Skip to content

Earlier editions: 2026-09

Article II — ADMINISTRATION AND CITY GOVERNMENT

Richmond Municipal Code Ch. 2.34 Fee and Service Charge Revenue/Cost Comparison System

Richmond Municipal Code · 2026-10 edition · updated 2026-10-08 · Richmond

Cite as: Richmond Municipal Code Chapter 2.34 · Text as of 2026-10-08

2.34.010 - Intent.

Pursuant to Article XIIIB of the California Constitution it is the intent of the City Council to require the ascertainment and recovery of costs reasonably borne from fees and charges levied therefor in providing the regulation, products or services hereinafter enumerated in this chapter.

Exceptions & meaning →

2.34.020 - Delegation of authority and direction to City Manager.

The City Manager is hereby delegated the authority and directed to adopt and adjust fees and charges to recover the percentage of costs reasonably borne in providing the regulation, products or services enumerated in this chapter. In adopting and adjusting fees and charges, the City Manager shall act in an administrative and ministerial capacity and shall consider only the standards and criteria established by this chapter.

Exceptions & meaning →

2.34.030 - "Costs reasonably borne" defined.

"Costs reasonably borne," as used in this chapter, shall mean and consist of the following:

(a) All applicable direct costs including, but not limited to salaries, wages, overtime, employee fringe benefits, services and supplies, maintenance and operation expenses, contracted services, special supplies and any other direct expense incurred;

(b) All applicable indirect costs including, but not restricted to, building maintenance and operations, equipment maintenance and operation, communications expenses, computer costs, printing and reproduction, and like expenses when distributed on an accounted and documented rational proration system;

(c) Fixed assets recovery expenses, consisting of depreciation of fixed assets, and additional fixed asset expense recovery charges calculated on the current estimated cost of replacement divided by the approximate life expectancy of the fixed asset. A further additional charge to make up the difference between book value depreciation not previously recovered and reserved in cash and the full cost of replacement, which also shall be calculated and considered a cost so as to recover such unrecovered costs between book value and costs of replacement over the remaining life of the asset;

(d) General overhead, expressed as a percentage, distributing and charging the expenses of the City Council, City Manager, City Clerk, Elections, City Treasurer, Finance Department, City Attorney, unallocated nondepartmental expenses, and all other staff and support service provided to the entire City organization as now organized and as it may be reorganized at any time in the future. Overhead shall be prorated between tax-financed services and fee-financed services on the basis of said percentage so that each of taxes and fees and charges shall proportionately defray such overhead costs;

(e) Departmental overhead, expressed as a percentage, distributing and charging the cost of each department head and his or her supporting expenses as enumerated in subsections (a), (b) and (c) of this section;

(f) Debt service costs, consisting of repayment of principal, payment of interest and trustee fees and administrative expenses for all applicable bond, certificate or securities issues or loans. Any required coverage factors of added reserves beyond basic debt service costs also shall be considered a cost if required by covenant within any securities ordinance, resolution, indenture or general law applicable to the City.

Exceptions & meaning →

2.34.040 - Schedule of fees and service charges.

(a) The City Manager shall review the fees and charges based upon the review schedule set forth below and shall set and adjust the fees or charges so as to recover up to the listed percentage of costs reasonably necessary to provide the listed regulation, products or services. The City Manager shall take such other actions as may be necessary to accomplish and to carry out the policy of the City Council established by this chapter.

