PART 58—ENVIRONMENTAL REVIEW PROCEDURES FOR ENTITIES ASSUMING HUD ENVIRONMENTAL RESPONSIBILITIES›Subpart D—Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification
§ 58.37 Environmental impact statement determinations.
24 C.F.R. Parts 50 & 58 — HUD Environmental Review (HUD-performed and responsible-entity NEPA procedures) · 2026 edition · updated 2026-07-29 · United States
(a) An EIS is required when the project is determined to have a potentially significant impact on the human environment.
(b) An EIS is required under any of the following circumstances, except as provided in paragraph (c) of this section:
(1) The project would provide a site or sites for, or result in the construction of, hospitals or nursing homes containing a total of 2,500 or more beds.
(2) The project would remove, demolish, convert or substantially rehabilitate 2,500 or more existing housing units (but not including rehabilitation projects categorically excluded under § 58.35), or would result in the construction or installation of 2,500 or more housing units, or would provide sites for 2,500 or more housing units.
(3) The project would provide enough additional water and sewer capacity to support 2,500 or more additional housing units. The project does not have to be specifically intended for residential use nor does it have to be totally new construction. If the project is designed to provide upgraded service to existing development as well as to serve new development, only that portion of the increased capacity which is intended to serve new development should be counted.
(c) If, on the basis of an EA, a responsible entity determines that the thresholds in paragraph (b) of this section are the sole reason for the EIS, the responsible entity may prepare a FONSI pursuant to 40 CFR 1501.4. In such cases, the FONSI must be made available for public review for at least 30 days before the responsible entity makes the final determination whether to prepare an EIS.
(d) Notwithstanding paragraphs (a) through (c) of this section, an EIS is not required where § 58.53 is applicable.
(e) Recommended EIS Format. The responsible entity must use the EIS format recommended by the CEQ regulations (40 CFR 1502.10) unless a determination is made on a particular project that there is a compelling reason to do otherwise. In such a case, the EIS format must meet the minimum requirements prescribed in 40 CFR 1502.10.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — 24 C.F.R. Parts 50 & 58 — HUD Environmental Review (HUD-performed and responsible-entity NEPA procedures)
- 24 C.F.R. Parts 50 & 58 — HUD Environmental Review (HUD-perfor…
- PART 50—PROTECTION AND ENHANCEMENT OF ENVIRONMENTAL QUALITY
-
▸ PART 58—ENVIRONMENTAL REVIEW PROCEDURES FOR ENTITIES ASSUMING …
Overview- Subpart A—Purpose, Legal Authority, Federal Laws and Authorities
- Subpart B—General Policy: Responsibilities of Responsible Enti…
- Subpart C—General Policy: Environmental Review Procedures
-
▸ Subpart D—Environmental Review Process: Documentation, Range o…
- Subpart E—Environmental Review Process: Environmental Assessme…
- Subpart F—Environmental Review Process: Environmental Impact S…
- Subpart G—Environmental Review Process: Procedures for Draft, …
- Subpart H—Release of Funds for Particular Projects