Chapter 9 — BUILDINGS›Article I — CODE ADOPTION AND AMENDMENTS

South Pasadena Municipal Code § 15.2 The ceiling height as established by door height or plate line does not exceed 6 feet (1829 mm)

South Pasadena Municipal Code · 2026-09 edition · updated 2026-10-04 · South Pasadena

Cite as: South Pasadena Municipal Code § 15.2 · Text as of 2026-10-04

  1. Canopies or awnings, completely supported by the exterior wall, attached to a Group R-3 or U Occupancy, and extending not more than 54 inches (1372 mm) from the exterior wall of the building, and not encroaching into the public right-of-way or any required fire separation distance specified by this Code.

  2. Sheds, office or storage buildings, and other structures that are less than 1,500 square feet (139 m2) and incidental to work authorized by a valid grading or building permit. Such structures must be removed upon expiration of the permit or completion of the work covered by the permit.

18. Oil derricks.

  1. Decks, walks and driveways not more than 30 inches (762 mm) above grade and not over any basement or story below, and which are not part of an accessible route.

  2. Prefabricated swimming pools and other bodies of water accessory to a Group R-3 Occupancy that are less than 18 inches (0.46 m) deep, or do not exceed 5,000 gallons (18,927 L) and are installed entirely above adjacent grade.

21. Playground equipment.

  1. One-story detached animal cages and kennels, chicken coops, and animal pens provided the gross floor area does not exceed 300 square feet (27.9 m2) and the height does not exceed 6 feet (1.8 m) and at least one horizontal dimension does not exceed 12 feet (3.69 m).

  2. Non-combustible livestock shelters provided that the gross floor area does not exceed 300 square feet (27.9 m2), the height does not exceed 12 feet (3.69 m), and at least 3 sides are each a minimum of 65 percent open.

  3. Nonfixed and movable fixtures, cases, racks, counters and partitions not over 5 feet 9 inches (1753 mm) in height.

Electrical:

An electrical permit shall not be required for the following:

  1. Minor repair work, such as the replacement of lamps, switches, receptacle devices, sockets, and the like, or the connection of portable motor and appliances to suitable receptacles which have been permanently installed.

  2. The wiring for temporary theater, motion picture or television stage sets.

  3. Electrical wiring, devices, appliances, apparatus, or equipment operating at less than 25 volts and not capable of supplying more than 50 watts of energy.

  4. Low-energy power, control, and signal circuits are not an integral part of an appliance and in which the power is limited from a source having a rated output of not more than 30 volts and 1,000 volt-amperes.

  5. Temporary decorative lighting.

  6. The installation of temporary wiring for testing or experimental purposes within suitable facilities.

  7. Replacement of over-current devices of the same type and the same rating.

  8. Portable generators, portable motors, appliances, tools, power outlets, and other portable equipment connected by means of a cord or cable having an attachment plug.

  9. Private telephone, intercom, sound and communication systems; provided, however, that the above system(s) do not exceed the value as indicated in (27) and (28) of this section. A permit shall be obtained for the power supplies required by the above systems.

Mechanical:

A mechanical permit shall not be required for the following:

  1. Any portable heating appliance.

  2. Any portable ventilating equipment.

  3. Any portable cooling unit.

  4. Any steam, hot, or chilled water piping within any heating or cooling equipment regulated by this Code.

  5. Replacement of any component part or assembly of an appliance which does not alter its original approval and complies with other applicable requirements of this Code.

  6. Any portable evaporative cooler.

  7. Any refrigerating equipment which is a part of the equipment for which a permit has been issued pursuant to the requirements of this Code.

  8. Any unit refrigerating system.

Plumbing:

A Plumbing permit shall not be required for the following:

  1. Clearing of stoppages and stopping of leaks which do not involve the replacement of any plumbing (including fixtures, traps, tailpieces and valves), drainage piping, vent piping, waste piping, soil piping, water piping or gas piping.

  2. (b) Change of residential plumbing fixtures which do not involve the replacement of the existing waste and vent piping excluding the trap, to include, residential toilets, residential bathroom hand sinks, bathtub and residential kitchen sinks.

  3. (c) Connection of any appliance approved for and intended to be connected by flexible gas piping to a gas shutoff valve which was previously permitted and inspected under a valid Plumbing permit.

107.3 Application for Permit. To obtain a permit, the applicant shall first file an application in writing on a form furnished by the City for that purpose. Each such application shall:

  1. Identify and describe the work to be covered by the permit for which application is made.

  2. Describe the land on which the proposed work is to be done by lot, block, tract, street address, or similar description that will readily identify and locate the proposed building or work.

  3. For building plans, show the use and occupancy of all parts of the building.

  4. Be accompanied by plans and calculations as required in Section 106.

  5. State the valuation of the proposed work or, for grading, the volume of earth to be handled.

  6. Give such other information as reasonably may be required by the building official.

107.4 Issuance. The building official shall issue a permit to the applicant for the work described in the application and plans filed therewith when the building official is satisfied that all of the following items comply:

  1. The work described conforms to the requirements of all Codes, relevant laws, ordinances, rules and regulations.

  2. The fees specified by resolution or ordinance have been paid.

  3. The applicant has obtained a permit pursuant to Public Resources Code Section 30600 et seq., if such a permit is required.

When the building official issues the permit, the building official shall endorse in writing or stamp on both sets of plans “Reviewed for Substantial Compliance Only.” Such stamped plans shall not be changed, modified or altered without authorization from the building official, and all work shall be done in accordance with the currently adopted Codes in effect at the time of permit issuance regardless of the information presented on the plans. The approval of the plans shall not be held to permit or to be an approval of any violation of any Federal, State, County or City laws or ordinances. The issuance of a permit shall not be deemed to certify that the site of the described work is safe.