City of Richmond

Master Fee Schedule

Fund Ctr./Muni. Code Description of Service Percentage of Costs to be Recovered Review Schedule
Abatement Abatement Abatement Abatement
See Police Department. See Police Department. See Police Department. See Police Department.
Art Center Art Center Art Center Art Center
The Richmond Art Center is a private, nonprofit organization. Their accounts are not included with City funds.
Building Regulations UBC Regulations used to factor fee amounts. RMC 5.12.050 , 5.12.070 , 6.02.180, 6.36.080 and 12.44.220
Permit Fees Permit Fees Permit Fees Permit Fees
Building Permit Fees Building Permit Fees Building Permit Fees Building Permit Fees
Permit filing fees: 100 Annual
COR1/40705 and 10, Reso. 142-86, RMC 6.02.180 One permit — Minimum $10 filing fee 100 Annual
RMC 6.02.180 Two permits — Minimum $15 filing fee 100 Annual
COR1/40705 and 10, Reso. 142-86, RMC 6.02.180 Three or more permits (every permit shall have a $10 filing fee with a $20 minimum on combination permits) 100 Annual
COR1/40705 and 10, Reso. 142-86, RMC 6.02.180 Building permit fee — For any building or structure, $54 minimum 100 Annual
Duplicate permit card 100 Annual
2nd time permit extension 100 Annual
Change of contractor 100 Annual
Third plan checking submittal (response to plan check comments) 100 Annual
Change of address—Min. 2 hrs 100 Annual
Release of record 100 Annual
Expedited plan review fee per hour 100 Annual
Property file retrieval per address 100 Annual
Fax permit per address 100 Annual
Technology fee per permit 100 Annual
Reinspection penalty fee/trip charge — Charged if a job is not ready for inspection at appointed time 100 Annual
COR1/40720, Reso. 142-86, RMC 6.02.180 New construction, for any building or structure where a building permit is issued, use the column which is 12.5% of the "building permit valuation fee," minimum $83.97 100 Annual
COR1/40720, Reso. 142-86, RMC 6.02.180 Other than new construction, contract amount will be the valuation and the fee will be the valuation fee, minimum $54 100 Annual
Plumbing Permit Fees Plumbing Permit Fees Plumbing Permit Fees Plumbing Permit Fees
COR1/40725, Reso. 142-86, RMC 6.02.180 New construction, for any building or structure where a building permit is issued, use the column which is 10% of the building permit valuation fee, minimum fee $83.98 100 Annual
COR1/40725, Reso. 142-86, RMC 6.02.180 Other than new construction, the contract amount will be the valuation and the fee will be the valuation fee, minimum $54 100 Annual
Mechanical Permit Fees Mechanical Permit Fees Mechanical Permit Fees Mechanical Permit Fees
COR1/40760, Reso. 142-86, RMC 6.02.180 New construction, for any building or structure where a building permit is issued, use the column which is 7.5% of the building permit valuation fee, minimum $83.77 100 Annual
COR1/40760, Reso. 142-86, RMC 6.02.180 Other than new construction, the contract amount will be the valuation and the fee will be the valuation fee, minimum $54 100 Annual
Building Plan Checking Fees Building Plan Checking Fees Building Plan Checking Fees Building Plan Checking Fees
COR1/40745, RMC 2.34.040-1, Reso. 142-86, RMC 6.02.180 1- and 2-family dwellings, use the 50% column 100 Annual
COR1/40745, RMC 2.34.040-1, Reso. 142-86, RMC 6.02.180 All other buildings and structures, use the 100% column 100 Annual
PC 1&2 FAM - $500,000—$1,000,000 100 Annual
Engineering Site Plan Review Fee Engineering Site Plan Review Fee Engineering Site Plan Review Fee Engineering Site Plan Review Fee
COR1/40801, RMC 2.34.040-33, Reso. 142-86, RMC 6.02.180 1- and 2-family dwellings, use the 7.5% column 100 Annual
COR1/40801, RMC 2.34.040-33, Reso. 142-86, RMC 6.02.180 All other buildings or structures, use the 15% column 100 Annual
Energy Conservation Site Review (Titled "Energy Conservation Compliance Review" in RMC) 100 Annual
COR1/40802, RMC 2.34.040-9, Reso. 142-86, RMC 6.02.180 1- and 2-family dwellings, use the 12.5% column 100 Annual
COR1/40802, RMC 2.34.040-9, Reso. 142-86, RMC 6.02.180 Other buildings or structures, use the 25% column 100 Annual
Occupancy Certification Program Fee Occupancy Certification Program Fee Occupancy Certification Program Fee Occupancy Certification Program Fee
COR1/40804, Reso. 142-86, RMC 6.02.180 Per unit: 100 Annual
COR1/40804, Reso. 142-86, RMC 6.02.180 Apartment house occupancy 100 Annual
COR1/40804, Reso. 142-86, RMC 6.02.180 1- and 2-family dwellings 100 Annual
COR1/40804, Reso. 142-86, RMC 6.02.180 Business occupancy 100 Annual
COR1/40804, Reso. 142-86, RMC 6.02.180 Other occupancies 100 Annual
COR1/40804, Reso. 142-86, RMC 6.02.180 Marina operating permit 100 Annual
COR1/40804, Reso. 142-86, RMC 6.02.180 Houseboats 100 Annual
COR1/40804, Reso. 142-86, RMC 6.02.180 New construction permits 100 Annual
COR1/40804, Reso. 142-86, RMC 6.02.180 Plus 10% of total permit fees on new construction or remodel permits (permit fees exclude filing, plan checking, and review fees) 100 Annual
Landscape Plan Checking Fee Landscape Plan Checking Fee Landscape Plan Checking Fee Landscape Plan Checking Fee
COR1/41550 (Plan check and inspection: RMC 2.34.040-7), Reso. 142-86, RMC 6.02.180 1- and 2-family dwellings: use the 7.5% column 100 Annual
COR1/41550 (Plan check and inspection: RMC 2.34.040-7), Reso. 142-86, RMC 6.02.180 Other dwellings: use the 15% column 100 Annual
COR1/40755, Reso. 142-86, RMC 6.02.180 Demolition permits — Varies based on construction costs 100 Annual
COR1/40715, RMC 15.06.040-A3, Reso. 142-86, RMC 6.02.180 Sign permits (also see planning) 100 Annual
Moving of Buildings or Structures Code (a.k.a. House Moving Permits) 100 Annual
COR1/40735, RMC 6.08.030-B/C, RMC 6.02.180 Permit fee 100 Annual
COR1/40735, Reso. 142-86, RMC 6.08.030C Permit fee 100 Annual
RMC 6.08.030-G and RMC 6.08.120 and RMC 10.08.100 , Reso. 142-86, RMC 6.02.180 Permit to trim, move, or replace any structures (including poles, trees, etc.) belonging to the City 100 Annual
COR1/40735, Reso. 142-86, RMC 6.08.030-G Permit fee to trim, move, or replace any structures (including poles, trees, etc.) belonging to the City 100 Annual
COR1/40735, RMC 6.08.090-A, RMC 6.08.030-E, RMC 6.02.180 Owner's bond equal to building official's cost plus 10% 100 Annual
RMC 12.20.020 , RMC 12.20.010.17b, RMC 6.02.180 Richmond municipal sewer district/sanitary sewer connection fee — Per "service unit," $990 minimum plus all other charges for permits and inspections required by other City ordinances 100 Annual
RMC 12.20.020 , RMC 12.20.010.17b, RMC 6.02.180 Residential — A dwelling is one "service unit" 100 Annual
RMC 12.20.020 , RMC 12.20.010.17b, RMC 6.02.180 Commercial/industrial — 5 fixture count equals one "service unit." Charge is $990 per service unit or fraction thereof 100 Annual
COR1/41515, RMC 12.28.130 , RMC 6.02.180 Digging up and disturbance of roadways, etc.,/street excavation bond, refundable 100 Annual
COR1/40740, RMC 12.08.050 , RMC 6.02.180 Water course permits — Fee plus 5% of construction cost within the public right-of-way 100 Annual
Full Cost Recovery Hourly Rates Full Cost Recovery Hourly Rates Full Cost Recovery Hourly Rates Full Cost Recovery Hourly Rates
Building inspector 100 Annual
Permit technician 100 Annual
Admin./clerical 100 Annual
Developer Fees Developer Fees Developer Fees Developer Fees
RMC 12.64.060 , RMC 15.08.040 Public Facility Impact Fees
The fees pay for major infrastructure improvements in each area required as a result of new development (off-site roads, traffic signals, fire, and police facilities, and park and recreation facilities).
RMC 6.02.180 Residential, single-family (DU). $5,359.01 allocated as follows: 100 Annual
RMC 15.08.400-2, RMC 15.08.400-8, RMC 6.02.180 Park/open space — $3,926.11 100 Annual
RMC 6.02.180 Community/aquatic centers — $942.01 100 Annual
RMC 6.02.180 Police facilities — $221.98 100 Annual
RMC 6.02.180 Fire facilities — $268.91 100 Annual
Residential, multifamily (DU) — $4,217.95 allocated as follows: 100 Annual
RMC 6.02.180 Park/open space — $3,225.02 100 Annual
RMC 6.02.180 Community/aquatic centers — $773.80 100 Annual
RMC 6.02.180 Police facilities — $118.29 100 Annual
RMC 6.02.180 Fire facilities — $100.84 100 Annual
Commercial, office (AC), per 1,000 sq. ft. — $3,468.97 allocated as follows: 100 Annual
RMC 6.02.180 Park/open space — $0 100 Annual
RMC 6.02.180 Community/aquatic centers — $0 100 Annual
RMC 6.02.180 Police facilities — $1,855.52 100 Annual
RMC 6.02.180 Fire facilities — $1,613.44 100 Annual
Commercial, office industrial (AC), per 1,000 sq. ft. — $2,593.40 allocated as follows: 100 Annual
RMC 6.02.180 Park/open space — $0 100 Annual
RMC 6.02.180 Community/aquatic centers — $0 100 Annual
RMC 6.02.180 Police facilities — $979.96 100 Annual
RMC 6.02.180 Fire facilities — $1,613.44 100 Annual
Brickyard Cove Developer Fees (for streets)
COR1/10747, RMC 15.04.520, RMC 6.02.180 Single-family residential (per residential unit) 100 Annual
COR1/10747, RMC 15.04.520, RMC 6.02.180 Multifamily residential (per residential unit) 100 Annual
COR1/10747, RMC 15.04.520, RMC 6.02.180 Commercial (per sq. ft. of bldg. area) 100 Annual
COR1/10747, RMC 15.04.520, RMC 6.02.180 Industrial (per sq. ft. of bldg. area) 100 Annual
El Sobrante Developer Fees (for streets)
COR1/10749, RMC 6.02.180 Single-family residential (per residential unit) 100 Annual
COR1/10749, RMC 6.02.180 Multifamily residential (per residential unit) 100 Annual
COR1/10749, RMC 6.02.180 Commercial (per sq. ft. of bldg. area) 100 Annual
COR1/10749, RMC 6.02.180 Industrial (per sq. ft. of bldg. area) 100 Annual
Hilltop/Pt. Pinole Developer Fees (for streets)
COR1/10748, RMC 6.02.180 Single-family residential (per residential unit) 100 Annual
COR1/10748, RMC 6.02.180 Multifamily residential (per residential unit) 100 Annual
COR1/10748, RMC 6.02.180 Commercial (per sq. ft. of bldg. area) 100 Annual
COR1/10748, RMC 6.02.180 Industrial (per sq. ft. of bldg. area) 100 Annual
RMC 6.02.180 County's Drainage Area No. 73 (El Sobrante Valley) — Varies based on lot size 100 Annual
RMC 6.02.180 Park dedication fees 100 Annual
RMC 6.02.180 Point Richmond parking district fee — Applies to the Point Richmond downtown commercial area (public works) — Varies based on numerous factors 100 Annual
RMC 6.02.180 Tisconia Estates fees (Pt. Richmond area) 100 Annual
RMC 6.02.180 Subregional Transportation Mitigation Program 100 Annual
RMC 6.02.180 STMP — The County sets this fee. We act as a pass-through agent (the City retains no portion of the fee) 100 Annual
RMC 15.12.050 , RMC 6.02.180 SF residential, per DU 100 Annual
RMC 15.12.050 , RMC 6.02.180 Multifamily residential, per DU 100 Annual
RMC 15.12.050 , RMC 6.02.180 Commercial office, industrial, retail, per sq. ft. 100 Annual
RMC 15.12.050 , RMC 6.02.180 Other — Per trip 100 Annual
RMC 2.34.040-37, RMC 15.08.220-9, RMC 15.08.310-7, RMC 6.02.180,E.O.90-037 Final parcel map review 100 Annual
RMC 2.34.040-37, RMC 15.08.220-9, RMC 15.08.310-7, RMC 6.02.180, E.O.90-038 Final subdivision map review — $500 + $10/lot 100 Annual
RMC 6.02.180,E.O.90-038 Per lot 100 Annual
Miscellaneous Miscellaneous Miscellaneous Miscellaneous
RMC 2.34.040-39, RMC 15.08.480-5, RMC 6.02.180,E.O.90-039 Improvement plan check — $400 + $10/lot 100 Annual
RMC 6.02.180,E.O.90-039 Per lot 100 Annual
Residential Dwelling Unit Inspection Residential Dwelling Unit Inspection Residential Dwelling Unit Inspection Residential Dwelling Unit Inspection
Non-Owner Occupied Residential Inspection
RMC 6.40.170-1, RMC 2.34.040-42c, RMC 6.02.180, Reso. 142-86 Registration fee (non-owner-occupancy program rental properties) 100 Annual
RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Reso. 142-86 Initial inspection fee — Per unit 100 Annual
RMC 6.40.170-3, RMC 6.02.180, Reso. 142-86 Reinspection fee — Per unit 100 Annual
RMC 6.40.170-4, RMC 6.02.180, Reso. 142-86 2nd reinspection fee — Per unit 100 Annual
COR1/40901, RMC 6.02.180 Miscellaneous penalty fees — Penalties charged for working without a permit, the penalty is double the amount of the fee 100 Annual
COR1/40904, RMC 6.02.180 Quarterly fees (C.I.P.) 100 Annual
Code Compliance Inspection Fees Code Compliance Inspection Fees Code Compliance Inspection Fees Code Compliance Inspection Fees
1-2 units,½ hour, plus $10 admin. fee and filing fee 100 Annual
3-4 units, 1 hour, plus $10 admin. fee and filing fee 100 Annual
5-6 units, 1-½ hours, plus $10 admin. fee and filing fee 100 Annual
7-up, 2 hours, plus $10 admin. fee and filing fee 100 Annual
COR1/40750 (Review and inspection: RMC 2.34.040-5 and 6), RMC 12.44.030-j, Reso. 142-86, UBC Sec. 70, RMC 6.02.180, E.O.90-005, E.O.90-006 Grading permits/excavation, grading, and earthwork construction — $200 filing fee plus plan review fee 100 Annual
RMC 12.44.030-kIB, Reso. 142-86, RMC 6.02.180 Excavation, grading, and earthwork construction deposit 100 Annual
RMC 12.52.060 Alquist Priolo Geological Study filing fee — Cost (staff time billed at approximately $80—$100/hour and consultant time charged at actual cost) 100 Annual
COR1/40820, RMC 2.34.040-12, RMC 6.02.180 Encroachment review — Private (see engineering for public right-of-way encroachment permit) 100 Annual
Plan retrieval 100 Annual
Reprint job card 100 Annual
Comprehensive Planning Fee (CPF) Comprehensive Planning Fee (CPF) Comprehensive Planning Fee (CPF) Comprehensive Planning Fee (CPF)
Levied 0.1769% for maintenance of General Plan, Specific Plans, Zoning Ordinance, and other adopted plans and policies required to make necessary findings and determinations regarding land uses 100 Until amended by City Council
Work Done Without Permits Work Done Without Permits Work Done Without Permits Work Done Without Permits
Ord. 17-20, RMC 6.38.110 , RMC 13.45 Investigation fee for work done without permits — 3 times permit fees (in addition to the permit fee) 100 As Needed
Building regulations uses the Uniform Building Code (UBC) valuation schedules.
**** These developer fees are being analyzed by an outside consultant, and proposed increases will be presented to Council at a later date.
Business License A combination of fees may be charged.
COR1/40605, RMC 7.04.030, Ord. 8-03, RMC 13.45 Basic rate — For each business (each location), annually 100 Annual
RMC 7.04.115.a, Ord. 8-03, RMC 13.45 Part-time business (generates more than $600 but less than $1,000) — Per fiscal year, annually 100 Annual
RMC 7.04.115.a, Ord. 8-03, RMC 13.45 Part-time business (generates more than $600 but less than $1,000) — Per fiscal year, semiannually 100 Annual
COR1/40605, RMC 7.04.200 , Ord. 8-03, RMC 13.45 Duplicate (copy) of lost business license 100 Annual
COR1/40605, RMC 7.04.030, Ord. 8-03, RMC 13.45 Additional amount per employee, for 1 to 25 employees, annually 100 Annual
COR1/40605, RMC 7.04.030, Ord. 8-03, RMC 13.45 Additional amount per each employee, 25+ employees, annually 100 Annual
COR1/40605, RMC 7.04.130 , Ord. 8-03, RMC 13.45 Amusements (skating rink, boxing exhibition, etc.) — Per ticket, annually 100 Annual
COR1/40605, RMC 7.04.060, Ord. 8-03, RMC 13.45 Arcade 100 Annual
COR1/40605, RMC 7.04.070, Ord. 8-03, RMC 13.45 Auction — Application fee 100 Annual
COR1/40605, RMC 7.04.070, Ord. 8-03, RMC 13.45 Auctioneer — Daily 100 Annual
COR1/40605, RMC 7.04.080, Ord. 8-03, RMC 13.45 Bowling alley — Annual license fee if $20,000 or less of gross receipts 100 Annual
COR1/40605, RMC 7.04.080, Ord. 8-03 For each $1,000 or fraction thereof over $20,000 100 Annual
COR1/40605, RMC 7.04.050, Ord. 8-03, RMC 13.45 Carnival — Daily 100 Annual
COR1/40605, RMC 7.04.050, Ord. 8-03, RMC 13.45 Circus — Daily 100 Annual
COR1/40605, RMC 7.04.032, Ord. 8-03, RMC 13.45 Child care home — In which 7 or more children receive in-home care, annually, plus per child fee 100 Annual
COR1/40605, RMC 7.04.032, Ord. 8-03, RMC 13.45 Child care home per child fee — Per child, annually 100 Annual
COR1/40605, RMC 7.24.100 , Ord. 8-03, RMC 13.45 Close-out sale — Application fee (for 30 days) 100 Annual
COR1/40605, RMC 7.04.260 , Ord. 8-03, RMC 13.45 Contractor/subcontractor (out of city) and businesses without a fixed place of business in the City of Richmond, quarterly, plus amount for additional employees (see below) 100 Annual
COR1/40605, RMC 7.04.030, Ord. 8-03, RMC 13.45 Additional amounts per quarter, per employee who will be working on the job at any time in the City of Richmond, up to 25 100 Annual
COR1/40605, RMC 7.04.030, Ord. 8-03, RMC 13.45 Additional amount for each employee, over 25, quarterly 100 Annual
COR1/40605, RMC 7.04.050, Ord. 8-03, RMC 13.45 Hawker — Daily, if article sold is not a patent or other medicine 100 Annual
COR1/40605, RMC 7.04.050, Ord. 8-03, RMC 13.45 Hawker — Daily, patent or other medicine 100 Annual
COR1/40605, RMC 7.04.125, Ord. 8-03, RMC 13.45 Hazardous waste facilities — Fee shall not exceed ten percent of facility's annual gross receipts, quarterly 100 Annual
COR1/40605, RMC 7.04.050, Ord. 8-03, RMC 13.45 Itinerant show — Daily 100 Annual
COR1/40605, RMC 7.04.090, Ord. 8-03, RMC 13.45 Juke box — Payable annually or semiannually, per machine, per year 100 Annual
COR1/40605, RMC 7.28.030.b, Ord. 8-03, RMC 13.45 , RMC 7.04.137 Junkyard application fee (in addition to basic fee schedule) 100 Annual
COR1/40605, RMC 7.04.090, Ord. 8-03, RMC 13.45 Mechanical musical instruments — $18/semiannually or 100 Annual
COR1/40605, RMC 7.04.090, Ord. 8-03, RMC 13.45 Mechanical musical instruments — $36 annually, per instrument 100 Annual
RMC 11.56.040.b/c, Ord. 8-03, RMC 13.45 , RMC 7.04.065 Mechanical or electronic amusement device police permit — One calendar year (prorated for calendar quarters), per device (plus conditional use permit paid to Planning Department) 100 Annual
COR1/40605, RMC 7.76.040 , Ord. 8-03, RMC 7.04.138, RMC 13.45 Mobilehome park — Per mobilehome lot, annually 100 Annual
Motion picture theater — Based on gross receipts, annually: 100 Annual
COR1/40605, RMC 7.04.040, Ord. 8-03, RMC 13.45 Up to $20,000 annually 100 Annual
COR1/40605, RMC 7.04.040, Ord. 8-03 >$20,000 annually, add $3 for each $1,000 or fraction thereof over $20,000 100 Annual
COR1/40605, RMC 7.04.135.a, Ord. 8-03, RMC 13.45 Oil drilling — Daily 100 Annual
COR1/40605, RMC 7.04.135.c, Ord. 8-03, RMC 13.45 Oil production/per barrel of oil produced (paid monthly within fifteen days after close of calendar month) 100 Annual
COR1/40605, Ord. 8-03, RMC 7.04.135.b, RMC 13.45 Oil production — First year, per well 100 Annual
COR1/40605, Ord. 8-03, RMC 7.04.135.b, RMC 13.45 Oil production — Each year thereafter, per well 100 Annual
COR1/40605, RMC 7.04.100 , RMC 7.40.020-c, Ord. 8-03, RMC 13.45 Peddler/solicitor — 6-month business license (plus police permit) 100 Annual
COR1/40605, RMC 7.04.100 , Ord. 8-03, RMC 7.40.020-c, RMC 13.45 Peddler/solicitor — 1-year business license (plus police permit) 100 Annual
COR1/40605, RMC 7.40.040 /7.40.042 Peddler/solicitor — Bond 100 Annual
COR1/40605, RMC 7.04.210 , RMC 13.45 , Ord. 8-03 Peddler/solicitor location change amendment fee 100 Annual
COR1/40605, RMC 7.04.210 , RMC 13.45 , Ord. 8-03 Peddler/solicitor transfer fee 100 Annual
Ord. 8-03, RMC 7.04.105, RMC 13.45 , RMC 7.40.030 Peddlers and solicitors police permit (plus business license permit) 100 Annual
Ord. 8-03, RMC 7.04.105, RMC 13.45 , RMC 7.40.030.d Peddlers and solicitors police permit renewal (plus business license permit) 100 Annual
COR1/40605, RMC 7.04.110 , Ord. 8-03, RMC 13.45 Photographs, enlargements, frames, coupons, and orders for taking photographs — Semiannual 100 Annual
COR1/40605, RMC 7.04.110 , Ord. 8-03, RMC 13.45 Photographs, enlargements, frames, coupons, and orders for taking photographs — Per day 100 Annual
COR1/40605, RMC 7.04.080, Ord. 8-03, RMC 13.45 Pool or billiard room — Per table, annually 100 Annual
COR1/40605, RMC 7.04.051, Ord. 8-03, RMC 13.45 Racing forms application fee (vendor) 100 Annual
COR1/40605, RMC 7.04.051, Ord. 8-03, RMC 13.45 Racing forms (vendor) — Quarterly 100 Annual
COR1/40605, RMC 7.04.050, Ord. 8-03, RMC 13.45 Rodeo — Daily 100 Annual
COR1/40605, RMC 7.04.060, Ord. 8-03, RMC 13.45 Shooting gallery — Annually 100 Annual
COR1/40605, RMC 7.04.120 , Ord. 8-03, RMC 13.45 Taxicab — Per cab 100 Annual
COR1/40605, RMC 7.04.092, Ord. 8-03, RMC 13.45 Weight scales — Per scale, annually 100 Annual
Delinquency (late) fee (business license renewal)
COR1/40605, RMC 7.04.290, Ord. 8-03 Days 1-30 100 Annual
COR1/40605, RMC 7.04.290, Ord. 8-03 Days 31-60 100 Annual
COR1/40605, RMC 7.04.290, Ord. 8-03 Over 60 days 100 Annual
Cable Cable Cable Cable
RMC 7.94.042-7 Telecommunications registration and review fee 100 Annual
Videotapes — Charged at cost for time and materials. Average approximate cost begins at $25.00 for one tape, $40.00 for two tapes (same footage) (materials and man hours) 100 Annual
Cannabis Cannabis Cannabis Cannabis
Cannabis Fees Cannabis Fees Cannabis Fees Cannabis Fees
Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 Application completeness review — $1,019.00 per application 100 As Needed
Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 Conditional use permit — $12,611.00 per application 100 As Needed
Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 Cannabis business permit — $4,262.00 per application 100 As Needed
Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 Retail storefront — $3,365.00 per permit 100 Annually
Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 Retail delivery — $3,365.00 per permit 100 Annually
Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 Distribution — $3,365.00 per permit 100 Annually
Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 Manufacturing — $3,587.00 per permit 100 Annually
Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 Specialty/cottage cultivation — $3,365.00 per permit 100 Annually
Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 Small cultivation — $3,587.00 per permit 100 Annually
Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 Medium cultivation — $3,809.00 per permit 100 Annually
Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 Large cultivation — $4,030.00 per permit 100 Annually
Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 Nursery cultivation — $3,365.00 per permit 100 Annually
Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 Processor cultivation — $3,365.00 per permit 100 Annually
Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 Testing — $3,365.00 per permit 100 Annually
Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 Reinspection fee — $1,463.00 per inspection 100 As Needed
City Attorney City Attorney City Attorney City Attorney
COR1/40907, RMC 2.40.110 , RMC 2.34.040.32d Photocopying, per page (8½″ × 11″) 100 Annual
Departmental and project legal support services 100 Annual
City Clerk City Clerk City Clerk City Clerk
RMC 2.34.040.32a, Ord. 2-03, E.O. 03-03 Appeal Filing Fees — Appeal a decision to a City Board 100 Annual
COR1/40907, RMC 2.40.110 , RMC 2.34.040.32d Photocopying, per page (8½″ × 11″) 100 Annual
RMC 1.04.070 Richmond Municipal Code full copy 100 Annual
RMC 1.04.070 Richmond Municipal Code supplements 100 Annual
City Manager City Manager City Manager City Manager
COR1/40907, RMC 2.40.110 , RMC 2.34.040.32d Photocopying, per page (8½″ × 11″) 100 Annual
Special event permit application 100 Annual
Community and Economic Development Community and Economic Development Community and Economic Development Community and Economic Development
RMC 13.55.080 Economic development fees — Application, commitment, financing, etc. (negotiated at estimated or actual cost) 100 Annual
RMC 13.55.100 Rents, payments, fees, charges, and interest 100 Annual
RMC 6.02.180 In lieu fees — Per noninclusionary units (unit is a dwelling or multifamily unit) 100 Annual
Richmond Community Development Department
Housing Division Fees/Portfolio Management
Subordination Processing Fee Subordination Processing Fee Subordination Processing Fee Subordination Processing Fee
RMC 6.40.170-1, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 Single Family/Condo/Townhouse 100% As Needed
RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 Multi-Family (Developer) Property less than 10 years old 100% As Needed
RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 Multi-Family (Developer) Property 10+ years old 100% As Needed
RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 Redraw Fee (Revisions) Single Family/Condo/Townhouse 100% As Needed
RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 Redraw Fee (revisions) Multi-Family (Developer) 100% As Needed
Demand Statement Demand Statement Demand Statement Demand Statement
RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 Demand Statement 100% As Needed
Re-conveyance Fee Re-conveyance Fee Re-conveyance Fee Re-conveyance Fee
RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 Property less than 10 years old 100% As Needed
RMC 6.02.180; RMC 2.34.040 , Ord. 3-04 Property 10+ years old 100% As Needed
Recording Fee Recording Fee Recording Fee Recording Fee
RMC 6.02.180; RMC 2.34.040 , Ord. 3-04 Recording Fee per property 100% As Needed
Notary Fee Notary Fee Notary Fee Notary Fee
RMC 2.34.040 , Ord. 3-04 Notary Fee per property 100% As Needed
Marina Shores Property Management Subordination Processing Fee
RMC 6.40.170-1, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 Single Family/Condo/Townhouse 100% As Needed
RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 Redraw Fee (Revisions) Single Family/Condo/Townhouse 100% As Needed
Demand Statement Demand Statement Demand Statement Demand Statement
RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 Demand Statement 100% As Needed
Re-conveyance Fee Re-conveyance Fee Re-conveyance Fee Re-conveyance Fee
RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 Property less than 10 years old 100% As Needed
RMC 6.02.180; RMC 2.34.040 , Ord. 3-04 Property 10+ years old 100% As Needed
Other Fees Other Fees Other Fees Other Fees
Fees by external department/agencies 100% As Needed
Legal Review Fees 100% As Needed
Employment and Training Employment and Training Employment and Training Employment and Training
Voucher Program Voucher Program Voucher Program Voucher Program
1700 EZ hiring tax credit voucher — Per voucher/verification, charged to receiving company 100 Annual
1700 EZ hiring tax credit voucher — Per voucher/verification, charged to Richmond Chamber of Commerce and Council of Industries members 100 Annual
1700 EZ hiring tax credit voucher expediting fee 100 Annual
1700 EZ hiring tax credit voucher look-up fee 100 Annual
Engineering Engineering Engineering Engineering
COR1/47035, RMC 2.34.040.123a, Ord. 21-03 Sale of plans and specifications for construction jobs — From $10—$55 (cost for printing and mailing) 100 Annual
COR1/41505, RMC 12.04.120 , RMC 12.04.130 , RMC 12.48.090j, RMC 2.34.040.12c, Ord. 21-03 Fees for work performed by City Engineer — Includes work performed under the provisions of the Improvement Acts of the State of California governing streets, avenues, etc.; cost of City employee time (Utility cut inspections, etc.) and overhead 100 Annual
Section 1 - Encroachment Permits Section 1 - Encroachment Permits Section 1 - Encroachment Permits Section 1 - Encroachment Permits
COR1/40820, RMC 2.34.040.12a, Ord. 21-03, E.O. 90-012 Encroachment agreement — Public right-of-way (see building regulations for private encroachment agreement) 100 Annual
COR1/40820, RMC 12.28.130 , RMC 2.34.040.12b, Ord. 21-03 Encroachment permit/digging up and disturbance of roadways, etc./maintenance and construction of sidewalks, driveways, curbs, and gutters — Includes up to 2 hours field time, additional expenses and field time over 2 hours will be charged at cost 100 Annual
Sidewalk Dining Sidewalk Dining Sidewalk Dining Sidewalk Dining
Encroachment permit application review for outdoor service on public sidewalks, minimum non-refundable 100 Annual
New encroachment permit for outdoor service on public sidewalks (first year, annual fee) 100 Annual
- plus additional fees for in-ground improvements within the public ROW (0—100 SF) 100 Annual
- plus in-ground improvements for square footage thereafter (over 100 SF) 100 Annual
Renew Encroachment Permit for outdoor service on public sidewalks (annual fee) 100 Annual
