Earlier editions: 2026-09
Article II — ADMINISTRATION AND CITY GOVERNMENT
Richmond Municipal Code Ch. 2.34 Fee and Service Charge Revenue/Cost Comparison System
Richmond Municipal Code · 2026-10 edition · updated 2026-10-08 · Richmond
Cite as: Richmond Municipal Code Chapter 2.34 · Text as of 2026-10-08
2.34.010 - Intent.¶
Pursuant to Article XIIIB of the California Constitution it is the intent of the City Council to require the ascertainment and recovery of costs reasonably borne from fees and charges levied therefor in providing the regulation, products or services hereinafter enumerated in this chapter.
2.34.020 - Delegation of authority and direction to City Manager.¶
The City Manager is hereby delegated the authority and directed to adopt and adjust fees and charges to recover the percentage of costs reasonably borne in providing the regulation, products or services enumerated in this chapter. In adopting and adjusting fees and charges, the City Manager shall act in an administrative and ministerial capacity and shall consider only the standards and criteria established by this chapter.
2.34.030 - "Costs reasonably borne" defined.¶
"Costs reasonably borne," as used in this chapter, shall mean and consist of the following:
(a) All applicable direct costs including, but not limited to salaries, wages, overtime, employee fringe benefits, services and supplies, maintenance and operation expenses, contracted services, special supplies and any other direct expense incurred;
(b) All applicable indirect costs including, but not restricted to, building maintenance and operations, equipment maintenance and operation, communications expenses, computer costs, printing and reproduction, and like expenses when distributed on an accounted and documented rational proration system;
(c) Fixed assets recovery expenses, consisting of depreciation of fixed assets, and additional fixed asset expense recovery charges calculated on the current estimated cost of replacement divided by the approximate life expectancy of the fixed asset. A further additional charge to make up the difference between book value depreciation not previously recovered and reserved in cash and the full cost of replacement, which also shall be calculated and considered a cost so as to recover such unrecovered costs between book value and costs of replacement over the remaining life of the asset;
(d) General overhead, expressed as a percentage, distributing and charging the expenses of the City Council, City Manager, City Clerk, Elections, City Treasurer, Finance Department, City Attorney, unallocated nondepartmental expenses, and all other staff and support service provided to the entire City organization as now organized and as it may be reorganized at any time in the future. Overhead shall be prorated between tax-financed services and fee-financed services on the basis of said percentage so that each of taxes and fees and charges shall proportionately defray such overhead costs;
(e) Departmental overhead, expressed as a percentage, distributing and charging the cost of each department head and his or her supporting expenses as enumerated in subsections (a), (b) and (c) of this section;
(f) Debt service costs, consisting of repayment of principal, payment of interest and trustee fees and administrative expenses for all applicable bond, certificate or securities issues or loans. Any required coverage factors of added reserves beyond basic debt service costs also shall be considered a cost if required by covenant within any securities ordinance, resolution, indenture or general law applicable to the City.
2.34.040 - Schedule of fees and service charges.¶
(a) The City Manager shall review the fees and charges based upon the review schedule set forth below and shall set and adjust the fees or charges so as to recover up to the listed percentage of costs reasonably necessary to provide the listed regulation, products or services. The City Manager shall take such other actions as may be necessary to accomplish and to carry out the policy of the City Council established by this chapter.
