A.13.2 Agreement Authorizing Deferment of Principal Payments for Level Annuity Monthly Payment
Permanent Placement
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-07-29 · United States
Fee ..... 3-4, 3-28, 13-22, 13-23, A3-3, A3-6 Permission to Occupy Permission to Occupy ........... 12-6, 12-8, 12-14, 12-15, 12-32, 12-33, 12-37, 12-40, 13-2, 13-7, 13-12, 14-7, 14-15, 19-14 Permits Permits and Governmental Approvals ....................................................... 19-57 Phase I Environmental Site Assessment Phase I Environmental Site Assessment ................................... 1-5, 5-6, 7-64, 9-1, 9-2, 9-13, 17-7, A2-13, A4-4, A4-10, A4-14 Physical Inspections Physical Inspections ............................................ 5-6 Plans and Specifications Plans and Specifications............. 3-20, 5-5, 5-15, 5-17, 5-19, 5-20, 5-21, 5-23, 5-26, 5-27, 5-28, 5-29, 5-30, 5-31, 5-32, 5-41, 5-45, 5-51, 6-4, 6-7, 6-13, 8-45, 9-9, 11-9, 12-40, 12-44, 12-46, 14-15, 16-4, 19-9, 19-38, 19-61, 19-66, 19-93, A4-4, A4-12, A4-16, A5-25, A5-57, A5-59 Plans and Specs............... 5-13, 5-14, 5-16, 5-18, 5-23, 5-37, 5-38, 5-40, 5-44, 19-39, A5-8, A5-22, A5-25, A5-35, A5-36, A5-37 Portfolio Manager ............ 5-27, 6-4, 6-5, 6-6, 6-11, 6-12, 6-13 Post-Closing Review ............................................... 15-7 Pre-Application Pre-Application Exhibit ......... 5-25, A4-9, A5-32 Pre-Application Invitation .............................. 7-42 Review the Feasibility of a Proposed Project ................................................................... 4-3 Pre-Approval of Principals Pre-Approval of Principals with Large Concentrations of FHA Insured Debt ...... 4-5 Pre-Construction Conference ....... 4-4, 12-2, 12-8, 12-40, 19-9, 19-11, 19-82 Preference Elderly Preference .............................................. 3-36 Occupancy Preference ...................................... 3-13 Residency Preference........................................ 3-14
MAP Guide, March 2021 Go to beginning of Index
Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index
To return to this page after clicking a link, press ALT + Back Arrow
Index
Go to Table of Contents
Prepayment Prepayment Lockout ........ 11-13, 11-14, 11-15, 19-78 Prepayment Penalties ............ 3-29, 8-42, 11-11, 18-2, 18-7, 18-11, A3-19, A3-20 Prepayment Penalty ................ 8-42, 11-14, 18-7 Prepayment Prohibitions ............... 19-50, 19-75 Prepayment Provisions ......... 3-25, 11-13, 14-2, 19-22, 19-29, 19-75
Prepayment Restriction ............. 3-2, 3-25, 8-54, 11-14, 19-29
Prevailing Wage ....... 3-12, 3-24, 5-38, 12-3, 12-4, 12-7, 12-19, 12-40, 13-6, 19-10, 19-19, 19-61, 19-64, 19-78, 19-84, A12-8
Previous Participation Previous Participation Certification ....8-2, 8-5, 8-6, 8-7, 8-9, 8-10, 10-7, 11-7, 14-12, 19-53, 19-79, 19-85, A4-5, A4-6, A4-11, A4-12, A4-15, A4-16, A8-8
Previous Participation Review ..............2-6, 3-5, 8-2, 8-5, 8-8, 10-1, 10-5, 14-2, 16-3, 18-13, 19-53, 19-54
Principal
Active Principal .............. 8-2, 8-3, 8-5, 8-6, 8-10, 8-11, 8-12, 8-14, 8-15, 8-16, 8-17, 8-18, 8-19, 8-21, 8-22, 8-23, 8-29, A8-6, A8-8, A8-12, A8-13, A8-14, A8-15, A8-16
Application Rejection ........................................ 8-30 Credit Reference ..................................... 8-14, 8-33 Credit Rejection ................................................... 8-14 Domestic Principal .................... 8-10, 8-11, 8-12, A8-17, A8-18
Foreign National Principal.................. 8-10, 8-11 Passive Principal ..... 8-2, 8-3, 8-4, 8-5, 8-6, 8-7, 8-10, 8-23, A8-13, A8-15, A8-16, A8-17, A8-18
Principal Types ........................................... 8-4, 8-23 Principal Types Not Subject to Credit Review ................................................................... 8-4 Prior Approval Decision .............. 8-23, 8-30, A8-7, A8-9, A8-10, A8-11 Processing Restrictions ............................................ 2-1 Profit and Risk Allowance Sponsor Profit and Risk Allowance ........... 3-14, 3-17
Profit-Motivated Borrower Entity Profit-Motivated Borrower Entity ............... 8-34 Project Architect Project Architect Duties and Responsibilities ................................................ 5-9 Project Architect Qualifications ...................... 5-9 When Project Architects are Required ............................................................ 5-14 Project Based Rental Assistance ........... 7-57, 13-3, A8-20 Projects in Volatile Markets .................................. 4-1 Promissory Note
Promissory Note ............... 3-2, 8-24, 8-25, 8-26, 8-27, 8-28, 8-43, 8-53, 8-54, 13-23, 13-33, 14-13, 18-12, 19-29, 19-43, 19-44, 19-48, 19-51, 19-75
Property Insurance Schedule........ 5-8, 5-40, 5-51, 5-53, 12-41, 13-31, 19-58, 19-59, A2-21, A2-23, A5-55, A5-63, A5-64
Protected Class
Protected Class........ 3-4, 3-14, 7-20, 7-36, 17-2
Q
Quality Control Plan Quality Control Review ...................................... 7, 2
R
Radon ............ 5-37, 9-3, 9-4, 9-8, 9-10, 9-11, 9-12, 9-32, 9-33, 9-34, 9-35, 9-36, 9-58, 18-6, A5-45, A7-13, A7-14 Rate Lock ...................................................... 11-4, 11-13 Ratio
Debt Service Coverage Ratio ............... 3-7, 3-20, 8-38, 8-39, 8-40, 18-3, A5-52, A8-3
Loan-to-Value Ratio ............................... 8-40, 8-41 Real Estate Owned (REO) Schedule ................. 8-21 Refinancing CNA for Existing Improvements in Refinance ............................................................. 5-6 Section 223(a)(7) Refinancing ......... 3-29, 18-3, 18-4
MAP Guide, March 2021 Go to beginning of Index
Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index
To return to this page after clicking a link, press ALT + Back Arrow
Index
Go to Table of Contents
Regulatory Agreement Additional Occupancy Restrictions and Policies ............................................................ 19-31 Regulatory Agreement Compliance ............ 3-24 Reissued Commitment Reissued Commitment ..................................... 11-8 Relocation Permanent Displacement ........ 3-41, 3-42, 3-44 Relocation Budget ........................................... A3-13 Relocation Compensation ............................... 3-42 Relocation Consultant3-41, 3-42, 3-45, A3-11, A3-12, A3-13, A3-14 Relocation Cost ................ 3-42, 3-44, 3-45, 14-7, A3-15 Relocation Escrow............... 14-7, A3-12, A3-13, A3-14 Relocation Expense........ 3-42, 3-45, 7-47, 8-50, 13-27, 13-32, A-13, A12-5 Relocation Plan .... 3-41, 3-42, 3-44, 5-13, 10-2, 12-5, 12-6, 12-31, 12-44, 12-45, A3-11, A3-12, A3-13, A3-14, A3-15, A4-4, A4-10, A4-14 Relocation Schedule ............ 3-44, A3-12, A3-14 Temporary Resident Relocation ................. 3-44, 12-33, 12-42 Remaining Economic Life Effective Age ............................................. 7-19, 7-20 Functional Obsolescence ................................. 7-19 Physical Life .................................. 7-18, 7-19, 7-20 Remaining Economic Life ......... 3-2, 3-19, 3-27, 3-29, 7-18, 7-19, 7-20, 7-41, 7-43, 8-37, 11-13, 17-5, 17-9, A4-2, A7-10, A7-12 Rent Comparability Study HAP Contract Renewal Request and Rent Comparability Study .......................... 14-6 Rent Comparability Study ...... 7-22, 14-5, 14-6, A3-19 Rent Comparables .............................................. 7-22 Rent Control ..................................... 7-17, 17-6, 17-10 Rent Roll ............. 3-22, 7-7, 7-23, 7-34, 7-42, 7-43, 8-16, 8-29, 11-2, 12-3, 17-6, 17-7, 17-12, A2-15, A4-5, A4-8, A5-44 Rental Assistance Federal Rental Assistance ............. A3-18, A3-19
Section 8 Project Based Rental Assistance ...................................................... A3-18 Rents RCS Rents ............................................................... 14-5 REO Real Estate Owned............ 8-3, 8-14, 8-21, 8-30, A8-1
REO ........ 1-4, 8-3, 8-15, 8-21, 8-22, 8-23, 8-32, 9-8, 9-10, 9-22, 9-25, A4-6, A4-12, A4-16, A8-1, A8-3, A8-8, A8-13, A8-14, A8-15, A8-27, A15-3
Repair Threshold Per Unit Threshold ................................. 3-12, 5-56 Repairs and Alterations Accessibility Repair....... 3-22, 3-23, 5-13, 5-18, 5-41, 5-55, 12-41, 12-43, 19-76, A5-48 Critical Repair ....... 3-20, 5-17, 5-18, 5-40, 5-41, 5-42, 6-8, 8-41, 8-42, 12-33, 12-41, 12-42, 13-14, 18-3, 19-76, A2-19, A2-23, A5-8, A5-9, A5-18, A5-20, A5-42, A5-48, A5-50, A5-54, A5-64, A5-70, A5-75 Critical-Life Safety Repair ............................... 3-22 Deferred Repair .............. 3-23, 3-26, 5-41, 5-42, 8-42, 12-42, 12-47, 13-14, 13-33, 13-34, 19-56, 19-76, 19-79 Level 1 Alteration ................ 5-3, 5-4, 5-15, 5-16, 5-56, 12-2, 12-43, A5-48 Level 2 Alteration .............. 5-3, 5-4, 5-15, 12-43 Level 3 Alteration ....... 5-3, 5-4, 5-5, 5-10, 5-15, 5-39, 5-56, 19-77, A5-20, A5-75 Non-Critical Repair .......... 2-2, 3-20, 3-22, 3-23, 5-4, 5-13, 5-14, 5-16, 5-18, 5-21, 6-8, 8-41, 8-42, 11-7, 12-41, 12-43, 13-7, 13-33, 15-7, 18-1, 18-3, 18-6, 19-76, A2-19, A2-22, A2-23, A5-9, A5-43, A5-48, A5-64, A5-70 Payment for Repairs ....................................... 12-42 Repair Threshold ..................... 17-2, 19-76, A3-5 Schedule of Values ................ 12-5, 12-41, 12-42, 12-45, 13-28, 13-30, 19-64, A12-9 Replacement Cost ............... 3-14, 3-15, 3-31, 3-32, 3-45, 5-8, 5-38, 5-44, 5-45, 5-50, 5-51, 5-53, 5-55, 7-16, 7-40, 7-41, 7-44, 7-45, 7-46, 7-47, 7-53, 7-55, 8-24, 8-26, 8-34, 8-38, 8-39, 8-50, 8-52, 13-3, 13-4, 13-5, 13-12, 13-13, 13-15,
