Skip to content

Earlier editions: 2026-07

Title 9 — Building Regulations›Chapter 9-68 — FLOOD DAMAGE PREVENTION

Santa Maria Municipal Code Art. 1 General Provisions

Santa Maria Municipal Code · 2026-10 edition · updated 2026-10-04 · Santa Maria

Cite as: Santa Maria Municipal Code Article 1 · Text as of 2026-10-04

Section 9-68.101. Statutory authorization.

The Legislature of the State of California has in Government Code Sections 65302, 65560 and 65800 conferred upon local government units authority to adopt regulations designed to promote the public health, safety and general welfare of its citizenry. Therefore, the City Council ordains the provisions of this chapter.

(Ord. 88-13 § 2, eff. 6/21/88; Ord. 2019-10, eff. 1/1/20)

Exceptions & meaning →

Section 9-68.102. Findings of fact.

(a) The flood hazard areas of the City are subject to periodic inundation which potentially could result in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood protection and relief, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare.

(b) These potential flood losses are caused by the cumulative effect of obstructions in areas of special flood hazards which increase flood heights and velocities, and when inadequately anchored, damage uses in other areas. Uses that are inadequately flood proofed, elevated or otherwise protected from flood damage also contribute to potential flood loss.

(Ord. 88-13 § 2, eff. 6/21/88; Ord. 2019-10, eff. 1/1/20)

Exceptions & meaning →

Section 9-68.103. Statement of purpose.

It is the purpose of this chapter to promote the public health, safety and general welfare, and to minimize public and private losses due to flood conditions in specific areas by provisions designed:

(a) To protect human life and health;

(b) To minimize expenditures of public money for costly flood control projects;

(c) To minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public;

(d) To minimize prolonged business interruptions;

(e) To minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in areas of special flood hazards;

(f) To help maintain a stable tax base by providing for the second use and development of areas of special flood hazard so as to minimize future flood blight areas;

(g) To ensure that potential buyers are notified that property is in an area of special flood hazard; and

(h) To ensure that those who occupy the areas of special flood hazard assume responsibility for their actions.

(Ord. 88-13 § 2, eff. 6/21/88; Ord. 2019-10, eff. 1/1/20)

Exceptions & meaning →

Section 9-68.104. Methods of reducing flood losses.

In order to accomplish its purpose, this chapter includes methods and provisions for:

(a) Restricting or prohibiting uses which are dangerous to health, safety and property due to water or erosion hazards, or which result in damaging increases in erosion or in flood heights or velocities;

(b) Requiring that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction;

(c) Controlling the alteration of natural floodplains, stream channels and natural protective barriers, which help accommodate or channel floodwaters;

(d) Controlling filling, grading, dredging and other development which may increase flood damage; and

(e) Preventing or regulating the construction of flood barriers which will unnaturally divert floodwaters or which may increase flood hazards in other areas.

(Ord. 88-13 § 2, eff. 6/21/88; Ord. 2019-10, eff. 1/1/20)

Exceptions & meaning →

Section 9-68.105. Definitions.

(a) Unless specifically defined in this section, words or phrases used in this chapter shall be interpreted so as to give them the meaning they have in common usage and to give this chapter its most reasonable application.

"Appeal"

means a request for a review of the floodplain administrator's interpretation of any provision of this chapter or a request for a variance.

"Area of shallow flooding"

means a designated AO or AH zone on the flood insurance rate map (FIRM). The base flood depths range from one to three feet, a clearly defined channel does not exist, the path of flooding is unpredictable and indeterminate, and velocity flow may be evident.

"Area of special flood hazard":

See "special flood hazard area."

"Area of special mudslide (i.e., mudflow) hazard"

means the area subject to severe mudslides (i.e., mudflows). The area is designated as zone M on the flood insurance rate map (FIRM).

"Base flood"

means the flood having a 1% chance of being equaled or exceeded in any given year (also called the "100 year flood").

"Basement"

means any area of the building having its floor subgrade (below ground level) on all sides.

"Breakaway walls"

means any type of walls, whether solid or lattice, and whether constructed of concrete, masonry, wood, metal, plastic or any other suitable building material, which is not part of the structural support of the building and which is designed to break away under abnormally high tides or wave action without causing any damage to the structural integrity of the building on which they are used or any buildings to which they might be carried by floodwaters. A breakaway wall shall have a safe design loading resistance of not less than 10 and no more than 20 pounds per square foot. Use of breakaway walls must be certified by a registered engineer or architect and shall meet the following conditions:

(A)

Breakaway wall collapse shall result from a water load less than that which would occur during the base flood; and

(B)

The elevated portion of the building shall not incur any structural damage due to the effects of wind and water loads acting simultaneously in the event of the base flood.

"Development"

means any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations.

"Existing manufactured home park or subdivision"

means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before June 21, 1988.

"Expansion to an existing manufactured home park or subdivision"

means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).