One set of approved plans and reports shall be returned to the applicant to be kept on such building or work site at all times while the authorized work is in progress.

The building official may issue a permit for the construction of part of a building or structure before the entire plans and calculations for the whole building or structure have been submitted or approved, provided adequate information and detailed statements have been filed complying with all pertinent requirements of all Codes. The holder of such permit shall proceed at his or her own risk without assurance that the permit for the entire building or structure will be granted.

107.5 Permit Validity. The issuance or granting of a permit or approval of plans and calculations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of any Code, relevant laws, ordinances, rules and regulations. No permit presuming to give authority to violate or cancel the provisions of any Code, relevant laws, ordinances, rules and regulations shall be valid, except insofar as the work or use which it authorizes is lawful.

The issuance of a permit based on plans and calculations shall not prevent the building official from thereafter requiring the correction of errors in said plans and calculations or from preventing building operations being carried on thereunder when in violation of any Code, relevant laws, ordinances, rules and regulations.

107.6 Expiration of Permit. Every permit issued under the provisions of this Code shall expire by limitation and become null and void if any of the following conditions occur:

  1. The work authorized by such permit is not commenced within one (1) year from the date of permit issuance; or

  2. No required building inspection, as defined in this Code and as identified on the Job Record issued with the permit, is approved by the Building Official within one (1) year from the date of the last approved inspection.

Partial inspections, or inspections related solely to electrical, mechanical, plumbing, grading, or reroofing, shall not constitute a required building inspection unless such work is integral to the primary building permit.

Supplemental permits for electrical, grading, mechanical, plumbing, or reroofing shall remain valid so long as the associated primary building permit remains active.

The Building Official may, at their discretion, grant one or more extensions of time, each not to exceed one hundred eighty (180) days, to prevent or cure the expiration of a permit, provided that:

  1. The permittee submits a written request demonstrating that the delay in progress was due to circumstances beyond the permittee’s control;

  2. For extensions requested prior to expiration, the request is submitted before the expiration date;

  3. For extensions requested after expiration, the request is submitted within twelve (12) months following the date of expiration; and

  4. An extension fee, in an amount determined by the Building Official, not to exceed twenty-five percent (25%) of the original permit fee, is paid for each extension.

Multiple extensions may be granted to cover the requested period of time; however, each extension shall be issued in increments not exceeding one hundred eighty (180) days, and a separate extension fee shall apply to each extension granted.

Any extension granted after expiration shall be deemed a continuation of the original permit and shall not constitute a reissuance or issuance of a new permit.

If no extension is granted, the permit shall remain expired and no further work shall be performed under that permit. The permittee shall be required to submit a new permit application, including all required plans and calculations, and pay all applicable fees in accordance with the codes and regulations then in effect.

107.7 Permit Suspension or Revocation. The building official may, in writing, suspend or revoke a permit issued under the provisions of any Code having jurisdiction over any portion of the work, relevant laws, ordinances, rules and regulations whenever the permit was issued in error or on the basis of incorrect information supplied, or in violation of any other laws, ordinances or regulations or any of the provisions of any Code.

The building official may also, in writing, withhold inspections, suspend or revoke a permit where work is being done in violation of any Code, where work is being done in violation of the approved plans, where work is being concealed without approval from the building official, or where work is not in accordance with the direction of the building official.

107.8 Cancellation of Permit by Applicant. If no portion of the work or construction covered by a permit issued by the building official under the provisions of any Code, relevant laws, ordinances, rules and regulations has been commenced, the person to whom such permit has been issued may deliver such permit to the building official with a request that such permit be cancelled. Only the person to whom such permit was issued may request cancellation of the permit. The building official shall thereupon stamp or write on the face of such permit the words, “Cancelled at the request of the applicant.” Thereupon such permit shall be null and void and of no effect. All fees except for issuance fees shall be returned to the applicant.

Exceptions & meaning →

107.9 Transfer of Permit by Applicant.

107.9.1 No Inspection Performed. When requested in writing by the person to whom the permit was issued, a permit may be transferred from the person to whom the permit was issued to a new individual. Fee credit shall be given where deemed appropriate by the building official and new fees shall be paid as required by ordinance or resolution.

107.9.2 One or More Inspection Performed. Permits may be transferred to any individual upon completion of a new application. Fee credit shall be given where deemed appropriate by the building official and new fees shall be paid as required by ordinance or resolution.

107.9.3 Permit Duration Remains Unchanged. Transfer of a permit shall be considered a continuation of the previous permit when determining the permit’s duration, and shall in no way extend the duration of the preceding permit.

Exceptions & meaning →

108 RESERVED

SECTION 109 USE AND OCCUPANCY

109.1 General. No building, structure or premises, or portion thereof, shall be used or occupied, and no change in the existing occupancy classification of a building, structure or premises, or portion thereof, shall be made until the building official has approved the building, structure or premises or portion thereof for such use or occupancy and until all permits have been approved or a temporary certificate of completed construction has been issued.

Upon final of a building permit and at the request of the applicant, a certificate of completed construction shall be issued by the building official for any structure that is ready to occupy.

Approval of a building, structure or premises, or portion thereof, for use or occupancy (including, but not limited to, final inspection approval and/or issuance of a certificate of completed construction or issuance of a temporary certificate of completed construction) shall not be construed as approval of a violation of the provisions of any Code, relevant laws, ordinances, rules and/or regulations. Approvals presuming to give authority to violate or cancel the provisions of any Code, relevant laws, ordinances, rules and/or regulations are not valid.

The building official may, in writing, suspend or revoke any such approvals or certificates whenever the building official determines that the approval or certificate was issued in error, or on the basis of incorrect information supplied, or when it is determined that the building, structure or premises, or portion thereof, is in violation of any provision of any Code, relevant laws, ordinances, rules and/or regulations. Any certificate of completed construction or temporary certificate of completed construction so issued shall be surrendered upon request of the building official.

