§129.0301 Purpose of Electrical Permit Procedures¶
The purpose of these procedures is to establish the process for review of Electrical Permit applications for compliance with the minimum standards necessary to safeguard public health, safety, and welfare. (Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.)
§129.0302 When an Electrical Permit Is Required¶
No electrical wiring, device, appliance, or equipment shall be installed within or on any structure or premises nor shall any alteration, addition, or replacement be made in any existing wiring, device, appliance, or equipment unless an Electrical Permit has been obtained for the work, except as exempted in Section 129.0303. (Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.)
§129.0303 Exemptions from an Electrical Permit¶
An Electrical Permit is not required for the following work:
(a) Minor work such as replacing fuses, replacing or repairing switches, circuit
breakers, lampholders, luminaires, ballasts, or receptacles where the
replacement is the same size and general type as the original equipment and
the work is done in accordance with the provisions of this article;
(b) The replacement of lamps or the connection of portable appliances to suitable
receptacles that have been permanently installed;
(c) Installation, alteration, or repair of wiring, devices, appliances, or equipment
that operates at a voltage not exceeding 25 volts between conductors and not
capable of supplying more than 50 watts of energy;
(d) Installation of remote-control switching devices on privately owned
appliances when the devices are installed by the San Diego Gas and Electric
Company or its authorized agents as part of the Peak-Shift energy
conservation program, provided that specifications for the installations are
approved in writing by the Building Official; or
Ch. Art. Div.
12 9 3 1
San Diego Municipal Code Chapter 12: Land Development Reviews (5-2020)
(e) Work done by employees of the City on City-owned or leased buildings.
(f) Repair or replacement of hardwired appliances such as dishwashers, garbage
disposals, cooking appliances and similar fixed appliances located within
dwelling units shall not impose additional electrical load to the existing circuit
impacted by the work.
(g) Exemption from the permit requirements of the Electrical Regulations does
not authorize any work to be done in any manner in violation of the provisions
of the Electrical Regulations or any other applicable local or state regulations.
(Amended 9-24-2002 by O-19104 N.S.)
(Amended 6-27-2005 by O-19392 N.S.)
(Amended 4-8-2008 by O-19727 N.S; effective 5-8-2008.)
(Amended 7-31-2012 by O-20187 N.S.; effective 8-30-2012.)
(Amended 4-6-2016 by O-20624 N.S.; effective 5-6-2016.)
§129.0305 General Rules for Electrical Permits¶
(a) An Electrical Permit shall be obtained before work is started except in cases where emergency or urgent necessity can be shown to exist, in which case a permit shall be obtained within 24 hours of beginning work, not including Saturdays, Sundays, and holidays.
(b) A separate Electrical Permit is required for each structure that stands alone,
except for garages that are accessory to single-unit residences and located on
the same premises.
(c) Permits for privately owned conduits or other materials in public places and in
and across streets and alleys may be issued only after approval has been
granted for the installation by the City Engineer.
(d) The Building Official may withhold permission to connect electrical service
to any structure until the structure is approved for occupancy.
(Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.)
Ch. Art. Div. 12 9 3 2
San Diego Municipal Code Chapter 12: Land Development Reviews (5-2020)
§129.0306 Qualifications for Obtaining an Electrical Permit¶
An Electrical Permit may be issued only to a person, firm, or corporation that holds a valid California State Contractor’s License that permits electrical installation or to the property owner or lessee. (Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.)
§129.0307 How to Apply for an Electrical Permit¶
(a) An application for an Electrical Permit shall be submitted in accordance with Sections 112.0102 and 129.0105.
(b) Every application shall include the following information:
(1) The location of the work proposed to be installed; and
(2) The amount and kind of work proposed.
(c) Submittal documents including plans, specifications, and schedules are
required to determine whether the installation as described will be in
compliance with the requirements of this article.
(1) Electrical plans are not required for electrical wiring in one and two
family dwellings or townhouses, as defined in the California
Residential Code, and their accessory structures, unless they are
connected to on-site alternative power production.
(2) Electrical plans are not required when the Building Official determines
that the scope of work and compliance with the California Electrical
Code can be verified through an inspection.
(d) The Electrical Permit shall be issued for the work proposed to be installed as
described in the permit application and no deviation from the work proposed
to be installed shall be made without the written approval of the Building
Official.
(e) All submitted plans shall show a single line diagram of service, feeders,
conduit, and wire sizes. Electrical calculations shall accompany all submitted
plans. A signed Certification of Compliance with the California Energy Code,
Title 24, Part 6, shall appear on the plans.
Ch. Art. Div.
12 9 3 3
San Diego Municipal Code Chapter 12: Land Development Reviews (5-2020)
(f) All submitted plans shall be signed as required by Chapter 7, Article 3 of the
California Business and Professions Code.
(Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.)
(Amended 6/27/2005 by O-19392 N.S.)
(Amended 7-31-2012 by O-20187 N.S.; effective 8-30-2012.)
(Amended 4-9-2020 by O-21181 N.S.; effective 5-9-2020.)
§129.0308 Decision Process for an Electrical Permit¶
(a) A decision on an application for an Electrical Permit shall be made by the Building Official in accordance with Process One, except that an appeal hearing shall be provided as described in Section 129.0308(b). The Electrical Permit shall be approved if the Building Official determines that the work described in the permit application and the accompanying plans complies with the requirements of the Electrical Regulations, other applicable laws and ordinances, and any applicable development permit.