"Flood" or "flooding"

means a general and temporary condition of partial or complete inundation of normally dry land areas from:

(A)

The overflow of floodwaters and/or;

(B)

The unusual and rapid accumulation of runoff or surface waters from any source; and/or

(C)

The collapse or subsidence of land along the shore of a lake or other body of water as a result of erosion or undermining caused by waves or currents of water exceeding anticipated cyclical levels or suddenly caused by an unusually high water level in a natural body of water, accompanied by a severe storm, or by an unanticipated force of nature, such as flash flood or an abnormal tide surge, or by some similarly unusual and unforeseeable event which results in flooding as defined in this section.

"Flood boundary and floodway map"

means the official map on which the Federal Emergency Management Agency or Federal Insurance Administration has delineated both the areas of flood hazard and the floodway.

"Flood insurance rate map (FIRM)"

means the official map on which the Federal Emergency Management Agency or Federal Insurance Administration has delineated both the areas of special flood hazards and the risk premium zones applicable to the community.

"Flood insurance study"

means the official report provided by the Federal Insurance Administration that includes flood profiles, the FIRM, the flood boundary and floodway map, and the water surface elevation of the base flood.

"Floodplain" or "flood-prone area"

means any land area susceptible to being inundated by water from any source (see definition of "flooding").

"Floodplain management"

means the operation of an overall program of corrective and preventive measures for reducing flood damage, including but not limited to emergency preparedness plans, flood control works and floodplain management regulations.

"Floodplain management regulations"

means zoning ordinances, subdivision regulations, Building Codes, health regulations, special purpose ordinances (such as floodplain ordinances, grading ordinances and erosion control ordinances) and other applications of police power. The term describes such state or local regulations in any combination thereof, which provide standards for the purpose of flood damage prevention and reduction.

"Floodproofing"

means any combination of structural and nonstructural additions, changes or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents.

"Floodway"

means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot. Also referred to as "regulatory floodway."

"Functionally dependent use"

means a use which cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities, but does not include long-term storage or related manufacturing facilities.

"Highest adjacent grade"

means the highest natural elevation of the ground surface prior to grading or construction next to the proposed walls of a structure.

"Historic structure"

means any structure that is:

(A)

Listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register;

(B)

Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district;

(C)

Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of Interior; or

(D)

Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either by an approved state program as determined by the Secretary of the Interior or directly by the Secretary of the Interior in states without approved programs.

"Lowest floor"

means the lowest enclosed area (including basement). An unfinished or flood-resistant enclosure, usable solely for parking of vehicles, building access or storage in an area other than a basement area is not considered a building's "lowest floor," provided that such enclosure is not built so as to render the structure in violation of the applicable non-elevation design requirements of this chapter.

"Manufactured home"

means a structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when connected to the required utilities. For floodplain management purposes the term "manufactured home" also includes park trailers, travel trailers and other similar vehicles placed on a site for greater than 180 consecutive days.

"Manufactured home park or subdivision"

means a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for sale or rent.

"Mean sea level"

means, for purposes of the National Flood Insurance Program, the National Geodetic Vertical Datum (NGVD) of 1929 or other datum, to which base flood elevations shown on a community's flood insurance rate map are referenced.

"New construction"

means, for floodplain management purposes, structures for which the "start of construction" commenced on or after the effective date of a floodplain management regulation adopted by this community.

"New manufactured home park or subdivision"

means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after June 21, 1988.

"One hundred year flood"

means a flood which has a 1% annual probability of being equaled or exceeded. It is identical to the "base flood," which will be the term used throughout this chapter.

"Person"

means an individual or his agent, firm, partnership, association or corporation, or agent of the aforementioned groups, or this State or its agencies or political subdivisions.

"Remedy a violation"

means to bring the structure or other development into compliance with State or local floodplain management regulations, or, if this is not possible, to reduce the impacts of its noncompliance. Ways that impacts may be reduced include protecting the structure or other affected development from flood damages, implementing the enforcement provisions of this chapter or otherwise deterring future similar violations, or reducing Federal financial exposure with regard to the structure or other development.

"Riverine"

means relating to, formed by, or resembling a river (including tributaries), stream, brook, etc.

"Special flood hazard area (SFHA)"

means an area having special flood or flood-related erosion hazards, and shown on an FHBM or FIRM as zone A, AO, A1-30, AE, A99 or AH.

"Start of construction"

includes substantial improvement, and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, placement or other improvement was within 180 days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure.

"Structure"

means a walled and roofed building, including a gas or liquid storage tank, that is principally above ground, as well as a manufactured home.

"Substantial damage"

means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before-damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred.

"Substantial improvement"

means any repair, reconstruction or improvement of a structure, the cost of which equals or exceeds 50% of the market value of the structure either:

(A)

Before the improvement or repair is started; or

(B)

If the structure has been damaged, and is being restored, before the damage occurred.