109.2 Unpermitted Structures. No person shall own, use, occupy or maintain any unpermitted structure.

109.3 Change in Use. Changes in the character or use of a building shall not be made except as specified in Existing Building Code.

109.4 Certificate of Occupancy. Upon passing final inspection and demonstrating compliance with this Code, applicable laws, ordinances, rules, and regulations, and upon full payment of all required fees, the Building Official may issue a Certificate of Occupancy upon written request by the permit holder.

The Certificate of Occupancy shall include the following information:

  1. The building permit number.

  2. The address of the building or structure.

  3. A description of the portion of the building covered by the certificate.

  4. A statement that the described portion was inspected and found to comply with applicable codes and regulations for the intended occupancy and use classification.

  5. The date of final approval; and

  6. Any additional information deemed necessary by the Building Official.

109.5 Temporary Certificate of Occupancy. The Building Official may issue a Temporary Certificate of Occupancy for the use or occupancy of any portion of a building or structure prior to the completion of all permitted work, provided it is determined that no substantial hazard will result from such use or occupancy.

A Temporary Certificate of Occupancy shall:

  1. Specify the portion of the building or premises to be occupied.

  2. Be valid for an initial period of thirty (30) calendar days; and

Exceptions & meaning →

3. Be subject to a fee per 30-day period, as established by the adopted fee schedule.

If additional time is needed, the Building Official may, upon written request and justification, approve a longer duration by allowing multiple 30-day periods to be purchased in advance. The total authorized time shall be based on project-specific conditions and shall remain at the discretion of the Building Official.

Upon expiration of a Temporary Certificate of Occupancy and any approved extensions, no portion of the building or premises shall be occupied until final approval, or a Certificate of Occupancy is issued.

109.6 Live Load Posted. In new construction, a durable sign that indicates the “live load” shall be required in commercial or industrial buildings where the floor or roof or portion thereof is or has been designed with a live load that exceeds 50 psf. The live load sign shall be posted on that part of each story or roof to which it applies, in a conspicuous place. The live load sign shall be posted as a condition precedent to the issuance of a certificate of completed construction certificate. It shall be unlawful to remove or deface any such sign.

109.7 Continued Use of Unpermitted and/or Noncomplying Conditions. When deemed appropriate by the building official, a certificate of continued use of unpermitted and/or noncomplying condition(s) may be issued. The certificate shall not be issued until documentation, satisfactory to the building official, has been provided indicating that 1) the unpermitted and/or noncomplying condition(s) were not created by the current owner, and 2) that the current owner had no knowledge that the conditions were unpermitted and/or noncomplying at the time of purchase.

An application shall be completed that states 1) that the continued use of the existing unpermitted construction and/or noncomplying conditions is permitted by the City only with the owner’s understanding that the City in no way assumes responsibility for the method of construction or the materials used; and 2) that it is further understood that this application for continued use is not to be construed as being equivalent in any way to a building permit.

An inspection shall then be made by the building official. Where necessary, permits shall be issued to correct any conditions deemed to pose a potential threat to life, limb or property. Once the inspection(s) have been made; all necessary permits have been obtained, inspected and approved; and all obvious potential threats to life, limb or property have been corrected, the building official may approve the application for unpermitted construction and or noncomplying condition(s). When approved by the building official, conditions deemed not to pose a potential threat to life, limb or property may be permitted to remain.

Exceptions & meaning →

110—PROHIBITED USES OF BUILDING SITES

110.1 Flood Hazard.

Buildings are not permitted in an area determined by the Building Official to be subject to flood hazard by reason of inundation, overflow or erosion.

The placement of the building and other structures (including walls and fences) on the building site shall be such that water or mud flow will not be a hazard to the building or adjacent property. This prohibition shall not apply when provision is made to eliminate such hazard to the satisfaction of the Building Official by providing adequate drainage facilities by protective walls, suitable fill, raising the floor level of the building, a combination of these methods, or by other means. The Building Official, in the application of this Section for buildings, structures, and grading located in whole or in part in flood hazard areas, shall enforce, as a minimum, the current Federal Flood Plain Management Regulations defined in Title 44, Code of Federal Regulations, Section 60.3, and may require the applicant or property owner to provide the following information and/or comply with the following provisions:

  1. Delineation of flood hazard areas, floodway boundaries and flood zones, and the design flood elevation, as appropriate;

  2. The elevation of the proposed lowest floor, including basement, in flood hazard areas (A Zones), and the height of the proposed lowest floor, including basement, above the highest adjacent grade;

  3. The elevation of the bottom of the lowest horizontal structural member in coastal high hazard areas (V Zone);

  4. If the design flood elevations are not included on the community’s Flood Insurance Rate Map (FIRM), then the applicant shall obtain and reasonably utilize any design flood elevation and floodway data available from other sources, as approved by the Building Official; and

  5. During construction, upon placement of the lowest floor, including basement, and prior to further vertical construction, the permittee shall provide to the Building Official documentation, prepared and sealed by a registered design professional, certifying the elevation of the lowest floor, including basement.

Exceptions & meaning →

110.2 GEOTECHNICAL HAZARDS.

110.2.1. No building or grading permit shall be issued under the provisions of this section when the Building Official finds that property outside the site of the proposed work could be damaged by activation or acceleration of a geotechnically hazardous condition and such activation or acceleration could be attributed to the proposed work on, or change in use of, the site for which the permit is requested. For the purpose of this section, a geotechnically hazardous condition does not include surface displacement due to earthquake faults.

110.2.2. Except as provided in Section 110.2.3, work requiring a building or grading permit is not permitted in an area determined by the Building Official to be subject to hazard from landslide, settlement, or slippage. For the purpose of this Section, landslide, settlement, or slippage does not include surface displacement due to the earthquake faults.