City of Richmond
Master Fee Schedule
| Fund Ctr./Muni. Code | Description of Service | Percentage of Costs to be Recovered | Review Schedule |
|---|---|---|---|
| Abatement | Abatement | Abatement | Abatement |
| See Police Department. | See Police Department. | See Police Department. | See Police Department. |
| Art Center | Art Center | Art Center | Art Center |
| The Richmond Art Center is a private, nonprofit organization. Their accounts are not included with City funds. | |||
| Building Regulations UBC Regulations used to factor fee amounts. RMC 5.12.050 , 5.12.070 , 6.02.180, 6.36.080 and 12.44.220 | |||
| Permit Fees | Permit Fees | Permit Fees | Permit Fees |
| Building Permit Fees | Building Permit Fees | Building Permit Fees | Building Permit Fees |
| Permit filing fees: | 100 | Annual | |
| COR1/40705 and 10, Reso. 142-86, RMC 6.02.180 | One permit — Minimum $10 filing fee | 100 | Annual |
| RMC 6.02.180 | Two permits — Minimum $15 filing fee | 100 | Annual |
| COR1/40705 and 10, Reso. 142-86, RMC 6.02.180 | Three or more permits (every permit shall have a $10 filing fee with a $20 minimum on combination permits) | 100 | Annual |
| COR1/40705 and 10, Reso. 142-86, RMC 6.02.180 | Building permit fee — For any building or structure, $54 minimum | 100 | Annual |
| Duplicate permit card | 100 | Annual | |
| 2nd time permit extension | 100 | Annual | |
| Change of contractor | 100 | Annual | |
| Third plan checking submittal (response to plan check comments) | 100 | Annual | |
| Change of address—Min. 2 hrs | 100 | Annual | |
| Release of record | 100 | Annual | |
| Expedited plan review fee per hour | 100 | Annual | |
| Property file retrieval per address | 100 | Annual | |
| Fax permit per address | 100 | Annual | |
| Technology fee per permit | 100 | Annual | |
| Reinspection penalty fee/ |
100 | Annual | |
| COR1/40720, Reso. 142-86, RMC 6.02.180 | New construction, for any building or structure where a building permit is issued, use the column which is 12.5% of the "building permit valuation fee," minimum $83.97 | 100 | Annual |
| COR1/40720, Reso. 142-86, RMC 6.02.180 | Other than new construction, contract amount will be the valuation and the fee will be the valuation fee, minimum $54 | 100 | Annual |
| Plumbing Permit Fees | Plumbing Permit Fees | Plumbing Permit Fees | Plumbing Permit Fees |
| COR1/40725, Reso. 142-86, RMC 6.02.180 | New construction, for any building or structure where a building permit is issued, use the column which is 10% of the building permit valuation fee, minimum fee $83.98 | 100 | Annual |
| COR1/40725, Reso. 142-86, RMC 6.02.180 | Other than new construction, the contract amount will be the valuation and the fee will be the valuation fee, minimum $54 | 100 | Annual |
| Mechanical Permit Fees | Mechanical Permit Fees | Mechanical Permit Fees | Mechanical Permit Fees |
| COR1/40760, Reso. 142-86, RMC 6.02.180 | New construction, for any building or structure where a building permit is issued, use the column which is 7.5% of the building permit valuation fee, minimum $83.77 | 100 | Annual |
| COR1/40760, Reso. 142-86, RMC 6.02.180 | Other than new construction, the contract amount will be the valuation and the fee will be the valuation fee, minimum $54 | 100 | Annual |
| Building Plan Checking Fees | Building Plan Checking Fees | Building Plan Checking Fees | Building Plan Checking Fees |