For the purposes of this definition "substantial improvement" is considered to occur when the first alteration of any wall, ceiling, floor or other structural part of the building commences, whether or not that alteration affects the external dimensions of the structure. The term does not, however, include either:

(A) Any project for improvement of a structure to comply with existing State or local health, sanitary or safety code specifications which are solely necessary to assure safe living conditions; or
(B) Any alteration of a structure listed on the National Register of Historic Places or a State inventory of historic places.

"Variance"

means a grant of relief from the requirements of this chapter which permits construction in a manner that would otherwise be prohibited by this chapter.

"Violation"

means the failure of a structure or other development to be fully compliant with the community's floodplain management regulations. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in this chapter is presumed to be in violation until such time as that documentation is provided.

(Ord. 88-13 § 2, eff. 6/21/88; Ord. 2016-05 § 19, eff. 3/2/16; Ord. 2019-10, eff. 1/1/20)

Exceptions & meaning →

Section 9-68.106. Lands to which this chapter applies.

This chapter shall apply to all areas of special flood hazards and areas of mudslide (i.e., mudflow) hazards within the jurisdiction of the City.

(Ord. 88-13 § 2, eff. 6/21/88; Ord. 2019-10, eff. 1/1/20)

Exceptions & meaning →

Section 9-68.107. Basis for establishing the areas of special flood hazard.

The areas of special flood hazard and areas of mudslide (i.e., mudflow) hazards identified by the Federal Insurance Administration in a scientific and engineering report entitled "The Flood Insurance Study for the City of Santa Maria," dated July 15, 1988, with an accompanying flood insurance rate map, and all subsequent amendments and/or revisions, is adopted by reference and declared to be a part of this chapter. The flood insurance study is on file at the City Community Development Department, 110 South Pine, and the Public Works Department, 810 West Church Street, Santa Maria, California, 93458. This flood insurance study is the minimum area of applicability of this chapter and may be supplemented by studies for other areas which allow implementation of this chapter and which are recommended to the City Council by the floodplain administrator.

(Ord. 88-13 § 2, eff. 6/21/88; Ord. 2002-05, eff. 7/18/02; Ord. 2003-02, eff. 3/6/03; Ord. 2016-05 § 20, eff. 3/2/16; Ord. 2019-10, eff. 1/1/20)

Exceptions & meaning →

Section 9-68.108. Compliance.

No structure or land shall be constructed, located, extended, converted or altered after the effective date of the ordinance from which this section derives without full compliance with the terms of this chapter and other applicable regulations. Violations of the provisions of this chapter by failure to so comply with any of its requirements (including violations of conditions and safeguards established in connection with conditions) constitute a misdemeanor. Nothing in this chapter shall prevent the City Council from taking such lawful action as is necessary to prevent or remedy any violation.

(Ord. 88-13 § 2, eff. 6/21/88; Ord. 2019-10, eff. 1/1/20)

Exceptions & meaning →

Section 9-68.109. Abrogation and greater restrictions.

This chapter is not intended to repeal, abrogate or impair any existing easements, covenants or deed restrictions. However, where this chapter and another ordinance, easement, covenant or deed restriction conflict or overlap, whichever imposes the more stringent restrictions shall prevail.

(Ord. 88-13 § 2, eff. 6/21/88; Ord. 2019-10, eff. 1/1/20)

Exceptions & meaning →

Section 9-68.110. Interpretation.

In the interpretation and application of this chapter, all provisions shall be:

(a) Considered as minimum requirements;

(b) Liberally construed in favor of the governing body; and

(c) Deemed neither to limit nor repeal any other powers granted under State statutes.

(Ord. 88-13 § 2, eff. 6/21/88; Ord. 2019-10, eff. 1/1/20)

Exceptions & meaning →

Section 9-68.111. Warning and disclaimer of liability.

The degree of flood protection required by this chapter is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur on rare occasions. Flood heights may be increased by man-made or natural causes. This chapter does not imply that land outside the areas of special flood hazards and areas of mudslide (i.e., mudflow) hazards or uses permitted within such areas will be free from flooding or flood damages. This chapter shall not create liability on the part of the City, any officer or employee of the City, or the Federal Insurance Administration, for any flood damages that result from reliance on this chapter or any administrative decision lawfully made under this chapter.

(Ord. 88-13 § 2, eff. 6/21/88; Ord. 2019-10, eff. 1/1/20)

Exceptions & meaning →

Section 9-68.112. Severability.

This chapter and the various parts thereof are declared to be severable. Should any section of this chapter be declared by the courts to be unconstitutional or invalid, such decision shall not affect the validity of this chapter as a whole, or any portion thereof other than the section so declared to be unconstitutional or invalid.

(Ord. 88-13 § 2, eff. 6/21/88; Ord. 2019-10, eff. 1/1/20)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Santa Maria Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.