Article 6 — INDUSTRIAL WASTE DISCHARGE PERMITS
Williams Municipal Code · 2026-09 edition · updated 2026-09-27 · Williams
13.08.400 - Wastewater analysis.¶
13.08.410 - Industrial waste discharge permit requirement.¶
13.08.420 - Issuing industrial waste discharge permits: Existing connections.¶
13.08.430 - Issuing industrial waste discharge permits: New connections.¶
13.08.440 - Industrial waste discharge permit application contents.¶
13.08.450 - Application signatories and certification.¶
13.08.460 - Industrial waste discharge permit decisions.¶
13.08.470 - Industrial waste discharge permit duration.¶
13.08.480 - Industrial waste discharge permit contents.¶
13.08.490 - Industrial waste discharge permit modifications.¶
13.08.500 - Industrial waste discharge permit transfer.¶
13.08.510 - Industrial waste discharge permit revocation.¶
13.08.520 - Industrial waste discharge permit reissuance.¶
13.08.530 - Baseline monitoring reports.¶
13.08.540 - Compliance schedule progress reports.¶
13.08.550 - Reports on compliance with categorical pretreatment standards deadline.¶
13.08.560 - Periodic compliance reports.¶
13.08.570 - Reports of changed conditions.¶
13.08.580 - Reports of a discharge of hazardous waste.¶
13.08.590 - Reports of potential problems.¶
13.08.600 - Reports from unpermitted users.¶
13.08.610 - Reports of sampling violation/repeat sampling.¶
13.08.620 - Analytical requirements.¶
13.08.630 - Sample collection.¶
13.08.640 - Timing.¶
13.08.650 - Record keeping.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code