| COR1/40745, RMC 2.34.040-1, Reso. 142-86, RMC 6.02.180 | 1- and 2-family dwellings, use the 50% column | 100 | Annual |
| COR1/40745, RMC 2.34.040-1, Reso. 142-86, RMC 6.02.180 | All other buildings and structures, use the 100% column | 100 | Annual |
| PC 1&2 FAM - $500,000—$1,000,000 | 100 | Annual | |
| Engineering Site Plan Review Fee | Engineering Site Plan Review Fee | Engineering Site Plan Review Fee | Engineering Site Plan Review Fee |
| COR1/40801, RMC 2.34.040-33, Reso. 142-86, RMC 6.02.180 | 1- and 2-family dwellings, use the 7.5% column | 100 | Annual |
| COR1/40801, RMC 2.34.040-33, Reso. 142-86, RMC 6.02.180 | All other buildings or structures, use the 15% column | 100 | Annual |
| Energy Conservation Site Review (Titled "Energy Conservation Compliance Review" in RMC) | 100 | Annual | |
| COR1/40802, RMC 2.34.040-9, Reso. 142-86, RMC 6.02.180 | 1- and 2-family dwellings, use the 12.5% column | 100 | Annual |
| COR1/40802, RMC 2.34.040-9, Reso. 142-86, RMC 6.02.180 | Other buildings or structures, use the 25% column | 100 | Annual |
| Occupancy Certification Program Fee | Occupancy Certification Program Fee | Occupancy Certification Program Fee | Occupancy Certification Program Fee |
| COR1/40804, Reso. 142-86, RMC 6.02.180 | Per unit: | 100 | Annual |
| COR1/40804, Reso. 142-86, RMC 6.02.180 | Apartment house occupancy | 100 | Annual |
| COR1/40804, Reso. 142-86, RMC 6.02.180 | 1- and 2-family dwellings | 100 | Annual |
| COR1/40804, Reso. 142-86, RMC 6.02.180 | Business occupancy | 100 | Annual |
| COR1/40804, Reso. 142-86, RMC 6.02.180 | Other occupancies | 100 | Annual |
| COR1/40804, Reso. 142-86, RMC 6.02.180 | Marina operating permit | 100 | Annual |
| COR1/40804, Reso. 142-86, RMC 6.02.180 | Houseboats | 100 | Annual |
| COR1/40804, Reso. 142-86, RMC 6.02.180 | New construction permits | 100 | Annual |
| COR1/40804, Reso. 142-86, RMC 6.02.180 | Plus 10% of total permit fees on new construction or remodel permits (permit fees exclude filing, plan checking, and review fees) | 100 | Annual |
| Landscape Plan Checking Fee | Landscape Plan Checking Fee | Landscape Plan Checking Fee | Landscape Plan Checking Fee |
| COR1/41550 (Plan check and inspection: RMC 2.34.040-7), Reso. 142-86, RMC 6.02.180 | 1- and 2-family dwellings: use the 7.5% column | 100 | Annual |
| COR1/41550 (Plan check and inspection: RMC 2.34.040-7), Reso. 142-86, RMC 6.02.180 | Other dwellings: use the 15% column | 100 | Annual |
| COR1/40755, Reso. 142-86, RMC 6.02.180 | Demolition permits — Varies based on construction costs | 100 | Annual |
| COR1/40715, RMC 15.06.040-A3, Reso. 142-86, RMC 6.02.180 | Sign permits (also see planning) | 100 | Annual |
| Moving of Buildings or Structures Code (a.k.a. House Moving Permits) | 100 | Annual | |
| COR1/40735, RMC 6.08.030-B/ |
Permit fee | 100 | Annual |
| COR1/40735, Reso. 142-86, RMC 6.08.030C | Permit fee | 100 | Annual |
| RMC 6.08.030-G and RMC 6.08.120 and RMC 10.08.100 , Reso. 142-86, RMC 6.02.180 | Permit to trim, move, or replace any structures (including poles, trees, etc.) belonging to the City | 100 | Annual |
| COR1/40735, Reso. 142-86, RMC 6.08.030-G | Permit fee to trim, move, or replace any structures (including poles, trees, etc.) belonging to the City | 100 | Annual |