- plus additional fees for in-ground improvements within the public ROW (0—100 SF) 100 Annual
- plus in-ground improvements for square footage thereafter (over 100 SF) 100 Annual
Section 2 - Transportation Permits Section 2 - Transportation Permits Section 2 - Transportation Permits Section 2 - Transportation Permits
COR1/40819, RMC 2.34.040.8 Oversized load (transportation permit/wide-load permit) 100 Annual
Annual permit — Per vehicle (transportation permit/wide-load permit) 100 Annual
Section 6 - Other Engineering Permits Section 6 - Other Engineering Permits Section 6 - Other Engineering Permits Section 6 - Other Engineering Permits
Traffic control plan review 100 Annual
Curb painting and handicap parking requests—Review to determine allowance of handicap, restricted/limited parking, etc. 100 Annual
Letter of map revision/amendment 100 Annual
Easement dedication (utility) 100 Annual
Consultant services 100 Annual
Section 7 - Review of Planning Application
Initial engineering review 100 Annual
Street vacation 100 Annual
Section 8 - Hourly Rates Section 8 - Hourly Rates Section 8 - Hourly Rates Section 8 - Hourly Rates
Fees for work performed by city staff — Includes work performed in excess of the standard fees listed or for services not otherwise listed.
City Engineer 100 Annual
Capital Projects Manager 100 Annual
Senior Civil Engineer 100 Annual
Associate Civil Engineer 100 Annual
Engineer II 100% Annual
Engineer I 100% Annual
Engineer Asset Administrator 100% Annual
Construction Inspector II 100 Annual
Construction Inspector I 100 Annual
Maintenance of Construction of Sidewalks
COR1/40730, RMC 12.36.060 , RMC 12.36.170-a, RMC 2.34.040.40a(1), Ord. 21-03 Permit, $75 plus amount per sq. ft. (see below) 100 Annual
COR1/40730, RMC 12.36.170-b, RMC 2.34.040.40a(2), Ord. 21-03 Per sq. ft. (in addition to permit) 100 Annual
RMC 12.28.180 Resurfacing — Cost, plus 25% 100 Annual
Section 9 - Fees for Duplication Section 9 - Fees for Duplication Section 9 - Fees for Duplication Section 9 - Fees for Duplication
Fees for Duplication Fees for Duplication Fees for Duplication Fees for Duplication
COR1/47035, RMC 2.34.040.123b, Ord. 21-03, RMC 2.40.110 Regular and legal size, per page 100 Annual
COR1/47035, RMC 2.34.040.123d, Ord. 21-03 Plan size, per page 100 Annual
Plotting — Refer to GIS fees for custom maps and predefined maps 100 Annual
Digital imaging fee — Parcel map, tract map or improvement plans, plus 100 Annual
Per sheet to be imaged 100 Annual
Miscellaneous Fees Miscellaneous Fees Miscellaneous Fees Miscellaneous Fees
RMC 2.34.040.123b, Ord. 21-03, RMC 2.40.110 Bike plan check—Per hour 100 As Needed
Finance Finance Finance Finance
RMC 1.12.010 , Ord. 16-84 N.S., RMC 2.34.040-121 Charges for bad checks/returned check processing 100 Annual
Mitigation Fee 100 Annual
RMC 2.34.040.123 Copy of financial statement, each 100 Annual
RMC 2.34.040.123 Copy of budget book, each 100 Annual
Credit Card Fees Credit Card Fees Credit Card Fees Credit Card Fees
Ord. 17-20, RMC 13.45 2% Processing fee for all credit card payments 100 As Needed
Business Tax Division Business Tax Division Business Tax Division Business Tax Division
New Business Registration Fee 100% As Needed
Fire Department RMC 8.16.040 Revises Section 103.2.1.1.1 of UFC to allow the City to collect fees solely to defray actual cost. Multiple fees may apply to one project.
Occupancies Occupancies Occupancies Occupancies
Pre-Inspection Fees (Group R2 Occupancies)
Residential occupancies:
HSC 13235(a) <=25 100 Annual
HSC 13235(a) >25 100 Annual
Assembly Occupancies Assembly Occupancies Assembly Occupancies Assembly Occupancies
With stage:
COR/40905, UFC Art. 1 , RMC 2.34.040.59a(1), Ord. 21-03, E.O. 94-59 1,000 or more occupant load** 100 Annual
COR/40905, UFC Art. 1 , RMC 2.34.040.59a(2), Ord. 21-03, E.O. 94-59 Less than 1,000 occupant load** 100 Annual
Without stage:
COR/40905, UFC Art. 1 , RMC 2.34.040.59a(3), Ord. 21-03, E.O. 94-59 300 or more occupant load** 100 Annual
COR/40905, UFC Art. 1 , RMC 2.34.040.59a(4), Ord. 21-03, E.O. 94-59 Without stage, 201-299 occupant load** 100 Annual
COR/40905, UFC Art. 1 , RMC 2.34.040.59a(5), Ord. 21-03, E.O. 94-59 Without stage, 101-200 occupant load** 100 Annual
COR/40905, UFC Art. 1 , RMC 2.34.040.59a(6), Ord. 21-03, E.O. 94-59 Without stage, 50-100 occupant load** 100 Annual
COR/40905, UFC Art. 1 , RMC 2.34.040.59a(7), Ord. 21-03, E.O. 94-59 Stadiums, grandstands, reviewing stands** 100 Annual
Business Establishments with Moderate Hazards
COR1/40909, UFC Art. 1 , RMC 2.34.040.58a(1), Ord. 21-03, E.O. 94-58 Repair garage, without flame or flammable liquids** 100 Annual
COR1/40909, RMC 8.16.050 , RMC 2.34.040.58a(2), Ord. 21-03, E.O. 94-58 Service station, including marine and private stations** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58a(3), Ord. 21-03, E.O. 94-58 Automotive wrecking yard** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58a(4), Ord. 21-03, E.O. 94-58 Junk yard, waste material, scrap** 100 Annual
COR1/40909, RMC 8.16.050 , RMC 2.34.040.58a(5), Ord. 21-03, E.O. 94-58 Clinic, where fire clearance required for licensing** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58a(6), Ord. 21-03, E.O. 94-58 Lumber yard, in excess of 100,000 board feet** 100 Annual
COR1/40909, RMC 8.16.050 , RMC 2.34.040.58a(7), Ord. 21-03, E.O. 94-58 Printing plant or shop** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58a(8), Ord. 21-03, E.O. 94-58 Waste material handling plant** 100 Annual
Protective Social Care (Group) Homes — Ages 18—64 (a.k.a. Group Homes)
Nonambulatory:
COR/40905, HSC 13146.2(b), RMC 2.34.040.59b(1), Ord. 21-03, E.O. 94-59 40 or more occupants** 100 Annual
COR/40905, HSC 13146.2(b), RMC 2.34.040.59b(2), Ord. 21-03, E.O. 94-59 13-39 occupants** 100 Annual
COR/40905, HSC 13146.2(b), RMC 2.34.040.59b(3), Ord. 21-03, E.O. 94-59 7-12 occupants** 100 Annual
COR/40905, HSC 1566.2, RMC 2.34.040.59b(4), Ord. 21-03, E.O. 94-59 1-6 occupants** 100 Annual
Ambulatory:
COR/40905, HSC 13146.2(b), RMC 2.34.040.59b(5), Ord. 21-03, E.O. 94-59 40 or more occupants** 100 Annual
COR/40905, HSC 13146.2(b), RMC 2.34.040.59b(6), Ord. 21-03, E.O. 94-59 13—39 occupants** 100 Annual
COR/40905, HSC 13146.2(b), RMC 2.34.040.59b(7), Ord. 21-03, E.O. 94-59 7—12 occupants** 100 Annual
COR/40905, HSC 1566.2, RMC 2.34.040.59b(8), Ord. 21-03, E.O. 94-59 1—6 occupants** 100 Annual
Educational Facilities, Privately-Owned Educational Facilities, Privately-Owned Educational Facilities, Privately-Owned Educational Facilities, Privately-Owned
Private school:
COR/40905, HSC 13146.2(b), RMC 2.34.040.59c(1), Ord. 21-03, E.O. 94-59 Grades 1-12, 50 or more students** 100 Annual
COR/40905, HSC 13146.2(b), RMC 2.34.040.59c(2), Ord. 21-03, E.O. 94-59 Private school, Grades 1-12, 1-49 students** 100 Annual
Private day care:
COR/40905, HSC 13146.2(b), RMC 2.34.040.59c(3), Ord. 21-03, E.O. 94-59 50 or more children** 100 Annual
COR/40905, HSC 13146.2(b), RMC 2.34.040.59c(4), Ord. 21-03, E.O. 94-59 15-49 children** 100 Annual
COR/40905, HSC 13146.2(b), RMC 2.34.040.59c(5), Ord. 21-03, E.O. 94-59 8-14 children** 100 Annual
COR/40905, HSC 13146.2(b), RMC 2.34.040.59c(6), Ord. 21-03, E.O. 94-59 State preschool, 13-49 children** 100 Annual
Adult day care facility:
COR/40905, HSC 13146.2(b), RMC 2.34.040.59d(1), Ord. 21-03, E.O. 94-59 50 + occupants 100 Annual
COR/40905, HSC 13146.2(b), RMC 2.34.040.59d(2), Ord. 21-03, E.O. 94-59 15-49 occupants** 100 Annual
COR/40905, HSC 13146.2(b), RMC 2.34.040.59d(3), Ord. 21-03, E.O. 94-59 8-14 occupants** 100 Annual
COR/40905, HSC 13146.2(b), RMC 2.34.040.59d(4), Ord. 21-03, E.O. 94-59 1-7 occupants** 100 Annual
Occupancies Where Hazardous Materials are Handled
COR1/40909, UFC Art. 1 , RMC 2.34.040.58b(1), Ord. 21-03, E.O. 94-58 Chemical plant, 5,000 square feet or less, per building** 100 Annual
COR1/40909, UFC Art. 1 , E.O. 94-58, RMC 2.34.040.58b(3), Ord. 21-03 Each additional 10,000 square feet or fraction** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58c(1), Ord. 21-03, E.O. 94-58 Chemical warehouse, 5,000 square feet or less, per building** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58c(3), Ord. 21-03,E.O.94-58 Each additional 10,000 square feet or fraction** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58d, Ord. 21-03,E.O.94-58 Compressed gas sales/warehouse, each 2,000 cubic feet of flammable gas or each 6,000 cubic feet of nonflammable gas** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58e(1), Ord. 21-03,E.O.94-58 Compressed/liquefied gas plant, 5,000 square feet or less** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58e(3), Ord. 21-03,E.O.94-58 Each additional 10,000 square feet or fraction** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58f, Ord. 21-03,E.O.94-58 Dry cleaning plant** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58g, Ord. 21-03,E.O.94-58 Dry cleaners** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58h(1), Ord. 21-03,E.O.94-58 Laboratory, 5,000 square feet or less per building** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58h(3), Ord. 21-03,E.O.94-58 Each additional 10,000 square feet or fraction** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58i(1), Ord. 21-03,E.O.94-58 Bulk plant, 10 acres or less** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58i(3), Ord. 21-03,E.O.94-58 Each additional 20 acres or fraction** 100 Annual
COR1/40909, RMC 2.34.040.58j(1), Ord. 21-03,E.O.94-58 Cabinet or furniture refinishing, 5,000 square feet or less per building** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58j(3), Ord. 21-03,E.O.94-58 Each additional 10,000 square feet or fraction** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58k(1), Ord. 21-03,E.O.94-58 Distillery, 5,000 square feet or less per building** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58k(2), Ord. 21-03,E.O.94-58 Each additional 10,000 square feet or fraction** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58l(1), Ord. 21-03,E.O.94-58 Flammable finish application, spray, electrostatic, dip, organic coatings, 5,000 square feet or less** 100 Annual
COR1/40909, RMC 8.16.050 , RMC 2.34.040.58l(3), Ord. 21-03,E.O.94-58 Each additional 10,000 square feet or fraction** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58m(1), Ord. 21-03,E.O.94-58 Flammable/combustible liquid warehouse, 5,000 square feet or less** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58m(3), Ord. 21-03,E.O.94-58 Each additional 10,000 square feet or fraction** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58n, Ord. 21-03,E.O.94-58 Refinery** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58o, Ord. 21-03,E.O.94-58 Tire recapping** 100 Annual
Dust or combustible fiber producing operations:
COR1/40909, RMC 8.16.050 , UFC Art. 1 ,E.O.94-58, Ord. 21-03, RMC 2.34.040.58p(1) 5,000 sq. ft. or less per building** 100 Annual
COR1/40909, RMC 2.34.040.58p(3), Ord. 21-03,E.O.94-58, UFC Art. 1 Each additional 10,000 square feet or fraction** 100 Annual
Highly combustible storage:
COR1/40909, RMC 2.34.040.58q(1), Ord. 21-03,E.O.94-58 5,000 sq. ft. or less** 100 Annual
COR1/40909, RMC 2.34.040.58q(3), Ord. 21-03,E.O.94-58 Each additional 10,000 square feet or fraction** 100 Annual
High-piled combustible stock:
COR1/40909, UFC Art. 1 , RMC 2.34.040.58r(1), Ord. 21-03,E.O.94-58 5,000 sq. ft. or less per building** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58r(3), Ord. 21-03,E.O.94-58 Each additional 10,000 square feet or fraction** 100 Annual
Woodworking establishment (where dust is generated):
COR1/40909, RMC 8.16.050 , RMC 2.34.040.58s(1), Ord. 21-03,E.O.94-58 5,000 sq. ft. or less** 100 Annual
COR1/40909, RMC 8.16.050 , RMC 2.34.040.58s(3), Ord. 21-03,E.O.94-58 Each additional 10,000 square feet or fraction** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58,E.O.94-58 Automotive body repair shop (Not a B1)**
Semiconductor fabrication facility:
COR1/40909, UFC Art. 1 , RMC 2.34.040.58t(1), Ord. 21-03,E.O.94-58 1,000 sq. ft. or less per building** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.58t(3), Ord. 21-03,E.O.94-58 Each additional 10,000 square feet or fraction** 100 Annual
Institutional Occupancies Institutional Occupancies Institutional Occupancies Institutional Occupancies
Nursery, hospital, or nursing home (nonambulatory):
COR/40905, HSC 13146.2(b), RMC 2.34.040.59e(1), Ord. 21-03,E.O.94-59 100 or more patients** 100 Annual
COR/40905, HSC 13146.2(b), RMC 2.34.040.59e(2), Ord. 21-03,E.O.94-59 21-99 patients** 100 Annual
COR/40905, HSC 13146.2(b), RMC 2.34.040.59e(3), Ord. 21-03,E.O.94-59 7-20 patients** 100 Annual
COR/40905, HSC 13143.5, RMC 2.34.040.59e(4), Ord. 21-03,E.O.94-59 Nursery, full-time care, 6 or fewer under age 6** 100 Annual
Nursing or children's home (ambulatory):
COR/40905, HSC 13146.2(b), RMC 2.34.040.59f(1), Ord. 21-03,E.O.94-59 100 or more guests** 100 Annual
COR/40905, HSC 13146.2(b), RMC 2.34.040.59f(2), Ord. 21-03,E.O.94-59 21-99 guests** 100 Annual
COR/40905, HSC 13146.2(b), RMC 2.34.040.59f(3), Ord. 21-03,E.O.94-59 7-20 guests** 100 Annual
COR/40905, HSC 13143.5, RMC 2.34.040.59f(4), Ord. 21-03,E.O.94-59 6 or fewer** 100 Annual
Jail or mental hospital:
COR/40905, HSC 3143.6.2(b), RMC 2.34.040.59g(1), Ord. 21-03,E.O.94-59 100 or more inmates** 100 Annual
COR/40905, HSC 3143.6.2(b), RMC 2.34.040.59g(2), Ord. 21-03,E.O.94-59 21-99 inmates** 100 Annual
COR/40905, HSC 3143.6.2(b), RMC 2.34.040.59g(3), Ord. 21-03,E.O.94-59 1-20 inmates** 100 Annual
COR/40905, HSC 3143.6.2(b), RMC 2.34.040.59g(4), Ord. 21-03,E.O.94-59 Holding cell (per cell)** 100 Annual
Residential Occupancies Residential Occupancies Residential Occupancies Residential Occupancies
Hotel or apartment house:
COR/40905, RMC 2.34.040.59h(1), Ord. 21-03,E.O.94-59 250 or more units** 100 Annual
COR/40905, RMC 2.34.040.59h(2), Ord. 21-03,E.O.94-59 100-249 units** 100 Annual
COR/40905, RMC 2.34.040.59h(3), Ord. 21-03,E.O.94-59 15-99 units** 100 Annual
COR/40905, RMC 2.34.040.59h(4), Ord. 21-03,E.O.94-59 6-14 units** 100 Annual
COR/40905, RMC 2.34.040.59h(5), Ord. 21-03,E.O.94-59 5 or fewer units** 100 Annual
COR/40905, HSC 13146.2(b), RMC 2.34.040.59i, Ord. 21-03, E.O.94-59 Family day care (ambulatory, 7-12)** 100 Annual
Special Services Special Services Special Services Special Services
COR/40905, RMC 8.16.050 , RMC 2.34.040.59j, Ord. 21-03, E.O.94-59 Callback — Unnecessary delay or return to be handled as a third follow-up inspection (see ″Follow-up inspection — Third and subsequent″ below) 100 Annual
COR/40905, RMC 2.34.040.59k(1), Ord. 21-03, E.O.94-59 Consultation,½-hour minimum 100 Annual
COR/40905, RMC 2.34.040.59k(2), Ord. 21-03,E.O.94-59 Consultation, per hour 100 Annual
COR1/40907, RMC 2.40.110 , RMC 2.34.040.123, GVT C 6257 Photocopying, per page (8-½ × 11) 100 Annual
False Alarms (for third and subsequent):
COR/40905, RMC 2.34.040.59l(1), Ord. 21-03,E.O.94-59 Third (unintentional, within a 6-month period) 100 Annual
COR/40905, RMC 2.34.040.59l(1), Ord. 21-03,E.O.94-59 Each occurrence thereafter 100 Annual
RMC 8.16.050 Fire company mercantile inspection 100% As Needed
Fire file review—To gain access to any fire file to review, including but not limited to the following: Incident reports including California Fire Incident Report System, property history, inspection history, and facility system history 100 Annual
COR/40905, RMC 2.34.040.59m, Ord. 21-03, E.O.94-59 Fire hydrant flow test 100 Annual
Fire Protection System Signaling Service:
Building Owner (Parent) Fire Permit 100 As Needed
AB-38 Inspections 100 As Needed
COR/40905, RMC 2.34.040.59n(1), Ord. 21-03,E.O.94-59 Registration and 1st year of service fee 100 Annual
COR/40905, RMC 2.34.040.59n(2), Ord. 21-03,E.O.94-59 Annual service fee 100 Annual
COR/40905, RMC 2.34.040.59n(3), Ord. 21-03,E.O.94-59 Follow-up inspection 100 Annual
COR/40905, HSC 13217, RMC 2.34.040.59n(4), Ord. 21-03,E.O.94-59 High-rise certification 100 Annual
COR/40905, RMC 8.16.050 , RMC 2.34.040.59n(5), Ord. 21-03,E.O.94-59 Halon concentrate test 100 Annual
COR/40905, RMC 8.16.050 , RMC 2.34.040.59n(6), Ord. 21-03 Knox box administrative processing fee (in addition to the device fee that is paid to the Knox Company) 100 Annual
COR/40905, RMC 2.34.040.59o(1), Ord. 21-03 Photograph, 3″ × 5″, each 100 Annual
COR/40905, RMC 2.34.040.59o(2), Ord. 21-03 Photograph, 8″ × 10″, each 100 Annual
COR/40905, RMC 2.34.040.59p(1), Ord. 21-03 Standby, single person, per hour 100 Annual
COR/40905, RMC 2.34.040.59p(2), Ord. 21-03 Standby, fire company, per hour 100 Annual
COR/40905, RMC 2.34.040.59p(3), Ord. 21-03 Training, per trainer, per hour 100 Annual
Plan Review Fees Plan Review Fees Plan Review Fees Plan Review Fees
Building Plans Building Plans Building Plans Building Plans
COR1/40910, RMC 2.34.040.10a, Ord. 21-03, E.O.94-10 Fire plan review fee/building plans — Fire Department's review of building plans with respect to access, sprinkler system, fire alarm requirements, etc., base fee (plus per sq. ft. fee) 100 Annual
RMC 2.34.040.10a(1), Ord. 21-03 Per sq. ft. of new construction (plus base fire plan review fee) 100 Annual
COR1/40910, RMC 2.34.040.10a(2), Ord. 21-03,E.O.94-10 Residential tenant improvement or remodeling, per sq. ft. (plus base fire plan review fee) 100 Annual
COR1/40910, RMC 8.16.040 , RMC 2.34.040.10a(3), Ord. 21-03,E.O.94-10 Commercial, minimum charge 100 Annual
COR1/40910, RMC 8.16.040 , RMC 2.34.040.10a(4), Ord. 21-03,E.O.94-10 Residential single-family dwelling 100 Annual
COR1/40910, RMC 8.16.040 , RMC 2.34.040.10a(5), Ord. 21-03,E.O.94-10 Apartments, condos, etc., per unit 100 Annual
Preliminary plan review/consultation — Hourly 100 Annual
Single-family home review—Tenant improvements for additions and alterations (does not include review of fire sprinkler systems). Fees include ½ hour plan review 100 Annual
Development Plans Development Plans Development Plans Development Plans
COR1/40910, RMC 2.34.040.10b(1), Ord. 21-03,E.O.94-10 Subdivision, fewer than 10 lots 100 Annual
COR1/40910, RMC 2.34.040.10b(2), Ord. 21-03,E.O.94-10 Subdivision, 10 or more lots, base fee 100 Annual
COR1/40910, RMC 2.34.040.10b(2),E.O.94-10 Each lot in excess of 10 100 Annual
COR1/40910, RMC 2.34.040.10b(3), Ord. 21-03,E.O.94-10 Controlled development, 1 hour minimum, per hour (example: Planning Dept. referrals, EIR review, tentative maps) 100 Annual
Fire Detection and Signaling Systems Fire Detection and Signaling Systems Fire Detection and Signaling Systems Fire Detection and Signaling Systems
COR1/40910, RMC 2.34.040.59q(1), Ord. 21-03 Automatic fire detection system, base fee, plus ** 100 Annual
COR1/40910, RMC 2.34.040.59q(2), Ord. 21-03 Per story fee** 100 Annual
COR1/40910 Per device fee** 100 Annual
COR1/40910, RMC 2.34.040.59q(3), Ord. 21-03 Household fire detection system** 100 Annual
COR1/40910, RMC 2.34.040.59q(4), Ord. 21-03 Manual alarm system, base fee, plus** 100 Annual
COR1/40910, RMC 2.34.040.59q(5), Ord. 21-03 Per story fee** 100 Annual
COR1/40910 Per device fee** 100 Annual
COR1/40910, RMC 2.34.040.59q(6), Ord. 21-03 Local supervisory system, separate** 100 Annual
COR1/40910, RMC 2.34.040.59q(7), Ord. 21-03 Firefighter's telephone system, base fee, plus** 100 Annual
COR1/40910, RMC 2.34.040.59q(8), Ord. 21-03 Per story fee** 100 Annual
COR1/40910, RMC 2.34.040.59q(9), Ord. 21-03 High-rise life safety system, base fee** 100 Annual
COR1/40910, RMC 2.34.040.59q(10), Ord. 21-03 Plus per story fee** 100 Annual
Fire Extinguishing Systems Fire Extinguishing Systems Fire Extinguishing Systems Fire Extinguishing Systems
RMC 2.34.040.59r(1), Ord. 21-03 Dry chemical system 100 Annual
COR1/40910, RMC 2.34.040.59r(2), Ord. 21-03 Halon system/gaseous agent 100 Annual
COR1/40910, RMC 2.34.040.59r(3), Ord. 21-03 Standpipe/sprinkler system, 100 or more heads 100 Annual
COR1/40910 Plus per head count fee 100 Annual
COR1/40910, RMC 2.34.040.59r(4), Ord. 21-03 25-99 heads 100 Annual
COR1/40910, RMC 2.34.040.59r(5), Ord. 21-03 4-24 heads 100 Annual
COR1/40910, RMC 2.34.040.59r(6), Ord. 21-03 3 or fewer heads 100 Annual
Underground for sprinklers 100 Annual
COR1/40910, RMC 2.34.040.59r(7), Ord. 21-03 Hood and duct system 100 Annual
COR1/40910, RMC 2.34.040.59r(8), Ord. 21-03 Hydrant system, each 100 Annual
COR1/40910, RMC 2.34.040.59r(9), Ord. 21-03 Spray booth 100 Annual
Gas Systems Gas Systems Gas Systems Gas Systems
COR1/40910, RMC 2.34.040.59s(1), Ord. 21-03 Bulk oxygen system** 100 Annual
COR1/40910, RMC 2.34.040.59s(2), Ord. 21-03 Gaseous hydrogen system** 100 Annual
COR1/40910, RMC 2.34.040.59s(3), Ord. 21-03 Liquid hydrogen system** 100 Annual
COR1/40910, RMC 2.34.040.59s(4), Ord. 21-03 Medical gas system** 100 Annual
COR1/40910, RMC 2.34.040.59s(5), Ord. 21-03 Welding and cutting piped system** 100 Annual
Venting Systems Venting Systems Venting Systems Venting Systems
COR1/40910, RMC 2.34.040.59t(1), Ord. 21-03 Explosion venting system 100 Annual
COR1/40910, RMC 2.34.040.59t(2), Ord. 21-03 Smoke and heat venting system 100 Annual
COR1/40910, RMC 2.34.040.59t(3), Ord. 21-03 Smoke management system 100 Annual
Special Uses/Activities/Operations Special Uses/Activities/Operations Special Uses/Activities/Operations Special Uses/Activities/Operations
COR1/40909, RMC 2.34.040.59t(4), Ord. 21-03 Ammonium Nitrate storage, over 1,000 pounds** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59t(5), Ord. 21-03 Bowling alley refinishing 100 Annual
COR1/40909, RMC 2.34.040.59t(6), Ord. 21-03 Burning permit, recreational 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59t(7), Ord. 21-03 Cellulose Nitrate storage** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59t(8), Ord. 21-03 Combustible fiber/material storage, 10,000 sq. ft. or less** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59t(9), Ord. 21-03 Each additional 10,000 sq. ft. or fraction** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59t(10), Ord. 21-03 Compressed, flammable gas storage** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59t(11), Ord. 21-03 Cryogenics** 100 Annual
COR1/40909, HSC 12101, RMC 2.34.040.59t(12), Ord. 21-03 Explosive or blasting agent, storage, use, or transportation, per 100 pounds or less** 100 Annual
COR1/40909, RMC 2.34.040.59t(13), Ord. 21-03 Over 100 pounds** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59t(14), Ord. 21-03 Fireworks — Public display, set piece display 100 Annual
COR1/40909, HSC 12640, RMC 2.34.040.59t(15), Ord. 21-03 Fireworks — Aerial display 100 Annual
Firework aerial display—Youth scouts/troops 100 Annual
Flammable or Combustible Liquids (UFC Art. 1 )
COR1/40909, RMC 2.34.040.59u(1), Ord. 21-03 Aboveground tank installation/removal 100 Annual
COR1/40909, RMC 2.34.040.59u(2), Ord. 21-03 Repair, alteration or extension of piping, plus 100 Annual
COR1/40909, RMC 2.34.040.59u(3), Ord. 21-03 Hourly rate for over specified field time 100 Annual
COR1/40909, RMC 2.34.040.59u(4), Ord. 21-03 Alcohol still** 100 Annual
COR1/40909, RMC 2.34.040.59u(5), Ord. 21-03 Dispensing inside or outside of a building** 100 Annual
COR1/40909, RMC 2.34.040.59u(6), Ord. 21-03 Lining or interior coating of tank 100 Annual
COR1/40909, RMC 2.34.040.59u(7), Ord. 21-03 Loading or unloading facility** 100 Annual
COR1/40909, RMC 2.34.040.59u(8), Ord. 21-03 Retail sales** 100 Annual
COR1/40909, RMC 2.34.040.59u(9), Ord. 21-03 Storage, cabinet** 100 Annual
COR1/40909, RMC 2.34.040.59u(10), Ord. 21-03 Storage, inside a building** 100 Annual
COR1/40909, RMC 2.34.040.59u(11), Ord. 21-03 Storage, outside a building** 100 Annual
COR1/40909, RMC 2.34.040.59u(12), Ord. 21-03 Storage, storeroom** 100 Annual
Underground Storage Underground Storage Underground Storage Underground Storage
COR1/40909, RMC 2.34.040.59v(1), Ord. 21-03 Abandonment in place 100 Annual
COR1/40909, RMC 2.34.040.59v(2), Ord. 21-03 Installation of underground tank, per tank 100 Annual
COR1/40909, RMC 2.34.040.59v(3), Ord. 21-03 Plus hourly rate over specified time 100 Annual
COR1/40909, RMC 2.34.040.59v(4), Ord. 21-03 Removal of underground tank, per tank 100 Annual
COR1/40909, RMC 2.34.040.59v(5), Ord. 21-03 Plus hourly rate over specified time 100 Annual
COR1/40909, RMC 2.34.040.59v(6), Ord. 21-03 Repair, alteration or extension of piping 100 Annual
COR1/40909, RMC 2.34.040.59v(7), Ord. 21-03 Plus hourly rate over specified time 100 Annual
COR1/40909, RMC 2.34.040.59v(8), Ord. 21-03 Installation or replacement of fuel dispenser/repair or alter of lower dispenser unit 100 Annual
COR1/40909, RMC 2.34.040.59v(9), Ord. 21-03 Plus hourly rate over specified time 100 Annual
Miscellaneous Miscellaneous Miscellaneous Miscellaneous
COR1/40905, UFC Art. 1 , RMC 2.34.040.59x, Ord. 21-03 Fruit ripening 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59y, Ord. 21-03 Fumigation or thermal, insecticidal fogging 100 Annual
Gunpowder:
COR1/40909, HSC 12640, RMC 2.34.040.59z(1), Ord. 21-03 100 pounds or less** 100 Annual
COR1/40909, 19CCR 1565.1, RMC 2.34.040.59z(2), Ord. 21-03 Over 100 pounds** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59aa, Ord. 21-03 Highly toxic pesticides** 100 Annual
High-piled combustible stock:
COR1/40909, UFC Art. 1 , RMC 2.34.040.59ab(1), Ord. 21-03 12,000 sq. ft. or less** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59ab(2), Ord. 21-03 Over 12,000 sq. ft.** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59ac, Ord. 21-03 Liquefied petroleum gas — Dispensing (per tank)** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59ad(1), Ord. 21-03 Tank installation, less than 2,000 gal/tank 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59ad(2), Ord. 21-03 Tank installation, 2,000 gallons or more 100 Annual
COR1/40909, RMC 2.34.040.59ae, Ord. 21-03 Portable containers approved for food prep./disp.** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59af, Ord. 21-03 Magnesium working** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59ag, Ord. 21-03 Mall, covered and atrium, special uses, displays and assembly** 100 Annual
COR1/40909, UFC APP. II-C, RMC 2.34.040.59ah, Ord. 21-03 Marine hotwork, single operations (extended permit fee established by fire prevention)** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59ai, Ord. 21-03 Match storage (over 864,000 matches)** 100 Annual
COR1/40909, RMC 2.34.040.59aj, Ord. 21-03 Miscellaneous permits (other than those specifically listed)** 100 Annual
COR1/40909, RMC 2.34.040.59ak, Ord. 21-03 Model rocket — Firing 100 Annual
COR1/40909, RMC 2.34.040.59al, Ord. 21-03 Model rocket — Retail sale** 100 Annual
COR1/40909, RMC 2.34.040.59am, Ord. 21-03 Open flame device** 100 Annual
COR1/40909, RMC 2.34.040.59an, Ord. 21-03 Oven, industrial baking or drying** 100 Annual
COR1/40909, RMC 8.08.050 , RMC 2.34.040.59ao, Ord. 21-03 Commercial incinerator** 100 Annual
COR1/40909, UFC ART, RMC 2.34.040.59ap, Ord. 21-03 Radioactive materials** 100 Annual
Operation of a Mechanical Refrigeration System/Ammonia:
COR1/40909, RMC 2.34.040.59aq(1), Ord. 21-03 0-500,000 pounds** 100 Annual
COR1/40909, RMC 2.34.040.59aq(2), Ord. 21-03 Over 500,000 pounds** 100 Annual
Tents or Air Supported Structures:
COR1/40909, RMC 2.34.040.59ar(1), Ord. 21-03 200-699 sq. ft. 100 Annual
COR1/40909, RMC 2.34.040.59ar(2), Ord. 21-03 700-4199 sq. ft. 100 Annual
COR1/40909, RMC 2.34.040.59ar(3), Ord. 21-03 4,200 sq. ft. or more 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59as, Ord. 21-03 Toxic gas** 100 Annual
COR1/40909, UFC Art. 1 , RMC 2.34.040.59at, Ord. 21-03 Welding and cutting — Single operations, extended permit fee established by fire prevention** 100 Annual
** Fire Department fees are based on the calendar year and will be prorated based on application date.
HSC = California Health and Safety Code. UFC = Uniform Fire Code. 19CCR = Title 19, California Code of Regulations, State Fire Marshal.
Permits are nontransferable, and fees are nonrefundable. Failure to pay invoiced fees within 30 days shall result in a 20 percent late payment charge. In the case of multiple annual permits, permits may be issued for a shorter period and prorated on the basis of a 1/12 th charge for each month and portion thereof. Occupancy permit fees cover one annual inspection and one follow-up inspection. Plan review fees cover the plan review and normal field inspections of usual duration.