MAP Guide, March 2021 Go to beginning of Index
Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index
To return to this page after clicking a link, press ALT + Back Arrow
Index
Go to Table of Contents
13-26, 13-27, 16-4, 16-5, 17-5, 18-3, A2-14, A5-45, A5-46, A5-55, A12-4, A12-6 Requesting an FHA Project Number ............. A4-19 Reserve for Replacement Account
Initial Deposit to the Reserve for Replacement Account ................... 12-23, 18-8 Repair Escrow ..... 1-2, 1-3, 3-26, 4-8, 5-2, 5-42, 5-43, 6-12, 6-14, 6-15, 8-42, 12-1, 12-42, 12-43, 12-44, 12-45, 12-46, 12-47, 13-33, 14-10, 19-76, A5-25, A5-51, A5-77 Resident Service Package ..................................... 3-39 Residual Receipts Residual Receipts ........ 8-25, 8-27, 8-28, 11-15, 13-32, 19-31, 19-44, 19-51, 19-89, 19-100, 19-101, 19-104
Residual Receipts Note ........... 8-25, 8-27, 8-28, 13-32, 19-44
Residual Receipts Rider ...... 8-27, 19-31, 19-44 Restricted Excess Mortgage Proceeds ......... A12-7 Restrictive Covenant
Restrictive Covenant .............. 8-25, 9-46, 11-14, 14-17, 19-35, 19-46, 19-47, 19-48, 19-49, 19-50, 19-52, 19-70, 19-84, 19-99, 19-100, 19-101
Rider/Restrictive Covenant Agreement ........................................................ 8-25 Rights of First Refusal ............ 19-35, 19-38, 19-60 Risk Indicator ............................................................ A2-9 Risk Management ...... 1-2, 2-18, 2-20, 15-2, A2-2, A2-7, A15-1 Risk Mitigation ........................................... 7-48, A5-41 Risk of Loss Insurance Policy ...... A12-11, A12-12
S
Scattered Site ............. 3-8, 3-9, 18-2, A4-20, A5-44 Secondary Financing
Bridge Loan .............. 2-10, 3-5, 8-28, 14-1, 14-2, 14-8, 14-11, 14-13, 14-15, 14-16, 19-103, A2-25, A4-6, A4-12, A4-15, A8-3, A12-6 Condition for Repayment of Secondary Financing ........................................................... 8-26 Restrictive Covenants and Use Agreements for Secondary Financing .......................... 19-46
Secondary Financing for LIHTC Transactions ...................................................... 3-5 Secondary Financing from Federal, State or Local Government Agencies ............. 19-48 Secondary Financing that is Unavailable at Initial Closing ................................................ 19-48 Unsecured Private Secondary Financing ........................................................... 8-27 Section 106 Consultation with Indian Tribes...... 9-37, 9-38, 9-39 Indian Tribe ........................................................... 9-39 Section 106 .............. 9-7, 9-36, 9-37, 9-38, 9-39, 9-40, A7-13, A9-10 Section 106 Delegation Memo .................... A9-10 Section 213 Cooperative Housing Section 213 Cooperative Housing ................. 9-5, 19-81 Section 213 Cooperative Program Rider ................................................ 19-32, 19-106 Section 220 Amount of Loan Rehabilitation Under Section 220 ....................................................... 8-39 Mixed Use Housing Project ............................. 3-16 Section 221(d) Firm Commitment for 220, 221(d) ............. 7-41 Section 223(a)(7) Five-Year Lockout ............................................ 19-78 HUD-Held Mortgage.............. 13-13, 18-2, 19-80 Refinancing of Multiple Loans into a Single Section 223(a)(7) Loan .............. 19-78 Section 223(a)(7) Firm Application........... A4-7 Section 223(a)(7) Refinancing ............2-1, 2-22, 3-29, 3-30, 18-1, 18-2, 18-8, 18-12 Section 223(f) Cost Estimation Guidance for 223(f) Transactions ................................................. 19-76 Firm Commitment for 223(f) ......................... 7-42 Repairs and Alterations Cost Worksheet ....................................... A5-40, A5-75 Section 223(f) Concept Meeting .................. A4-2 Section 223(f) Firm Applications ................ A4-3 Section 231 Controlling Mortgage Criteria for Section 231 ....................................................... 3-18
MAP Guide, March 2021 Go to beginning of Index
Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index
To return to this page after clicking a link, press ALT + Back Arrow
Index
Go to Table of Contents
Housing Restricted to Persons Age 62+.... 3-37 Rehabilitation Under Section 231 ............... 8-39 Valuation for Section 231................................ 7-45 Section 241(a) Architectural Review of Section 241(a) Loans ................................................................... 3-20 Cross-Default Provision ...... 3-19, 19-50, 19-70 Default Under the Section 241(a) Loan ......................................................... 3-19, 3-21 Section 50 Definition of Principal for Regulatory Agreement ........................................................ 8-11 Section 50 .......... 3-4, 3-24, 5-3, 5-21, 5-24, 8-2, 8-3, 8-5, 8-11, 8-12, 8-35, 19-30, A2-17, A4-8, A5-6, A5-7, A5-9, A5-12, A5-13, A514, A5-15, A5-16, A5-17, A5-18, A5-36, A538, A5-44, A5-56, A5-58 Section 504 Requirements Section 504 Requirements ........... A5-12, A5-13 Section 504 Requirements for Assisted Housing ............................................ A5-12, A5-13 Section 8 Project-Based Assistance with LIHTC ....................................................................... 7-61 Seismic Benchmark Building ....................................... A5-19 Exempt Building ............................................... A5-19 Seismic Report ...... A5-19, A5-22, A5-24, A5-39 Seismic Resistance ............... 5-18, A5-19, A5-18 Seismic Resistance Standards .................... A5-18 Threshold Report ............. A5-21, A5-22, A5- 24 Seller Financed Secondary Debt ........................ 8-26 Senior Housing.......................................................... A3-9 Settlement Agreement Settlement Agreement....................... 15-5, 19-21 Settlement Agreements Settlement Negotiation ..................... 15-5, 15-12 Sewerage System Septic System ....................................................... A5-3 Significant Cash Out Significant Cash Out .................................. 3-27, 4-1 Simplified Form of Cost Certification Simplified Cost Certification .......................... 13-9 Single Asset Mortgagor Entity Single Asset Mortgagor ................. 2-9, 3-1, 8-25, 13-20, 18-2, A3-7
.... 15-5, 15-12 Sewerage System Septic System ....................................................... A5-3 Significant Cash Out Significant Cash Out .................................. 3-27, 4-1 Simplified Form of Cost Certification Simplified Cost Certification .......................... 13-9 Single Asset Mortgagor Entity Single Asset Mortgagor ................. 2-9, 3-1, 8-25, 13-20, 18-2, A3-7
Single Room Occupancy Property SRO ............................................................................ 3-11 Site Improvements ............. 3-12, 3-14, 3-32, 5-22, 5-33, 5-45, 5-46, 6-6, 6-7, 6-14, 7-38, 7-39, 9-2, 12-5, 12-17, 12-31, 19-66, 19-67, A5-9, A5-39, A5-46, A5-56, A5-57, A5-58, A12-1, A12-13 Site Ingress and Egress ............ 5-26, A5-21, A5-33 Slush Pit........................................................................ 9-55 Soft Cost Overrun ............................................... A12-17 Special Limited Partner Entity Special Limited Partner Entity ......... 8-3, 19-55, 19-56, 19-87 Specifications Drawings and Specifications ...... 3-20, 5-7, 5-8, 5-13, 5-14, 5-15, 5-16, 5-19, 5-20, 5-26, 5-29, 5-30, 5-31, 5-32, 5-34, 5-37, 5-49, 5-51, 6-3, 6-9, 6-10, 9-9, 11-7, 12-5, 12-6, 12-9, 12-12, 12-26, 12-27, 12-39, 14-15, 16-3, 19-14, 19-64, 19-77, 19-82, A5-21, A5-23, A5-32, A5-42, A5-55, A5-57, A5-58 Plans and Specifications............. 3-20, 5-5, 5-15, 5-17, 5-19, 5-20, 5-21, 5-23, 5-26, 5-27, 5-28, 5-29, 5-30, 5-31, 5-32, 5-41, 5-45, 5-51, 6-4, 6-7, 6-13, 8-45, 9-9, 11-9, 12-40, 12-44, 12-46, 14-15, 16-4, 19-9, 19-38, 19-61, 19-66, 19-93, A4-4, A4-12, A4-16, A5-25, A5-57, A5-59 Standard Certification ................ 5-52, 5-53, A2-18, A2-20, A2-21, A2-23, A3-20 Statement of Energy Performance SEP ....... 6-3, 6-4, 6-5, 6-8, 6-9, 6-10, 6-11, 6-14 Statutory Loan limit Loan Limit ......................................... 3-5, 3-26, 8-39 Statutory Loan Limit Demolition ............... 3-6, 3-12, 3-42, 5-33, 5-46, 5-54, 5-55, 7-11, 7-39, 7-55, 8-48, 9-6, 9-27, 9-29, 9-30, 9-38, 13-26, 19-12, A2-17, A2-20, A12-6 Student Housing ......................................................... 3-7 Subordinate Loan Subordinate Mortgage ....................... 8-45, 19-78 Subordination Agreement ...... 8-24, 8-25, 8-26, 8-27, 8-45, 14-2, 14-12, 19-24, 19-44, 19-45, 19-46
MAP Guide, March 2021 Go to beginning of Index
Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index
To return to this page after clicking a link, press ALT + Back Arrow
Index
Go to Table of Contents
- Subordinated Lien ............ 3-5, 8-27, 13-21, 19-34, 19-37, 19-43
Subordination Agreement .......... 8-24, 8-25, 8-26, 8-27, 8-45, 14-2, 14-12, 19-24, 19-44, 19-45, 19-46
Subordination, Non-Disturbance and Attornment Agreements (SNDA) .............. A8-19 Substantial Error .................................................. 13-38 Substantial Ground Disturbance