| COR1/40735, RMC 6.08.090-A, RMC 6.08.030-E, RMC 6.02.180 | Owner's bond equal to building official's cost plus 10% | 100 | Annual |
| RMC 12.20.020 , RMC 12.20.010.17b, RMC 6.02.180 | Richmond municipal sewer district/ |
100 | Annual |
| RMC 12.20.020 , RMC 12.20.010.17b, RMC 6.02.180 | Residential — A dwelling is one "service unit" | 100 | Annual |
| RMC 12.20.020 , RMC 12.20.010.17b, RMC 6.02.180 | Commercial/ |
100 | Annual |
| COR1/41515, RMC 12.28.130 , RMC 6.02.180 | Digging up and disturbance of roadways, etc.,/street excavation bond, refundable | 100 | Annual |
| COR1/40740, RMC 12.08.050 , RMC 6.02.180 | Water course permits — Fee plus 5% of construction cost within the public right-of-way | 100 | Annual |
| Full Cost Recovery Hourly Rates | Full Cost Recovery Hourly Rates | Full Cost Recovery Hourly Rates | Full Cost Recovery Hourly Rates |
| Building inspector | 100 | Annual | |
| Permit technician | 100 | Annual | |
| Admin./clerical | 100 | Annual | |
| Developer Fees | Developer Fees | Developer Fees | Developer Fees |
| RMC 12.64.060 , RMC 15.08.040 | Public Facility Impact Fees | ||
| The fees pay for major infrastructure improvements in each area required as a result of new development (off-site roads, traffic signals, fire, and police facilities, and park and recreation facilities). | |||
| RMC 6.02.180 | Residential, single-family (DU). $5,359.01 allocated as follows: | 100 | Annual |
| RMC 15.08.400-2, RMC 15.08.400-8, RMC 6.02.180 | Park/ |
100 | Annual |
| RMC 6.02.180 | Community/ |
100 | Annual |
| RMC 6.02.180 | Police facilities — $221.98 | 100 | Annual |
| RMC 6.02.180 | Fire facilities — $268.91 | 100 | Annual |
| Residential, multifamily (DU) — $4,217.95 allocated as follows: | 100 | Annual | |
| RMC 6.02.180 | Park/ |
100 | Annual |
| RMC 6.02.180 | Community/ |
100 | Annual |
| RMC 6.02.180 | Police facilities — $118.29 | 100 | Annual |
| RMC 6.02.180 | Fire facilities — $100.84 | 100 | Annual |
| Commercial, office (AC), per 1,000 sq. ft. — $3,468.97 allocated as follows: | 100 | Annual | |
| RMC 6.02.180 | Park/ |
100 | Annual |
| RMC 6.02.180 | Community/ |
100 | Annual |
| RMC 6.02.180 | Police facilities — $1,855.52 | 100 | Annual |
| RMC 6.02.180 | Fire facilities — $1,613.44 | 100 | Annual |
| Commercial, office industrial (AC), per 1,000 sq. ft. — $2,593.40 allocated as follows: | 100 | Annual | |
| RMC 6.02.180 | Park/ |
100 | Annual |
| RMC 6.02.180 | Community/ |
100 | Annual |
| RMC 6.02.180 | Police facilities — $979.96 | 100 | Annual |
| RMC 6.02.180 | Fire facilities — $1,613.44 | 100 | Annual |
| Brickyard Cove Developer Fees (for streets) | |||
| COR1/10747, RMC 15.04.520, RMC 6.02.180 | Single-family residential (per residential unit) | 100 | Annual |
| COR1/10747, RMC 15.04.520, RMC 6.02.180 | Multifamily residential (per residential unit) | 100 | Annual |
| COR1/10747, RMC 15.04.520, RMC 6.02.180 | Commercial (per sq. ft. of bldg. area) | 100 | Annual |
| COR1/10747, RMC 15.04.520, RMC 6.02.180 | Industrial (per sq. ft. of bldg. area) | 100 | Annual |
| El Sobrante Developer Fees (for streets) | |||
| COR1/10749, RMC 6.02.180 | Single-family residential (per residential unit) | 100 | Annual |
| COR1/10749, RMC 6.02.180 | Multifamily residential (per residential unit) | 100 | Annual |
| COR1/10749, RMC 6.02.180 | Commercial (per sq. ft. of bldg. area) | 100 | Annual |
