18.49.010 - Purpose.

This chapter establishes standards for the development and operation of telecommunication and electrical generating towers.

18.49.020 - Applicability.

Except as may be mandated by federal law this chapter applies to all telecommunication towers including cellular wireless communications towers, single pole/tower amateur radio antennas, and television and radio broadcasting towers; and to all electrical generating towers including tower-mounted solar arrays and wind turbines.

18.49.030 - Permit requirements.

A conditional use permit is required for all telecommunication towers and electrical generating towers pursuant to Chapter 18.60.

18.49.040 - Standards.

In reviewing proposals for telecommunications and electrical generating towers, the planning commission shall apply the following standards:

A.

Sites shall be limited to commercial and industrial zoning districts;

B.

Towers, antennas, satellite dishes, and appurtenant equipment shall not be located within any front yard setback or street side yard setback;

C.

The owner and/or operator of the facility shall operate and maintain such facilities in a clean, safe, and attractive condition at all times;

D.

In conjunction with issuance of the conditional use permit, permitee shall provide a performance bond or cash equivalent equal to one hundred percent of the city's estimated cost for removal of the facility. Said bond amount may be revised periodically by the city, and the bond may be utilized by the city in the event that permitee fails to remove the facility; and

E.

Unused and/or obsolete equipment and towers shall be removed from the site within six months after their need has ceased, or the city may, after notice and hearing, remove the equipment and towers and place a lien on the land to recover reasonable cost of removal.

F.

The height of towers shall be limited as specified in section 18.10.050.

18.49.050 - Design criteria.

In evaluating proposed towers, the planning commission shall consider the following design criteria:

A.

Sites should be selected according to the following order of preference:

1.

In locations where topography, vegetation and other natural features provide the greatest amount of screening;

2.

On existing structures that lend themselves to tower-mounted equipment (such as water towers, church steeples, light poles, head frames, and the like); and

3.

Within industrial areas in which existing structures provide a visual buffer from adjacent areas.

B.

Preference should be given to co-location with other similar facilities;

C.

Equipment and supporting structures should be painted a single, neutral, non-glossy color, preferably earth-tones;

D.

Electrical and equipment wiring should be placed underground; and

E.

Monopole towers should be given preference over lattice towers.

18.49.060 - Application requirements.

In addition to the application information required for conditional use permits pursuant to Chapter 18.60, the following additional information shall be provided for any telecommunications or electrical generation tower:

A.

Alternate Site and Network Analysis. The applicant shall submit documentation that all potential alternative sites have been explored and analyzed, including co-location sites;

B.

Photo Simulation. Photo simulations of the proposed facility from all relevant viewsheds, roadways, and neighboring properties shall be submitted; and

C.

Airport Safety Zone. A clearance letter from the airport land use commission shall be submitted.

18.49.070 - Residential satellite antennas.

A.

Satellite antennas utilized for residential use, including portable units and dish antennas, shall be designed, installed and maintained in compliance with Federal Communications Commission and California Public Utilities Commission regulations.

B.

All such antennas and satellite dishes shall not be installed within the front yard setback, the side yard setback, or the street side yard setback.

C.

If compliance with these requirements would result in no or poor satellite reception, the location may be modified upon application to and approval by the planning commission.

Chapter 18.50 - SITE PLANS

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Sutter Creek Zoning Code
Sutter Creek Zoning Code
  1. Title 18 — ZONING ORDINANCE
  2. ▸Title 18 — ZONING ORDINANCE
    Overview
    1. ▸Chapter 18.04 — PURPOSE
      Overview
      1. Chapter 18.06 — PROCEDURES
      2. Chapter 18.10 — General Provisions
      3. Chapter 18.12 — ZONES
      4. Chapter 18.13 — RR ZONE—RESIDENTIAL RANCHETTE ZONING DISTRICT
      5. Chapter 18.14 — RE ZONE—RESIDENTIAL ESTATE
      6. Chapter 18.15 — RL ZONE—RESIDENTIAL LOW DENSITY
      7. Chapter 18.16 — R-1 ZONE—ONE FAMILY DWELLING
      8. Chapter 18.20 — R-2 ZONE—TWO FAMILY DWELLING
      9. Chapter 18.28 — R-3 ZONE—MULTIPLE FAMILY DWELLINGS
      10. Chapter 18.29 — PS ZONE—PUBLIC SERVICE
      11. Chapter 18.30 — MH COMBINING ZONE—MANUFACTURED HOUSING COMBINING
      12. Chapter 18.32 — C-1 ZONE—LIMITED COMMERCIAL
      13. Chapter 18.36 — C-2 ZONE—COMMERCIAL
      14. Chapter 18.38 — DTC ZONE—DOWNTOWN COMMERCIAL
      15. Chapter 18.39 — MU ZONE—MIXED USE
      16. Chapter 18.40 — I-1 ZONE—LIGHT INDUSTRIAL
      17. Chapter 18.41 — I-2 ZONE—HEAVY INDUSTRIAL
      18. Chapter 18.42 — PD COMBINING ZONE—PLANNED DEVELOPMENT COMBINING
      19. Chapter 18.43 — OS ZONE—OPEN SPACE
      20. Chapter 18.44 — R ZONE—RECREATION
      21. Chapter 18.45 — DESIGN STANDARDS
      22. Chapter 18.46 — NONCONFORMING BUILDINGS AND USES
      23. Chapter 18.47 — SPECIAL EVENTS
      24. Chapter 18.48 — OFF-STREET PARKING
      25. Chapter 18.49 — TELECOMMUNICATION AND ELECTRICAL GENERATING TO…
      26. Chapter 18.50 — SITE PLANS
      27. Chapter 18.52 — VARIANCES
      28. Chapter 18.54 — ZONE CHANGES
      29. Chapter 18.56 — ZONING UPON ANNEXATION
      30. Chapter 18.58 — ACCOMMODATIONS OF PERSONS WITH DISABILITIES
      31. Chapter 18.60 — CONDITIONAL USE PERMITS
      32. § 18.060
      33. Chapter 18.61 — ACCESSORY DWELLING UNITS
      34. Chapter 18.62 — DENSITY BONUSES
      35. Chapter 18.66 — SURFACE MINING AND RECLAMATION
      36. Chapter 18.68 — ENFORCEMENT

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.