Substantial Ground Disturbance .................. 9-38 Substantial Rehabilitation Cost Review Report for Firm Exhibits New Construction and Substantial Rehabilitation ............................................... A5-62 HUD Construction Administration Period ........................................................ 4-4, 12-1 Streamlined Processing for Substantial Rehabilitation .................................................. 5-36 Substantial Rehabilitation Loan Limits ..... 8-39 Substantial Rehabilitation Transactions .... 3-2, 3-11, 3-12, 3-18, 4-2, 7-45, 8-48, 11-10, 13-22 Title Policy Requirements ........................... 19-36 Substantive Change Housing Directive Waiver ............................ 19-24 Narrative Submission .................................... 19-24 Substantive Change ............ 1-4, 2-17, 4-2, 19-6, 19-22, 19-24, 19-25, 19-26, 19-46, 19-48 Subsurface Exploration ............................. 5-49, A5-4 Supervisory Architect ..... 2-5, 5-48, 12-11, 19-63, 19-77, A3-14, A3-13, A4-16
Supplemental Loan
Supplemental Loan ............. 1-3, 3-5, 3-18, 3-19, 3-20, 5-43, 5-44, 6-14, 13-27, 19-24, 19-26, 19-28, 19-37, 19-79, 19-80, 19-81, A3-1, A3-21, A5-42
Supplemental Loan Proceeds ..................... A3-21 Supplemental Operating Statement Supplemental Income Statement .............. 13-14 Surety Bond ............. 5-42, 8-47, 8-50, 8-51, 12-43, 19-57, 19-64, 19-76, 19-83, 13, 17 Surety Requirements .......................................... 19-66 Surplus Cash .............. 5-43, 8-17, 8-24, 8-25, 8-26, 8-27, 8-28, 8-34, 8-53, 10-7, 13-32, 14-8, 14-9, 14-12, 14-14, 14-16, 16-2, 18-7, 19-31,
19-44, 19-48, 19-51, 19-86, 19-89, 19-100, 19-101, 19-104, 19-25
Survey
Apparent Interests .............................. 19-41, A5-5 Encroachments ..... 12-32, 19-37, 19-38, 19-39, 19-41, 19-91, A5-5
Survey .......... 5-18, 5-22, 5-24, 5-31, 5-41, 5-58, 7-8, 7-21, 9-30, 9-31, 11-12, 12-17, 12-31, 12-32, 12-37, 12-39, 12-45, 13-24, 13-26, 14-6, 19-4, 19-14, 19-28, 19-33, 19-34, 19-35, 19-36, 19-37, 19-39, 19-40, 19-41, 19-42, 19-71, 19-79, 19-91, A4-5, A5-8, A5-10, A5-11, A5-14, A5-1, A5-4, A5-5, A5-18, A5-26, A12-5, A12-9
Survey Affidavit of No Change ......... 19-41, 19-79, 19-91
Suspension and Debarment .............. 15-16, 15-17
Sustaining Occupancy .......... 3-7, 3-35, 8-16, 8-19, 8-20, 12-35, 12-36, 12-38, 12-40, 13-39, 13-40, A5-42
Syndication .............. 8-21, 8-28, 8-44, 13-12, 16-3, 16-4, A2-26, A8-4, A12-1, A12-2, A12-16
T TAP Traditional Application Processing..... 1-1, 3-2, 9-5, 11-9, 19-1, 19-81, A4-1 Tax Abatement Deferral of Real Estate Taxes ......................... 7-60 Full Term Tax Abatement................................ 7-57 Partial Term Abatement .................................. 7-58 Period of the Tax Abatement ......................... 7-57 Tax Abatement and Deferral Agreements ................................................... 19-60 Variable Tax Abatement .................................. 7-58 Tax Credit Equity Bridge Loans Tax Credit Equity Bridge Loans .................... 8-28 Tax Exempt Bond ........ 7-60, 13-21, 14-17, A4-21, A4-23 Tax Increment Financing Tax Increment Financing ......... 3-6, 7-35, 19-43 TIF ....................................................................3-6, 7-35 Technical Specialist
MAP Guide, March 2021 Go to beginning of Index
Bookmarked Version
Go to Acronym and Abbreviation List, Glossary, Index
To return to this page after clicking a link, press ALT + Back Arrow
Index
Go to Table of Contents
Technical Specialist ............ 4-6, 4-7, 5-12, 11-6, 11-7, 12-5
Tentative Closing Date ...... 19-2, 19-3, 19-4, 19-5, 19-10, 19-24
Third-Party Professionals
Third Party Contractor ............ 2-1, 2-4, 2-5, 4, 5 Third-Party Professionals .......... 2-8, 5-44, 11-2
Title Policy
Encroachment ...... 9-13, 9-14, 9-16, 9-18, 9-20, 9-21, 19-37
Title Policy ..... 5-34, 12-39, 13-24, 13-44, 19-5, 19-7, 19-8, 19-13, 19-34, 19-35, 19-36, 19-37, 19-38, 19-39, 19-40, 19-41, 19-43, 19-58, 19-59, 19-71, 19-80, 19-83, A5-5
Trade Line Item
Trade Line Item ... 5-27, 5-46, 5-51, 5-52, 5-54, 13-30
Traditional Application Processing 1-1, 3-2, 9-5, 11-9, 19-1, 19-81, A4-1
Transfer of Physical Assets
Tax Credit Equity Bridge Loans .............8-3, 8-5, 8-17, 8-23, 8-25, 8-26, 8-27, 14-12, 18-13, 19-87
Transient Housing Hotel .......................3-7, 3-40, 17-1, A3-12, A5-16 Turnover Rate Turnover Rate ...................................................... 17-3
U
UCC
UCC .... 19-4, 19-5, 19-13, 19-28, 19-37, 19-59, 19-67, 19-70, 19-80, A12-10
UCC Search ......................................................... 19-59 UCC-1 Financing Statement ......... 19-13, 19-28, 19-37, 19-67, 19-70, 19-80
UFAS
Alternative to UFAS ........................................ A5-15 UFAS Resources ............................................... A5-15
Underwriter Checklist ..................................... A8-1 Underwriter Narrative ............... 4-4, 8-10, 8-32, 11-3, A3-19, A16-1
Underwriting
Application-Level Mortgage Credit Underwriting ................................................... 8-23 Commercial Tenant ..... 7-27, 7-28, 16-1, 19-31, A5-2, A8-20, A8-21, A16-2, A16-3 Underwriting Commercial Rents .............. A8-20 Underwriting Deficiencies ........... A15-3, A15-4, A15-5 Underwriting for Waiver Procedures .......... 1-4 Underwriting Standards ............ 1-1, 3-33, 7-53, 14-3
Uniform Federal Accessibility Standards ....... 5-6, 5-7, 5-37, A5-14, A5-15, A5-36, A5-38
Urban Redevelopment
Urban Redevelopment ...................................... 3-16 Use Restriction
Elderly and/or Age Use Restrictions ......... A3-9 USPAP
Competency Rule Described in USPAP ........ 7-3 Ethics Rule .................................................7-34, A7-2 Guidance for Income-Restricted Projects .............................................................. 7-14 Jurisdictional Exception Rule ........... 7-16, 7-63, A7-2, A7-4 Record Keeping Rule .............................7-63, A7-2 Scope of Work Rule ........................... 7-14, 2, A7-3 Standards Rule ............................. 7-14, 7-15, A7-2 USPAP Advisory Opinion ......... 7-14, 7-15, 7-36 USPAP Certification ............................ 7-20, A2-15
Utility Conservation
Utility Conservation .................. 5-5, 6-14, A5-45, A5-50
Utility Consumption
Utility Consumption 3-15, 5-5, 5-7, 5-12, 5-27, 6-1, 6-5, 6-6, 6-8, 6-10, 6-13, 6-14, 6-15 Utility Cost
Reduced Utility Costs ........................................ 6-14
Underwriter
Credit Approval ............... 8-22, 8-23, 8-30, 8-36, 11-1, A8-6, A8-7, A8-8, A5-11
Oversight and Performance ........ 4-5, 4-7, 11-2, 11-6
MAP Guide, March 2021 Go to beginning of Index
Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index
To return to this page after clicking a link, press ALT + Back Arrow
Index
Go to Table of Contents
V
Vacancy
Collection Loss ........ 3-6, 3-10, 7-16, 7-23, 7-27, 17-10, A3-2, A3-5
Vacancy Rate ........ 7-10, 7-11, 7-13, 7-21, 7-23, 7-29, 10-3, 11-3, 17-3, A2-25, A8-13
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)
- Revision March 19, 2021 Office of the Assistant Secretary for …
- Table of Contents
- Index
- Chapter 1 Introduction
- 1.1 Multifamily Accelerated Processing Guide
- 1.2 Purposes of MAP
- 1.3.1 Lender Qualifications and Monitoring
- 1.3.2 Programs Covered by MAP
- 1.3.3 Application Processing
- 1.3.4 Construction Responsibilities
- 1.3.5 Servicing
- 1.4 Regulations, Policies, and the MAP Guide
- 1.5 Workload Management
- Chapter 2 Lender Qualifications and Practices
- 2.1 Introduction
- 2.2 HUD Approval of Lenders
- 2.3 Lender Standards
- 2.4 Loan Consultants, Correspondents, or Mortgage Brokers
- 2.5 Underwriting and Construction Administration 2.5.1 Underwr…
- 2.5.2 Construction Administrator Duties
- 2.5.3 Underwriting and Construction– HUD’s Role
- 2.5.4 Electronic Communications
- 2.6.1 Introduction
- 2.6.2 Definitions
- 2.6.3 Identity of Interest - General
- 2.6.4.1 Lender Owned FHA-Insured Properties
- 2.6.4.2 Secondary Financing Relationships
- 2.6.4.3 Bridge Loans and Balance Sheet Loans
- 2.6.4.4 Lenders with Tax Credit Equity Affiliates
- 2.6.4.5 Lender’s Consultants, Correspondents, or Mortgage Brok…
- 2.6.4.6 Other Lender Conflicts
- 2.6.4.7 Prohibited Practices - Inducements
- 2.6.4.8 Prohibited Practices - Gifts
- 2.6.4.9 Prohibited Practices - Charitable Donations
- 2.6.5.1 In General
- 2.6.5.2 IOI Discovered Before Processing
- 2.6.5.3 IOI Discovered During Processing
- 2.6.5.4 IOI Discovered After Firm Commitment
- 2.6.6 Certification
- 2.6.7 Syndicator or Investor Influence
- 2.7 New MAP Lender Application Package
- 2.8 Limitations and Notices
- 2.9 Quality Control, Records and Monitoring
- 2.10 Underwriters – HUD Approval
- 2.10.1 MAP Underwriters
- 2.10.2 Chief Underwriters
- 2.10.3 Deputy Chief Underwriters
- 2.11 Underwriter Trainees
- 2.12 MAP Underwriter Transfers
- Chapter 3 Programs
- 3.1 General Program Requirements
- 3.1.1 Regulatory Agreement
- 3.1.2 Single Asset Mortgagor Entity
- 3.1.3 Non-Recourse
- 3.1.4 Interest Rate
- 3.1.5 Amortization Plan
- 3.1.6 Loan Terms
- 3.1.7 Prepayment Restrictions
- 3.1.8 HUD Application Fee
- 3.1.9 HUD inspection Fee
- 3.1.10 Mortgage Insurance Premium
- 3.1.11 Lender Fees and Charges
- 3.1.12 Definition of Affordable Housing
- 3.1.13 Fair Housing and Equal Opportunity
- 3.1.14 Previous Participation
- 3.1.15 HUD's Fiscal Procedures
- 3.1.16 Bridge or Gap Financing
- 3.1.17 Secondary Financing