| COR1/10749, RMC 6.02.180 | Industrial (per sq. ft. of bldg. area) | 100 | Annual |
| Hilltop/ |
|||
| COR1/10748, RMC 6.02.180 | Single-family residential (per residential unit) | 100 | Annual |
| COR1/10748, RMC 6.02.180 | Multifamily residential (per residential unit) | 100 | Annual |
| COR1/10748, RMC 6.02.180 | Commercial (per sq. ft. of bldg. area) | 100 | Annual |
| COR1/10748, RMC 6.02.180 | Industrial (per sq. ft. of bldg. area) | 100 | Annual |
| RMC 6.02.180 | County's Drainage Area No. 73 (El Sobrante Valley) — Varies based on lot size | 100 | Annual |
| RMC 6.02.180 | Park dedication fees | 100 | Annual |
| RMC 6.02.180 | Point Richmond parking district fee — Applies to the Point Richmond downtown commercial area (public works) — Varies based on numerous factors | 100 | Annual |
| RMC 6.02.180 | Tisconia Estates fees (Pt. Richmond area) | 100 | Annual |
| RMC 6.02.180 | Subregional Transportation Mitigation Program | 100 | Annual |
| RMC 6.02.180 | STMP — The County sets this fee. We act as a pass-through agent (the City retains no portion of the fee) | 100 | Annual |
| RMC 15.12.050 , RMC 6.02.180 | SF residential, per DU | 100 | Annual |
| RMC 15.12.050 , RMC 6.02.180 | Multifamily residential, per DU | 100 | Annual |
| RMC 15.12.050 , RMC 6.02.180 | Commercial office, industrial, retail, per sq. ft. | 100 | Annual |
| RMC 15.12.050 , RMC 6.02.180 | Other — Per trip | 100 | Annual |
| RMC 2.34.040-37, RMC 15.08.220-9, RMC 15.08.310-7, RMC 6.02.180,E.O.90-037 | Final parcel map review | 100 | Annual |
| RMC 2.34.040-37, RMC 15.08.220-9, RMC 15.08.310-7, RMC 6.02.180, E.O.90-038 | Final subdivision map review — $500 + $10/lot | 100 | Annual |
| RMC 6.02.180,E.O.90-038 | Per lot | 100 | Annual |
| Miscellaneous | Miscellaneous | Miscellaneous | Miscellaneous |
| RMC 2.34.040-39, RMC 15.08.480-5, RMC 6.02.180,E.O.90-039 | Improvement plan check — $400 + $10/lot | 100 | Annual |
| RMC 6.02.180,E.O.90-039 | Per lot | 100 | Annual |
| Residential Dwelling Unit Inspection | Residential Dwelling Unit Inspection | Residential Dwelling Unit Inspection | Residential Dwelling Unit Inspection |
| Non-Owner Occupied Residential Inspection | |||
| RMC 6.40.170-1, RMC 2.34.040-42c, RMC 6.02.180, Reso. 142-86 | Registration fee (non-owner-occupancy program rental properties) | 100 | Annual |
| RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Reso. 142-86 | Initial inspection fee — Per unit | 100 | Annual |
| RMC 6.40.170-3, RMC 6.02.180, Reso. 142-86 | Reinspection fee — Per unit | 100 | Annual |
| RMC 6.40.170-4, RMC 6.02.180, Reso. 142-86 | 2nd reinspection fee — Per unit | 100 | Annual |
| COR1/40901, RMC 6.02.180 | Miscellaneous penalty fees — Penalties charged for working without a permit, the penalty is double the amount of the fee | 100 | Annual |
| COR1/40904, RMC 6.02.180 | Quarterly fees (C.I.P.) | 100 | Annual |
| Code Compliance Inspection Fees | Code Compliance Inspection Fees | Code Compliance Inspection Fees | Code Compliance Inspection Fees |
| 1-2 units,½ hour, plus $10 admin. fee and filing fee | 100 | Annual | |
| 3-4 units, 1 hour, plus $10 admin. fee and filing fee | 100 | Annual | |
| 5-6 units, 1-½ hours, plus $10 admin. fee and filing fee | 100 | Annual | |
| 7-up, 2 hours, plus $10 admin. fee and filing fee | 100 | Annual | |
