Chapter 7.08 — WATER SERVICE

Tulare Municipal Code · 2026-09 edition · updated 2026-10-01 · Tulare

§ 7.08.010 Turning on water—Permit required.

No person shall turn on any curb cock or connection admitting water from the water mains to any property in the city without first obtaining a permit therefor from the Water Collector. (1995 Code, § 7.08.010)

Exceptions & meaning →

§ 7.08.020 Issuance of permit—Applications.

The permit shall be issued without payment of any fee therefor and, upon the application blanks, as the Water Collector shall from time to time decide. (1995 Code, § 7.08.020)

Exceptions & meaning →

§ 7.08.030 Front foot and service lateral fees—Water main extensions.

(A) Whenever an applicant applies for a permit to connect property fronting an existing water main, the installation cost of which main was paid by the city or by a previous applicant and approved by the city, such subsequent applicant shall pay to the city, prior to the granting of such permit, the water front foot charge. Said front foot charge shall be based on 60% of the estimated cost of an eight-inch water main and appurtenances in an existing paved local city street. Said fee shall be computed by the City Engineer, and adopted by resolution of the Board of Public Utilities annually. (B) Whenever an applicant applies for a permit to connect property where a water service has already been installed by the city or a previous applicant and approved by the city, such subsequent applicant shall pay to the city a water service charge. The fee shall be computed by the City Engineer, and adopted by resolution of the Board of Public Utilities annually. (1995 Code, § 7.08.030) (Ord. 06-2026, passed - -2006)

Exceptions & meaning →

§ 7.08.040 Benefit district refunding.

(A) Any applicant desiring to make an extension to the water system of the city to serve applicant’s property shall make a request in writing to the City Engineer for a preliminary investigation into the feasibility of such extension. If the extension is found to be feasible, such extension may be made to the water system of the city in accordance with the provisions of this section. The city shall inspect and may permit the final connection to the city system only if it is found that such extension conforms in all respects with city standards and specifications for waters within the city and with the sizes and grades designated by the City Engineer. (B) Any applicant paying for the installing of a public water main shall, prior to the construction of the water main, file with the City Engineer a legal description of the applicant’s property, which is served by said water main. Within 90 days following the notice of completion of the main, the applicant shall file with the City Engineer a financial statement, in the form specified by the City Engineer, stating the cost (excluding any anticipated city reimbursement) of the construction of the main. Actual costs shall be limited to engineering, applicable fees paid to the city, county, state, contractor, surety bonding company, and for staking, compaction tests and interest as defined in division (F) below. If the financial statement is not filed within this

time period, the applicant shall not be eligible for any reimbursements under this chapter. (C) For a period of not to exceed 20 years after the notice of completion of a water main referred to in division (B) of this section, all of the front foot fees collected by the city pursuant to this chapter for a connection to such water main shall be paid by the city to applicant, not to exceed 100% of the approved cost of constructing water mains which do not front on any of the applicant’s property and 50% of the cost of constructing water mains for those portions where the applicant’s property fronts on only one side of the street. Payments shall be made annually in July, or as soon thereafter as practical. (D) Whenever a water main is extended to serve property, the water shall be extended across the full street frontage of the property to be served unless the City Engineer determines that such water shall not be extended in the future. (E) Existing benefit districts. After the effective date of this ordinance, the Engineer shall determine which benefit districts which existed prior to this ordinance are still active. The City Engineer shall then determine what unpaid balance exists in each active benefit district, together with any accrued interest as provided for at the time of adoption of said district and apply the same procedures for repayment as outlined in division (C) to said unpaid balance except that the 20-year time limit mentioned in that section shall be from the original date of the adoption of said district. (F) Interest. The unpaid balance due the applicant for water main shall be adjusted by annual compounding with a variable interest rate. The interest rate used for each calendar year shall be based on the average annual Local Agency Investment Fund (LAIF) rate of return on City of Tulare investments from the previous calendar year. (1995 Code, § 7.08.040) (Ord. 06-2026, passed - -2006)

Exceptions & meaning →

§ 7.08.050 In-lieu water fees.

Whenever the City Engineer determines it is impractical or unreasonable for an applicant to install a water main on a street frontage for which such installation would be otherwise be required, the applicant shall pay to the city an in-lieu fee for their fair share of the future installation of the main. The fee shall be the same front foot fee as established in § 7.08.030 above. (1995 Code, § 7.08.050) (Ord. 06-2026, passed - -2006)

Exceptions & meaning →

§ 7.08.060 Surplus.

Any surplus of monies remaining after the applicant has been reimbursed in accordance with the applicable provisions of this code may be expended for construction or reconstruction of the facilities including raising of facilities to grade or, work for which the funds were collected. (1995 Code, § 7.08.060) (Ord. 06-2026, passed - -2006)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Tulare Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.