- 3.1.18 Statutory Loan Limits
- 3.1.19 Tax Increment Financing
- 3.1.20 Commercial Space
- 3.1.21 Military Impacted Areas
- 3.1.22 Student Housing
- 3.1.23 Real Estate Requirements
- 3.1.24 Transient Housing/Hotel Services Prohibition
- 3.1.25 Sustaining Occupancy
- 3.1.26 Operating Deficit
- 3.1.27 Short-Term Lease Premiums
- 3.1.28 Replacement Reserve
- 3.1.29 Developer Fees
- 3.1.30 Scattered Sites
- 3.1.31 Condominiums
- 3.1.32 Environmental Review
- 3.1.33 Underwritten Vacancy and Collection Loss
- 3.1.34 Borrower’s Certifications
- 3.1.35 Waivers
- 3.1.36 Opportunity Zones
- 3.2 New Construction/Substantial Rehabilitation Program Requir…
- 3.2.1 Properties
- 3.2.2 Insurance for Construction and Permanent Loan Periods
- 3.2.3 New Construction Transactions
- 3.2.4 Substantial Rehabilitation Transactions
- 3.2.5 Cost Certification
- 3.2.6 Federal Labor Standards
- 3.2.7 Assurance of Completion
- 3.2.8 Absorption Period
- 3.2.9 Marketing and Leasing Plan
- 3.2.10 Working Capital Escrow
- 3.2.11 Furniture, Fixture, and Equipment in Cost Basis
- 3.2.12 Elderly Developments
- 3.2.13 Occupancy Preference
- 3.2.14 Builder and Sponsor Profit and Risk Allowance (BSPRA)
- 3.2.15 Energy Efficiency
- 3.2.16 Cost vs. Value
- 3.3 Section 221(d)(4)–New Construction and Substantial Rehabil…
- 3.3.1 Criterion 1
- 3.3.2 Criterion 3
- 3.3.3 Criterion 4
- 3.3.4 Criterion 5
- 3.4 Section 220 Mortgage Insurance for Redevelopment Areas
- 3.4.1 Eligible Areas
- 3.4.2 Commercial Facilities
- 3.4.3 Maximum Loan Ratios and DSCRs
- 3.4.4 Builder and Sponsor Profit and Risk Allowance (BSPRA)
- 3.4.5 Sponsor Profit and Risk Allowance (SPRA)
- 3.4.6 Age Restriction Prohibited
- 3.5 Section 231 Mortgage Insurance
- 3.5.1 Definitions
- 3.5.2 Design and Amenities
- 3.5.3 BSPRA or SPRA allowances
- 3.5.4 Maximum Loan Ratios and DCRs
- 3.6.1 Eligibility
- 3.6.2 Term
- 3.6.3 Equity Requirement and Controlling Mortgage Criteria
- 3.6.3.1 Criterion 3–Loan to Value/Cost
- 3.6.3.2 Criterion 4–Statutory Limits
- 3.6.3.3 Criterion 5–Debt Service Coverage Ratio (DSCR)
- 3.6.4 CNAs, Plans and Cost Estimates
- 3.6.5 Davis-Bacon Act Applicability
- 3.6.6 Insurance of Advances or Insurance upon Completion
- 3.6.7 Environmental Review
- 3.6.8 Working Capital and Operating Deficit Reserves
- 3.6.9 Management Exhibits
- 3.6.10 Multiple Lenders
- 3.6.11 MIP
- 3.7.1 General Requirements
- 3.7.2 Eligible Properties
- 3.7.3 Ineligible properties
- 3.7.4 Additional Section 223(f) Requirements
- 3.7.5 Repairs
- 3.7.6 Accessibility Requirements
- 3.7.7 Age Restricted Projects
- 3.7.8 Defaults, Claims, or Enforcement Referrals
- 3.7.9 Labor Standards
- 3.7.10 Prepayment Provisions and Prohibition
- 3.7.11 Maximum Loan and Debt Service Coverage Ratios (DSCR)
- 3.7.11.1 Section 223(f) Refinance and Acquisition Processing
- 3.7.12 For Cash Out/Equity Out Proceeds When Repairs are Defer…
- 3.7.13 Capitalization Rates and Determination of Value
- 3.7.14 Statutory Loan Limits
- 3.7.15 Cost Not Attributable to Dwelling Space
- 3.7.16 Reserve for Replacements (RfR)
- 3.7.17 Secondary Financing
- 3.7.18 Commercial Space
- 3.7.19 Real Estate Requirements
- 3.7.20 Mortgage Term
- 3.7.21 Firm Commitment Processing Only
- 3.7.22 Market Study
- 3.7.23.1 Discounts and/or Costs of Issuance
- 3.7.23.2 Defeasance Costs Associated with Underlying Bond Fina…
- 3.8 Section 223(a)(7) Refinancing
- 3.8.1 Eligibility
- 3.8.2 Terms
- 3.8.3 Controlling Mortgage Criteria
- 3.8.4 Lender Fees
- 3.8.5 Borrower Fees
- 3.8.6 CNA
- 3.8.7 Other Issues
- 3.9.1 Insurance During Construction
- 3.9.2 Permanent Insurance
- 3.9.2.1 Public Liability Insurance
- 3.9.2.2 Vehicle Liability Insurance
- 3.9.2.3 Flood insurance
- 3.9.2.4 Casualty Insurance
- 3.9.3 Other Insurance Requirements
- 3.10.1 Purpose
- 3.10.2 Underwriting Ratios for Large Loans
- 3.10.3 Increased Reserves for Large Loans
- Loan size Reserve amount shall be the greater of
- 3.10.4 Extended Lease-Up Period
- 3.10.5 Higher Net Worth and Liquidity
- 3.11.1 Restrictions Authorized by Statute
- 3.11.1.1 Restrictions Allowed by HUD Statutory Authority
- 3.11.1.2 Housing for Persons Age 55+ (55+ Exemption)
- 3.11.1.3 Housing Restricted to Persons Age 62+
- 3.11.1.4 Other Fair Housing Act Exemptions
- 3.11.2 Age Restriction in Certain Projects and Programs
- 3.11.2.1 Market Rate Projects
- 3.11.2.2 Affordable Projects and 55+ Exemption
- 3.11.2.3 Section 231 Projects, both Market Rate and Affordable…
- 3.11.3.1 Services
- 3.11.3.2 Meals Service Exceptions
- 3.11.3.3 Prohibition on Founder’s Fees
- 3.11.3.4 Guest Suites
- 3.12.1 Relocation-General
- 3.12.2 Projects with Federal Assistance
- 3.12.3 Projects with No Federal Assistance
- 3.12.4 Relocation Costs on HUD Forms
- Chapter 4 Application Processing
- 4.1 Introduction/General
- 4.1.1 Approval of Lender's Reviewers
- 4.2.1.1 Concept Meetings
- 4.2.1.2 HUD Response
- 4.2.1.3 Firm Commitment Application Submissions
- 4.2.1.4 Firm Commitment Issuance
- 4.2.1.5 Firm Commitment Acceptance and Rate Lock
- 4.2.1.6 Closing
- 4.2.2.1 Concept Meetings
- 4.2.2.2 Pre-Application Stage
- 4.2.2.3 Invitation Letters
- 4.2.2.4 Firm Commitment
- 4.2.2.5 Closing
- 4.2.2.6 Construction Period
- 4.2.3 Appeals
- 4.3.1 General Requirements
- 4.3.2 Processing
- 4.4.1 General Requirements
- 4.4.2 Processing
- 4.4.3 Construction Period Responsibilities
- 4.4.4 Servicing
- Chapter 5 Architectural and Construction Analysis
- 5.1 Eligible Construction Activities
- 5.1.1 New Construction
- 5.1.2 Substantial Rehabilitation
- 5.1.3 Class of Work
- 5.1.4 Defining Construction Activities
- 5.1.5 Eligible Construction by Program
- 5.2 Consultant Due Diligence Responsibilities
- 5.2.1 General
- 5.2.2.1 Needs Assessor Qualifications
- 5.2.2.2 Needs Assessor Responsibilities
- 5.2.2.3 Construction Analysts Qualifications
- 5.2.2.4 Construction Analyst Responsibilities
- 5.2.3.1 Project Architect Qualifications
- 5.2.3.2 Project Architect Duties and Responsibilities
- 5.2.3.3 Owner-Architect Agreement for Services
- 5.2.3.4 Project Architect as Owner’s Representative
- 5.2.4 Other Technical Specialists
- 5.2.5 HUD Approval of Qualifications
- 5.3 Requirements by Construction Activity and Program
- 5.3.1 General
- 5.3.2.1 Scope of Work
- 5.3.2.2 Construction Costs
- 5.3.2.3 Schedule
- 5.3.3.1 When Project Architects are Required
- 5.3.3.2 When General Contractors are Required
- 5.3.3.3 Licensed Trades
- 5.3.3.4 Scope of Work
- 5.3.3.5 Construction Costs
- 5.3.3.6 Schedule
- 5.3.4.1 Scope of Work
- 5.3.4.2 Construction Costs
- 5.3.4.3 Schedule
- 5.4 Architectural and Other Building Standards
- 5.5.1 New Construction and Substantial Rehabilitation
- 5.5.2 Section 223(f) Transactions
- 5.6.1 Eligibility for Streamlined Processing [12]
- 5.6.2 Section 223(f) with new LIHTC Applications
- 5.6.3 Documentation at Firm Commitment
- 5.6.4 Requirements for Issuing a Firm Commitment
- 5.6.5 Modifications to the Firm Commitment
- 5.6.6 Risks Related to Deferred Document Submission
- 5.7.1 Concept Meeting
- 5.7.2 Pre-Application
- 5.7.3 Firm Commitment Application
- 5.7.4 Special Considerations for Industrialized Housing
- 5.8.1 Plans and Specifications Revisions
- 5.8.2 Major Changes
- 5.8.3 Construction Documents
- 5.8.4 Recommendation for Initial Endorsement
- 5.8.5 Distribution of Drawings and Specifications
- 5.8.6 Early Start of Construction
- 5.9 Substantial Rehabilitation Processing through Initial Endo…
- 5.9.1 Concept Meeting
- 5.9.2 Pre-Application
- 5.9.3 Firm Commitment Application
- 5.9.4 Firm Commitment to Initial Endorsement
- 5.10 Standard Processing for Section 223(a)(7) and 223(f)
- 5.10.1 Architectural Standards
- 5.10.2 Concept Meetings
- 5.10.3 Capital Needs Assessment
- 5.10.4 Lender’s Review of Costs
- 5.10.5 Certification
- 5.10.6 Firm Commitment
- 5.10.7 Time for Completion of Repairs
- 5.10.8 Escrow Agreement for Deferred Repairs
- 5.10.9 Completion of Repairs and Alterations
- 5.11.1 Supplemental Loan for New Construction
- 5.11.2 Supplemental Loan for Existing Structures
- 5.12 Cost Estimating for Lenders
- 5.12.1 Estimation Method
- 5.12.2 Cost Categories
- 5.12.3 Allowances and Fees
- 5.12.4 Builder’s and Sponsor’s Profit and Risk Allowance (BSPRA)
- 5.12.5 Construction Time
- 5.13 CNAs are Required for All Applications
- 5.14.1 Detailed Cost Estimate
- 5.14.2 Substantial Rehabilitation Costs
- 5.14.3 Refinance/Acquisition Costs
- 5.15.1 HUD Underwriting Assignment
- 5.15.2 CNA e-Tool and HUD Underwriting
- 5.15.3 Instructions and Training for Users
- 5.15.4 Consultation and Review Timeliness
- Chapter 6 Energy and Water Conservation
- 6.1 Purpose and Summary Requirements
- 6.1.1 New Construction and Substantial Rehabilitation Standards
- 6.1.2 Incentives for Improved Building Performance
- 6.2 Statutes and Regulations
- 6.3 Green Building Certifications Specifications Recognized fo…
- 6.3.1 New Construction and Substantial Rehabilitation Certific…
- 6.3.2 Certifications for Existing Buildings
- 6.3.3 Certifications Not Recognized by HUD
- 6.4 General Requirements for Green MIP
- 6.4.1 Continuing Performance Required under Green MIP
- 6.4.2 ENERGY STAR® Appliances and High-Performance Components
- 6.4.3 HUD Forms – Borrower’s Certifications
- 6.4.4 Regulatory Agreement Rider 5 Required for Green MIP
- 6.4.5 Data Collection Plan
- 6.4.6 Real-Time Consumption Monitoring, Smart Home Tools
- 6.4.7 Design and Construction Team Qualifications