Fire Department Prevention Bureau Fees

GROUP AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES FEE
A one (1) time fee is based on size of occupancy.
Aerial Pre-Plan: Aerial Pre-Plan:
APP - 1 Small (elementary school size or smaller) $695.00
APP - 2 Medium (middle school size or smaller) $803.00
APP - 3 Larger (high school size or smaller) $910.00
APP - 4 Extra Large (cost will vary depending on overall size)
General Aerial preplans shall comply with the following requirements: Please review section RMC 8.16.040 Fire Prevention Code & Section 404 of CFC (California Fire Code) for complete requirements.
Where Required Occupancies:
1. Group A (Assembly) - An aerial pre-plan is required for assembly occupancies having an occupant load of 300 or more and larger than 5,000 square feet. If occupancy is attached to commercial complex larger than 10,000 square feet than an aerial pre-plan is required.
Exception: Other than Group A occupancy used exclusively for the purpose of religious worship having an occupant load less than 2,000
2. Group B (Business) - Occupant load of 500 or more persons
3. Group E (Educational) - Schools
4. Group F (Factory) - Occupant load of 500 or more persons
5. Group H (High Hazards) - Including any facility in the Contra Costa Health Services Hazardous Material Program
6. Group I (Institutional) - Hospitals, nursing homes, Jails, etc…)
7. Group R - 1, Hotels & motels (transient) - 20 or more sleeping units
8. Group R - 2, Apartments, hotels & motels (non-transient), Live/work units
9. Group R - 4, Licensed Care Facilities (referrer to
10. High-rise buildings
11. Group M (mercantile) buildings i.e. Department stores, markets, retail or wholesales stores having an occupant load of 500 or more person
12. Covered malls exceeding 50,000 square feet
13. Open malls exceeding 50,000 square feet
14. Underground buildings
15. Buildings with atrium and having an occupancy in Group A, E or M
GROUP LICENSED CARE FACILITIES - 24 HOUR FEE
Occupant Load Greater than six (6) - up to six (6) Nonambulatory Occupant Load less than seven (7)
LCF - 1 Base Fee: $239.00
LCF - 2 Plus each additional unit/occupant $5.00
Infant-care facility for children 2½ years of age and younger
LCF - 3 Base Fee: $239.00
LCF - 4 Plus each additional unit/occupant $5.00
GROUP LICENSED CARE FACILITIES - LESS 24 HOUR FEE
***OCCUPANT LOAD GREATER THAN SIX (6) OR MORE ***
Adult or Day Care Facility (Nonambulatory Person)
LCF - 5 Base Fee: $239.00
LCF - 6 Plus per unit/occupant $5.00
Adult or Child Large Family Day Care Adult or Child Large Family Day Care
LCF - 7 Base Fee: $239.00
LCF - 8 Plus per unit/occupant $5.00
Adult or Child Day Care Center Adult or Child Day Care Center
LCF - 9 Base Fee: $239.00
LCF - 10 Plus per unit/occupant $5.00
LCF - 11 Licensed Clinic $239.00
LCF - 12 Pre-Inspection Fees - 850 Form $239.00
GROUP EDUCATIONAL (PRIVATE SCHOOL) OCCUPANCY FEE
To operate and maintain a school To operate and maintain a school
EDU - 1 Occupant load less than 50 $297.00
EDU - 2 Occupant load 50—149 $417.00
EDU - 3 Occupant load 150—499 $494.00
EDU - 4 Occupant load 500 or more $595.00
GROUP INSTITUTIONAL OCCUPANCIES FEE
INS - 1 HOSPITAL (medical, surgical & psychiatric) and Nursing Homes $477.00
INS - 1.1 Plus $5.00 per patient/bed $5.00
INS - 2 Out Patient Clinics greater than 5 patients $239.00
INS - 2.1 Plus $5.00 per patient/bed $5.00
INS - 3 Inspection of Police Services facilities (holding cells) & DOJ Review (Includes the approval of Evacuation & Life Safety Procedures). $238.00
INS - 4 Inspection of adult and/or juvenile detention facilities $892.00
GROUP RESIDENTIAL OCCUPANCIES FEE
HOTEL/MOTEL OR APARTMENT/CONDOMINIUM HOUSE:
RES - 1 *250 or more units $838.00
RES - 2 *100—249 units $504.00
RES - 3 *15—99 units $251.00
RES - 4 *6—14 units $205.00
RES - 5 *5 or Less units $112.00
*Fees applied per building
GROUP BUSINESS OCCUPANCIES FEE
MULTI-BUSINESS OCCUPANCIES:
BUS - 1 35 or more Suites $413.00
BUS - 2 25—34 Suites $354.00
BUS - 3 15—24 Suites $295.00
BUS - 4 6—14 Suites $236.00
BUS - 5 5 or Less Suites $177.00
GROUP HIGH RISE FEE
HR - 1 High Rise To inspect a Hi-Rise building (State certification inspection) - Pre 1974 $2,030.00
High Rise
HR-2 To inspect a Hi-Rise building (State certification inspection) - Post 1974 $520.00
HR-2.1 ($.005 per square foot) $.005 sq. ft.
Mid-Rise To inspect and test life safety systems (i.e., smoke management) and where such systems are installed in lieu of fire department access or when required for the mitigation of other life safety issues or requirements.
HR-3 Life safety system test $520.00
HR-3.1 ($.05 per square foot) $.05 sq. ft.
MLB-3 Low-Rise - One to Two Floors(s) To Inspect and test life safety systems (i.e. fire alarm, sprinkler, smoke control) with a minimum 4 hours inspection time (includes re-inspection) $932.00
GROUP SPECIAL SERVICE TASK FEE
Callback, Third, and/or Additional Inspection:
SST - 1 Callback or Third (3 rd ) follow-up or subsequent inspection. $239.00
GROUP AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES FEE
SST - 1.1 Additional inspection time during normal business hours - $119.00 per half hour. $119.00
SST - 1.2 Additional inspection time after normal business hours - $239.00 per hour. $239.00
SST - 1.3 Overtime and weekend inspections: Three-hour $717.00 minimum fee. $717.00
SST - 1.4 Fire Company Mercantile Inspection $117.00
SST - 2 Consultation: ½ hour minimum $119.00
SST - 3 Per hour $239.00
SST - 4 Copying: Per Page $.20
False Alarms: Initial notice to correct any malfunctions with alarm system No Charge
SST - 5 For 1 st (within six-month period - Jan 1 st - Jun 30 th or Jul 1 st - Dec 31 st ) $267.00
SST - 6 2 nd - (within six-month period - Jan 1 st - Jun 30 th or Jul 1 st - Dec 31 st ) $535.00
SST - 7 3 rd - and/or each occurrence thereafter (within six-month period - Jan 1 st - Jun 30 th or Jul 1 st - Dec 31 st ) $1,070.00
SST - 8 Fire Hydrant Flow Test $477.00
Fire Protection System Signaling Service
SST - 9 Registration and 1 st Year service fee $239.00
SST - 9.1 Annual Service Fee $42.00
SST - 10 High Rise Certification $3,102.00
SST - 11 Halon Concentration Test $477.00
SST - 12 Knox Box Service $40.00
SST - 13 Standby: Single person per hour $239.00
SST-13.1 Fire Engine Company per hour $717.00
Training/Instructional Services
SST - 14 Minimum instructional fee. $477.00
Fees include two (2) hours of training/instruction during normal working hours.
SST-14.1 Each additional hour. $239.00
SST - 15 Fire File Review To Gain access to any fire file to review including but not limited to the following; incident reports including California Fire Incident Report System, property history, inspection history, and facility system history. $27.00
SST - 16 Business License Inspection B or M Occupancy less than 2,000 square feet $119.00
GROUP PRELIMINARY PLAN REVIEW - CONSULTATIONS/MEETING FEE
PR - 1 In office design review/preliminary plan consultation meetings. Per half hour. $119.00
PR - 1.2 Out of office design and/or consultation meetings. ($239.00 Per hour two hour minimum) $477.00
Review of fire & life safety measures for building(s).
PR - 1.3 Fees include one (1) hours plan review and one (1) site inspection. $477.00
PR - 21 Additional plan review time or inspection, per half hour. $119.00
GROUP SUBDIVISION - PLAN REVIEW FEE
Major Subdivision Plan Review (5 or More Lots/Parcels) (See PR 11.1)
PR - 2 Review of subdivision for access, hydrant placement. $717.00
Fees include two (2) hours plan review and one (1) visual inspection.
PR - 2.1 Each additional site inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Minor Subdivision Plan Review (1 to 4 Lots/Parcels) (See PR 11.1)
PR - 2.2 Review of subdivision for access, hydrant placement. $358.00
Fees include ½ hour plan review and one (1) visual inspection.
PR - 2.2.1 Each additional inspection. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
PR - 2.3 Single Family Home Review - access & water supply
Review of plans for access and water supply. $358.00
PR - 2.3.1 Single Family Home Review -Tenant Improvement for additions and Modifications
Fees include ½ hour plan review and one (1) visual inspection. $118.00
(Does not include review of fire sprinkler systems - see Sec PR 5.4)
PR - 2.4 Each additional inspection. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
GROUP BUILDING CONSTRUCTION - NEW BUILDINGS & TENANT IMPROVEMENTS FEE
New Construction or Building Additions Plan Review (See PR 11.1)
PR - 3 Minimum plan review base fee. $717.00
PR - 3.1 Plus $.08 per square foot in excess of 2,000 sq. ft. $.08 sq. ft.
Fee includes two (2) hours of plan review and one (1) field inspection.
PR - 3.1.2 Additional inspections per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
PR - 3.2 Tenant Improvement Plan Review (for building additions see PR 3.1)
PR - 3.2.1 Minimum plan review base fee. $477.00
Plus $.08 per square foot in excess of 2,000 sq. ft. $.08 sq. ft.
PR - 3.2.2 Fee includes one (1) hour plan review and one (1) field inspection.
PR-20 Additional inspections per hour. $239.00
PR-21 Re-submittals or revisions. $239.00
Additional plan review time, per half hour $119.00
GROUP WATER SUPPLY - FIRE SERVICE MAINS - FIRE HYDRANTS FEE
Fire Service - Emergency Repair
PR - 4 Review of underground piping, placement, and size. $477.00
Fees include one (1) hour plan review and one (1) visual inspection.
PR - 4.1 Each additional inspection. $239.00
PR - 17 Additional plan review time, per half hour. $ 119.00
Install, Repair Private Fire Service Hydrants and/or Piping to Firewater Lines
PR - 4.2 Minimum plan review base fee of system. $477.00
Fees include one (1) hour plan review and one (1) visual inspection.
PR - 4.2.1 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Fire service main installation also requires hydro and flush. See 4.3 & 4.4
GROUP AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES FEE
Flush - Private Fire Service System
PR - 4.3 Minimum inspection base fee. $239.00
Fee includes one (1) hour onsite inspection time.
PR - 4.3.1 Each additional inspection per hour. $239.00
Hydrostatic Test - Private Fire Service System
PR - 4.4 Minimum inspection/test base fee. $477.00
Fee includes one (1) hour onsite test time.
PR - 4.4.1 Each additional inspection per hour. $239.00
Water Flow Information Field Test
PR - 4.5 Minimum field test base fee. $477.00
(Fee includes field testing for available fire flow for Hydrant and Fire Sprinkler Systems)
PR - 4.5.1 Additional or multiple flow tests per ½ hour. $119.00
GROUP FIRE PROTECTION SYSTEMS FEE
Tenant Improvement Fire Sprinklers (without calculations)
PR - 5 Minimum plan review base fee. $477.00
PR - 5.1.1 Plus $1.00 per head in excess of 10 heads. $1.00
Fee includes one (1) hour of plan review and one (1) field inspection.
PR - 5.1.2 Additional inspections per hour (i.e. weld-o-let, hydro, visual, etc…) $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Tenant Improvement Fire Sprinklers (with calculations)
PR - 5.2 Minimum plan review base fee. $595.00
PR-5.2.1 Plus $1.00 per head in excess of 10 heads. $1.00
Fee includes 1.5 hours of plan review and one (1) field inspection.
PR-5.2.2 Each additional inspection per hour (i.e. weld-o-let, hydro, visual, etc…) $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
New Commercial Fire Sprinkler System (13 & 13R systems)
PR - 5.3 Minimum plan review base fee per riser. $954.00
PR-5.3.1 Plus $1.00 per sprinkler head. $1.00
Fee includes two (2) hours plan review and two (2) field inspections.
PR-5.3.2 Each additional inspection per hour (i.e. weld-o-let, hydro, visual, etc…) $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Residential Fire Sprinkler System (single family home)
PR - 5.4 Minimum plan review base fee. $537.00
Fee includes one (1) hour of plan review and 1 water service flush, 1 overhead hydro & 1 final.
PR-5.4.1 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Residential Fire Sprinkler System (multiple homes)
PR - 5.5 Minimum plan review base fee per model. $595.00
For model only - fee includes one (1) hour of plan review and 1 water service flush, 1 overhead hydro & 1 final.
PR-5.5.1 Each additional lot (flush, hydrostatic test and final) $358.00
PR-5.5.2 Each Additional inspection per hour (i.e. models, individual homes) $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Standpipe System
PR - 5.6 Minimum plan review base fee. $717.00
Fee includes plan review and one (1) field inspection.
PR-5.6.1 Each additional inspection per hour (i.e. hydro, flush, flow test, etc…) $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Spray Booth (includes booth and fire extinguishing system)
PR - 5.7 Minimum plan review base fee. $717.00
Fee includes two (2) hours plan review and one (1) field inspection.
PR-5.7.1 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Pre-Action Fire Suppression System
PR - 5.8 Minimum plan review base fee. $717.00
Fee includes one (1) hours plan review and two (2) field inspection.
*(Fire alarm review (6.1) not included)
PR-5.8.1 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Fixed Fire Suppression System - (wet/dry chem., water mist, etc…)
PR - 5.9 Minimum plan review base fee. $477.00
PR-5.9.1 Each additional separate system at same location. $239.00
Fee Includes plan review and one (1) field inspection.
PR-5.9.2 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Clean Agent Fire Suppression System
PR - 5.10 Minimum plan review base fee. $954.00
Fee includes one (1) hour plan review and up to 3 hours of inspection time.
*(does not include fire alarm plan review - see Sec. PR 6.1)
PR-5.10.1 Each Additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Fire Pump Installation
PR - 5.11 Minimum plan review base fee. $1,670.00
Fee includes two (2) hours plan review and up to five (5) hours field inspection time.
*(does not include review of generator or separate fuel storage tank)
PR-5.11.1 Each Additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Commercial Cooking (Hood and Duct) Fire Suppression System
PR - 5.12 Minimum plan review base fee. $477.00
GROUP AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES FEE
PR-5.12.1 Each additional system review $239.00 each. $239.00
Fee includes one (1) hour plan review and one (1) hour of inspection time.
PR-5.12.2 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Smoke & Heat Vents
PR - 5.13 Minimum plan review base fee. $477.00
Fee includes one (1) hour plan review and one (1) hour of inspection time.
PR -5.13.1 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Smoke Management/Control System
PR - 5.14 Minimum plan review base fee. $1,670.00
Fee includes two (3) hours plan review and up to four (4) hours field inspection time.
PR-5.14.1 Each Additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Explosion Control (includes: vents, dust collection, etc…)
PR - 5.15 Minimum plan review base fee. $954.00
Fee includes two (2) hours plan review & up to two (2) hours field inspection time.
PR-5.15.1 Each Additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
GROUP FIRE ALARM SYSTEM FEE
Fire Alarm System
PR - 6 Minimum plan review base fee. $595.00
PR - 6.1 Plus $11.00 per initiating & notification device. $11.00
Fee includes two (2) hours plan review and up to one (1) hour field inspection time.
PR - 6.1.1 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
PR - 6.1.2 Pre-wire inspections assessed at $239.00 per hour. $239.00
Dedicated Function Fire Alarm System (i.e. sprinkler monitoring, elevator recall, etc…)
PR - 6.2 Minimum plan review base fee. $477.00
Fee includes one (1) hour plan review and one (1) hour of field inspection time.
PR-6.2.1 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Fire Alarm Panel Replacement Only
PR - 6.3 Minimum plan review base fee. $477.00
Fee includes one (1) hour plan review and up to one (1) hour field inspection time.
PR - 6.3.1 Each additional inspection per hour. $179.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
High-Rise Fire Alarm (new and/or system upgrade)
PR - 6.4 Minimum plan review base fee. $1,909.00
PR - 6.4.1 Plus $11.00 per initiating device & notification device. $11.00
Fee includes four (4) hours plan review and up to four (4) hours field inspection time.
PR - 6.4.2 Each additional inspection per hour. $239.00
PR - 6.4.3 Each per-wire inspection where required. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour $119.00
GROUP FLAMMABLE & COMBUSTIBLE LIQUIDS (TANKS - PIPING & DISPENSING ) FEE
Install Underground Tanks
PR - 7 Minimum plan review base fee. $477.00
Fee includes one (1) hour of plan review of tank location and One (1) hour of site inspection time.
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Remove (Repair, Modify, Extend Piping) Underground Tank
PR - 7.1 Minimum plan review base fee. $717.00
Fee includes one (1) hour plan review and two (2) hours of inspection/site time.
PR-7.1.1 Each additional inspection/stand-by time per hour. $239.00
Install (Repair, Modify, Extend Piping) Aboveground Tank
PR - 7.2 Minimum plan review base fee. $477.00
PR - 7.2.1 Each additional tank. $239.00
Fee includes one (1) hour plan review and one (1) hour of inspection/site time.
PR - 7.2.2 Each additional inspection. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Abandon Underground Tank in Place
PR - 7.3 Minimum plan review base fee. $717.00
Fee includes one (1) hour plan review and two (2) hours of inspection/site time.
PR - 7.3.1 Each additional inspection/stand-by time per hour. $239.00
Environmental Upgrade (vapor recovery and processing systems, spill control, secondary containment and environmental agency requirements)
PR - 7.4 Minimum plan review base fee. $477.00
Each additional inspection per hour.
PR - 7.4.1 Fee includes one (1) hour plan review and one (1) hour of inspection time. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Apply Interior Coating to Flammable Liquid Tanks
PR - 7.5 Minimum plan review base fee. $717.00
Fee includes one (1) hour plan review and two (2) hours of inspection/site time.
PR - 7.5.1 Each additional inspection/stand-by time per hour. $239.00
GROUP COMPRESSED GAS SYSTEMS: LPG/CNG/MEDICAL/CRYOGENICS FEE
Container Exchange Programs; LPG Tank Installation Without Dispensing
PR - 8 Minimum plan review base fee. $477.00
Fee includes one (1) hour of plan review and one (1) site inspection time.
PR - 8.1 Each additional inspection per hour. $239.00
GROUP AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES FEE
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Install, Modify, Repair LPG - CNG - Hydrogen (Tank Install and/or Dispensing)
PR - 8.2 Minimum plan review base fee. $835.00
Fee includes 1½ hours of plan review and two (2) hours site inspection time.
PR - 8.2.1 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Install, Modify, Repair Medical or Compressed Gas Systems
PR - 8.3 Minimum plan review base fee. $835.00
Fee includes 1 ½ hours of plan review and two (2) site inspections.
PR - 8.3.1 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Install, Modify, Repair Cryogenics Fixed Installation
PR - 8.4 Minimum plan review base fee. $835.00
Fee includes 1½ hours of plan review and two (2) site inspections.
PR - 8.4.1 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Install, Modify, Repair Compressed Gas Storage
PR - 8.5 Minimum plan review base fee. $477.00
Fee includes one (1) hour of plan review and one (1) field inspection.
PR - 8.5.1 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
GROUP SPECIAL HAZARDS - HAZARDOUS FEE
Battery Systems
PR - 9 Minimum plan review base fee. $477.00
Fee includes one (1) hour of plan review and one (1) field inspection.
PR - 9.1 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Dust Collection Systems
PR - 9.2 Minimum plan review base fee. $595.00
Fee includes one (1) hour of plan review and two (2) site inspections.
PR - 9.2.1 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Explosives Storage
PR - 9.3 Minimum plan review base fee. $954.00
Fee includes two (2) hours of plan review and two (2) site inspections.
PR - 9.3.1 Each additional inspection per hour. $239.00
PR - 16 Re-submittals or revisions. $239.00
PR - 21 Additional plan review time, per half hour. $119.00
Hazardous Materials Compliance Review
PR - 9.4 Minimum review of MSDS, HMMP and/or HMIS submittals. $239.00
Fees include one (1) hour of review time.
PR - 9.4.1 Additional plan review time, per half hour. $119.00
Hazardous Materials - Storage/Dispensing - Open/Closed Systems
PR - 9.5 Minimum plan review base fee. $954.00
Fee includes two (2) hours of plan review and two (2) site inspections.
PR - 9.5.1 Each additional system minimum two (2) hours of plan review. $477.00
PR - 9.5.2 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Install, Modify, Repair Mechanical Refrigeration Systems
PR - 9.6 Minimum plan review base fee. $717.00
Fee includes one (1) hour of plan review and two (2) site inspections.
PR - 9.6.1 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
GROUP HIGH PILE RACK STORAGE SYSTEMS FEE
High-Pile or Rack Storage
PR - 10 Minimum plan review base fee. $717.00
Fee includes 1½ hours of plan review and 1½ hours site inspections.
PR-10.1 Field inspection time will be charged per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $ 119.00
Temporary Access Roads & Water Supply
Install a Temporary Access Road - Residential and Commercial
PR - 11 Minimum plan review base fee for one and two homes. $239.00
PR-11.1 Minimum plan review for large developments and commercial projects. $477.00
Fee includes one (1) hour of plan review and one (1) field inspection.
PR-11.1.2 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Install a Temporary Water Supply System
PR - 12 Minimum plan review base fee. $477.00
Fee includes one (1) hour plan review and one (1) hour field inspection.
PR-12.1 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Miscellaneous Submittals - Alternative Means and Methods
Miscellaneous Submittals or Plans Review
Plans or submittals not described elsewhere.
PR - 13 Minimum plan review base fees up to two hours. $477.00
PR-13.1 Additional plan review time will be charged on hourly basis. $239.00
Fee includes one (1) hour of plan review and one (1) field inspection.
PR-13.1.2 Each additional inspection per hour. $239.00
PR-20 Re-submittals or revisions. $239.00
PR-21 Additional plan review time, per half hour. $119.00
Alternative Means and Methods Requests or Code Interpretation Review
GROUP AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES FEE
PR - 13.2 Minimum review base fee. $477.00
Fee includes 2 hours of plan review/consultation time.
PR-21 >Additional plan review time, per half hour. $119.00
GROUP EXPEDITE PLAN REVIEW REQUEST & ADDITIONAL CHARGES/INSPECTION TIME FEE
Reviews Expedited as a Result of Working without Approved Plans
Working without approved plans - Minimum plan review fees (overtime)
PR - 14 Three (3) hours - plus applicable plan review fees. $717.00
PR-14.1 (Additional plan review time, $239.00 per hour) $239.00
PR-14.2 Expedited Plans - reviewed after normal business hours, three-hour minimum. $717.00
PR -14.3 (Additional plan review time, $ 239.00 per hour) $239.00
All revisions will be performed on an expedited/overtime basis at $239.00 per hour with a three hour minimum.
Total fees assessed will be the sum of all applicable plan review fees including expedite/overtime fees.
Demolition Permit pursuant to Chapter 33, CFC
PR - 15 Fees include ½ hour plan review and ½ hour site review $239.00
If cutting & welding is being done during demo PTO 11.1 ($239) needs to be added *PTO 11.1 separate fee
GROUP BULK/TERMINAL/BULK TRANSER/PROCESS TRANSFER MAINTENANCE REVIEW FEE
Fees will be based on construction permit required for routine maintenance/repair work which conducted within these facilities.
Install, Modify, Repair, Replace Fireproofing
PR - 16 Minimum plan review base fees up to two hours. $477.00
PR-20.1 Additional plan review time will be charged on hourly basis. $239.00
Fee includes one (1) hour of plan review and one (1) field inspection.
PR-20.2 Each additional inspection per hour. $239.00
PR -20 Re-submittals or revisions. $239.00
PR - 21 Additional plan review time, per half hour. $119.00
Install, Modify, Repair and/or Replace Hydrant, Pipeline For Firewater Systems
PR - 17 Minimum plan review base fees up to two hours. $477.00
PR-21.1 Additional plan review time will be charged on hourly basis. $239.00
Fee includes one (1) hour of plan review and one (1) field inspection.
PR-21.2 Each additional inspection per hour. $239.00
PR -20 Re-submittals or revisions. $239.00
PR - 21 Additional plan review time, per half hour. $119.00
Install, Modify, Repair, Replace Piping for Systems Containing Hazardous Materials
PR - 18 Minimum plan review base fees up to two hours. $477.00
PR-18.1 Additional plan review time will be charged on hourly basis. $239.00
Fee includes one (1) hour of plan review and one (1) field inspection.
PR-18.2 Each additional inspection per hour. $239.00
PR -20 Re-submittals or revisions. $239.00
PR - 21 Additional plan review time, per half hour. $119.00
Install, Modify, Repair Pump Installed In Hazardous Material Process System
PR - 19 Minimum plan review base fees up to two hours. $477.00
PR-19.1 Additional plan review time will be charged on hourly basis. $239.00
Fee includes one (1) hour of plan review and one (1) field inspection.
PR-19.2 Each additional inspection per hour. $239.00
PR -20 Re-submittals or revisions. $239.00
PR - 21 Additional plan review time, per half hour. $119.00
Additional Charges and Inspection Time
PR - 20 Re-submittals or revisions. $239.00
PR - 21 Additional plan review time, $119.00 per half hour. $119.00
GROUP PERMIT TO OPERATE - SPECIAL USE/ACTIVITY/OPERATIONS FEE
PTO - 1 Aerosol Products Permit to store, manufacture or handle an aggregate quantity of Level 2 or Level 3 aerosol products in excess of 500 pounds net weight. $239.00
