Chapter 9-12 — FLOODPLAIN MANAGEMENT
Part II — FLOOD RESISTANT DEVELOPMENT
Walnut Creek Municipal Code · 2026-09 edition · updated 2026-09-27 · Walnut Creek
§ 9-12.2.101. Requirements for Buildings and Structures in Flood Hazard Areas.¶
§ 9-12.2.102. Detached Garages and Accessory Storage Structures.¶
§ 9-12.2.103. Utility and Miscellaneous Group U.¶
§ 9-12.2.201. Minimum Requirements.¶
§ 9-12.2.202. Subdivision Requirements.¶
§ 9-12.2.301. Minimum Requirements.¶
§ 9-12.2.302. Sanitary Sewer Facilities.¶
§ 9-12.2.303. Water Supply Facilities.¶
§ 9-12.2.304. Development in Floodways.¶
§ 9-12.2.305. Limitations on Placement of Fill.¶
§ 9-12.2.401. Installation.¶
§ 9-12.2.402. Foundations.¶
§ 9-12.2.403. Anchoring.¶
§ 9-12.2.404. General Elevation Requirement.¶
§ 9-12.2.405. Elevation Requirement for Certain Existing Manufactured Home Parks and¶
§ 9-12.2.406. Flood Damage-Resistant Materials.¶
§ 9-12.2.407. Enclosures.¶
§ 9-12.2.408. Protection of Mechanical Equipment and Outside Appliances.¶
§ 9-12.2.501. Temporary Placement.¶
§ 9-12.2.502. Permanent Placement.¶
§ 9-12.2.601. General Requirements for Other Development.¶
§ 9-12.2.602. Tanks.¶
§ 9-12.2.603. Requirements for Temporary Structures and Temporary Storage in Flood Hazard¶
§ 9-12.2.604. Fences in Floodways.¶
§ 9-12.2.605. Oil Derricks.¶
§ 9-12.2.606. Retaining Walls, Sidewalks and Driveways in Floodways.¶
§ 9-12.2.607. Roads and Watercourse Crossings in Floodways.¶
§ 9-12.2.608. Swimming Pools.¶
§ 9-12.2.701. Flood Control Projects; General.¶
§ 9-12.2.702. Flood Control Projects; Applications.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code