- 6.4.8 Energy Professionals Qualifications
- 6.4.9 Energy Modeling and Modeling Software
- 6.4.10 Change Orders Modifying Energy Measures
- 6.5 Requirements for Section 223(a)(7) Applications
- 6.5.1 Existing Green MIP Mortgages
- 6.5.2 Proving Continuing Performance Under ENERGY STAR® Existi…
- 6.5.3 Delivery of ENERGY STAR® Existing Building Certification
- 6.5.4 Recording Baseline Data - CNA
- 6.6 Green MIP Requirements for Section 223(f) Applications
- 6.6.1 Properties with Previously Earned Certifications
- 6.6.2 Newly Built Properties with No Prior Certification
- 6.6.3 Existing Properties with No Prior HUD Recognized Green B…
- 6.7 Green MIP Requirements for Sections 220, 221(d)(4), 231-Ne…
- 6.7.1 ENERGY STAR® Appliances and Systems Required
- 6.7.2 Project Architect’s Green MIP Responsibilities
- 6.7.3 Recording Baseline Data-CNA
- 6.8 Green MIP Requirements for Section 241(a)
- 6.9 Underwriting Owner’s Utility Cost as Part of Operating Exp…
- 6.9.1 Methods for Underwriting Owner’s Utility Costs Changes
- 6.9.2 Underwriting Owner Utility Operating Expense for New Pro…
- 6.9.3 CAUTION: Changed Energy Use Not Proportionate to Resulti…
- Chapter 7 Valuation & Market Analysis
- 7.1 Introduction
- 7.2 Selection of Appraisers and Market Analysts
- 7.3.1 Appraiser Qualifications
- 7.3.2 Market Analyst Qualifications
- 7.4 Valuation Reviews of Third-Party Reports
- 7.5.1 Purpose and Focus of the Study
- 7.5.2 Effective Date
- 7.5.3 Forecast Period for Market Study
- 7.5.4 Project Rents Used in Market Study
- 7.5.5 HUD as an Intended User
- 7.5.6 Executive Summary
- 7.5.7 Description of the Proposed Project
- 7.5.8 Primary Market Area
- 7.5.9 Economic Context
- 7.5.10 Demographic Analysis
- 7.5.11 Current Housing Market Conditions
- 7.5.12 Rental Units in the Pipeline
- 7.5.13.1 Net Demand Analysis
- 7.5.13.2 Effective Demand
- 7.5.13.3 Evaluation of Net Demand and Effective Demand
- 7.5.13.4 Demand for LIHTC Projects
- 7.5.14 Findings and Conclusions
- A. According to USPAP Advisory Opinion 14:
- 7.5.16 Data, Estimates, and Forecasts
- 7.6 Appraisal Requirements
- 7.6.1 Effective Date
- 7.6.2 Brevity
- 7.6.3 Complex or Unusual Appraisal Assignments
- 7.6.4 HUD Forms to Include in the Report
- 7.6.5 USPAP Jurisdictional Exception Rule
- 7.6.6 Occupancy Percentage
- 7.6.7 Sections 220, 221(d)(4), and 231
- 7.6.8 Section 223(f)
- 7.6.8.1 Value for Rent Controlled Properties
- 7.6.8.2 Cost/ Summation Approach
- 7.6.8.3 Sales Comparison Approach
- 7.6.8.4 Income Approach
- 7.6.9 Reconciliation of the Approaches to Value
- 7.6.10 Section 231 Substantial Rehabilitation
- 7.6.11 Remaining Economic Life (REL)
- 7.6.12 Confidentiality Rule of USPAP
- 7.6.13 Appraiser’s Certification
- 7.6.14 Inspection of the Subject and Comparables
- 7.6.15 Required Appraisal Report Exhibits
- 7.6.16 Market Analysis
- 7.7.1 Rental Estimates
- 7.7.1.1 Rent Comparables
- 7.7.2 Adjustments
- 7.7.3 Final Rent Estimate
- 7.7.4 LIHTC and/or Bond Financed Projects
- 7.7.5 Trending of Rents
- 7.7.6 Equipment Included in Rent
- 7.7.7 Occupancy/Vacancy and Collection Losses
- Property Type
- 7.7.8 Project Rent Concessions
- 7.7.9 Occupancy
- 7.7.10 Utilities/Services
- 7.7.11 Project Location, Amenities, and Other Factors
- 7.7.12.1 Ancillary Income
- 7.7.12.2 Resale/Submetering of Utilities
- 7.7.12.3 Resale of Internet and Media Services
- 7.7.12.4 Cell Tower Income
- 7.7.12.5 Short-Term Lease Premiums
- 7.7.12.6 Corporate Leases
- 7.7.12.7 Pool and Pet Fees
- 7.7.12.8 Ineligible Income
- 7.7.12.9 Commercial Income
- income collected under the contract if it is a fixed monthly p…
- Commercial Space and Income Limitations
- 7.7.13 Limited Waiver of Commercial Income and Space Limits
- 7.7.14 Commercial Space Valuation
- 7.8.1 Purpose
- 7.8.2 Sources of Expense Data
- 7.8.3 General
- 7.8.4 Estimate of Operating Expenses by Units of Comparison
- 7.8.5 Expense Comparables
- 7.8.6 Expense Adjustments
- 7.8.7 Updating Procedures
- 7.8.8 Consistent Expense Line Items
- 7.8.9 Underwritten NOI and Program Guidance
- 7.9 Site Analysis
- 7.9.1 Analysis of Location
- 7.9.2 Specific Location
- 7.9.3 Civic, Social, and Commercial Centers
- 7.9.3.1 Schools
- 7.9.3.2 Neighborhood Shopping
- 7.9.3.3 Religious and Recreation Centers
- 7.9.4 Transportation
- 7.9.5 Special Hazards and Nuisances
- 7.9.6 Parking Facilities
- 7.9.7 Site Suitability
- 7.9.8 Land/Site Valuation
- 7.9.9 Warehousing of “Excess” Land Area
- 7.10.1 Lender’s Responsibilities
- 7.11.1 Lender’s Responsibilities
- 7.11.2 HUD Review
- 7.12.1 Lender’s Responsibilities
- 7.13.1 General
- 7.13.2 Completing Form HUD-92264
- 7.13.3 Applicable Approaches for "As Is" Value
- 7.13.4 Valuation for 220 and 221(d)(4)
- 7.13.5 Valuation for Section 231 Substantial Rehabilitation
- 7.13.6 Valuation for RAD Transactions
- 7.13.7 Contingency Reserves
- 7.13.8 Interest During Construction
- 7.13.9 Inspection Fee
- 7.13.10 Offsite Costs
- 7.13.11 Rehabilitation Cost not Attributable to Residential Use
- 7.13.12 Developer’s Fee, when Applicable
- 7.13.13 Exclusions to Estimated Replacement Cost
- 7.14.1 Estimate of a Project’s Operating Deficit
- 7.15 Leaseholds/Ground Leases
- 7.15.1 Definitions
- J. Operating Expenses. See Section 7.7.
- 7.15.2 Legal Requirements
- 7.15.3.1 Acceptable Form of Ground Rent Computation
- 7.15.3.2 Unacceptable Lease Payments (Ground Rent)
- 7.15.3.3 Ground Rent During Construction
- 7.15.4 Valuation of the Leasehold Estate
- 7.15.5 Rehabilitation of an Existing Project
- 7.15.6 Maximum Mortgage Amount for Criterion 3
- 7.15.7 Fee-Joinders
- 7.16.1 General Comments and Exceptions
- 7.16.2 Full Term Tax Abatement
- 7.16.3 Partial Term or Variable Tax Abatement
- 7.16.4 Deferral of Real Estate Taxes
- 7.17.1 For Section 223(f)
- 7.17.1.1 Criterion 3 Market Value
- 7.17.1.2 Criterion 5 Debt Service Analysis
- 7.17.1.3 Form HUD-92264T for LIHTC Projects without Section 8
- 7.17.1.4 Form HUD-92264T for Section 8 Project-Based Assistanc…
- 7.17.1.5 Form HUD-92264T for Section 8 Project-Based Assistanc…
- 7.17.2 Fee Income
- 7.17.3 Income Limits
- 7.17.4 Expenses/Fees
- 7.18.1 Scope of Work
- 7.18.2 Jurisdictional Exception Rule
- 7.18.3 Record Keeping Rule
- 7.18.4 Loan Committee
- 7.18.5 Workload Sharing
- 7.18.6 Consultations with Other Staff
- 7.18.7 Environmental Processing
- 7.18.8 Technical Appraisal Review Requirements
- 7.18.9 Documentation of the Appraisal Review
- Chapter 8 Mortgage Credit
- 8.1 Introduction
- 8.2 Borrower Types – Single Asset Borrower Entity
- 8.3 Reviewing Principals and Other Parties in Control
- 8.3.1 Determining Principals and Who is in Control
- B. “Principals” may include any of the following:
- 8.3.2 Underwriting Active Principals and Those with Control
- 8.3.3 Previous Participation Certification Requirements
- 8.3.4 Nonprofit Principals
- 8.3.5 Foreign National Participation in FHA-Insured Multifamil…
- Definition of Principal for Regulatory Agreement Section 50
- 8.4 Investigating Credit and Character
- 8.4.1 Use of Credit Reports and Credit Investigation
- 8.4.2 Lender’s Review of the Credit Report
- 8.4.3 Delinquent Federal Debt, Judgments and Pending Litigation
- 8.4.4 Trade and Credit References
- 8.4.5 Rejection Due to Unacceptable Character and Credit
- 8.5.1 Financial Statement Analysis
- 8.5.1.1 Submission of Financial Statements–New Construction
- 8.5.1.2 Existing Project Financial Statements
- 8.5.1.3 Review of Financial Statements and Other Documents
- B. Exceptions:
- 8.5.1.4 Letters and Lines of Credit
- 8.5.1.5 Sponsor’s Continuing Commitments
- 8.5.1.6 General Contractor with Adequate Capital
- 8.5.1.7 LIHTC, Historic Tax Credit or New Market Tax Credit Tr…
- 8.5.1.8 Real Estate Owned Schedule and Mortgage Debt Schedule
- 8.6.1.1 Purpose
- 8.6.2 Principal Types
- 8.6.3 Threshold
- 8.6.4 Threshold Applies to Current and Expected Balance
- 8.6.5 Effective Date and Duration
- 8.6.6 Lender Submission and Procedure
- 8.7 Secondary Financing
- 8.7.1 Public Sources
- 8.7.2 Private Sources – Section 223(f)
- NOTE: Project-specific exceptions or waivers to these policies…
- 8.7.3 Private Source – New Construction/Substantial Rehab
- 8.7.4 Section 223(a)(7) Refinance Program
- 8.7.5 Condition for Repayment of Secondary Financing
- 8.7.6 Secured Public Secondary Financing Conditions
- 8.7.7 Unsecured Private Secondary Financing Conditions
- 8.7.8 Tax Credit Equity Bridge Loans
- 8.8 Application Exhibits and Responsibilities
- 8.8.1 General Responsibilities of Lender’s Underwriter
- 8.8.2 Additional Exhibits Required of Project Participants
- 8.8.3 Evaluating Nonprofit Sponsors and Borrowers
- 8.8.4 Credit Review of a Nonprofit Sponsor and Borrower
- 8.8.5 Nonprofit Developer Fees
- 8.8.6 Consultant Fees
- 8.8.7 Establishing a Profit-Motivated Borrower Entity
- 8.8.8 Lender’s Review and Recommendation
- 8.8.9 Mortgage Credit Duties of HUD
- 8.9.1 Sections 220, 221(d)(4), 241(a) and 231 Projects
- 8.9.2 Section 207 Pursuant to 223(f) Projects
- 8.9.3 Section 223(a)(7) Projects
- 8.10.1 Mortgage Amounts and Cash Requirements
- 8.11.1 Determining Mortgage Amounts, Cash Requirements, and Re…
- B. Identity of Interest Purchase Transaction . Refer to Chapte…
- 8.12.1 General
- 8.12.2 Application for Mortgage Insurance
- 8.12.3.1 Firm Commitment
- 8.12.3.2 Initial Endorsement
- 8.12.3.3 Grant and Loan Proceeds Must be Advanced
- 8.12.4 Grants and Loans from a Non-Governmental Source
- B. Initial Endorsement.