PTO - 2 Amusement Buildings - Permit to operate a special amusement building. $239.00
PTO - 3 Aviation Facilities - Required to use a group H or S occupancy for aircraft servicing or repair and aircraft fuel-servicing vehicles. (Does not include permit for hot work, flammable/combustible spraying operations or hazardous materials). $417.00
PTO - 4 Carbon Dioxide Systems used in Beverage Dispensing Application - Permit is required for carbon dioxide systems used in beverage dispensing applications having more than 100 pounds of carbon dioxide. $239.00
Carnivals and Fairs - Permit is required to conduct a carnival or fair.
PTO - 5.0 Inspections conducted during normal work hours - (1.25 hours) $297.00
PTO - 5.1 Additional inspection time during normal business hours per ½ hour. $119.00
PTO - 5.2 After hours inspection time per ½ hour. $239.00
PTO - 5.3 Overtime & Weekend inspections - three (3) hours minimum. $717.00
PTO - 5.4 Float, Parade: Per Float $119.00
PTO - 6 Cellulose Nitrate Film - Permit for the storage, use and handling in public assembly. $358.00
Combustible Dust-Producing Operations/Refinishing Permit to operate facility with combustible dust operations - i.e. cabinet shops, milling & fiberglass cutting, forming operations, paper shredding.
PTO - 7 Less than 5,000 square feet $294.00
PTO - 7.1 Each additional 5,000 square feet or fraction thereof $239.00
PTO - 8 Combustible Fibers/Material Storage Permit to storage/handling of combustible fibers in excess of 100 cubic feet. $417.00
PTO - 9 Compressed Flammable Gases (In Excess of amounts in Table 105.6.9 CFC) Each 200 cubic feet of flammable gas or Each 1,000 cubic feet of inert or simple asphyxiant Highly toxic - Any Amount Oxidizing (including oxygen - 504 cubic feet) $297.00
Compressed/Liquefied Gas Plant:
PTO - 9.1 5,000 square feet or less $538.00
GROUP AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES FEE
PTO - 9.2 Each additional 5,000 sq. feet or fraction thereof $538.00
PTO - 10 Covered & Open Mall Buildings Permit for the placement/installation of displays, concession equipment, displays of highly combustible goods, liquid or gas-fired equipment and the use of open flame equipment in the mall (i.e. auto displays, etc…) $297.00
PTO - 11 Cryogenic Fluids Permit to produce, store, transport on site, handle or dispense amounts in excess of Table 105.6.11. CFC - California Fire Code $297.00
PTO - 12 Cutting & Welding (fixed facility operations) Permit to conduct welding, cutting & similar operations using electric or gas equipment. $297.00
PTO - 12.1 Single Operation (Permit is valid for 180 days) $239.00
PTO - 13 Dry Cleaning Permit to operate is dry cleaning operations or to change to a more hazardous cleaning solvent in existing equipment. $297.00
PTO - 13.1 Dry Cleaning Plant Permit to operate a dry cleaning plant operation . $297.00
PTO - 14 Exhibits & Trade Shows - Permit is required to operate exhibits and trade shows. $239.00
Explosives or Blasting Agent: Storage, Use or Transportation Permit is required for the manufacturing storage, handling, sales or use of any quantity of explosives, explosive materials
PTO - 15 100 lbs. or less $417.00
PTO - 15.1 Over 100 lbs. $717.00
PTO - 15.2 Ammonium Nitrate Storage $417.00
PTO - 15.3 Gunpowder Sales - 100 lbs. or less $239.00
PTO - 15.4 Gunpowder Sales - Over 100 lbs. $477.00
PTO - 16 Fire Hydrants and Valves - Private Permit to remove from service or the operation of a private fire hydrant and valves. A change to existing hydrant systems requires plan review and approval. (Refer to Plan Review - Private Fire Service System Page 8, PR 4.2) $239.00
Flammable & Combustible Liquids: Storage or Use
PTO - 17 Repair, Modification or Extension of Piping (Plus $233/hour over specified field time) $ 239.00
Flammable/Combustible Liquids - Storage or Use Permit to store, handle or the use of (includes installation of new tank):
PTO - 17.1 Class I liquids in excess of 5 gallons - Inside $297.00
PTO - 17.2 Class I liquids in excess of 10 gallons - Outside $417.00
PTO - 17.3 Class II or Class III A liquids in excess of 25 gallons - Inside $297.00
PTO - 17.4 Class II or Class III A liquids in excess of 60 gallons - Outside $417.00
PTO - 17.5 Flammable/Combustible Liquids - (removal) Permit to remove flammable or Class II combustible liquids from underground or above ground tank by means other than an approved fixed pump. $297.00
Flammable/Combustible Liquids - Plants/Warehouse - loading & unloading Permit to operate tank vehicles, wells, fuel-dispensing stations, small refineries, breweries, distilleries and similar facilities where flammable and combustible liquids are: produced, processed, transported, stored, or used.
PTO - 17.6 5,000 square feet or less $417.00
PTO - 17.7 Each additional 5,000 square feet or fraction of $417.00
PTO - 17.8 Flammable/Combustible Liquids - Out of Service Tank Permit to place temporarily out of service (for more than 90 days) an underground, protected above-ground (vaulted) or aboveground flammable or combustible liquid tank. $595.00
PTO - 17.9 Flammable/Combustible Liquids - Change of Contents Permit to change contents stored in a flammable or combustible liquid tank which poses a greater hazard. $297.00
PTO-17.10 Flammable/Combustible Liquids - Manufacture Permit to manufacture, process, blend, or refine flammable or combustible liquids. $417.00
PTO-17.11 Printing Plant or Shop Permit to print items using flammable/combustible liquids $239.00
Highly Combustible Storage
PTO-17.12 5,000 square feet or less $472.00
PTO-17.13 Each additional 5,000 square feet or fraction thereof $297.00
PTO - 18 Floor Finishing's Permit to use Class I or Class II liquids for the refinishing of flooring in excess of 350 square feet. $297.00
PTO - 19 Fruit & Crop Ripening Permit to operate a fruit or crop ripening facility or conduct a fruit ripening process using ethylene gas. $239.00
PTO - 20 Fumigation & Insecticidal Fogging Permit to operate a business of fumigation or thermal insecticidal fogging and to maintain a room, vault or chamber in which a toxic or flammable fumigant is used. N/C
Hazardous Materials Permit to store, transport on site, dispense, use or handle hazardous materials in amounts in excess of Table 105.6.21 CFC - California Fire Code
PTO - 21 1 - 5 Products $239.00
PTO - 21.1 5 - 10 Products $595.00
PTO - 21.2 11 or more Products $1,193.00
Chemical Plant
PTO - 21.3 5,000 square feet or less $538.00
PTO - 21.4 Each additional 5,000 square feet or fraction thereof $538.00
PTO - 21.5 Radioactive Material (any amount) $477.00
Chemical Warehouse
PTO - 21.6 5,000 square feet or less $297.00
PTO - 21.7 >Each additional 5,000 square feet or fraction thereof $297.00
Laboratory
PTO - 21.8 5,000 square feet or less $538.00
PTO - 21.9 Each additional 5,000 square feet or fraction thereof $538.00
Bulk Plant/Terminal
PTO-21.10 10 acres or less $2,598.00
PTO-21.11 Each additional 10 acres or fraction thereof $2,598.00
Bulk Transfer
PTO-21.12 10 acres or less $2,598.00
PTO-21.13 Each additional 10 acres or fraction thereof $2,598.00
Process Transfer
PTO-21.14 10 acres or less $2,598.00
PTO-21.15 Each additional 10 acres or fraction thereof $2,598.00
PTO - 22 HPM (Hazardous Production Material) Facilities - Semiconductor manufacturer Permit to store, handle or use hazardous production materials. $1,193.00
High Pile Storage (Permit for the use of a building or portion thereof)
PTO - 23 In excess of 500 square feet - less than 5,000 square feet $669.00
PTO - 23.1 Each additional 5,000 square feet or fraction thereof $ 477.00
PTO - 24 Hot Work Operations Permit for hot work including, but not limited to the following: $239.00
PTO - 24 1. Public exhibitions/demos. $239.00
PTO - 24 2. Inside a building not tied to construction permit. $239.00
PTO - 24 3. Welding booths (fixed site location). $239.00
PTO - 24 4. Within a wildfire risk area. $239.00
PTO - 24 5. Application of roof coverings with the use of an open flame device. $239.00
PTO - 24 6. Where approved, the fire code official shall issue a permit to carry out a hot work program. Refer to CFC 105.6.24 #6 for the remaining information. $239.00
Hot Work Operations - Marine single [use]
PTO - 24.1 Inspections conducted during normal work hours - (1.25 hours) $297.00
PTO - 24.2 Additional inspection time during normal business hours per ½ hour. $119.00
PTO - 24.3 After hours inspection time per ½ hour. $239.00
PTO - 24.4 Overtime & Weekend inspections - three (3) hours minimum. $717.00
PTO - 25 Industrial Ovens Permit to operate an industrial oven $417.00
PTO - 25.1 Commercial Incinerators $417.00
PTO - 26 Lumber Yard & Woodworking Plants Permit for the storage or the processing of lumber exceeding 100,000 board feet $477.00
PTO - 27 Liquid or Gas Fueled vehicles or Equipment in Assembly Buildings Permit to display, operate or demonstrate liquid or gas fueled vehicles or equipment in assembly buildings. $239.00
Liquid Propane (LP) Gas - Per Tank
PTO - 28 Permit for exchange of cylinders only - no refilling. $239.00
PTO - 28.1 Permit to dispense, store, install and use LPG. (less than 2K gallons) $297.00
PTO - 28.2 Permit to dispense, store, install and use LPG. (more than 2K gallons) $477.00
PTO - 28.3 To operate a plant/facility 5,000 square feet or less $477.00
PTO - 28.4 Each additional 5,000 square feet or fraction thereof $477.00
PTO - 29 Magnesium Permit to melt, cast, heat treat or grind more than 10 pounds. $358.00
PTO - 30 Miscellaneous Combustible Storage Permit to store in any building or upon any premises in excess of 2,500 cubic feet gross volume of combustible empty packing cases, boxes, barrels or similar containers, rubber tires, rubber, cork, wood or plastic pallets or similar combustible materials. $477.00
PTO - 31 Motor Fuel-Dispensing Facilities Permit is required for the operations of automobile (service stations), marine and fleet motor fuel-dispensing facilities. $417.00
PTO - 31.1 Tank Vehicle Dispensing Permit is required for the fueling of motor vehicles at approved locations from a tank vehicle. Also includes the limited or temporary fueling operations for special events (i.e. fueling or watercraft from shore, piers, floats, or barges) $239.00
PTO - 32 Open Burning Permit is required for the kindling or maintaining of an open fire or fire on any public street, alley, road, or other public or private ground. Exception: Recreational $239.00
PTO - 33 Open Flames & Torches Permit is required to remove paint with a torch; or to use a torch or open flame device $239.00
PTO - 34 Open Flames & Candles Permit for the use of open flames inside restaurants, public assemblies and/or drinking establishments. $239.00
PTO - 35 Organic Coatings Permit for organic-coating manufacturing operation producing more than 1 gallon of an organic coating in one day. $239.00
Places of Assembly Exception: Other than Group A occupancy used exclusively for the purpose of religious worship having an occupant load less than 2,000
PTO - 36 *ASSEMBLY: With stage, 1,000 or more occupant load $595.00
PTO - 36.1 *ASSEMBLY: With stage, less than 1,000 occupant load $595.00
PTO - 36.2 *ASSEMBLY: Without stage, 300 or more occupant load $494.00
PTO - 36.3 ASSEMBLY: Without stage, 201-299 occupant load $477.00
PTO - 36.4 Without stage, 101-200 occupant load $427.00
PTO - 36.5 Without stage, 50-100 occupant load $297.00
PTO - 37 Private Fire Hydrants Permit is required for the removal from service, use or operation of private fire hydrants $239.00
Pyrotechnic Special Effects Material Permit to use fireworks, pyrotechnics inside .
PTO - 38 Inspections during normal work hours - (2 hours) $477.00
PTO - 38.1 Additional inspection time during normal business hours @ $ 119.00 per ½ hour $119.00
PTO - 38.2 Additional inspection time after normal business hours @ $ 239.00 per hour $239.00
PTO - 38.3 Overtime and weekend inspections: Three hour minimum fee - $ 717.00. $717.00
PTO - 39 Pyroxylin Plastics Permit for storage and handling of more than 25 lbs. of cellulose nitrate (pyroxylin) $239.00
PTO - 40 Refrigeration Operation Equipment Permit to operate a mechanical refrigeration unit or system $358.00
Repair Garages Permit for operation of repair garages
PTO - 41 1 - 4 repair bays $297.00
PTO - 41.1 5 - 8 repair bays $358.00
PTO - 41.2 Greater than 8 repair bays $417.00
PTO - 42 Rooftop Heliports Permit to operate a rooftop heliport. $239.00
Spraying or Dipping - Finish Application Permit to conduct spraying or dipping operations utilizing flammable or combustible liquids or the application of combustible powders.
PTO - 43 5000 square feet or less $472.00
PTO - 43.1 Each additional 5,000 square feet or fraction thereof $297.00
PTO - 44 Storage of Scrap Tires & Tire Byproducts Permit to establish, conduct or maintain storage of scrap tires and tire byproducts that exceeds 2,500 cubic feet of total volume of scrap tires, and for indoor storage of tires and tire byproducts. $417.00
Temporary Membrane Structures & Tents Permit to operate an air-supported or temporary membrane structure including tents and canopies:
PTO - 45 399—699 square feet $119.00
PTO - 45.1 699—4,199 square feet $239.00
PTO - 45.2 Greater than 5,000 square feet $358.00
PTO - 45.3 Additional inspection time during normal business hours @ $119.00 per ½ hour $119.00
PTO - 45.4 Additional inspection time after normal business hours @ $239.00 per hour $239.00
PTO - 45.5 Overtime and weekend Inspections: Three-hour minimum fee - $717.00 $717.00
PTO - 45.6 Extended Period of Use Permit to extend the use of a tent, canopy or air supported structure for an additional 180 days. (1 Extension of use per structure) $239.00
PTO - 46 Tire-Rebuilding Plants Permit to operate and maintain a tire rebuilding plant $417.00
PTO - 47 Waste Handling Permit to operation of wrecking yards, junk yards and waste material-handling facilities $446.00
PTO - 48 Wood Products Permit is required to store chips, hogged material, wood or other combustible pallets, lumber or plywood in excess of 200 cubic feet (6 m3). $417.00
Additional Permits
PTO - 49 1. Production Facilities - Change use or occupancy or allow the attendance of a live audience, or for wrap parties. $477.00
PTO - 49.1 2. Pyrotechnics & Special Effects - Use of pyrotechnics special effects for the use of motion picture, television and commercial production. $477.00
PTO - 49.2 3. Live Audiences - Install seating for live audiences (production studios & sound stages) $239.00
PTO - 50 Temporary Assembly - Permit is required 10 days prior to conduct an event that will assemble more than 1,000 people. Any event that has more than 3,000 people shall require two personnel from the Fire Prevention Division for the duration of the event to ensure compliance of all codes are adhered to. Fees include one (1) hour site plan review and one (1) hour site inspection A floor plan outlining but not limited to the following is required.
PTO - 50.1 1. Number of people expected to attend $461.00
PTO - 50.1 2. Number of exits $461.00
PTO - 50.1 3. Location of fire extinguishers $461.00
PTO - 50.1 4. Location of tables & chairs $461.00
PTO - 50.1 5. Location of stage $461.00
PTO - 50.1 6. Location of tents requires separate permit - PTO - 43 $461.00
PTO - 50.1 7. Location of cooking area(s) $461.00
PTO - 50.1 8. Location of any open flames used for cooking or decorating $461.00
PTO - 51 Christmas Tree Sales - Permit to operate a Christmas Tree lot. $239.00
PTO - 52 Asbestos Removal - Permit to conduct asbestos removal operations. $239.00
PTO - 53 Battery System Storage Permit to operate stationary lead-acid battery systems having liquid capacity of more than 50 gallons $239.00
Firework Aerial Display Permit to use fireworks, pyrotechnics outside.
PTO - 54 Inspections during normal work hours - (2.5 hours) $1,416.00
PTO-54.1 Additional inspection time during normal business hours @ $ 119.00 per ½ hour $119.00
PTO-54.2 Additional inspection time after normal business hours @ $ 239.00 per hour $239.00
PTO-54.3 Overtime and weekend inspections: Three hour minimum fee - $717.00. $717.00
PTO-54.4 Set Piece Display $477.00
PTO - 55 Model Rocket Permit to operate/launch motorized rockets (fees include ½ hour site inspection) $358.00
PTO -55.1 Retail Sale $119.00
PTO - 55.2 Youth Scouts/Troops $27.00
PTO - 56 Temporary Water Supply Permit is required to use a temporary water supply for construction of residential projects. $239.00
PTO - 57 Tire Storage & Scrap Tires Permit to store tires in excess of 1,000 cubic feet inside buildings (per Ch. 25 - CFC) $297.00
PTO - 58 Change of Occupancy/Site Inspection or Miscellaneous Inspection A permit is required for a requested inspection for the change of occupancy including, but not limited to: Inspections conducted when required by Building Official, Planning, or other Governmental agency and where not elsewhere listed. Provides 1 ¼ hour site/inspection time. $290.00
GROUP NOTES FEE
Permits are non-transferrable and fees are non-refundable.
Failure to pay invoice fees within 30 days shall result in a 20 percent late payment charge.
In the case of multiple annual permits, permits may be issued for shorter periods and prorated on the basis of a 1/12 th charge for each month and portion thereof.
N - 1 Failure to obtain operational permit $522.00
N - 2 Extended Period of Use Permit to extend the use of a permit for an additional 180 days $239.00
GROUP MOTOR VEHICLE INCIDENT FEE
MVI - 1 Provide hazardous materials assessment and scene stabilization. This will be the most common "invoice level." This occurs almost every time a RFD apparatus responds to an accident/incident involving a driving under the influence (DUI). $400.00
MVI - 2 Includes MVI 1 services as well as clean up and material used (absorbents) for hazardous fluid clean up and disposal. Invoiced at this level if the RFD unit has to clean up any gasoline or other automotive fluids that are spilled as a result of the accident/incident. $425.00
GROUP AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES FEE
MVI - 3 (Vehicle Fire) Provide scene safety, fire suppression, breathing air, rescue tools, hand tools, hose, tip use, foam, structure protection, and clean up gasoline or other automotive fluids that are spilled as a result of the accident/incident. $450.00
MVI - 4 Includes MVI 1 & 2 services as well as extrication (heavy rescue tools, ropes, airbags, cribbing etc.). Invoiced at this level when RFD unit has to extricate anyone from the vehicle(s) using any equipment. No invoice if the patient is simply unconscious and an RFD unit is able to open the door to access the patient. This level is to be invoiced only if equipment is deployed. $1,800.00
MVI - 5 Includes MVI 1, 2, & 4 services as well as multi RFD unit response $ 2,000.00
GROUP HAZARDOUS MATERIAL INCIDENT FEE
HZM-1 Basic Response: Invoice will include engine response, first responder assignment, and certified hazmat team and appropriate equipment, perimeter establishment, evacuations, set-up and command. $700.00
HZM - 2 Intermediate Response: Invoice will include engine response, first responder assignment, certified hazmat team and appropriate equipment, perimeter establishment, evacuations, set-up and command, Level A or B suit donning, breathing air and detection equipment. Set-up and removal of decontamination center. $2,500.00
HZM - 3 Advanced Response: Invoice will include engine response, first responder assignment, hazmat certified team and appropriate equipment, perimeter establishment, evacuations, first responder set-up and command, Level A or B suit donning, breathing air and detection equipment and robot deployment. Set-up and removal of decontamination center, detection equipment, recovery and identification of material. Disposal and environment clean up. Includes above in addition to any disposal fees of material and contaminated equipment and material used at scene. Includes 3 hours of on scene time. $5,900.00
HZM-3.1 Each additional hour @$300.00 per hazardous material team. $300.00
GROUP PIPELINE INCIDENTS/POWER LINE INCIDENTS not Limited to Gas, Sewer, & Water FEE
PLI - 1 Basic Response: Invoice will include engine response and first responder assignment, perimeter establishment, evacuations, first responder set-up and command. $400.00
PLI - 2 Intermediate Response: Invoice will include engine response, first responder assignment, and appropriate equipment, perimeter establishment, evacuations, first responder set-up and command. May include HAZMAT team, Level A or B suit donning, breathing air and detection equipment. $1,000.00
PLI - 3 Advanced Response: Invoice will include engine response, first responder assignment, and appropriate equipment, perimeter establishment, evacuations, first responder set-up and command. May include HAZMAT team, Level A or B suit donning, breathing air and detection equipment. Supervise and/or assist pipeline repair of intermediate to major pipeline damage. May include set-up and removal of decontamination center, detection, recovery and identification of material. Disposal and environment clean up. Itemized
GROUP FIRE INVESTIGATOR RESPONSE FEE
INV - 1 Includes the following: Scene Investigation, Investigation Report, Scene Documentation based on per hour. The claim begins when the Fire Investigator responds to the incident and is billed for logged time only. $239.00
GROUP WATER INCIDENT RESPONSE FEE
WIR - 1 Basic Response: Invoice will include engine response, first responder assignment, perimeter establishment, evacuations, first responder set-up and command, scene safety and investigation (including possible patient contact, hazard control). This will be the most common "billing level." This occurs almost every time RFD Victory responds to a water incident. $400.00
WIR - 1.1 *Plus $50 per hour, per rescue person (minimum 3 fire personnel) $50.00*
WIR - 2 Intermediate Response: Includes WIR 1 services as well as clean up and material used (sorbents), minor hazardous clean up and disposal. Invoiced at this level if the RFD has to clean up small amounts of gasoline or other fluids that are spilled as a result of the incident. Billed at $800.00 plus $50.00 per hour, per rescue person. $800.00
WIR - 2.1 *Plus $50 per hour, per rescue person (minimum 3 fire personnel) $50.00*
WIR - 3 Advanced Response: Includes WIR 1 and WIR 2 services, including HAZMAT team, set up and removal of decontamination center, detection equipment, recovery and identification of material. Disposal and environment clean up. Includes above in addition to any disposal fees of material and contaminated equipment and material used at scene. $2,000.00
WIR-3.1 *Plus $50 per hour, per rescue person (minimum 3 fire personnel) $50.00*
WIR-3.2 *Plus $100 per hour, per HAZMAT team member $100.00*
WIR - 4 RFD reserves the right to invoice for individual event with customized mitigation rates including itemized, per person, at various response levels and for itemized products and equipment used.
GROUP FIRE INCIDENT RESPONSE FEE
FIR - 1 Per engine response, per hour (includes captain, engineer and firefighter) $400.00
FIR - 2 Breathing Support Unit, per hour (includes captain, engineer and firefighter) $400.00
FIR - 3 Per truck response, per hour (includes captain, engineer and firefighter) $500.00
FIR - 4 Miscellaneous equipment billed $300.00
FIR - 5 RFD reserves the right to invoice for individual event with customized mitigation rates including itemized, per person, at various response levels and for itemized products and equipment used.
GROUP FIRE INCIDENT RESPONSE CHIEF LEVEL RESPONSE FEE
GROUP AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES FEE
CLR - 1 Chief of Department, per hour $188.00
CLR - 2 Deputy Fire Chief, per hour $167.00
CLR - 3 Battalion Chief, per hour $102.00
CLR - 4 Fire Marshal, per hour $125.00
CLR - 5 Deputy Fire Marshal, per hour $102.00
Fund Ctr./Muni. Code Description of Service Percentage of Costs to be Recovered Review Schedule
GIS Geographic Information Systems GIS Geographic Information Systems GIS Geographic Information Systems GIS Geographic Information Systems
General Services General Services General Services General Services
Labor — Chargeable on any service listed under GIS when the project takes more than one hour (custom map), any customization is required (predefined map, mapping series), or any other GIS-related customer service is requested. The rate is hourly-based ($72), and is chargeable by quarter-hour increments ($18). 100 Annual
Custom Map Custom Map Custom Map Custom Map
Plotter Plotter Plotter Plotter
8½″ × 11″ (ANSI-A) or 11″ × 17″ (ANSI-B) 100 Annual
Additional prints (per print) (max. 5) 100 Annual
With orthophotos 100 Annual
With orthophotos, additional prints (per print) (max. 5) 100 Annual
17″ × 22″ (ANSI-C) 100 Annual
Additional prints (per print) (max. 5) 100 Annual
With orthophotos 100 Annual
With orthophotos, additional prints (per print) (max. 5) 100 Annual
22″ × 34″ (ANSI-D) 100 Annual
Additional prints (per print) (max. 5) 100 Annual
With orthophotos 100 Annual
With orthophotos, additional prints (per print) (max. 5) 100 Annual
34″ × 44″ (ANSI-E) 100 Annual
Additional prints (per print) (max. 5) 100 Annual
With orthophotos 100 Annual
With orthophotos, additional prints (per print) (max. 5) 100 Annual
All scales, electronic format copies (e.g., pdf) on CD/ftp (per copy) 100 Annual
Printer Printer Printer Printer
8½″ × 11″ color 100 Annual
Additional prints (per print) (max. 5) 100 Annual
With orthophotos 100 Annual
With orthophotos, additional prints (per print) (max. 5) 100 Annual
11″ × 17″ 100 Annual
Additional prints (per print) (max. 5) 100 Annual
With orthophotos 100 Annual
With orthophotos, additional prints (per print) (max. 5) 100 Annual
All scales, electronic format copies (e.g., pdf) on CD/ftp (per copy) 100 Annual
Electronic Map Electronic Map Electronic Map Electronic Map
CD — All scales, stand-alone (i.e., w/out hardcopy map) 100 Annual
ftp — All scales, stand-alone (i.e., w/out hardcopy map) 100 Annual