110.2.3. Subject to the conditions of Subsection 110.2.1, permits may be issued in the following cases.

110.2.3.1. When the applicant has submitted an engineering geology and/or soils engineering report or reports complying with the provisions of Section 111 such that said reports show to the satisfaction of the Building Official that the hazard will be eliminated prior to the use or occupancy of the land or structures.

110.2.3.2. When the applicant has submitted an engineering geology and/or soils engineering report or reports that comply with the provisions of Section 111, and that demonstrate, to the satisfaction of the Building Official, that the site is safe for the intended use.

110.2.3.3. When the proposed work involves the alteration or minor repair of existing structures and the cost of such alteration or repair does not exceed 25 percent of the current valuation of the existing structure, such value to be based on assumed continuation of the established legal use. Before a permit may be issued pursuant to this section, the owner shall do all of the following:

  1. If required by the Building Official, submit an engineering geology and/or soils engineering report or reports that contain(s), at a minimum, a qualitative and/or conditional finding that the proposed work complies with the provisions of Section 110.2.1 of this Chapter.

  2. Record in the office of the Department of Registrar-Recorder, a statement that the owner is aware that the records of the Building Official indicate that the property is potentially subject to hazard from landslide, settlement, or slippage.

  3. Record in the office of the Department of Registrar-Recorder, an agreement relieving the City and all officers and employees thereof of any liability for any damage or loss which may result from issuance of such a permit. This agreement shall provide that it is binding on all successors in interest of the owner and shall continue in effect until the Building Official records in the office of the Department of Registrar-Recorder a statement that the Building Official has determined that such hazard from landslide, settlement or slippage no longer exists. The repair work shall consist of restoring the original construction. The Building Official may require that provisions be made in anticipation of future settlement. For the purposes of this Section 110.2.3.3, “alteration” does not include an addition or additions.

110.2.3.4. When the proposed work involves an addition or additions to an existing structure but is not a change in use or occupancy and such work does not increase the gross floor area of the structure by more than 25 percent of the area of the structure as it existed on July 6, 1968, and the Building Official determines that the proposed work will not impact a historically active landslide. Before a permit may be issued pursuant to this Section, the owner shall do all of the following:

  1. Submit an engineering geology and/or soils engineering report or reports that contain(s), at a minimum, a qualitative and/or a conditional finding that the proposed work complies with the provisions of Section 110.2.1.

  2. Record in the office of the Department of Registrar-Recorder the finding of such report or reports.

  3. Record in the office of the Department of Registrar-Recorder an agreement relieving the City and all officers and employees thereof of any liability for any damage or loss which may result from the issuance of such a permit. This agreement shall provide that it is binding on all successors in interest of the owner and shall continue in effect until the Building Official records in the office of the Department of Registrar-Recorder a statement that the Building Official has determined that a hazard from landslide, settlement, or slippage no longer exists.

110.2.3.5. When the proposed work involves the repair of a single-family residence or accessory structures where the cost of such repair exceeds 25 percent of the current valuation of the existing building.

The scope of the repair work shall be subject to the approval of the Building Official. Before a permit may be issued pursuant to this Section, the owner shall do all of the following:

  1. Submit an engineering geology and/or soils engineering report or reports that contain(s), at a minimum, a qualitative and/or conditional finding that the proposed work complies with the provisions of Section 110.2.1 of this Chapter.

  2. Record in the office of the Department of Registrar-Recorder a statement by the owner acknowledging that the records of the Building Official indicate that the property is potentially subject to hazard from landslide, settlement, or slippage.

  3. Record in the office of the Department of Registrar-Recorder an agreement relieving the County and all officers and employees thereof of any liability for any damage or loss which may result from issuance of such a permit. This agreement shall provide that it is binding on all successors in interest of the owner and shall continue in effect until the Building Official records in the office of the Department of Registrar-Recorder a statement that the Building Official has determined that such hazard from landslide, settlement, or slippage no longer exists.

110.2.3.6. When the proposed work involves the replacement of structures destroyed by causes other than landslide, settlement, or slippage, and the permit applicant was the owner of the property at the time of the loss, their immediate heir(s), or their authorized representative, and the application for a permit under this Section is filed no later than ten (10) years following the date of the loss.

The replacement structure(s) shall not exceed the area, number of stories, load, or number of fixtures and bedrooms of the structure that was destroyed. No change in occupancy type shall be permitted. Before a permit may be issued pursuant to this Section, the owner shall do all of the following:

  1. Demonstrate, to the satisfaction of the Building Official, that the replacement structure and/or the associated private sewage disposal system (if any) and/or the replacement landscaping (if any) will not result in a greater amount of groundwater infiltration than occurred under the original condition.

  2. Submit an engineering geology and/or soils engineering report or reports that contain, at a minimum, a qualitative and/or conditional finding that the proposed work complies with the provisions of Section 110.2.1 of this Chapter and that contain recommendations for enhancing the stability of the site.

  3. Record in the office of the Department of Registrar-Recorder a statement by the owner acknowledging that the owner is aware that the records of the Building Official indicate that the property is potentially subject to a hazard from landslide, settlement, or slippage.

  4. Record in the office of the Department of Registrar-Recorder an agreement relieving the City and all officers and employees thereof of any liability for any damage or loss which may result from issuance of such a permit. This agreement shall provide that it is binding on all successors in interest of the owner and shall continue in effect until the Building Official records in the office of the Department of Registrar-Recorder a statement that the Building Official has determined that such hazard from landslide, settlement, or slippage no longer exists.