- 8.13 Insurance Upon Completion
- 8.14 Determining Cash Requirements for Completion
- 8.15.1 Review of Financing Documents
- 8.15.2 Loan Rates
- 8.15.3 Tax-Exempt Loans and/or Bonds
- 8.15.4 Itemized Statement of Costs
- 8.15.5.1 Prepayment of Note
- 8.15.5.2 State/Local Occupancy Use and/or Rent Restrictions
- 8.15.6 Pre-Cost Certification Conference Information
- Chapter 9 Environmental Review and Requirements
- 9.1 Introduction
- 9.1.1 Legal Authorities, Guidance, Standards, and Documentation
- 9.1.2 Project Description, Aggregation, and Extent of Review
- 9.1.3 Levels of Environmental Review
- 9.1.4 Local, State, Tribal or Federal Requirements
- 9.2.1 Lender Responsibilities and Limitations
- 9.2.2 HUD Responsibilities
- 9.2.3 Timing Considerations
- 9.2.4 Verifying Qualifications of Professionals
- 9.2.5 Consulting with Regional or Satellite Offices
- 9.3 HEROS Environmental Reports
- 9.4 Contamination and Toxic Substances
- 9.4.1 Phase I Environmental Site Assessment Requirements
- 9.4.2 Phase II Environmental Site Assessment Requirements
- 9.4.3 Remediation Response Planning
- 9.4.4 Remediation Plans with Complete Removal of Contamination
- 9.4.5 Remediation Plans with Incomplete Removal of Contamination
- 9.4.6 Monitoring Wells, Flushing Wells, and Testing Wells 9.4.…
- 9.4.6.2 Monitoring Well Protocols
- 9.4.6.3 Monitoring Wells for Off-site Contamination
- 9.4.6.4 Flushing Wells
- 9.4.6.5 Testing or Monitoring Wells Ordered by LSTF
- 9.4.6.6 Non-operating Wells
- 9.4.7 Off-Site Contamination
- 9.4.8 Escrow
- 9.4.9 Waivers
- 9.4.10 LSTF Approvals and Reviews
- 9.4.11 Superfund Sites
- 9.4.11.1 Superfund National Priority List (NPL) Sites
- 9.4.11.2 Superfund Sites Not on the NPL
- 9.4.11.3 EC/IC Put in Place by EPA
- 9.4.12 Unacceptable Sites
- 9.4.13 Underground Storage Tanks Not Regulated by the LSTF
- 9.5.1 General Responsibilities
- 9.5.2 Projects with Complete Removal of Site Contamination 9.5…
- 9.5.2.2 Architecture/Engineering and Cost
- 9.5.2.3 Mortgage Credit
- 9.5.3 Projects with Incomplete Removal of Site Contamination
- 9.5.4 Insurance and Guarantee Requirements
- 9.5.5 Management, Coordination, and Communication
- 9.6.1 Lead-Based Paint (24 CFR Part 35.115(a))
- 9.6.2 Asbestos (24 CFR 50.3(i))
- 9.6.3.1 Background
- A. Radon Report :
- B. Radon Professionals :
- C. Exceptions to a Radon Report :
- D. Testing Protocols :
- E. Occupant Notification :
- F. Mitigation Standards :
- G. Mitigation Timing :
- H. Certificate of completion :
- I. Operation and Maintenance Plans :
- J. Existing Mitigation Systems :
- K. Cost estimates :
- 9.6.3.3 Requirements for Section 223(f) Projects
- 9.6.3.4 Requirements for Substantial Rehabilitation and Conver…
- 9.6.3.5 Requirements for New Construction
- 9.6.4 Historic Preservation (24 CFR 50.4(a))
- 9.6.5 Floodplain Management (24 CFR 50.4(b)(2))
- 9.6.6 Flood Insurance (24 CFR 50.4(b)(1))
- 9.6.7 Wetlands Protection (24 CFR 50.4(b)(3))
- 9.6.8 Noise Abatement and Control (24 CFR Part 51, Subpart B)
- 9.6.9 Explosive and Flammable Hazards (24 CFR Part 51 Subpart C)
- 9.6.10 Air Quality (24 CFR 50.4(h))
- 9.6.11 Airport Hazards (24 CFR Part 51 Subpart D)
- 9.6.12 Coastal Barrier Resources (24 CFR 50.4(c)(1))
- 9.6.13 Coastal Zone Management (24 CFR 50.4(c)(2))
- Endangered Species (24 CFR 50.4(e))
- 9.6.15 Farmlands Protection (24 CFR 50.4(j))
- 9.6.16 Sole Source Aquifers (24 CFR 50.4(d))
- 9.6.17 Wild and Scenic Rivers (24 CFR 50.4(f))
- 9.6.18 Environmental Justice (24 CFR 50.4(l))
- 9.6.19 Additional Nuisances and Hazards
- 9.6.20 Environmental Assessments (24 CFR 50 Subpart E)
- 9.6.21 Operation and Maintenance Plans
- Chapter 10 Management Analysis
- 10.1 Introduction
- 10.2 Exhibits Required for Firm Commitment
- G. Marketing, Leasing, and (if applicable) Relocation Plan :
- 10.3 Lender Review of Management Documents
- 10.4 HUD Asset Management Review
- 10.5 Review of Previous Participation
- 10.6 Bonding Requirements for Agents
- 10.7.1 Applicability
- 10.7.2 Required Contents
- 10.7.3 Length/term of the Agreement
- 10.7.4 Management Fee
- 10.8 Approval of Proposed Management Agent
- 10.9 Affirmative Fair Housing Marketing
- 10.10 Management Agents and Escrow Administration
- Chapter 11 Lender Underwriting, HUD Review and Closing
- 11.1 General
- 11.2 Lender Underwriting
- 11.2.1 Pre-application
- 11.2.2 Firm Commitment Application
- 11.2.3 Third-Party Report Certifications
- 11.2.4 HUD Forms Submission
- 11.3.1 HUD Underwriter Responsibilities
- 11.3.2 Pre-Application and Firm Commitment Processing
- 11.3.3 Underwriting Recommendation
- 11.3.4 Firm Commitment Issuance, Extensions, Amendments and Re…
- 11.3.5 Waivers
- 11.3.6 Interest Rate Lock
- 11.4 Program Closing Provisions
- 11.5 Loan Fees
- 11.5.1 Deferred Fee Collection
- 11.5.2 Broker’s Fees
- 11.6.1 Preliminary Title Report
- 11.6.2 Air Rights and Other Shared Interest Projects
- 11.7 Borrower Entity’s Organizational Documents
- 11.8.1 Term
- 11.8.2 Prepayment Provisions
- 11.8.3 Conditions for Including Lockouts and/or Penalties
- 11.8.4 Late Charge Provisions
- 11.8.5 Override of Prepayment Lockout
- Chapter 12 Construction Period
- 12.1.1 General
- 12.1.2 HUD Construction Analyst (CA)
- 12.1.3 HUD Inspector
- 12.2.1 General Requirements
- 12.2.2 Contract Administration
- 12.2.3 Cost Certification
- 12.3.1 Purpose of Inspection
- 12.3.2 Access
- 12.3.3.1 Assignment
- 12.3.3.2 Offsite Fabricated Construction
- 12.3.3.3 Trip Report Review
- 12.3.3.4 HUD Inspector Oversight
- 12.3.4 HUD Inspector’s Duties
- 12.3.4.1 Orientation
- 12.3.4.2 Facilities
- 12.3.4.3 Inspections
- 12.3.4.4 Start of Construction Date
- 12.3.4.5 Shop Drawings and Other Data
- 12.3.4.6 Work Stoppage
- 12.3.4.7 Occupancy
- 12.3.4.8 Additional Duties of the Inspector
- 12.3.4.9 Construction Record
- 12.3.4.10 Projects Insured Upon Completion
- 12.3.4.11 Off-Site Inspection
- 12.3.5 Construction Progress Meetings (monthly meetings)
- 12.3.6 Reporting Serious Construction Problems
- 12.4.1 General Requirements
- 12.4.2 Architect's Supplemental Instructions
- 12.4.3 Architect Administering the Construction Contract
- 12.5 Architect’s Adequacy
- 12.5.1 Deficient Administration
- 12.5.2 Reasons for Termination of Services
- 12.5.3 HUD Office Actions
- 12.5.4 Request for Contract Termination
- 12.5.5 Contract Termination
- 12.6.1 Substantial Completion
- 12.6.2 Final 100% Draw Completion Inspection
- 12.6.3 Warranty Inspections
- 12.7.1 General
- 12.7.2 Lender’s Role in Processing Application for Insurance o…
- 12.7.3 Stages of Advances
- 12.7.4 Approval of Initial/Interim Advances
- 12.7.5 Contractor’s Monthly Requisition and Related Matters
- 12.7.6 Next to Final Advance
- 12.7.7 Final Advance
- 12.7.8 Keeping the Mortgage in Balance
- 12.8.1 General Requirements
- 12.8.2 Change Order Classification
- 12.8.3 Additive change Orders
- 12.8.4 Deductive Change Orders
- 12.8.5 Changes that Adversely Affect Property Income
- 12.8.6 Extension of Contract Time
- 12.8.7 Changes to Items of Delayed Completion
- 12.8.8 Emergency Changes
- 12.8.9 Insurance Upon Completion
- 12.8.10 Changes to Offsite Construction
- 12.8.11 Other Changes
- 12.9.1 General Procedure
- 12.9.2 Voiding Changes
- 12.9.3 Unapproved Changes
- 12.10.1 Architectural
- 12.10.2 Cost
- B. Approved time extensions:
- 12.11.1 Appraisal Reconsideration, When Required
- A. Processing:
- 12.12.1 Wages
- 12.12.2 Labor Violations
- 12.12.3 FHEO Noncompliance
- 12.12.4 Compliance with Any Applicable Relocation Plan
- 12.13 Surveys
- 12.14 Permission to Occupy
- 12.14.1 Physical Completion
- 12.14.2 Signatures, Approval and Permission
- 12.14.3 Submission Documents
- 12.14.4 Partial Occupancy Approval
- 12.15.1 Application for Disbursement of Escrowed Funds
- 12.15.2 Release of Letters of Credit
- 12.15.3 Working Capital Deposit
- D. Final Release of Escrow.
