 19.1.4 Post-Closing Handling of Closing Dockets
- 19.2.1 Initial Endorsement Activities
- 19.2.2.1 Davis Bacon Labor Standards (DBLS) Clearance Required
- 19.2.2.2 Procedures for Firm Application, Issuance, and Initia…
- 19.2.2.3 Early Start of Construction
- 19.2.2.4 Procedures for Final Closings
- 19.2.3 Early Start of Construction
- 19.2.4.1 HUD Prior Written Approval Needed
- 19.2.4.2 Prior Document Review by HUD Counsel.
- 19.2.4.3 Implementation
- 19.3.1.1 Definitions
- 19.3.1.2 Assurance of Completion
- 19.3.1.3 Commencement of Preparation for Final Closing
- 19.3.1.4 Prerequisites for Final Closing
- 19.3.1.5 Final Closing Procedures
- 19.3.1.6 Internal Closing Forms
- 19.3.2.1 Request for Final Endorsement
- 19.3.2.2 Final Endorsement of the Note
- 19.3.2.3 Release of Final Advance
- 19.3.2.4 Release of Working Capital Deposit
- 19.3.3.1 Requirements for Final Advance
- 19.3.3.2 Application for Insurance of Advance of Mortgage Proc…
- 19.3.4.1 Disputes
- 19.3.4.2 Relevant Issues for HUD’s Consideration
- 19.3.4.3 Closing Without Full Participation of the Contractor.
- 19.3.5.1 Introduction
- 19.3.5.2 Workouts
- Part II: Closing Documents and Program-Specific Requirements
- 19.4.1.1 Required Use of HUD Forms and Closing Protocols
- 19.4.1.2 Completion of HUD’s OMB-approved Forms
- 19.4.1.3 Date of Documents
- 19.4.1.4 Closing Checklists
- 19.4.1.5 Submission of Closing Documents
- 19.4.1.6 Changes to Form Documents and Deviations from Closing…
- 19.4.1.7 Multi-Tiered Review of Requests for Substantive Changes
- 19.4.2.1 General Requirements
- 19.4.2.2 Permitted Modifications for State Requirements and Pr…
- 19.4.2.3 Supplemental, Consolidated, Amended or Restated Loan
- 19.4.2.4 Ground Lease
- 19.4.2.5 Fee-Joinders
- 19.4.3.1 General Requirements
- 19.4.3.2 Description of Collateral
- 19.4.4.1 General Requirements
- 19.4.4.2 Prepayment Provisions
- 19.4.4.3 Endorsement Panel
- 19.4.4.4 Late Charge Provision
- 19.4.4.5 Changes to Loan Interest Rates
- 19.4.4.6 Change(s) to Permanent Financing After Initial Closing
- 19.4.4.7 Supplemental, Consolidated, Amended or Restated Loan
- 19.4.5.1 Form
- 19.4.5.2 Notice Address for HUD
- 19.4.5.3 Section 50
- 19.4.5.4 Section 30 - Additional Occupancy Restrictions and Po…
- 19.4.5.5 Residual Receipts Rider
- 19.4.5.6 Additional Riders
- 19.4.6.1 General
- 19.4.6.2 Borrower’s Counsel Legal Review and Opinion
- 19.4.6.3 Required Organizational Documents for Borrower
- 19.4.6.4 Tax Credit Transactions
- 19.4.6.5 Final Closings
- 19.4.7.1 Logistics
- 19.4.7.2 Title and Survey Review Standards
- 19.4.7.3 Pro Forma Title Policy Submission
- 19.4.7.4 Title Policy Requirements
- 19.4.7.5 Title Policy Issuance and Escrow Services
- 19.4.7.6 Survey, Survey Map/Plat and Surveyor’s Report.
- 19.4.8.1 General
- 19.4.8.2 Supplemental Opinions
- 19.4.8.3 Litigation Disclosure
- 19.4.9.1 General
- 19.4.9.2 Unsecured Secondary Financing
- 19.4.9.3 Secured Secondary Financing – Public Sources
- E. Instructions for submission to the HUD Closing Attorney.