110.2.3.7. When the proposed work involves a one-story, detached, light-frame accessory structure not intended or used for human occupancy and not exceeding 400 square feet in gross floor area nor 12 feet in height. Before a permit may be issued pursuant to this Section, the owner shall do all of the following:

  1. When required by the Building Official, submit an engineering geology and/or soils engineering report or reports that contain, at a minimum, a qualitative and/or conditional finding that the proposed work complies with the provisions of Section 110.2.1.

  2. Record in the office of the Department of Registrar-Recorder a statement by the owner acknowledging that the owner is aware that the records of the Building Official indicate that the property is potentially subject to hazard from landslide, settlement, or slippage.

  3. Record in the office of the Department of Registrar-Recorder an agreement relieving the City and all officers and employees thereof of any liability for any damage or loss which may result from issuance of such a permit. This agreement shall provide that it is binding on all successors in interest of the owner and shall continue in effect until the Building Official records in the office of the Department of Registrar-Recorder a statement that the Building Official has determined that such hazard from landslide, settlement, or slippage no longer exists.

110.2.3.8. When the Building Official determines that the hazard from landslide, settlement, or slippage is based solely on the fact that the area has been identified as a potentially liquefiable area in a seismic hazard zone (pursuant to Public Resources Code section 2690 et seq.) and a foundation investigation is performed in connection with the work in accordance with the Building Code.

110.2.3.9. Notwithstanding any other provisions of this Section, the Building Official may, at his or her discretion, deny a permit for any building, structure, or grading subject to hazard from landslide, settlement, or slippage, which cannot be mitigated and may endanger the health or safety of the occupants, adjoining property, or the public.

110.2.3.10. When the proposed work involves the repair and restoration of a slope. Before a permit may be issued pursuant to this Section, the owner shall submit an engineering geology and/or soils engineering report or reports that contain(s) the following:

  1. A description and analysis of the existing conditions, including the cause or causes of the failed slope.

  2. Recommendations for the repair of the failed slope.

  3. A qualitative and/or conditional finding that the proposed work complies with the provisions of Section 110.2.1 of this Chapter.

  4. An analysis demonstrating that future failures originating from the repaired portion of the slope will not impact previously permitted structures.

  5. An analysis demonstrating that the proposed work will improve existing slope stability.

111—ENGINEERING GEOLOGY AND SOILS ENGINEERING REPORTS

The Building Official may require an engineering geology or soils engineering report, or both, where in the Building Official’s opinion, such reports are essential for the evaluation of the safety of the site. The engineering geology or soils engineering report or both shall contain a finding regarding the safety of the site of the proposed work against hazard from landslide, settlement or slippage and a finding regarding the effect that the proposed work will have on the geotechnical stability of the area outside of the proposed work. Any engineering geology report shall be prepared by a certified engineering geologist licensed in the State of California. Any soils engineering report shall be prepared by a civil engineer licensed in the State of California, experienced in the field of soil mechanics, or a geotechnical engineer licensed in the State of California. When both an engineering geology and soils engineering report are required for the evaluation of the safety of a building site, the two reports shall be coordinated before submission to the Building Official.

Exceptions & meaning →

112—EARTHQUAKE FAULT MAPS

Earthquake fault zone maps within the City prepared under Sections 2622 and 2623 of the California Resources Code which show traces of earthquake faults are hereby declared to be, on the date of official issue, a part of this Code, and may be referred to elsewhere in this Code. Earthquake fault zone maps revised under the above sections of the California Resources Code shall, on the date of their official issue, supersede previously issued maps which they replace.

Exceptions & meaning →

SECTION 113—EARTHQUAKE FAULTS

113.1 General.

The construction of a building or structure near a known active earthquake fault and regulated by this Code shall be permitted as set forth in this Section.

113.2 Scope.

The provisions of this Section shall apply only to permits for buildings or structures on individual lots or parcels and are not intended to be supplementary to geologic investigations required to qualify divisions of land as set forth in the SPMC.

113.3 Definition.

For the purpose of this Section, a geologist shall be a professional geologist, licensed by the California State Board for Geologists and Geophysicists to practice geology in California.

Exceptions & meaning →

113.4 Known Active Earthquake Faults.

For the purpose of this Section, known active earthquake faults are those faults which have had displacement within Holocene time (approximately the last 11,000 years) as defined in the most current issue of Special Publication 42 of the California Geological Survey.

113.5 Construction Limitations.

No building or structure shall be constructed over or upon the trace of a known active earthquake fault which is shown on maps maintained by the Building Official. These maps include, but are not limited to, earthquake fault zone maps prepared under Sections 2622 and 2623 of the California Public Resources Code.

The absence of a known active earthquake fault trace at the proposed building location shall be determined by a professional geologist licensed in the State of California in the following cases:

  1. When the proposed building is within (50) feet (15.24 m) of that line designated by the Building Official as the assumed location of a known active earthquake fault on the aforementioned maps.

  2. When the proposed building is within 50 feet (15.24 m) of the most probable ground location of the trace of a known active earthquake fault shown on the aforementioned maps.

In these cases, the Building Official may require the excavation of a trench, for the purpose of determining the existence of an active earthquake fault. Such a trench will be required if a lack of distinguishable fault features in the vicinity prevents the Building Official from determining by a site examination, review of available aerial photographs, or by other means that the fault trace does not underlie the proposed building. The trench shall be approximately perpendicular to the most probable direction of the fault trace, at least 1-1/2 feet (0.15 m) wide, and at least five feet in depth measured from natural grade, or to a depth satisfactory to the Building Official.

The trench must be accessible for mapping and inspection by the Building Official, when requested, and meet the requirements of Title 8 of the California Code of Regulations, Construction Safety Orders. The trench need not extend further than the full width of the proposed structure plus 5 feet (1.52 m) beyond the traversed exterior walls. A known active earthquake fault shall be presumed nonexistent if an exposure is not found by the professional geologist in the walls or floor of the trench.