(b) An applicant may appeal a Building Official’s denial of an application for an
Electrical Permit for the following by filing an application for a Process Two
appeal hearing:
(1) a small rooftop solar energy system as set forth in Section
141.0418(c); or
(2) an electric vehicle charging station as set forth in Section 141.0419.
(Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.)
(Amended 8-7-2015 by O-20555 N.S.; effective 9-6-2015.)
(Amended 4-5-2016 by O-20634 N.S.; effective 5-5-2016.)
§129.0309 Issuance of an Electrical Permit and Closing of an Electrical Permit Application¶
(a) An Electrical Permit may be issued after all approvals have been obtained and the required fees have been paid.
(b) An Electrical Permit shall not be issued for a development that requires a
development permit until the development permit has been issued.
Ch. Art. Div. 12 9 3 4
San Diego Municipal Code Chapter 12: Land Development Reviews (5-2020)
(c) If one year has elapsed since the date an Electrical Permit application is
deemed complete and the applicant has not requested that an Electrical Permit
be issued, the application file shall be closed. Plans and other data submitted
for review may be returned to the applicant or destroyed by the Building
Official. To reapply, the applicant shall submit a new Electrical Permit
application with required submittal materials and shall be subject to all
applicable fees and regulations in effect on the date the new application is
filed.
(d) The Electrical Permit application file for City projects shall be closed after
two years have elapsed since the date the Electrical Permit application is
deemed complete.
(e) The Building Official may extend an Electrical Permit application one time,
for a period not exceeding 180 calendar days, if the Building Official
determines that circumstances beyond the control of the applicant prevented
issuance of the Electrical Permit.
(Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.)
(Retitled from “Issuance of an Electrical Permit” to “Issuance of an Electrical
Permit and Closing of an Electrical Permit Application” and amended 4-9-2020 by
O-21181 N.S.; effective 5-9-2020.)
§129.0310 Electrical Permit Expiration¶
(a) An Electrical Permit shall expire if substantial work authorized by the permit has not been completed and validated by an inspection within 180 calendar days of the date of permit issuance.
(b) An Electrical Permit shall expire if, after initial utilization of a permit pursuant
to Section 129.0310(a), work authorized by the permit is suspended or the
structure is abandoned for a continuous period of 180 calendar days.
(c) An Electrical Permit shall expire 2 years after the date of permit issuance if the
work authorized by the Electrical Permit has not received final inspection
approval by the permit expiration date.
(d) If the work authorized by the Electrical Permit has not received final
inspection approval by the permit expiration date, all work shall stop until a
new permit is issued.
(e) Any Electrical Permit associated with a Building Permit shall expire
concurrently with the Building Permit.
Ch. Art. Div.
12 9 3 5
San Diego Municipal Code Chapter 12: Land Development Reviews (5-2020)
(f) An expired Electrical Permit may be extended by the Building Official
concurrently with the extension of a Building Permit.
(g) A new Electrical Permit is required to finish any work that was not finished
because of the expiration of the permit; however, unfinished work may be
removed without a permit.
(Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.)
(Amended 7-31-2012 by O-20187 N.S.; effective 8-30-2012.)
(Retitled from “Initial Utilization of an Electrical Permit” to “Electrical Permit
Expiration” and amended 4-6-2016 by O-20624 N.S.; effective 5-6-2016.)
§129.0314 Required Inspections for an Electrical Permit¶
All construction work and equipment authorized by an Electrical Permit shall be inspected by the Building Official in accordance with Section 129.0111. Inspections that may be required are established by the Building Official. (Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.) (Amended 7-31-2012 by O-20187 N.S.; effective 8-30-2012.) (Amended 1-18-2018 by O-20897 N.S.; effective 2-17-2018.)
§129.0315 Electrical Permits for Temporary Installations¶
(a) The Building Official may issue a Temporary Electrical Permit for the following types of temporary electrical installations:
(1) Temporary power during the time construction is in progress;
(2) Temporary power for carnivals, conventions, festivals, fairs, and
similar events. during the time the event is in progress, not to exceed
90 calendar days; and
(3) Temporary power for the testing of any permanent system of wiring
prior to the final approval of that system during the time required for
testing, not to exceed 30 calendar days.
(b) A Temporary Electrical Permit shall be issued only if the Building Official
determines that the safety of life and property will not be jeopardized by the
temporary electrical installation.
Ch. Art. Div. 12 9 3 6
San Diego Municipal Code Chapter 12: Land Development Reviews (5-2020)
(c) All temporary installations shall conform as nearly as practicable with the
requirements of the Electrical Regulations of the San Diego Municipal Code
for permanent installations. Deviations from the Electrical Regulations of the
San Diego Municipal Code may be permitted if the Building Official
determines that the deviations will not cause hazard to life or property.
(d) If the Building Official determines that the electrical installation is a hazard to
life or property, the Building Official may immediately disconnect or order
disconnection of all energy to the electrical installation and initiate
proceedings to rescind or cancel the temporary permit covering the
installation.
(e) Upon expiration of the time designated in the Temporary Electrical Permit,
the Building Official may disconnect or order disconnection of all electrical
energy authorized by the temporary permit.
(Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.)
(Retitled to “Electrical Permits for Temporary Installations” and amended
7-31-2012 by O-20187 N.S.; effective 8-30-2012.)
Ch. Art. Div.
12 9 3 7
San Diego Municipal Code Chapter 12: Land Development Reviews (5-2020)
Article 9: Construction Permits
Continue researching
San Diego sources →San Diego local, state and federal sources. Edit the document title or filters, then run your search.
Get a plain-English answer with a citation back to this text.
Ask AI about this code