CD/ftp — Additional copies (per copy) 100 Annual
Note: The default format for electronic maps is pdf
Predefined Map Predefined Map Predefined Map Predefined Map
Plotter Plotter Plotter Plotter
8½″ × 11″ (ANSI-A) or 11″ × 17″ (ANSI-B) or 17″ × 22″ (ANSI-C) 100 Annual
Additional prints (max. 5) 100 Annual
With orthophotos 100 Annual
With orthophotos, additional prints (max. 5) 100 Annual
22″ × 34″ (ANSI-D) 100 Annual
Additional prints (max. 5) 100 Annual
With orthophotos 100 Annual
With orthophotos, additional prints (max. 5) 100 Annual
34″ × 44″ (ANSI-E) 100 Annual
Additional prints (max. 5) 100 Annual
With orthophotos 100 Annual
With orthophotos, additional prints (max. 5) 100 Annual
All scales, electronic format copies (e.g., pdf) on CD/ftp (per copy) 100 Annual
Print Print Print Print
8½″ × 11″ color 100 Annual
Additional prints (max. 5) 100 Annual
With orthophotos 100 Annual
With orthophotos, additional prints (max. 5) 100 Annual
8½″ × 11″ black and white 100 Annual
Additional prints (max. 5) 100 Annual
With orthophotos 100 Annual
With orthophotos, additional prints (max. 5) 100 Annual
11″ × 17″ 100 Annual
Additional prints (max. 5) 100 Annual
With orthophotos 100 Annual
With orthophotos, additional prints (max. 5) 100 Annual
All scales, electronic format copies (e.g., pdf) on CD/ftp (per copy) 100 Annual
Electronic Map Electronic Map Electronic Map Electronic Map
CD — All scales, stand-alone (i.e., w/out hardcopy map) 100 Annual
ftp — All scales, stand-alone (i.e., w/out hardcopy map) 100 Annual
CD/ftp — Additional copies (per copy) 100 Annual
Note: The default format for electronic maps is pdf
Mapping Series Mapping Series Mapping Series Mapping Series
Basemap series — Basic (L) (on CD) 100 Annual
Basemap series — Medium (M) (on CD) 100 Annual
Basemap series — Complex (H) (on CD) 100 Annual
Note: Mapping series are not available as of December 2003. However, they are under development and the fee structure is intended to anticipate their future release.
Harbor Harbor Harbor Harbor
Fees collected in association with the harbor and marina are governed by Westrac, who sets the fees. The City receives a percentage of the fees collected. RMC Chapters 5.08.080 and 5.16.090 allow fees.
Library Library Library Library
COR1/41015, RMC 2.34.040-84 Processing fee for lost or damaged books, videos, CDs, DVDs, audio cassettes and audio books with barcodes 100 Annual
COR1/41015, RMC 2.34.040-84 Replacement fee for magazines circulated with a generic blue or yellow card (materials checked out with a barcode are charged the item's list price), plus processing fee for items without barcodes 100 Annual
Replacement charge processing fee for items without a barcode 100 Annual
COR1/41015, RMC 2.34.040-85 Replacement charge for lost or damaged library card 100 Annual
COR1/41015, RMC 2.34.040-85 Look up charge for adult library card number in the on-line catalog when ready to check-out 100 Annual
COR1/41015, RMC 2.34.040-85 Look up charge for a juvenile card number in the on-line catalog when ready to check-out 100 Annual
COR1/41015, RMC 2.34.040-86 Extended search charge, including juvenile materials and juvenile borrowers 100 Annual
COR1/41015, Reso. 23-03 Overdue fine, adult materials, $0.20 daily/item except videos and DVD's, maximum $5/item 100 Annual
100 Annual
COR1/41015, Reso. 23-03 Overdue fine, juvenile materials, $0.10 daily/item except videos and DVD's, maximum $2.50/item 100 Annual
100 Annual
COR1/41015 Overdue fine, videos and DVD, $1.00 daily/item, maximum $5/item 100 Annual
100 Annual
COR1/41015 Overdue fine, reference materials: Adult and Juvenile, $6.00 daily, maximum $60 100 Annual
100 Annual
COR1/41015, RMC 2.34.040-88 Adult guest card to use the public PC for time period specified by library policy 100 Annual
COR1/41015, RMC 2.34.040-84 Lost or damaged books, videos, DVDs, CDs, cassettes, and magazines (checked out with the barcodes) are charged the list price of the item plus processing fee for items with barcodes 100 Annual
COR1/41015 Rental: Library Community Room (Madeline F. Whittlesey Room), one booking/month, 6-month maximum, hourly 100 Annual
Deposit—$125 minimum (may be higher) 100 As Needed
Paratransit Services (Fees are supplemented by grant funding; therefore, they are not adjusted based on ECI)
Paratransit Services
RMC 2.34.040-103 Taxi scrip — $10 for $30 worth of scrip 100 Annual
RMC 2.34.040-103 Transit service — One way (late cancels, no-shows, and not-ready fee of $2.50, full ticket price, applies) 100 Annual
RMC 2.34.040-103 Special purpose group trip — $50 100 Annual
RMC 2.34.040-103 Transit service — Book of 10 tickets (one ticket for a one-way trip) 100 Annual
One way — Advance reservation (one to ten days in advance) — Day trip (7:00 AM to 6:59 PM) 100 Annual
One way — Advance reservation (one to ten days in advance) — After hours trip (7:00 PM to 6:59 AM) 100 Annual
One way — Same day reservation (reservation is same day as the pick up 12:00 AM to 11:59 PM) — Day trip (7:00 AM to 6:59 PM) 100 Annual
One way — Same day reservation (reservation is same day as the pick up 12:00 AM to 11:59 PM) — After hours trip (7:00 PM to 6:59 AM) 100 Annual
One way trip — Late cancellation (cancellation one hour before pick up) or no show (client is not at pick up location, is not ready, cancels trip at the door, or refuses to take trip) fee. {The fee is the cost of booked trip.} 100 Annual
Planning Fee Legend: (D) = Deposit fee, (F) = Flat fee
Environmental (CEQA) Review Environmental (CEQA) Review Environmental (CEQA) Review Environmental (CEQA) Review
Mitigated negative declaration (city performs work) (F) 100 Annual
Mitigated negative declaration (city administration of contractor) (F) 100 Annual
Environmental Impact Report (city administration of contractor) (F) 100 Annual
Mitigation monitoring — First year (F) 100 Annual
Mitigation monitoring — Each subsq year (F) 100 Annual
Environmental Impact Report (EIR) Environmental Impact Report (EIR) Environmental Impact Report (EIR) Environmental Impact Report (EIR)
RMC 2.34.040.23a, Ord. 2-03, E.O. 03-03 Mitigation monitoring — Billed at $125/hour to recover actual cost 100 Annual
RMC 2.34.040.23a, E.O. 03-03 Mitigation monitoring deposit (refundable) — $1,000 minimum deposit, deposit may be higher based on the project size 100 Annual
RMC 2.34.040.23b, Ord. 2-03, E.O. 03-03 Fish and game — Negative declaration 100 Annual
RMC 2.34.040.23c, Ord. 2-03, E.O. 03-03 Fish and game — EIR 100 Annual
COR1/40813, E.O. 03-03, RMC 2.34.040.24 Initial study application review — Billed at $125/hour to recover actual cost 100 Annual
COR1/40813, E.O. 03-03, RMC 2.34.040.24 Initial study application review deposit (refundable) — $1,000 minimum deposit, deposit may be higher based on the project size 100 Annual
E.O. 03-03, RMC 2.34.040-23 Environmental Impact Report (E.I.R.) 100 Annual
COR1/40814, RMC 2.34.040.23d, Ord. 2-03, E.O. 03-03 Environmental appeal 100 Annual
E.O. 03-03, RMC 2.34.040-29 General plan amendment review — Billed at $125/hour to recover actual cost 100 Annual
E.O. 03-03, RMC 2.34.040-29 General plan amendment review deposit (refundable) — $2,000 minimum deposit, deposit may be higher based on the project size 100 Annual
COR1/40808, E.O. 03-03, RMC 2.34.040-17 Rezoning review — Billed at $125/hour to recover actual cost 100 Annual
E.O. 03-03, RMC 2.34.040-17 Rezoning review deposit — $2,000 minimum deposit, deposit may be higher based on project size 100 Annual
Variance Review:
COR1/40806, E.O. 03-03, RMC 2.34.040-14 Minor variance project 100 Annual
COR1/40806, E.O. 93-014, RMC 2.34.040-14 Major variance project 100 Annual
Subdivision Review Subdivision Review Subdivision Review Subdivision Review
Preliminary plan (F) 100 Annual
Development plan (F) 100 Annual
COR1/40809, E.O. 93-018, RMC 2.34.040-18 Lot line adjustment review 100 Annual
COR1/40811, E.O. 93-020, RMC 2.34.040-20 Tentative parcel map review 100 Annual
E.O. 03-03, RMC 2.34.040.20a, Ord. 2-03 Certificate of compliance 100 Annual
RMC 2.34.040-21a, Ord. 2-03, RMC 15.08.130.4, E.O. 03-03 Subdivision tentative map review — Billed at $125/hour to recover actual cost 100 Annual
RMC 2.34.040-21a, E.O. 03-03 Subdivision tentative map review deposit — $1,000 minimum deposit, may be higher based on project size 100 Annual
RMC 15.08.125-2b, E.O. 03-03, RMC 2.34.040.21b, Ord. 2-03 Vesting tentative map review — Billed at $125/hour to recover actual cost 100 Annual
E.O. 03-03, RMC 2.34.040.21b Vesting tentative map review deposit — 1,000 minimum deposit, may be higher based on project size 100 Annual
COR1/41545, E.O. 03-03, RMC 2.34.040.21c, Ord. 2-03 Preliminary plan review — Billed at $125/hour to recover actual cost 100 Annual
E.O. 03-03, RMC 2.34.040.21c, Ord. 2-03 Preliminary plan review deposit — $1,000 minimum deposit, may be higher based on project size 100 Annual
RMC 2.34.040.21d, Ord. 2-03, E.O. 03-03 Development plan review — Billed at $125/hour to recover actual cost 100 Annual
RMC 2.34.040.21d, Ord. 2-03, E.O. 03-03 Development plan review deposit — $1,000 minimum deposit, may be higher based on project size 100 Annual
COR1/40815, E.O. 03-03, RMC 2.34.040.21e, Ord. 2-03 PA-Preliminary development plan review — Billed at $125/hour to recover actual cost 100 Annual
E.O. 03-03, RMC 2.34.040.21e PA-Preliminary development plan review deposit — $2,000 minimum deposit, may be higher based on project size 100 Annual
COR1/40816, E.O. 03-03, RMC 2.34.040.21f, Ord. 2-03 PA-Tentative development plan review — Billed at $125/hour to recover actual cost 100 Annual
COR1/40816, E.O. 03-03, RMC 2.34.040.21f PA-Tentative development plan review deposit — $2,000 minimum deposit, may be higher based on project size 100 Annual
COR1/40817, E.O. 03-03 PA-Final development plan review — Billed at $125/hour to recover actual cost 100 Annual
E.O. 03-03 PA-Final development plan review deposit — $2,000 minimum deposit, may be higher based on project size 100 Annual
Use Permit Review Use Permit Review Use Permit Review Use Permit Review
Conditional Use Permit Conditional Use Permit Conditional Use Permit Conditional Use Permit
Conditional use permit — Temporary use (F) 100 Annual
Conditional use permit — Amendment (F) 100 Annual
RMC 2.34.040.16a, Ord. 2-03, E.O. 03-03 Mobile vendor 100 Annual
RMC 2.34.040.16b/c, Ord. 2-03, E.O. 03-03 Minor project — 1 to 4 units residential or under 1,200 sq. ft. commercial and quality as CEQA exemption 100 Annual
RMC 2.34.040.16d/e, E.O. 03-03 Major project — 4 or more units residential or above 1,200 sq. ft. commercial or projects requiring initial study, billed at $125/hour to recover actual cost 100 Annual
RMC 2.34.040.16 and 16a-e, E.O. 03-03 Major project deposit — $2,000 minimum deposit, may be higher based on project size 100 Annual
Design Review Design Review Design Review Design Review
Plan check (Exempt projects: 500 sq. ft. or fewer)
RMC 15.04.930.040E Administrative design review — 501-1,200 sq. ft. floor area under 15 ft. in height 100 Annual
RMC 2.34.040.19a, Ord. 2-03, E.O. 03-03, RMC 15.04.930.090E Design review 1 — Projects 501-1,200 sq. ft. floor area not satisfying administrative design review criteria 100 Annual
RMC 2.34.040.19b, Ord. 2-03, E.O. 03-03, RMC 15.04.930.090E Design review 2 — Projects 1,201 sq. ft. and larger, hourly 100 Annual
RMC 2.34.040.19c, Ord. 2-03, E.O. 03-03, RMC 15.04.930.090E Design review 2 deposit — Projects 1,201 sq. ft. and larger 100 Annual
Engineering Review Fees Engineering Review Fees Engineering Review Fees Engineering Review Fees
Engineering review — Parcel map (0—5 lots) (F) 100 Annual
Engineering review — Final map (6—25 lots) (F) 100 Annual
Engineering review — Final map (26—100 lots) (F) 100 Annual
Engineering review — Final map (101—200 lots) (F) 100 Annual
Sign Review Sign Review Sign Review Sign Review
RMC 2.34.040.4a, Ord. 2-03, E.O. 03-03, RMC 15.06.040.2 Signs — 1 to 2 signs 100 Annual
RMC 2.34.040.4b, Ord. 2-03, E.O. 03-03, RMC 15.06.040.2 Signs — 3 or more, billed at $125/hour to recover actual cost 100 Annual
RMC 2.34.040.4b, E.O. 03-03, RMC 15.06.040.2 Signs deposit — 3 or more, $2,000 minimum deposit, may be higher based on project size 100 Annual
Sign-Change of Copy (F) — $55 100 As Needed
Miscellaneous Miscellaneous Miscellaneous Miscellaneous
E.O. 93-132, RMC 2.34.040.14a, Ord. 2-03 Fence height exception review 100 Annual
Non-residential Fence (F) — $219 100 As Needed
COR1/41510, E.O. 03-03, RMC 2.34.040.22 Street vacation review 100 Annual
E.O. 93-131, RMC 2.34.040.14b, Ord. 2-03 Special use permit review — Billed at $125/hour to recover actual cost 100 Annual
E.O. 93-131, RMC 2.34.040.14b Special use permit review deposit — $2,000 minimum deposit, may be higher based on project size 100 Annual
RMC 15.04.945.D, RMC 2.34.040.17a, Ord. 2-03, E.O. 03-03 Zoning administrator review 100 Annual
Appeal Fees:
E.O. 03-03, RMC 2.34.040.32a City Council appeal (fee received by City Clerk's office) 100 Annual
E.O. 03-03, RMC 2.34.040.32b, Ord. 2-03 Administrative appeal 100 Annual
E.O. 03-03, RMC 2.34.040.32c, Ord. 2-03 Planning Commission study session — Billed at $125/hour to recover actual cost 100 Annual
E.O. 03-03, RMC 2.34.040.32c, Ord. 2-03 Planning Commission study session deposit — $1,000 minimum deposit, may be higher based on project size 100 Annual
RMC 2.34.040.29a, Ord. 2-03, E.O. 03-03 Specific plan amendment — Billed at $125/hour to recover actual cost 100 Annual
RMC 2.34.040.29a, E.O. 03-03 Specific plan amendment deposit — $2,000 minimum deposit, may be higher based on project size 100 Annual
RMC 2.34.040.17b, Ord. 2-03, E.O. 03-03 Zoning compliance 100 Annual
E.O. 03-03 Plan retrieval 100 Annual
E.O. 03-03, RMC 2.34.040.16f, Ord. 2-03 Time extensions permit application 100 Annual
Staff research — Includes rebuild letters and all other zoning related correspondence and research, hourly 100 Annual
Staff research deposit 100 Annual
Pre-application review — Development 5,000 sq. ft. and fewer, hourly 100 Annual
Pre-application review large project — Development 5,001 sq. ft. and larger, hourly 100 Annual
Pre-application review large project deposit 100 Annual
RMC 12.46.060 Surface mining and reclamation performance bond — Refundable, annual (and conditional use permit RMC 12.46.040 ) 100 Annual
COR1/40907, RMC 2.40.110 , RMC 2.34.040.32d, Ord. 2-03, E.O. 03-03 Photocopying, per page (8-½″ × 11″) 100 Annual
E.O. 03-03, RMC 2.34.040.32e, Ord. 3-02 Sale of documents — Varies from $5 - $20 100 Annual
E.O. 03-03, RMC 2.34.040.32f, Ord. 2-03 Tape duplication 100 Annual
RMC 2.34.040.32g, Ord. 2-03, E.O. 03-03 Mailing charge — For normal weight items. Heavier weight items will be weighed by mail room staff. 100 Annual
Planning Documents Planning Documents Planning Documents Planning Documents
Form-based Code — $28 100 As Needed
Police Police Police Police
RMC 7.106.110 , RMC 7.106.130 Compliance inspection of alcohol and/or tobacco retailer 100 Annual
RMC 7.106.110 , RMC 7.106.130 Combined inspection of alcohol and tobacco retailer 100 Annual
RMC 7.106.110 , RMC 7.106.130 Re-inspection of alcohol and/or tobacco retailer 100 Annual
RMC 7.106.110 , RMC 7.106.130 Underage sales investigation of alcohol and/or tobacco retailer 100 Annual
COR1/40907, RMC 2.40.110 , RMC 2.34.040.32d Photocopying, per page (8-½″ × 11″) 100 Annual
RMC 10.20.010 , RMC 2.40.110 , RMC 2.34.040.123 Traffic accident report (federal state, county, municipalities, districts, and other political subdivisions exempt), per page 100 Annual
COR1/40921 Booking fees (passed through to County) 100 Annual
RMC 14.72.050 Traffic violations — In accordance with California Penal Code Section 19 100 Annual
Photo Requests Photo Requests Photo Requests Photo Requests
3 × 5 100 Annual
8 × 10 100 Annual
Fingerprinting Fingerprinting Fingerprinting Fingerprinting
(also see ″Concealed Weapons Permit″)
RMC 2.34.040-50 Resident, first card 100 Annual
RMC 2.34.040-50 Resident, additional card 100 Annual
RMC 2.34.040-50 Nonresident, first card 100 Annual
RMC 2.34.040-50 Nonresident, additional card 100 Annual
RMC 2.34.040 Lifescan fingerprinting service, resident 100 Annual
RMC 2.34.040 Lifescan fingerprinting service, nonresident 100 Annual
RMC 2.34.040-48 Prisoner medical transport (cost) 100 Annual
RMC 2.34.040-49 Police clearances/records check 100 Annual
False alarm charges (based on 6-month period)
COR1/41610, RMC 7.96.150, RMC 2.34.040-47 1st and 2nd false alarms 100 Annual
COR1/41610, RMC 7.96.150, RMC 2.34.040-47 3rd false alarm 100 Annual
COR1/41610, RMC 7.96.150, RMC 2.34.040-47 4th false alarm and each thereafter 100 Annual
Taxi Permits (Script Only) Taxi Permits (Script Only) Taxi Permits (Script Only) Taxi Permits (Script Only)
RMC 7.68.090 New driver 100 Annual
RMC 7.68.100 Annual renewal 100 Annual
RMC 7.84.040 Horse race permit fee 100 Annual
RMC 11.84.020 Parade permit 100 Annual
Sound permit 100 Annual
CAD printouts 100 Annual
Communications dispatch tapes, each 100 Annual
RMC 2.34.040-53 Copy of interview video tapes, each 100 Annual
RMC 2.34.040-53 Copy of interview cassette tapes, each 100 Annual
Vehicle Tow Fees Vehicle Tow Fees Vehicle Tow Fees Vehicle Tow Fees
22651(p) VC Vehicle removal from highway, public or private land 100 Annual
22651(i)(1) VC Vehicle removal (nonrental) from highway or public land for 5 or more unpaid parking violations 100 Annual
22651(o) VC Vehicle found in private or public land with registration expired in excess of 6 months 100 Annual
22651(k) VC Vehicle parked or left standing on highway for more than 72 hours 100 Annual
RMC 14.40.050 Vehicle parked on street or alley for more than 72 hours 100 Annual
RMC 11.76.100 First vehicle abandoned, wrecked, dismantled that is a public nuisance or reduces property values 100 Annual
RMC 11.76.100 Each additional vehicle abandoned, wrecked, dismantled that is a public nuisance or reduces property values 100 Annual
Tow Truck Permit Tow Truck Permit Tow Truck Permit Tow Truck Permit
COR1/40765, RMC 7.72.080 New driver — Annually 100 Annual
COR1/40765, RMC 7.72.080 Renewal — Annually 100 Annual
Dealers in firearms Dealers in firearms Dealers in firearms Dealers in firearms
Ord. 7.10040, RMC 2.34.040-51a Dealers in firearms — Initial application fee 100 Annual
Dealers in firearms — Renewal application fee 100 Annual
Peddlers and solicitors Peddlers and solicitors Peddlers and solicitors Peddlers and solicitors
Ord. 8-03, RMC 7.04.105, RMC 13.45 , RMC 7.40.030 Peddlers and solicitors police permit (plus business license permit) — Paid at business license unit 100 Annual
Ord. 8-03, RMC 7.04.105, RMC 13.45 , RMC 7.40.030.d Peddlers and solicitors police permit renewal (plus business license permit) — Paid at business license unit 100 Annual
RMC 9.52.080 , RMC 2.34.040-46 Community noise ordinance violation — Cost for administrative enforcement and noise testing 100 Annual
RMC 11.56.040.b/c, Ord. 8-03, RMC 13.45 , RMC 7.04.065 Mechanical or electronic amusement device permit — One calendar year (prorated for calendar quarters), per device — Paid at business license unit 100 Annual
Concealed Weapons Permit Concealed Weapons Permit Concealed Weapons Permit Concealed Weapons Permit
CA Penal Code 12050-12054(a) Original permit application filing fee 100 Annual
CA Penal Code 12050-12054 Fingerprint fee 100 Annual
CA Penal Code 12050-12054(a) Permit renewal fee 100 Annual
CA Penal Code 12050-12054(b) Permit amendment fee 100 Annual
Abatement Abatement Abatement Abatement
COR1/40912, RMC 2.34.040.43a, Ord. 2-03, RMC 6.40.170 , 9.48.080, 9.50 , 11.76 , 11.78 , E.O. 03-04 Inspection and notice 100 Annual
COR1/40912, RMC 2.34.040.43b, Ord. 2-03, E.O. 03-04 Request for entry 100 Annual
COR1/40912, RMC 2.34.040.43c, Ord. 2-03, E.O. 03-04 Inspection warrant 100 Annual
COR1/40912, RMC 2.34.040.43d, Ord. 2-03, E.O. 03-04 Appeal 100 Annual
COR1/40912, RMC 2.34.040.43e, Ord. 2-03, E.O. 03-04 Reinspection 100 Annual
COR1/40912, RMC 2.34.040.43f, Ord. 2-03, E.O. 03-04, RMC 11.76.060 Administrative fee for clean-up 100 Annual
COR1/40912, RMC 2.34.040.43g, Ord. 2-03, E.O. 03-04 Abatement warrant 100 Annual
COR1/40912, RMC 2.34.040.43h, Ord. 2-03, E.O. 03-04 Collection 100 Annual
E.O. 03-04 Lien and special assessment 100 Annual
E.O. 03-04 Release of recordation 100 Annual
RMC 2.34.040-44, E.O. 03-04 Auto abatement — Cost 100 Annual
COR1/40912, RMC 2.34.040.43o, Ord. 2-03, RMC 6.38.150-A, RMC 6.38.160-C, RMC 9.42.090 (Graffiti), 2.34.040-62, E.O. 03-04 Actual abatement cost (varies with consideration given to amount of solid waste removed, materials used, etc.) 100 Annual
RMC 2.34.040.43o, E.O. 03-04 Clean up (actual cost) 100 Annual
RMC 2.34.040.43o, E.O. 03-04 Dumping (actual cost) 100 Annual
Vacant Dwellings or Buildings Vacant Dwellings or Buildings Vacant Dwellings or Buildings Vacant Dwellings or Buildings
RMC 6.38.115 Vacant Property Registration Vacant Property Registration Vacant Property Registration
COR1/40912, RMC 2.34.040.43i, Ord. 2-03, RMC 6.38.100-E, E.O. 03-04 Permit to secure the building — Calculated based on cost evaluation and square footage 100 Annual
RMC 6.38.115 Per month fee to cover the staff time and cost to monitor our chronically vacant property inventory 100 As Needed
COR1/40912, RMC 2.34.040.43j, Ord. 2-03, RMC 9.48.080, RMC 2.34.040-42b Annual registration/reregistration fee — Registration fee plus actual abatement costs (see ″Actual Abatement Cost″ for additional information) 100 Annual
COR1/40912, RMC 2.34.040.43k, Ord. 2-03, RMC 9.48.080-2A, E.O. 03-04 Unimproved lot which cannot be improved — Annual, plus actual abatement costs 100 Annual
COR1/40912, RMC 2.34.040.43l, Ord. 2-03, RMC 9.48.080-2B, E.O. 03-04 Unimproved lot, plus actual abatement costs 100 Annual
COR1/40912, RMC 2.34.040.43m, Ord. 2-03, RMC 9.48.080-2C, E.O. 03-04 Improved lot with one structure containing less than four residential units, plus actual abatement costs 100 Annual
COR1/40912, RMC 2.34.040.43n, Ord. 2-03, RMC 9.48.080-2D, E.O. 03-04 Improved lot with multiple structures or with residential structure containing four or more residential units, plus actual abatement costs 100 Annual
Recreation And Parks (Continued on attached ″Rental Extra Fee Listing″)
The fee structure is in place to encourage use, while allowing citizens to recover associated costs. The City of Richmond and some nonprofit organizations, West Contra Costa Unified School District, and residents may be eligible for discounts. See Comprehensive Recreation and Parks ″Rental Policy and Fee Schedule″ for additional information. All or portions of a facility use permit deposit may be withheld due to improper use and/or violation of use by the lessee or related permit use inclusive of cancellation procedures.
Rents Rents Rents Rents
Rental Cancellation Fees Rental Cancellation Fees Rental Cancellation Fees Rental Cancellation Fees
COR1/41201, RMC 10.16.060 , Reso. 160-01 28 days prior (100% refund) 100 Annual
COR1/41201, RMC 10.16.060 , Reso. 160-01 21 days prior to event (75% refund) 100 Annual
COR1/41201, RMC 10.16.060 , Reso. 160-01 14 days prior (50% refund) 100 Annual
COR1/41201, RMC 10.16.060 , Reso. 160-01 7 days prior (25% refund) 100 Annual
COR1/41201, RMC 10.16.060 , Reso. 160-01 Less than 7 days (no refund) 100 Annual
Richmond Convention Center Richmond Convention Center Richmond Convention Center Richmond Convention Center
Rental: Memorial Auditorium Main Floor
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90a(1) Deposit — (any time), $2,400 minimum (may be higher) 100 Annual
Set up and break down Fee (Only applies to Auditorium Complex, Auditorium Main Floor and Bermuda plus Catalina rentals), hourly — $200 100 As Needed
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90a(2) Friday — Sunday, hourly 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90a(3) Monday — Thursday, hourly 100 Annual
RMC 2.34.040-51, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90a(4) Bingo, 8-hour max., daily 100 Annual
Rental: Convention Center Complex
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90b(1) Deposit — (any time), $2,400 minimum (may be higher) 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90b(2) Friday — Sunday, hourly 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90b(3) Monday — Thursday, hourly 100 Annual
Rental: Bermuda/Catalina
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90c(1) Deposit — $500 minimum (may be higher) 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90c(2) Friday — Sunday (R), hourly 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90c(3) Monday — Thursday (R), hourly 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90c(4) Friday — Sunday (NR), hourly 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90c(5) Monday — Thursday (NR), hourly 100 Annual
Rental: Terrace Rooms (C/D/E/F/G/H)
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90d(1) Deposit — $500 minimum (may be higher) 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90d(2) R, hourly 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90d(3) NR, hourly 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90d(4) Additional Terrace Room, R, hourly 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90d(5) Additional Terrace Room, NR, hourly 100 Annual
Rental: Convention Center Lobby
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90e(1) Deposit — $500 minimum (may be higher) 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90e(2) Monday — Thursday, R, hourly 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90e(3) Friday — Sunday, R, hourly 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90e(4) Monday — Thursday, NR, hourly 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90e(5) Friday — Sunday, NR, hourly 100 Annual
Rental: Convention Center Kitchen