The Building Official may require a more extensive investigation by a professional geologist as evidence to the absence of a known active earthquake fault prior to the issuance of a permit for Groups A, E, I, H and R, Division 1 Occupancies and B, F, M and S Occupancies over one story in height.

The results of the investigation, conclusions and recommendations shall be presented in a geology report prepared by a professional geologist as defined by Section 113.3. The report shall comply with the guidelines presented in Note 49 prepared by the California Department of Conservation, Geological Survey.

EXCEPTION: The provisions of this Section do not apply to:

  1. One-story, detached light-frame buildings not intended or used for human occupancy and not exceeding 1,000 square feet (92.9 m2 ) in gross floor area or 12 feet (3.66 m) in building height.

  2. Alterations or repairs to an existing building provided that the aggregate value of such work within any 12-month period does not exceed 50 percent of the current market value of the existing building. For the purposes of this Section 113.5, “alteration” does not include an addition or additions.

  3. Swimming pools, retaining walls, fences and minor work of a similar nature.

Exceptions & meaning →

SECTION 114 FACTORY-BUILT HOUSING

114.1. Plans shall be submitted for plan review for all field-built portions of factory-built structures that clearly describe all work to be done at the site, including connection and/or anchorage of the factory-built structure to the field-built foundation and connection of utilities. Plans shall indicate compliance with all Codes, relevant laws, ordinances, rules and regulations for all work that is to be done at the site.

SECTION 115 FEES

115.1 Plan review fees shall be equal to 85 percent of the permit fees, and permit fees shall be as adopted by separate resolution and/or ordinance.

Plan checking fees shall be paid at the time of plan review submittal. In addition to the aforementioned fees, the building official may require additional charges for review required by changes, additions or revisions of approved plans or reports, and for services beyond the first and second check due to changes, omissions or errors the part of the applicant.

115.2 Permit fees shall be as adopted by separate resolution and/or ordinance. Permit fees shall be paid at the time of permit issuance.

115.3 Valuation. The determination of value or valuation under any of the provisions of this code shall be made by the Building Official. Valuation shall be based on the type of construction, occupancy classification, and size of the project, and shall include all components of the permitted work, including structural elements, finishes, roofing, mechanical, electrical, plumbing, fire protection systems, and other permanently installed features or equipment.

In establishing valuation, the Building Official may reference the most current Building Valuation Data (BVD) published by the International Code Council or other similar industry data sources. These references are intended to provide a consistent and uniform basis for determining construction valuation for fee assessment purposes. The calculated valuation is not required to reflect actual or reported construction costs.

Exceptions & meaning →

SECTION 116 REFUNDS

116.1 Plan Check Fee Refunds. Plan check fees may be refunded up to a maximum of eighty percent (80%) of the original plan check fee, provided that:

  1. no plan review has been performed; and

  2. a written request for a refund is submitted to the Building Official within one (1) year from the date of payment; and

  3. the refundable amount exceeds the equivalent of the minimum permit fee, as determined by the current adopted fee schedule.

The Building Official shall determine eligibility and the amount of any refund in accordance with these provisions.

116.2 Permit Fee Refunds. Permit fees may be refunded to a maximum of eighty percent (80%) of the original permit fee, provided that:

  1. No portion of the work authorized by the permit has commenced; and

  2. The permit has been cancelled; and

  3. A written request for refund is submitted to the Building Official within one (1) year from the date of permit cancellation or expiration; and

  4. The refundable amount exceeds the equivalent of the minimum permit fee, as determined by the current adopted fee schedule.

Permit issuance fees are non-refundable. The Building Official shall determine eligibility and the amount of any refund in accordance with these provisions.

Exceptions & meaning →

SECTION 117 INSPECTIONS.

117.1 General. All construction or work for which a permit is required shall be subject to inspection by the building official, and all such construction or work shall remain accessible and exposed for inspection purposes until approved by the building official.

In addition to the inspections required to be made by the building official, certain types of construction shall have additional inspections made in accordance with the Code having jurisdiction over the respective work. Required special inspections made in

accordance with any Code having jurisdiction over the respective work shall not relieve the permit applicant of the responsibility to have the work inspected and approved by the building official prior to proceeding with new work.

Approval as a result of an inspection shall not be construed to be an approval of a violation of any provision of any Code, relevant laws, ordinances, rules or regulations. Inspections presuming to give authority to violate or cancel the provisions of any Code, relevant laws, ordinances, rules and regulations shall not be valid.

It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection.

It shall be the duty of the permit applicant to provide access for the inspector to the area of work. Access may include, but shall not be limited to, ladders, scaffolding, catwalks and lifts. It shall be the duty of the permit applicant to maintain a safe access path for the inspector to the area of work. Safety precautions may include, but shall not be limited to, handrails, guardrails and safety harnesses. All components of the access path shall be securely anchored in place. The building inspector shall have the right to refuse to make any inspection in an area that does not have an access path deemed safe for use by said building inspector. It shall be the duty of the permit applicant to make any necessary improvements to the access path to allow inspection by the building inspector.

It shall be the duty of the permit applicant to protect all existing construction from damage caused during inspection. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material damaged during the course of inspection.

For additional provisions applicable to grading, see Appendix J.

117.2 Inspection Requests. It shall be the duty of the permit holder to notify the building official that work authorized by a permit is ready for inspection. The building official may require that every request for inspection be filed at least one working day before such inspection is desired. Such request may be in writing or by telephone at the option of the building official.

It shall be the duty of the person requesting any inspection required by any Code, relevant laws, ordinances, rules and regulations to provide access to and means for inspection of such work.

For additional provisions applicable to grading, see Appendix J.