- 19.4.9.4 Secured Secondary Financing – Private
- 19.4.9.5 Restrictive Covenants and Use Agreements for Secondar…
- 19.4.9.6 Equity Bridge Loans (EBL) for Tax Credit Projects
- 19.4.9.7 Deferred Developer Fees (DDF) for Low Income Housing …
- 19.4.9.8 Secondary Financing That Is Unavailable at Initial Cl…
- 19.4.10.1 General
- 19.4.10.2 Firm Commitment
- 19.4.10.3 Lender’s Certificate
- 19.4.10.4 Tax-Exempt Bond/IRS Code 142(d) Projects
- 19.4.10.5 Restrictive Covenants/Tax Regulatory Agreement
- 19.4.10.6 Borrower’s Counsel Opinion
- 19.4.10.7 Bond Counsel’s Opinion
- 19.4.10.8 HUD Note – Prepayment Prohibitions
- 19.4.10.9 HUD-Required Language for Trust Indenture/Funding Lo…
- 19.4.10.10 Bond Disbursement Agreement and Bond Loan Agreement
- 19.4.10.11 Bond Note
- 19.4.10.12 Supremacy of HUD Requirements and Conflicts
- 19.4.11.1 Firm Commitment Condition
- 19.4.11.2 Subordination of Restrictive Covenants
- 19.4.11.3 Borrower's Attorney's Opinion (Tax Credits)
- 19.4.11.4 LIHTC Equity Pay-In
- 19.4.11.5 Equity Investor Certification
- 19.4.11.6 LIHTC Rider
- 19.4.11.7 Pre-Approval of Special Limited Partners
- 19.4.11.8 Determinative Criteria for SLP Pre-Approval
- 19.4.11.9 Post-Closing Requirements for HUD Pre-Approval of SLP
- 19.4.12.1 General Requirements
- 19.4.12.2 Escrow Agreement for Deferred Repairs (Form HUD-9247…
- 19.4.12.3 Escrow Agreement for Operating Deficits (Form HUD-92…
- 19.4.12.4 Escrow Agreement for Working Capital (Form HUD-92412M)
- 19.4.12.5 Escrow Agreement for Incomplete Construction (Form H…
- 19.4.12.6 Escrow Agreement for Latent Defects (Form HUD-92414M)
- 19.4.12.7 Escrow Agreement of Sponsor to Furnish Additional Fu…
- 19.4.13.1 Permits and Governmental Approvals
- 19.4.13.2 Zoning and Building Code Compliance
- 19.4.13.3 Evidence of Utility Access and Service
- 19.4.13.4 Property Insurance
- 19.4.13.5 UCC Searches
- 19.4.13.6 Certifications
- 19.4.13.7 Certified Closing Statement
- 19.5.1.1 General
- 19.5.2 Project Completion Funds
- 19.5.3 Disbursement Agreement
- 19.5.4.1 General Requirements
- 19.5.4.2 HUD Amendment to AIA Document B108 (Form HUD-92408M) …
- 19.5.4.3 Professional Liability Insurance
- 19.5.5.1 Construction Contract
- 19.5.5.2 Prevailing Wage Rates
- 19.5.5.3 Identity of Interest Disclosure
- 19.5.5.4 Cost Breakdown
- 19.5.5.5 Completion of Forms
- 19.5.5.6 Liquidated Damages
- 19.5.5.7 Cost Certification
- 19.5.5.8 Side Agreements
- 19.5.6.1 General Requirements
- 19.5.6.2 Surety Requirements
- 19.5.6.3 Letters of Credit
- 19.5.6.4 Assurance of Completion for Off-Site Improvements
- 19.5.7.1 Introduction
- 19.5.7.2 HUD-Insured Advance Requirements for Building Compone…
- 19.5.8 Lender’s Certificate for New Construction or Substantia…
- 19.5.9.1 General Requirements
- 19.5.9.2 Maximum Insurable Mortgage Form
- 19.5.9.3 Modifications to Original Loan Terms
- 19.5.9.4 Modification Documents
- 19.5.9.5 Borrower’s Attorney’s Opinion
- 19.5.9.6 Title Evidence at Final Endorsement
- 19.5.9.7 Final As-Built Survey & Surveyor’s Report
- 19.5.9.8 Updated Organizational Documents of Borrower
- 19.5.9.9 Lender’s Current Payment Letter and Certification
- 19.5.9.10 Guarantee Following Completion
- 19.5.10.1 Conditions for Approval of Final Advance of Mortgage…
- 19.5.10.2 Exceptions to General Rule
- 19.5.10.3 Application for Insurance of Advance of Mortgage Pro…
- 19.5.10.4 Approval of a Final Advance
- 19.5.10.5 Escrow for Completion
- 19.5.11.1 General Rule
- 19.5.11.2 Exception to General Rule
- 19.6.1.1 General
- 19.6.1.2 Promissory Note (Form HUD-94001M)
- 19.6.1.3 Evidence of Zoning and Building Code Compliance
- 19.6.1.4 Utilities
- 19.6.1.5 Request for Endorsement of Credit Instrument (Form HU…
- 19.6.1.6 Short-Form Cost Certification
- 19.6.1.7 Repairs and Alterations
- 19.6.1.8 Latent Defects Guarantee
- 19.6.1.9 Projects with Expanded Work
- 19.6.2.1 General
- 19.6.2.2 Five-Year Lockout
- 19.6.2.3 Refinances of Second Mortgages.
- 19.6.2.4 Differences from Section 223(f) Procedures
- 19.6.3.1 Introduction
- 19.6.3.2 Effect on Existing Financing
- 19.6.3.3 Additional Requirements for 241(a) Supplemental FHA L…
- 19.6.3.4 HUD Form Documents for 241(a) Supplemental Loans
- 19.6.4 Section 213 Cooperative Housing Loans
- 19.6.5.1 General
- 19.6.5.2 Firm Commitment
- 19.6.5.3 Construction Requirements
- 19.6.5.4 Closing
- Part III: Sample Language, Certifications, and Riders
- 19.7 HUD-Required Provisions for Borrower’s Organizational Doc…
- 19.8 Rider to Security Instrument – LIHTC Projects
- LENDER
- 19.9 Rider to Regulatory Agreement for Residual Receipts Requi…
- BORROWER
- 19.10 Survey Affidavit of No Change
- AFFIANT:
- 19.11 Certification of Architectural/Engineering Fees
- 19.12 Building Code Verification
- 19.13 Zoning Letter
- 19.14 Third Party Obligee Certification
- 19.15 HUD [Rider / Amendment] To Restrictive Covenants
- Note: This document has been submitted to OMB for PRA approval…
- 19.16 Equity Bridge Loan Rider – LIHTC Projects
- Section 213 Cooperative Program Rider to Regulatory Agreement …
- Appendix 2 Quality Control Plans and Identity of Interest
- A.13.2 Agreement Authorizing Deferment of Principal Payments f…