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90f(1) Shared use (with event booking) 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90f(2) Sole use (with event booking) 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90f(3) Sole use (without event booking), 6-hour max. 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90f(4) Deposit for sole use, without event booking 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90g(1) Dressing room — Band/chorus room (w/ event booking) 100 Annual
COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90g(2) Individual dressing rooms — Upstairs, w/ event booking, per room 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.90h Alcohol use — Resident (available at convention center and parks) 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.90h(2) Alcohol use — Nonresident (available at convention center and parks) 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.90h(3) Alcohol sold — Resident (available at convention center and parks) 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.90h(4) Alcohol sold — Nonresident (available at convention center and parks) 100 Annual
COR1/41201, RMC 2.34.010 , Ord. 19-03, RMC 2.34.040.90i Concert receipts (donations and/or admission tickets) 100 Annual
Community Center Rooms Community Center Rooms Community Center Rooms Community Center Rooms
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94a(1) Social hall — (R) (RRC and Sr.C), hourly 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94a(2) Deposit, $350 minimum (may be higher) 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94b(1) Social hall — (NR) (RRC and Sr.C) 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94b(2) Deposit, $350 minimum (may be higher) 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94c(1) Social hall — (R) (MLK and Nevin) 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94c(2) Deposit, $350 minimum (may be higher) 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94d(1) Social hall — (NR) (MLK and Nevin) 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94d(2) Deposit, $350 minimum (may be higher) 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94e(1) Social hall — (R) (BTA/Shields/Parchester) 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94e(2) Deposit, $350 minimum (may be higher) 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94f(1) Social hall — (NR) (BTA/Shields/Parchester) 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94f(2) Deposit, refundable, $350 minimum (may be higher) 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94g(1) Conference rooms — (R) (BTA/Shields/MLK/Nevin/RRC/May Valley/Pt. Center/Sr. Annex) 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94g(2) Deposit, $100 minimum (may be higher) 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94h(1) Conference rooms — (NR) hourly (BTA/Shields/MLK/Nevin/RRC/ May Valley/Pt.Center/Sr. Annex) 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94h(2) Deposit, $100 minimum (may be higher) 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94i Washington Field House (by special approval only) 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94j(1) Kitchen — (R) 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94j(2) Kitchen — (NR) 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.94j(3) Concession fee (R) — Refer to Concession Policy, Section 8, Pg. 7 100 Annual
Multi-Purpose Room - hourly (BTA, NEVIN & PT. RICHMOND) — $101 100 As Needed
Deposit — $250 minimum (may be higher)
Field Permits Field Permits Field Permits Field Permits
Reso. 160-01, Ord. 19-03, RMC 2.34.040.66a(1) Baseball/softball — Youth (R) 50 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.66a(2) League deposit, refundable 100 Annual
Ord. 19-03, RMC 2.34.040.66b(1), Reso. 160-01 Baseball/softball — Youth (NR), hourly 50 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.66b(2) League deposit 100 Annual
Ord. 19-03, RMC 2.34.040.66c(1), Reso. 160-01 Adult softball (R), hourly 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.66c(2) League deposit 100 Annual
Ord. 19-03, RMC 2.34.040.66d(1), Reso. 160-01 Adult softball (NR), hourly 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.66d(2) League deposit 100 Annual
Ord. 19-03, RMC 2.34.040.66e(1), Reso. 160-01 Adult baseball, hourly (NR and R) 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.66e(2) League deposit 100 Annual
Ord. 19-03, RMC 2.34.040.66f(1), Reso. 160-01 Soccer — Youth (R) 50 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.66f(2) On-going deposit 100 Annual
Ord. 19-03, RMC 2.34.040.66g(1), Reso. 160-01 Soccer — Youth (NR), hourly 50 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.66g(2) On-going deposit 100 Annual
Ord. 19-03, RMC 2.34.040.66h(1), Reso. 160-01 Soccer — Adults, resident, hourly 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.66h(2) Deposit 100 Annual
Ord. 19-03, RMC 2.34.040.66i(1), Reso. 160-01 Soccer — Adults (NR), hourly 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.66i(2) League deposit 100 Annual
Ord. 19-03, RMC 2.34.040.66j, Reso. 160-01 Lawn bowling green — By special arrangement 100 Annual
Ord. 19-03, RMC 2.34.040.66k(1), Reso. 160-01 Tennis courts (R and NR), hourly 75 Annual
Ord. 19-03, RMC 2.34.040.66k(2), Reso. 160-01 Deposit (NR) 100 Annual
Ord. 19-03, RMC 2.34.040.66l, Reso. 160-01 Note: Tennis pro by special permit/contract only 100 Annual
Ord. 19-03, RMC 2.34.040.66m, Reso. 160-01 Sand volleyball 100 Annual
Gymnasiums Gymnasiums Gymnasiums Gymnasiums
COR1/41201, Ord. 19-03, RMC 2.34.040.67a(1), Reso. 160-01 Gymnasium, hourly, (BTA/MLK and RRC) (R) 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.67a(2), Reso. 160-01 Deposit 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.67b(1), Reso. 160-01 Gymnasium hourly, (BTA/MLK and RRC) (NR) 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.67b(2), Reso. 160-01 Deposit 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.67c(1), Reso. 160-01 Gymnasium, hourly, as social hall (BTA/MLK and RRC) (R) 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.67c(2), Reso. 160-01 Deposit 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.67d(1), Reso. 160-01 Gymnasium, hourly, as social hall (BTA/MLK and RRC) (NR) 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.67d(2), Reso. 160-01 Deposit 100 Annual
Park Reservations Park Reservations Park Reservations Park Reservations
(All park/picnic reservation fees not covered by this schedule will be done by special arrangement with the approval of the Director)
Reso. 160-01 Reservations for residents is free 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.68a Deposit 100 Annual
Excluding Marina Bay, Nicholl, Barbara and Jay Vincent, Shimada-by special arrangement ONLY (permission required for amplified sound at all parks):
Reso. 160-01, Ord. 19-03, RMC 2.34.040.68b Resident groups for fundraisers/commercial use will be charged), hourly for 100 or fewer hours 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.68c Resident groups for fundraisers/commercial use will be charged, hourly for 101—249 hours 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.68d Resident groups for fundraisers/commercial use will be charged), hourly for 250 or more hours 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.68e Nonresident, hourly for under 100 hours 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.68f 101-249 hours, nonresident, hourly 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.68g 250+ hours, nonresident, hourly 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.68h Deposit 100 Annual
Picnic Areas Picnic Areas Picnic Areas Picnic Areas
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69a Nicholl Park, resident, 1st 4 hours 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.68b Nicholl Park, resident, each hour thereafter, hourly 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.68c Deposit 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69d Nicholl park, nonresident, 1st 4 hours 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69e Nicholl park, nonresident, each hour thereafter, hourly 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69f Deposit 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69g Barbara and Jay Vincent, resident, 1st 4 hours 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69h Barbara and Jay Vincent, resident, each hour thereafter, hourly 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69i Deposit 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69j Barbara and Jay Vincent, nonresident, 1st 4 hours 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69k Barbara and Jay Vincent, nonresident, each hour thereafter, hourly 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69l Deposit 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69m Marina Bay Park, resident, per table 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69n Deposit 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69o Marina Bay Park, nonresident, per table 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69p Deposit 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69q Shimada Park, resident, per table and use 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69r Deposit 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69s Shimada Park, nonresident, per table and use 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69t Deposit 100 Annual
COR1/40913 Pools
COR1/41201, Ord. 19-03, RMC 2.34.040.70a Richmond plunge, pool rental, resident, hourly 100 Annual
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.70b Deposit 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.70c, Reso. 160-01 Richmond plunge, pool rental, nonresident, hourly 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.70d, Reso. 160-01 Deposit 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.70e, Reso. 160-01 Richmond plunge, pool lane rental, resident, hourly 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.70f Deposit, club/organization 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.70g, Reso. 160-01 Richmond swim center, pool rental, resident, hourly 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.70h, Reso. 160-01 Deposit 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.70i, Reso. 160-01 Richmond swim center, pool rental, nonresident, hourly 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.70j, Reso. 160-01 Deposit 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.70k, Reso. 160-01 Richmond swim center, pool lane rental, resident, hourly 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.70l, Reso. 160-01 Deposit (club/organization) 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.70m, Reso. 160-01 Richmond swim center, pool lane rental, nonresident, hourly 100 Annual
COR1/41201, Ord. 19-03, RMC 2.34.040.70n, Reso. 160-01 Deposit (club/organization) 100 Annual
Ord. 19-03, RMC 2.34.040.70o, Reso. 160-01 Drop-in admission — Varies by season, type (recreation, laps, etc.) and age (youth vs. adult) 100 Annual
RSC Outdoor Picnic Area Only (No Pool), Monday to Thursday, rental only during Recreation Swim Session, maximum of 50 guests, seating for 36 at picnic tables — $90 100 As Needed
RSC Outdoor Picnic Area Only (No Pool), Friday to Sunday, rental only during Recreation Swim Session, maximum of 50 guests, seating for 36 at picnic tables — $113 100 As Needed
RSC Outside Pool plus Picnic Area, Monday to Thursday, hourly -two (2) hours minimum rental — $150 100 As Needed
RSC Outside Pool plus Picnic Area, Friday to Sunday, hourly -two (2) hours minimum rental — $188 100 As Needed
COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.71 Polling Place (county/state regulated), hourly 100 Annual
Booths, Festivals and Other Special Events
Reso. 160-01, Ord. 19-03, RMC 2.34.040.97a Nonprofit information/crafts 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.97b Nonprofit food vendor 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.97c Commercial food vendor 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.97d Commercial merchandise 100 Annual
Reso. 160-01, Ord. 19-03, RMC 2.34.040.97e Office space, leased (by special arrangement) 100 Annual
Ord. 19-03, RMC 2.34.040.75, Reso. 160-01 Adult recreation classes (includes leagues) 100 Annual
Ord. 19-03, RMC 2.34.040.76, Reso. 160-01 Youth recreation classes (includes leagues) 50 Annual
Film Permits Film Permits Film Permits Film Permits
Still Photography, daily — $50 100 As Needed
Music Videos, Industrial, Web Content, daily — $100 100 As Needed
Commercial, Corporate, Short Films, Feature, Television, daily — $150 100 As Needed
(NR) = Nonresident (R) = Resident (NR) = Nonresident (R) = Resident (NR) = Nonresident (R) = Resident (NR) = Nonresident (R) = Resident
The fee structure is in place to encourage use, while allowing citizens to recover associated costs. The City of Richmond and some nonprofit organizations, West Contra Costa Unified School District, and residents may be eligible for discounts. See Comprehensive Recreation and Parks ″Rental Policy and Fee Schedule″ for additional information. All or portions of a facility use permit deposit may be withheld due to improper use and/or violation of use by the lessee or related permit use inclusive of cancellation procedures.
RENT PROGRAM RENT PROGRAM RENT PROGRAM RENT PROGRAM
Residential Rental Housing Fee City to collect fees solely to defray actual cost
RMC 6.02.180, RMC 6.38.110 (a)(5), RMC Ch. 11.100 , RMC 11.100.030 (f), RMC 11.100.060 (e)(7) The City shall be entitled to payment from any landlord for services rendered by the City of Richmond Rent Program. The amount of any fee, including late payment fee, and collection cost owed to the Rent Board of the City of Richmond shall be deemed a debt to the City of Richmond. The Rent Board shall charge and collect residential rental housing fees, including late payment fees, and may commence collection actions at any time, as may be furthered described by the Richmond Rent Board's regulations 100 As Needed
Delinquency Delinquency Delinquency Delinquency
RMC 11.100.030 (f) Any landlord who fails to file any required statement and pay the amount of the Residential Rental Housing Fee prescribed by City Council resolution within 30 days after it becomes due shall be deemed delinquent and shall be assessed the following late payment fee 100 As Needed
(1) Ten percent of the residential rental housing fee if the payment is made within one to 30 days after it became delinquent
(2) Twenty-five percent of the residential rental housing fee if the payment is made within 31—60 days after it became delinquent
(3) Fifty percent of the residential rental housing fee if the payment is made more than 60 days after it became delinquent
Such late payment fee shall become part of the residential rental housing fee then required to be paid under this section and enabling resolution
STORMWATER Stormwater collection system service fee, stormwater collection system collection fee (SEE building regulations, this fee is collected by building regulations)
C.3 Fees for projects which create or replace more than 10,000 square feet of impervious surface (fee is not applicable when a subdivision plan check fee is collected)
C.3 Stormwater control plan review 100 Annual
C.6 Construction sites greater than 1 acre or determined to be a significant threat to water quality
C.6 SWPPP monthly inspection and compliance deposit (total refundable deposit = Monthly fee multiplied by construction duration in months) 100 Annual
C.6 SWPPP monthly inspection and compliance (monthly fee to be multiplied by # months planned duration of construction) 100 Annual
C.6 Construction sites less than 1 acre or determined not to be a significant threat to water quality
Monthly inspection (monthly fee to be multiplied by # months planned duration of construction) 100 Annual
Stormwater plan review for projects not required to submit a SWCP
Plan review fee (1 hour) 100 Annual
Stormwater Permit Fees Stormwater Permit Fees Stormwater Permit Fees Stormwater Permit Fees
Stormwater Encroachment Permit — $479 100 As Needed
Hourly Rates Hourly Rates Hourly Rates Hourly Rates
Fees for work performed by City staff — Includes work performed in excess of the standard fees listed or for services not otherwise listed.
City Engineer 100 Annual
Wastewater-Stormwater General Manager 100 Annual
Stormwater Program Manager 100 Annual
Source Control Inspector III 100 Annual
Source Control Inspector II 100 Annual
Source Control Inspector I 100 Annual
Engineer Asset Administrator 100 Annual
Transportation - Parking Management Services
Shared Mobility Services Shared Mobility Services Shared Mobility Services Shared Mobility Services
Dedicated Public Parking Stalls - Mobility Operators
Gas vehicles with dedicated parking public parking stalls 100% As Needed
ZEV (zero emission vehicles) with dedicated public parking 100% As Needed
Free Floating Car Share Vehicle Permits Free Floating Car Share Vehicle Permits Free Floating Car Share Vehicle Permits Free Floating Car Share Vehicle Permits
Gas Vehicles (1 to 10 vehicles) 100% As Needed
Gas Vehicles (More than 10 vehicles) 100% As Needed
ZEV (1 to 10 vehicles) 100% As Needed
ZEV (More than 10 vehicles) 100% As Needed
Dedicated Car Share Vehicle Permits Dedicated Car Share Vehicle Permits Dedicated Car Share Vehicle Permits Dedicated Car Share Vehicle Permits
Gas Vehicles - Operating from private property (1 to 10 vehicles) 100% As Needed
Gas Vehicles - Operating from private property (More than 10 vehicles) 100% As Needed
Gas vehicles - Parked/stored on public streets 100% As Needed
ZEV (1 to 10 vehicles) 100% As Needed
ZEV (More than 10 vehicles) 100% As Needed
Bike Share/Scooter Providers (non grant funded)
Permit Application Fee (staff costs to review permit) 100% As Needed
Annual Permit Fee 100% As Needed
Public Property Repair and Maintenance Endowment fee 100% As Needed
Private Shuttle Providers Private Shuttle Providers Private Shuttle Providers Private Shuttle Providers
Permit to Operate Permit to Operate Permit to Operate Permit to Operate
Gas Vehicles 100% As Needed
ZEV 100% As Needed
Special Event transportation 100% As Needed
Dedicated Right of Way loading zones 100% As Needed
On Street Metered (Paid) Parking On Street Metered (Paid) Parking On Street Metered (Paid) Parking On Street Metered (Paid) Parking
Public parking stalls 100% As Needed
WASTEWATER Sewer service fees, Richmond Municipal Sewer District, sanitary sewer connection fee (see building regulations, this fee is collected by building regulations)
Richmond Municipal Sewer District/ sanitary sewer connection fee — See building regulations (the fee is received by building regulations) 100 Annual
Sanitary System Sewer Charges Sanitary System Sewer Charges Sanitary System Sewer Charges Sanitary System Sewer Charges
RMC 12.20.050 Within City and within West County Wastewater District or Stege Sanitary District No. 1 — Annual 100 Annual
Within City and within Richmond Municipal Sewer District No. 1 — Single unit residential, annual 100 Annual
RMC 12.20.050 FY 03-04, per SSU 100 Annual
RMC 12.20.050 FY 04-05, per SSU 100 Annual
RMC 12.20.050 FY 05-06, per SSU 100 Annual
RMC 12.20.050 FY 06-07, per SSU 100 Annual
RMC 12.20.050 FY 07-08, per SSU 100 Annual
RMC 12.20.050 FY 08-09, per SSU 100 Annual
Within City and within Richmond Municipal Sewer District No. 1 — Multi-unit residential, annual
RMC 12.20.050 FY 03-04, per SSU 100 Annual
RMC 12.20.050 FY 04-05, per SSU 100 Annual
RMC 12.20.050 FY 05-06, per SSU 100 Annual
RMC 12.20.050 FY 06-07, per SSU 100 Annual
RMC 12.20.050 FY 07-08, per SSU 100 Annual
RMC 12.20.050 FY 08-09, per SSU 100 Annual
Within City and within Richmond Municipal Sewer District No. 1 — Commercial and industrial, annual
RMC 12.20.050 FY 03-04 — Not less than $182, based on water usage 100 Annual
RMC 12.20.050 FY 04-05 — Not less than $186, based on water usage 100 Annual
RMC 12.20.050 FY 05-06 — Not less than $223, based on water usage 100 Annual
RMC 12.20.050 FY 06-07 — Not less than $227, based on water usage 100 Annual
RMC 12.20.050 FY 07-08 — Not less than $232, based on water usage 100 Annual
RMC 12.20.050 FY 08-09 — Not less than $237, based on water usage 100 Annual
Richmond Municipal Sewer District No. 1, commercial and industrial, annual
FY 11-12 $41.65 per IWU, $0.885 per lbs BOD and $0.408 per lbs TSS, but not less than $344, based on water usage 100 Annual
FY 12-13 $43.73 per IWU, $0.929 per lbs BOD and $0.429 per lbs TSS, but not less than $361, based on water usage 100 Annual
FY 13-14 $45.92 per IWU, $0.975 per lbs BOD and $0.450 per lbs TSS, but not less than $379 based on water usage 100 Annual
Stormwater Management Program Charge Stormwater Management Program Charge Stormwater Management Program Charge Stormwater Management Program Charge
RMC 12.20.050 Within City and within West County Wastewater District or Stege Sanitary District No. 1 — Not less than $32, based on water usage, annual 100 Annual
RMC 12.20.050 Within City and within Richmond Municipal Sewer District No. 1 — Single unit residential and multi-unit residential, not less than $32, based on water usage, annual 100 Annual
RMC 12.20.050 Within City and within Richmond Municipal Sewer District No. 1 — Commercial and industrial, not less than $32, based on water usage, annual 100 Annual
Stormwater Permitting Program Stormwater Permitting Program Stormwater Permitting Program Stormwater Permitting Program
RMC 12.20.050 (b.1) Permit fee — Annual (includes biennial inspections) 100 Annual
RMC 12.20.050 (b.2) Additional site visit inspection charge — Each site 100 Annual
RMC 12.20.050 (b.3) Violation site visit inspection charge — Each site, when site includes monitoring, sampling or testing 100 Annual
RMC 12.20.050 (b.4) Violation laboratory charges — Cost plus 10%, as needed 100 Annual
Wastewater Discharge Permitting Program Wastewater Discharge Permitting Program Wastewater Discharge Permitting Program Wastewater Discharge Permitting Program
Baseline Monitoring Report Review for New Categorical Dischargers as defined in 40 CFR Chapter I, Subchapter N) charged at cost plus overhead 100 Annual
Wastewater Permit Fees Wastewater Permit Fees Wastewater Permit Fees Wastewater Permit Fees
First Violation — $250 100 As Needed
Second Violation — $500 100 As Needed
Third Violation — $1000 100 As Needed
Expedited Plan Review Fee (Min. 2 hours) — $1,080 100 As Needed
Wastewater Inspection Program Wastewater Inspection Program Wastewater Inspection Program Wastewater Inspection Program
Additional site inspection fee charged at cost plus overhead 100 Annual
Fats, Oils and Grease Program Fees Fats, Oils and Grease Program Fees Fats, Oils and Grease Program Fees Fats, Oils and Grease Program Fees
Additional site inspection fee charged at cost plus overhead 100 Annual
Food handling facilities with grinders and no treatment system — 10% surcharge will be added to the annual sewer service fees 100 Annual
Wastewater Plan Review Fee Wastewater Plan Review Fee Wastewater Plan Review Fee Wastewater Plan Review Fee
Additional staff time for plan review charged at cost plus overhead 100 Annual
Expedited Plan Review Fee (Min 2 hours) — $1080 100 As Needed
Miscellaneous Miscellaneous Miscellaneous Miscellaneous
Pre and post sewer lateral video review 100 Annual
Hourly Rates Hourly Rates Hourly Rates Hourly Rates
Fees for work performed by City staff — Includes work performed in excess of the standard fees listed or for services not otherwise listed.
City Engineer 100 Annual
Wastewater-Stormwater General Manager 100 Annual
Source Control Inspector III 100 Annual
Source Control Inspector II 100 Annual
Source Control Inspector I 100 Annual
Engineer Asset Administrator 100 Annual
SSU = Sewer service unit, IWU = Industrial waste unit, BOD = Five-day chemical oxygen demand in mg/L, TSS = Total suspended solids in mg/l
** Fire Department fees are based on the calendar year and will be prorated based on application date.
*** ″+″ in the Fee column may signify that an separate/additional fee is required OR signifies that the fee will be at least the amount listed and may be higher.
Multiple fees from various departments may apply to the same project.
Deposits may be refundable based on condition.
RMC = Richmond Municipal Code, E.O. = Executive Order, Ord. = Ordinance, Reso. = Resolution, GVT C = California Government Code, HSC = California Health and Safety Code, UFC = Uniform Fire Code, 1994 Edition, 19CCR = Title 19 (California Code of Regulations, State Fire Marshal)
″Proposed″ Column Key: ″Proposed″ Column Key: ″Proposed″ Column Key: ″Proposed″ Column Key:
= fees being increased through means other than ECI.
= fees will be or have been submitted to Council under separate cover, from the overseeing dept.
(white box) in ″Proposed″ column = fees increased within the last year and are not being considered for increase at this time in ″Proposed″ column = fees increased within the last year and are not being considered for increase at this time in ″Proposed″ column = fees increased within the last year and are not being considered for increase at this time
Description Percentage of Costs Proposed Fees
IMPACT FEES IMPACT FEES IMPACT FEES
Residential Residential Residential
Parks—Quimby (Subdivisions) 100 As Needed
Parks (Infill) 100 As Needed
Community/Aquatic Center 100 As Needed
Police Facilities 100 As Needed
Fire Protection Facilities 100 As Needed
Library Facilities 100 As Needed
Storm Drains 100 As Needed
Sewer Facilities 100 As Needed
Nonresidential Nonresidential Nonresidential
Office 100 As Needed
Police Facilities 100 As Needed
Fire Facilities 100 As Needed
Library Facilities 100 As Needed
Storm Drainage 100 As Needed
Sewer Facilities 100 As Needed
Industrial 100 As Needed
Police Facilities 100 As Needed
Fire Facilities 100 As Needed
Library Facilities 100 As Needed
Storm Drainage 100 As Needed
Sewer Facilities 100 As Needed
Warehousing 100 As Needed
Police Facilities 100 As Needed
Fire Facilities 100 As Needed
Library Facilities 100 As Needed
Storm Drainage 100 As Needed
Sewer Facilities 100 As Needed