117.3 Inspection Record Card. When deemed necessary by the building official, work requiring a permit shall not be commenced until the applicant has posted or otherwise made available an inspection record card so as to allow the building official to conveniently make the required entries thereon regarding inspection of the work. This card shall continue to be posted or otherwise made available by the permit holder until final approval of the permit has been granted by the building official.

For additional provisions applicable to grading, see Appendix J.

117.4 Work Ready for Inspection.

117.4.1 General. Upon notification from the applicant that the work for which there is a valid permit is ready for inspection, the building official shall be allowed to make all applicable inspections specified in any Code, on the inspection record card and any additional inspections required by the building official.

No work shall be approved by the building official that was not completely verified. Partial or spot inspections shall not be performed by the building official, nor shall partial or spot inspection be used as a justification for approving any required inspection.

Inspection by a special inspector shall not be made in-lieu of any inspections required to be made by the building official.

For additional provisions applicable to grading, see Appendix J.

117.4.2 Minimum Inspection Requirements. The following inspections shall not be requested until the associated requirements have been satisfied.

  1. Foundation inspection: Shall not be requested until all trenches are excavated and forms erected, any required reinforcing steel is in place, and when all materials for the foundation are delivered to the job. All

holdown hardware shall be securely installed in place. Where concrete from a central mixing plant (commonly termed “transit mixed”) is to be used, materials need not be on the job.

Where any fill more than 8 inches in depth is placed, and/or where required by the building official or the soils engineer, compaction tests shall be submitted to the building official prior to requesting inspection.

Where required by the soils engineer, foundation trenching shall be reviewed and approved by the soils engineer prior to requesting inspection.

  1. Concrete slab or under-floor inspection: Shall not be requested until all in-slab or under-floor building service equipment, conduit, piping accessories and other ancillary equipment items are in place, but before any concrete is poured and/or floor sheathing installed,

including the subfloor.

  1. Floor sheathing inspection: Floor sheathing inspection shall not be requested until all sheathing is in place; all diaphragm nailing is complete; and all diaphragm ties, chords and/or drag struts have been installed. No walls shall be erected above the floor sheathing.

  2. Roof sheathing inspection: Roof sheathing inspection shall not be requested until all sheathing is in place; all diaphragm nailing is complete; and all diaphragm ties, chords and/or drag struts have been installed. No portion of the roof sheathing shall be covered by crickets or similar construction.

  3. Frame inspection: Shall not be requested until after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys, vents and all rough electrical, plumbing and mechanical work are complete. Roof coverings shall not be installed.

  4. Lath inspection and/or wallboard: Shall not be requested until after all lathing and/or wallboard, interior and exterior, is in place, but before any plastering is applied or before wallboard joints and fasteners are taped and finished.

  5. Final inspection: Shall not be requested until after finish grading and the building is completed and is ready for occupancy.

  6. Other Inspections: In addition to the inspections specified above, the building official shall be allowed to make all applicable inspections specified on the Inspection Record card. The building official may also make or require any other inspections of any construction work to ascertain compliance with the provisions of any Code, relevant laws, ordinances, rules and regulations that are enforced by the building official.

For additional provisions applicable to grading, see Appendix J.

117.4.3 Reinspections. An inspection fee may be assessed for reinspection, as determined by the Building Official, for any of the following reasons:

  1. The portion of work for which inspection is requested is not complete;

  2. Corrections given are not completed;

  3. There is inadequate work site access preventing inspection;

  4. The inspection record card is not posted or otherwise available on the work site:

  5. The approved plans are not available for the inspector;

  6. Work has deviated from the approved plans and has not been approved by the Building Official.

This Section is not to be interpreted as requiring additional inspection fees the first time a job is rejected for failure to comply with the requirements of this or any other Code.

To obtain re-inspection, the applicant shall pay the re-inspection fee in advance. as determined per the fee resolution.

117.5 Provisions for Special Inspection.

117.5.1 When Required. In addition to the inspections required in any Code adopted or enforced by the City, the owner shall employ one or more special inspectors, who shall provide inspections during construction in accordance with the Code having jurisdiction over the respective work. The special inspector may be employed either directly or through the architect or engineering firm in charge of the design of the structure, or through an independent inspection test firm approved by the building official.

Exception: The building official may waive the requirement for the employment of a special inspector if the construction is of a minor nature.

117.5.2 Identification of Work. When special inspection is required by Section 117.5.1, the architect or engineer of record shall identify on the plans all work that is required to have special inspection.

Where the special inspection method(s) to be employed are not specified in any Code, relevant laws, ordinances, rules and/or regulations, the architect or engineer of record shall prepare an inspection program that shall be submitted to and approved by the building official prior to building permit issuance.

The special inspector(s) may be employed by the owner, the engineer or architect of record, or an agent of the owner, but shall not be employed by the contractor, the contractor’s employees, representatives or agents of the contractor, or any other person performing the work.

The architect or engineer of record shall identify, on forms provided by the City, the individual(s) and/or firm(s) who are to perform any required special inspection, and where an inspection program is required by this section, shall specify the special inspection duties of the special inspector(s).

117.5.3 Qualifications, Requirements and Duties of the Special Inspector. The special inspector shall be approved by the building official prior to performing any inspection duties. The special inspector shall complete an application form provided by the City and shall submit documentation satisfactory to the building official that the special inspector is qualified to make the special inspection(s) for which application is made. The building official shall have the right to administer a written or verbal examination as deemed appropriate by the building official to verify that the special inspector is qualified to perform the inspection duties for which application is made. A special inspector who fails to pass the examination administered by the building official shall be required to wait a minimum of seven (7) days before submitting a new application to provide special inspection within the City.

The building official shall not be required to accept any documentation provided by a special inspector who was not approved by the building official prior to performing inspection duties. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material(s) or work installed, constructed or placed under the review of a special inspector who was not approved by the building official.