- 12.15.4 Initial Operating Deficit Deposit
- 12.15.5 Amount of Contractor's Retainage and Release
- E. Early partial release of retainage.
- 12.15.6 Cash-Out Escrow from Land Equity
- 12.16 Insurance Upon Completion (IUC)
- 12.17.1 Repairs and Alterations
- 12.17.1.1 Completion of Repairs and Alterations
- 12.17.1.2 Payment for Repairs
- 12.17.1.3 Release of Cash-Out/ Equity from Loan Proceeds
- 12.17.1.4 Funds Remaining in the Escrow
- 12.17.2 Inspection
- 12.17.3 Schedule of Values for Reimbursement from the Repair E…
- 12.17.4 Final Report
- 12.17.5 Change Orders
- 12.17.6 Warranty Inspections
- 12.17.7 Projects in Difficulty
- 12.18 Casualty Events During Construction
- Chapter 13 Cost Certification
- 13.1 Projects that Must Certify
- 13.2 Projects Exempt from Cost Certification
- 13.2.1 Low Income Housing Tax Credits
- 13.2.1.1 Audit Fee Not Applicable
- 13.2.1.2 Establishing Substantial Completion Date
- 13.2.1.3 Treatment of Operating Income Generated During Constr…
- 13.2.1.4 Copy of Final Sources and Uses Statement
- 13.2.1.5 Modification to Form HUD-92580
- 13.3 Types of Cost Certification
- 13.4 Entities That Must Cost Certify
- 13.5 Cost Certification Sequence of Events
- 13.6 Project Completion and Cut-Off Dates
- 13.7 Administrative Completion Date
- 13.8 Submission Date
- 13.9 Required Forms
- 13.10 Required Statements and Certifications
- 13.10.1 Simplified Form of Cost Certification
- 13.10.2 Long Form Cost Certification
- 13.10.3 Section 223(f) Projects
- 13.11 Deficiencies in Cost Certification Submission
- 13.12 Mortgage Credit Limited Review
- 13.13 Mortgage Credit Detailed Review
- 13.14.1 Construction Contract
- 13.14.2 Architect’s Fee(s)
- 13.14.3 Interest Accrued
- 13.14.4 Taxes Accrued
- 13.14.5 Property Insurance Accrued
- 13.14.6 Mortgage Insurance Premium
- 13.14.7 HUD Application, Commitment, and Inspection Fees
- 13.14.8 Financing Expenses
- Exclude:
- 13.14.9 Title and Recording Expenses
- 13.14.10 Legal, Organization, and Audit Expenses
- 13.14.11 Offsite Costs
- NOTE:
- 13.14.12 Other Costs
- 13.14.13 Builder’s and Sponsor’s Profit and Risk Allowance
- 13.14.14 Non-Profit Developer Fee
- 13.15.1 Actual Costs
- 13.15.2 Mortgage Increase or Detailed Review Not Requested
- 13.15.3 Cost Review
- 13.15.4 Lump Sum Construction Contract Cost Certification
- 13.15.5 Summary of Cost Certification Review (on Form HUD92331)
- 13.16 Non-Profit Borrower’s Initial Equity Investment
- 13.17 Determine the Borrower’s Initial Investment
- 13.18 Section 223(f) Modified Form of Cost Certification
- 13.19 Special Instructions for Substantial Rehabilitation
- 13.20 Mortgage Reduction after Cost Certification
- 13.21 Increase in Mortgage Amount
- 13.22 Restrictions on Mortgage Increases
- 13.23 Processing a Mortgage Increase
- 13.24 Authorization to Reopen Mortgage Transaction
- 13.25 Deferment of Principal Payments
- 13.26 Document Distribution
- 13.27 Office of Inspector General
- 13.28 Cost Certification Incontestability
- 13.29 Post-Closing Escrows
- 13.30.1.1 Advance Amortization Requirements
- 13.30.1.2 Income and Expense Statement Requirement
- 13.30.1.2.1 Agreement of Borrower
- 13.30.1.2.2 Treatment of Items in Statement
- 13.30.1.3 Amount of Required Prepayment
- 13.30.1.4 Excess (Unused) Mortgage Loan Proceeds
- 13.30.2.1 Preparing Form HUD-92580, Maximum Insurable Mortgage
- 13.30.2.2 Decrease in Loan Amount
- 13.30.2.3 Increase in Loan Amount
- 13.30.2.4 Statement of Status of Escrows
- 13.30.2.5 Borrower’s Investment
- 13.30.3 Final Closing – Insurance Upon Completion
- Chapter 14 LIHTC and Other Tax Credit Programs
- 14.1 Introduction
- 14.2 LIHTC Underwriting Guidance
- MAP Guide Section Number Content
- MAP Guide Section Number Content
- Content
- 14.3 Historic and New Markets Tax Credits
- 14.4 Subsidy Layering Review
- 14.5 Evidence of Tax Credit Allocations
- 14.6 HAP Contract Renewals for Section 8 Projects
- 14.7 Application/Submission Requirements
- 14.8 Architecture and Engineering
- 14.9 Identities of Interest in Tax Credit Transactions
- 14.10 Mortgage Amounts, Contingency and Escrow
- 14.11 Structuring of Secondary Debt
- 14.12.1 Treatment of Developer Fee
- 14.12.2 Deferred Developer Fee (DDF)
- 14.13 Tax Credit Equity Pay-In Schedule
- Benchmarks for Equity Installments
- 67,68
- 14.14 Definition of “Net Equity”
- Net Equity = (Total Equity) – (Equity Pay In 1) – (Allowed Ded…
- Sample Owner’s Proposed Reductions:
- Total $1,900,000
- 14.15 Equity Bridge Loans in Tax Credit Projects
- 14.16 Syndicator and Investor Fees from Operations
- 14.17 Mark to Market (M2M) Transactions
- 14.18 Firm Commitment Additional Conditions
- 14.19 Other Matters
- 14.19.1 Bond-Financed Projects in New York City
- 14.19.2 Lien Priority
- 14.19.3 Tax Credit Regulatory Agreements
- 14.19.4 Tax Exempt Bonds - FHA Insured Permanent Debt
- 14.19.5 Refinancing of M2M Properties
- 14.19.6 Income Averaging
- 14.20 FHA Tax Credit Pilot Program Expansion
- Chapter 15 Oversight of MAP Program Requirements
- 15.1 Oversight of MAP Lenders
- 15.2.1 Functions
- 15.2.2 Data and Reports
- 15.2.3 Timing of MAP Lender Reviews
- 15.3.1 General
- 15.4 Administrative Record
- 15.5 Settlement Agreements
- 15.6 Letters of Caution, Warning Letters or Sanctions
- 15.7 Warning Letters and Targeted Enforcement Measures
- 15.7.1 Warning letter
- 15.7.2 Targeted Enforcement Measures
- 15.8 MAP Probation
- 15.9 MAP Suspension
- 15.10 MAP Termination
- 15.11 MAP Lender Review Board
- 15.12 MAP Lender Review Board: Staff Responsibilities
- 15.13 MAP Lender Review Board: Procedures
- 15.14 Notice of Violation
- 15.15 Notice of Action
- 15.16 Appeal Conference and Procedures
- 15.17 Suspension, Debarment or LDP
- 15.17.1 Parties subject to a suspension, debarment or LDP
- 15.17.2 Limited Denial of Participation
- 15.17.3 Suspension and debarment
- 15.17.4 Procedures to refer a suspension, debarment or LDP
- 15.18 Referral to Mortgagee Review Board or OIG
- 15.19 Other Enforcement Actions
- Chapter 16 Master Leases with Market Tax Credits
- 16.1 Introduction
- 16.2 Background
- 16.3 General Programmatic Requirements
- A. Firm Commitment Special Conditions:
- 16.5 Cost Certification and Final Endorsement
- Chapter 17 Section 207: Refinancing Cooperative Housing Projects
- 17.1 Introduction and Background
- 17.2 Program Eligibility
- 17.3 Program Requirements
- 17.3.1 Loan Parameters
- 17.3.2 General Operating Reserve (GOR)
- 17.3.3 Model Forms and Closing Documents
- 17.4 Application Processing
- 17.5.1 Architectural and Cost Processing
- 17.5.2 Valuation Processing: Appraisal Scope-of-Work
- 17.5.3 Environmental Processing
- 17.5.4 Mortgage Credit Processing
- 17.5.5 Asset Management Processing
- 17.6 Loan Closing Procedures
- Chapter 18 Section 223(a)(7)
- 18.1 Introduction
- 18.2 Purpose of Section 223(a)(7)
- 18.3.1 Standard Processing Time
- 18.3.2 Inapplicable Mortgages
- 18.3.3 Maximum Mortgage
- 18.3.4 Mortgage Term
- Loan Data
- Loan Requirements
- Loan Data
- 18.3.5 Mortgage Insurance Premium
- 18.3.6 Environmental Review Requirements
- 18.3.7 Fees
- 18.3.8 Project Numbering
- 18.3.9 Regulatory Agreement
- 18.3.10 Cost Certification
- 18.3.11 Commencement of Amortization
- 18.3.12 Source of Funds for Prepayment Penalty Costs
- 18.3.13 Refinancing Partial Payment of Claim (PPC) Properties
- 18.3.14 Commitment, Regulatory Agreement and Closing
- 18.4 Processing
- 18.4.1 Project Analysis
- B. The following is an example of a sample transaction – the d…
- C. The following is an example of a sample transaction – the d…
- D. The following is an example of a sample transaction – the d…
- 18.4.2 Verification of Existing Borrower Debt
- 18.4.3 CNA Requirement
- 18.4.4 Site Visits
- 18.4.5 Section 202 Mortgage Refinancing
- Loan Requirements Section of the Act
- 18.4.6 Ownership and Property Management Changes
- 18.5 Application Requirements Checklist
- Chapter 19 Closing Guide
- Part I: Introduction and Procedures
- 19.1.1 Applicability
- 19.1.1.1 Objective
- 19.1.1.2 Defined Terms
- 19.1.2.1 General
- 19.1.2.2 Firm Application
- 19.1.2.3 After Firm Commitment Issuance and Prior to Package S…
- B. Lender’s Introductory Response and Interim Communication:
- 19.1.2.4 HUD Review of Closing Packages
- 19.1.2.5 Changes to Tentative or Confirmed Closing Dates
- 19.1.3.1 Administrative Clearance to Close
- 19.1.3.2 HUD Signature Page
- 19.1.3.3 Note Endorsement
- 19.1.3.4 Circulation and Submission of Recordable Documents
- 19.1.3.5 Form of Closing Docket Submission
- 19.1.3.6 Restriction on Post-Closing Revision to Closing Docket
- 19.1.3.7 Closing Type: Mail or In-Person
- 19.1.4 Post-Closing Handling of Closing Dockets
- 19.2.1 Initial Endorsement Activities
- 19.2.2.1 Davis Bacon Labor Standards (DBLS) Clearance Required
- 19.2.2.2 Procedures for Firm Application, Issuance, and Initia…
- 19.2.2.3 Early Start of Construction
- 19.2.2.4 Procedures for Final Closings
- 19.2.3 Early Start of Construction
- 19.2.4.1 HUD Prior Written Approval Needed
- 19.2.4.2 Prior Document Review by HUD Counsel.