(b) The fees for the hereinabove services shall be as set forth in the "master fee schedule," a copy of which is on file with the Finance Director of the City.

(c) All fees and charges adopted or adjusted pursuant to this section shall take effect after: (1) the City Manager certifies in writing that all provisions of this section have been complied with; (2) the City Manager has published and posted the notice of adoption of adjustment of fees and charges as set forth below; and (3) the time in which an appeal to the City Council has expired or the appeal has been resolved by the City Council, whichever is later.

(d) The schedule of frequency of rate adjustments may be changed by the City Manager: (1) to adjust revenues sufficient to meet debt service coverage requirements of any bond, certificate, ordinance, resolution, indenture, contract or action under which securities have been issued by the City which contain any coverage factor requirement, and (2), if, in the City Manager's judgment, a gross inequity would be perpetrated by the existing rate schedule due to a new or unanticipated event.

(Amended by Ordinance Nos. 47-89 N.S., 3.91 N.S., 6.91 N.S., 16-93 N.S., 41-95 N.S., 2-97 N.S., 2-03 N.S., 19-03 N.S., 21-03 N.S., 3-04 N.S., 3-07 N.S. and 15-08 N.S.; Ord. No. 6-10 N.S., § 1, 2-2-2010; Ord. No. 8-10 N.S., § I, 2-16-2010; Ord. No. 17-11 N.S., § 1, 7-19-2011; Ord. No. 25-13 N.S., § 1, 12-17-2013; Ord. No. 15-14 N.S., § 1, 7-30-2014; Ord. No. 19-15 N.S., § 1, 7-21-2015; Ord. No. 8-16 N.S., § 1, 6-7-2016; Ord. No. 17-16 N.S., § 1, 12-6-2016; Ord. No. 16-17 N.S., §§ 1—4, 7-25-2017; Ord. No. 16-18 N.S., § 1, 6-26-2018; Ord. No. 21-18 N.S., §§ 3, 4, 7-17-2018; Ord. No. 17-20 N.S., § 1, 7-21-2020; Ord. No. 04-22 N.S., § 1, 3-1-2022; Ord. No. 08-23 N.S. , §§ 1, 2, 6-6-2023; Ord. No. 06-24 N.S., § 1, 6-4-2024; Ord. No. 13-25 N.S. , § 1, 6-3-2025)

Exceptions & meaning →

2.34.050 - Publication and posting of fees and charges.

Upon the adoption or adjustment of any fees and charges hereunder, the City Manager shall have a notice of adoption or adjustment of fees and charges published twice in a newspaper of general circulation within the City, with at least five days intervening between the dates of the first and last publication, and posted in two conspicuous locations in the Richmond City Hall. Said notice shall provide a general explanation of fees and charges and shall provide notification of the right to appeal under Section 2.34.060. The City Manager shall make available to the public appropriate data indicating the cost, or estimated cost, required to support the adoption or adjustment of fees and charges.

Exceptions & meaning →

2.34.060 - Appeal to City Council.

Any person who feels that any fee or charge determined and set by the City Manager is in excess of the percentage of costs reasonably borne to be recovered as set out in Section 2.34.040 may appeal in writing to the City Council within ten days after the date of the last publication of the notice of adoption or adjustment of fees and charges. Upon the filing of an appeal, the City Clerk shall set the matter for hearing before the City Council. Such hearing shall be held within 30 days after the date of filing of the appeal. Upon the conclusion of the hearing, the City Council shall declare its findings based upon the testimony and documents produced before it. The City Council may confirm, modify or reject any adoption or adjustment in fees and charges by the City Manager. The decision of the City Council shall be final.

(Source: Ordinance No. 38-89 N.S.)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Richmond Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.