Failure to be approved by the building official prior to performing any special inspection duties may be considered by the building official as a failure to perform properly and shall allow the building official to refuse to allow the special inspector to perform inspection within the City.

The special inspector shall observe the work assigned for conformance with the approved design drawings.

The special inspector shall furnish inspection reports to the building official. All observed discrepancies shall be brought to the immediate attention of the contractor for correction, then if uncorrected, to the proper design authority and to the building official.

The special inspector shall submit a final signed report stating that the work requiring special inspection was, to the best of the inspector’s knowledge, in conformance with the approved plans and the applicable workmanship provisions of the Code(s) having jurisdiction over any portion of the work.

The building official shall have the right to reject any work performed under the review of a special inspector where the work performed fails to meet the minimum requirements of any Code, relevant laws, ordinances, rules and regulations. Regardless of the information communicated between the permit applicant and the special inspector, all work shall comply with the approved plans and any Code, relevant laws, ordinances, rules and regulations.

Upon evidence, satisfactory to the building official, of the failure of a special inspector to perform properly and effectively the duties of said office, the building official may revoke, suspend or refuse to allow the special inspector to perform inspection on sites within the City. Prior to such action, the holder shall be given an opportunity to appear before the building official and be heard.

117.6 Provisions for Structural Observation. When structural observation is required in accordance with the requirements of any Code adopted or enforced by the City, the engineer or architect of record shall indicate on the plans what work is required to be observed by the engineer or architect responsible for the structural design, or the engineer or architect responsible for the structural design shall prepare an inspection program and shall name the individuals or firms who are to perform structural observation and describe the stages of construction at which structural observation is to occur. The inspection program shall include samples of inspection reports and provide time limits for the submission of observation reports. The program shall be submitted to and approved by the building official prior to building permit issuance.

When required by the engineer or architect responsible for the structural design or the building official, the owner shall employ the engineer or architect responsible for the structural design, or another engineer or architect designated by the engineer or architect responsible for the structural design, to perform structural observation as defined in Section 202.

When deemed appropriate by the engineer or architect responsible for the structural design, the owner or owner’s representative shall coordinate and call a preconstruction meeting between the engineer or architect responsible for the structural design, the structural observer, the contractor, the affected subcontractors and the special inspector(s). The structural observer shall preside over the meeting. The purpose of the meeting shall be to identify the major structural elements and connections that affect the vertical and lateral load systems of the structure and to review scheduling of the required observations. A record of the meeting shall be submitted to the building official.

All observed discrepancies shall be brought to the immediate attention of the engineer or architect responsible for the structural design and the contractor for correction; then if unresolved, to the building official. The structural observer shall submit to the building official a written statement at each significant construction stage stating that the required site visits have been made and identifying any reported deficiencies which, to the best of the structural observer’s knowledge, have not been resolved.

The structural observer shall submit a final signed report stating that the work requiring structural observation was, to the best of the observer’s knowledge, in conformance with the approved plans and the applicable workmanship provisions of the Code(s) having jurisdiction over any portion of the work.

117.7 Required Approvals. No work shall be done on any part of the building structure or premises beyond the point indicated in each successive inspection without first obtaining the written approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate in writing that the work appears to comply as completed, or shall notify the applicant in writing which portion of the work fails to comply with any Code, relevant laws, ordinances, rules and/or regulations. Any work that does not comply shall be corrected and such work shall not be covered or concealed until authorized by the building official.

There shall be a final inspection and approval of all work when completed and ready for occupancy.

For additional provisions applicable to grading, see Appendix J.

117.8 Site Requirements. A survey of the lot may be required by the building official to verify compliance of the structure with the approved plans.

117.9 Noninspected Work. No person shall own, use, occupy or maintain any structure on which noninspected work has been performed.

117.10 Utility Release. When deemed appropriate by the building official, gas and electric utilities may be released. Release of either utility may be done prior to building final for testing and inspection purposes. The building official shall retain the right to revoke the release of either utility for just cause, and may have either utility disconnected at the earliest availability of the utility purveyor.

Attempting to occupy prior to issuance of a certificate of completed construction, whether temporary or final, may be considered as just cause by the building official, and may result in disconnection of the utilities.

117.11 Authority to Disconnect Electric Utility. The building official is hereby empowered to disconnect or to order in writing the discontinuance of electric utility service to buildings, structures or premises, or portions thereof, or wiring, devices or materials installed without permit or found to be a hazard to life, health and/or property.

The building official shall have the power to disconnect or to order in writing the discontinuance of electric utility service as a means of preventing, restraining, correcting or abating any violation of any Code, relevant laws, ordinances, rules or regulations.

The electrical service shall remain disconnected or electrical utility service shall remain discontinued until the Code violation has been abated to the satisfaction of the building official, or until the installation of such wiring, devices or materials have been made safe as directed by the building official; or until a permit has been issued and the work has been inspected and approved by the building official.

117.12 Authority to Disconnect Gas Utility. The building official is hereby empowered to disconnect or to order in writing the discontinuance of gas utility service to buildings, structures, premises, appliances, devices or materials installed without permit or found to be a hazard to life, health and/or property.

The building official shall have the power to disconnect or to order in writing the discontinuance of gas utility service as a means of preventing, restraining, correcting or abating any violation of any Code, relevant laws, ordinances, rules or regulations

The gas service shall remain disconnected or gas utility service shall remain discontinued until the Code violation has been abated to the satisfaction of the building official, or until the installation of such appliances, devices or materials has been made safe as directed by the building official; or until a permit has been issued and the work has been inspected and approved by the building official.

(Ord. No. 2308, § 1, 2016; Ord. No. 2370, § 1, 2022; Ord. No. 2371, § 1, 2022; Ord. No. 2407, § 2, 2025.)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — South Pasadena Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.