- 19.2.4.3 Implementation
- 19.3.1.1 Definitions
- 19.3.1.2 Assurance of Completion
- 19.3.1.3 Commencement of Preparation for Final Closing
- 19.3.1.4 Prerequisites for Final Closing
- 19.3.1.5 Final Closing Procedures
- 19.3.1.6 Internal Closing Forms
- 19.3.2.1 Request for Final Endorsement
- 19.3.2.2 Final Endorsement of the Note
- 19.3.2.3 Release of Final Advance
- 19.3.2.4 Release of Working Capital Deposit
- 19.3.3.1 Requirements for Final Advance
- 19.3.3.2 Application for Insurance of Advance of Mortgage Proc…
- 19.3.4.1 Disputes
- 19.3.4.2 Relevant Issues for HUD’s Consideration
- 19.3.4.3 Closing Without Full Participation of the Contractor.
- 19.3.5.1 Introduction
- 19.3.5.2 Workouts
- Part II: Closing Documents and Program-Specific Requirements
- 19.4.1.1 Required Use of HUD Forms and Closing Protocols
- 19.4.1.2 Completion of HUD’s OMB-approved Forms
- 19.4.1.3 Date of Documents
- 19.4.1.4 Closing Checklists
- 19.4.1.5 Submission of Closing Documents
- 19.4.1.6 Changes to Form Documents and Deviations from Closing…
- 19.4.1.7 Multi-Tiered Review of Requests for Substantive Changes
- 19.4.2.1 General Requirements
- 19.4.2.2 Permitted Modifications for State Requirements and Pr…
- 19.4.2.3 Supplemental, Consolidated, Amended or Restated Loan
- 19.4.2.4 Ground Lease
- 19.4.2.5 Fee-Joinders
- 19.4.3.1 General Requirements
- 19.4.3.2 Description of Collateral
- 19.4.4.1 General Requirements
- 19.4.4.2 Prepayment Provisions
- 19.4.4.3 Endorsement Panel
- 19.4.4.4 Late Charge Provision
- 19.4.4.5 Changes to Loan Interest Rates
- 19.4.4.6 Change(s) to Permanent Financing After Initial Closing
- 19.4.4.7 Supplemental, Consolidated, Amended or Restated Loan
- 19.4.5.1 Form
- 19.4.5.2 Notice Address for HUD
- 19.4.5.3 Section 50
- 19.4.5.4 Section 30 - Additional Occupancy Restrictions and Po…
- 19.4.5.5 Residual Receipts Rider
- 19.4.5.6 Additional Riders
- 19.4.6.1 General
- 19.4.6.2 Borrower’s Counsel Legal Review and Opinion
- 19.4.6.3 Required Organizational Documents for Borrower
- 19.4.6.4 Tax Credit Transactions
- 19.4.6.5 Final Closings
- 19.4.7.1 Logistics
- 19.4.7.2 Title and Survey Review Standards
- 19.4.7.3 Pro Forma Title Policy Submission
- 19.4.7.4 Title Policy Requirements
- 19.4.7.5 Title Policy Issuance and Escrow Services
- 19.4.7.6 Survey, Survey Map/Plat and Surveyor’s Report.
- 19.4.8.1 General
- 19.4.8.2 Supplemental Opinions
- 19.4.8.3 Litigation Disclosure
- 19.4.9.1 General
- 19.4.9.2 Unsecured Secondary Financing
- 19.4.9.3 Secured Secondary Financing – Public Sources
- E. Instructions for submission to the HUD Closing Attorney.
- 19.4.9.4 Secured Secondary Financing – Private
- 19.4.9.5 Restrictive Covenants and Use Agreements for Secondar…
- 19.4.9.6 Equity Bridge Loans (EBL) for Tax Credit Projects
- 19.4.9.7 Deferred Developer Fees (DDF) for Low Income Housing …
- 19.4.9.8 Secondary Financing That Is Unavailable at Initial Cl…
- 19.4.10.1 General
- 19.4.10.2 Firm Commitment
- 19.4.10.3 Lender’s Certificate
- 19.4.10.4 Tax-Exempt Bond/IRS Code 142(d) Projects
- 19.4.10.5 Restrictive Covenants/Tax Regulatory Agreement
- 19.4.10.6 Borrower’s Counsel Opinion
- 19.4.10.7 Bond Counsel’s Opinion
- 19.4.10.8 HUD Note – Prepayment Prohibitions
- 19.4.10.9 HUD-Required Language for Trust Indenture/Funding Lo…
- 19.4.10.10 Bond Disbursement Agreement and Bond Loan Agreement
- 19.4.10.11 Bond Note
- 19.4.10.12 Supremacy of HUD Requirements and Conflicts
- 19.4.11.1 Firm Commitment Condition
- 19.4.11.2 Subordination of Restrictive Covenants
- 19.4.11.3 Borrower's Attorney's Opinion (Tax Credits)
- 19.4.11.4 LIHTC Equity Pay-In
- 19.4.11.5 Equity Investor Certification
- 19.4.11.6 LIHTC Rider
- 19.4.11.7 Pre-Approval of Special Limited Partners
- 19.4.11.8 Determinative Criteria for SLP Pre-Approval
- 19.4.11.9 Post-Closing Requirements for HUD Pre-Approval of SLP
- 19.4.12.1 General Requirements
- 19.4.12.2 Escrow Agreement for Deferred Repairs (Form HUD-9247…
- 19.4.12.3 Escrow Agreement for Operating Deficits (Form HUD-92…
- 19.4.12.4 Escrow Agreement for Working Capital (Form HUD-92412M)
- 19.4.12.5 Escrow Agreement for Incomplete Construction (Form H…
- 19.4.12.6 Escrow Agreement for Latent Defects (Form HUD-92414M)
- 19.4.12.7 Escrow Agreement of Sponsor to Furnish Additional Fu…
- 19.4.13.1 Permits and Governmental Approvals
- 19.4.13.2 Zoning and Building Code Compliance
- 19.4.13.3 Evidence of Utility Access and Service
- 19.4.13.4 Property Insurance
- 19.4.13.5 UCC Searches
- 19.4.13.6 Certifications
- 19.4.13.7 Certified Closing Statement
- 19.5.1.1 General
- 19.5.2 Project Completion Funds
- 19.5.3 Disbursement Agreement
- 19.5.4.1 General Requirements
- 19.5.4.2 HUD Amendment to AIA Document B108 (Form HUD-92408M) …
- 19.5.4.3 Professional Liability Insurance
- 19.5.5.1 Construction Contract
- 19.5.5.2 Prevailing Wage Rates
- 19.5.5.3 Identity of Interest Disclosure
- 19.5.5.4 Cost Breakdown
- 19.5.5.5 Completion of Forms
- 19.5.5.6 Liquidated Damages
- 19.5.5.7 Cost Certification
- 19.5.5.8 Side Agreements
- 19.5.6.1 General Requirements
- 19.5.6.2 Surety Requirements
- 19.5.6.3 Letters of Credit
- 19.5.6.4 Assurance of Completion for Off-Site Improvements
- 19.5.7.1 Introduction
- 19.5.7.2 HUD-Insured Advance Requirements for Building Compone…
- 19.5.8 Lender’s Certificate for New Construction or Substantia…
- 19.5.9.1 General Requirements
- 19.5.9.2 Maximum Insurable Mortgage Form
- 19.5.9.3 Modifications to Original Loan Terms
- 19.5.9.4 Modification Documents
- 19.5.9.5 Borrower’s Attorney’s Opinion
- 19.5.9.6 Title Evidence at Final Endorsement
- 19.5.9.7 Final As-Built Survey & Surveyor’s Report
- 19.5.9.8 Updated Organizational Documents of Borrower
- 19.5.9.9 Lender’s Current Payment Letter and Certification
- 19.5.9.10 Guarantee Following Completion
- 19.5.10.1 Conditions for Approval of Final Advance of Mortgage…
- 19.5.10.2 Exceptions to General Rule
- 19.5.10.3 Application for Insurance of Advance of Mortgage Pro…
- 19.5.10.4 Approval of a Final Advance
- 19.5.10.5 Escrow for Completion
- 19.5.11.1 General Rule
- 19.5.11.2 Exception to General Rule
- 19.6.1.1 General
- 19.6.1.2 Promissory Note (Form HUD-94001M)
- 19.6.1.3 Evidence of Zoning and Building Code Compliance
- 19.6.1.4 Utilities
- 19.6.1.5 Request for Endorsement of Credit Instrument (Form HU…
- 19.6.1.6 Short-Form Cost Certification
- 19.6.1.7 Repairs and Alterations
- 19.6.1.8 Latent Defects Guarantee
- 19.6.1.9 Projects with Expanded Work
- 19.6.2.1 General
- 19.6.2.2 Five-Year Lockout
- 19.6.2.3 Refinances of Second Mortgages.
- 19.6.2.4 Differences from Section 223(f) Procedures
- 19.6.3.1 Introduction
- 19.6.3.2 Effect on Existing Financing
- 19.6.3.3 Additional Requirements for 241(a) Supplemental FHA L…
- 19.6.3.4 HUD Form Documents for 241(a) Supplemental Loans
- 19.6.4 Section 213 Cooperative Housing Loans
- 19.6.5.1 General
- 19.6.5.2 Firm Commitment
- 19.6.5.3 Construction Requirements
- 19.6.5.4 Closing
- Part III: Sample Language, Certifications, and Riders
- 19.7 HUD-Required Provisions for Borrower’s Organizational Doc…
- 19.8 Rider to Security Instrument – LIHTC Projects
- LENDER
- 19.9 Rider to Regulatory Agreement for Residual Receipts Requi…
- BORROWER
- 19.10 Survey Affidavit of No Change
- AFFIANT:
- 19.11 Certification of Architectural/Engineering Fees
- 19.12 Building Code Verification
- 19.13 Zoning Letter
- 19.14 Third Party Obligee Certification
- 19.15 HUD [Rider / Amendment] To Restrictive Covenants
- Note: This document has been submitted to OMB for PRA approval…
- 19.16 Equity Bridge Loan Rider – LIHTC Projects
- Section 213 Cooperative Program Rider to Regulatory Agreement …
- Appendix 2 Quality Control Plans and Identity of Interest
-
▸ A.13.2 Agreement Authorizing Deferment of Principal Payments f…
Overview- Insert when applicable.
- A.15.1 Background and Purpose
- A.15.2 MAP Lender Compliance
- A.15.3 Loan Underwriting or Application Processing Deficiencies
- A.16.1 Sample Master Lease Ownership Structure
- Acronym and Abbreviation List
- Definition
- Definition
- Definition
- Definition
- Definition
- Definition
- Go to Table of Contents
- A
- CNA
- Identity of Interest
- N
- Occupancy
- Permanent Placement
- Valuation