| COR1/40750 (Review and inspection: RMC 2.34.040-5 and 6), RMC 12.44.030-j, Reso. 142-86, UBC Sec. 70, RMC 6.02.180, E.O.90-005, E.O.90-006 | Grading permits/ |
100 | Annual |
| RMC 12.44.030-kIB, Reso. 142-86, RMC 6.02.180 | Excavation, grading, and earthwork construction deposit | 100 | Annual |
| RMC 12.52.060 | Alquist Priolo Geological Study filing fee — Cost (staff time billed at approximately $80—$100/hour and consultant time charged at actual cost) | 100 | Annual |
| COR1/40820, RMC 2.34.040-12, RMC 6.02.180 | Encroachment review — Private (see engineering for public right-of-way encroachment permit) | 100 | Annual |
| Plan retrieval | 100 | Annual | |
| Reprint job card | 100 | Annual | |
| Comprehensive Planning Fee (CPF) | Comprehensive Planning Fee (CPF) | Comprehensive Planning Fee (CPF) | Comprehensive Planning Fee (CPF) |
| Levied 0.1769% for maintenance of General Plan, Specific Plans, Zoning Ordinance, and other adopted plans and policies required to make necessary findings and determinations regarding land uses | 100 | Until amended by City Council | |
| Work Done Without Permits | Work Done Without Permits | Work Done Without Permits | Work Done Without Permits |
| Ord. 17-20, RMC 6.38.110 , RMC 13.45 | Investigation fee for work done without permits — 3 times permit fees (in addition to the permit fee) | 100 | As Needed |
| Building regulations uses the Uniform Building Code (UBC) valuation schedules. | |||
| **** These developer fees are being analyzed by an outside consultant, and proposed increases will be presented to Council at a later date. | |||
| Business License A combination of fees may be charged. | |||
| COR1/40605, RMC 7.04.030, Ord. 8-03, RMC 13.45 | Basic rate — For each business (each location), annually | 100 | Annual |
| RMC 7.04.115.a, Ord. 8-03, RMC 13.45 | Part-time business (generates more than $600 but less than $1,000) — Per fiscal year, annually | 100 | Annual |
| RMC 7.04.115.a, Ord. 8-03, RMC 13.45 | Part-time business (generates more than $600 but less than $1,000) — Per fiscal year, semiannually | 100 | Annual |
| COR1/40605, RMC 7.04.200 , Ord. 8-03, RMC 13.45 | Duplicate (copy) of lost business license | 100 | Annual |
| COR1/40605, RMC 7.04.030, Ord. 8-03, RMC 13.45 | Additional amount per employee, for 1 to 25 employees, annually | 100 | Annual |
| COR1/40605, RMC 7.04.030, Ord. 8-03, RMC 13.45 | Additional amount per each employee, 25+ employees, annually | 100 | Annual |
| COR1/40605, RMC 7.04.130 , Ord. 8-03, RMC 13.45 | Amusements (skating rink, boxing exhibition, etc.) — Per ticket, annually | 100 | Annual |
| COR1/40605, RMC 7.04.060, Ord. 8-03, RMC 13.45 | Arcade | 100 | Annual |
| COR1/40605, RMC 7.04.070, Ord. 8-03, RMC 13.45 | Auction — Application fee | 100 | Annual |
| COR1/40605, RMC 7.04.070, Ord. 8-03, RMC 13.45 | Auctioneer — Daily | 100 | Annual |
| COR1/40605, RMC 7.04.080, Ord. 8-03, RMC 13.45 | Bowling alley — Annual license fee if $20,000 or less of gross receipts | 100 | Annual |
| COR1/40605, RMC 7.04.080, Ord. 8-03 | For each $1,000 or fraction thereof over $20,000 | 100 | Annual |
| COR1/40605, RMC 7.04.050, Ord. 8-03, RMC 13.45 | Carnival — Daily | 100 | Annual |
| COR1/40605, RMC 7.04.050, Ord. 8-03, RMC 13.45 | Circus — Daily | 100 | Annual |
| COR1/40605, RMC 7.04.032, Ord. 8-03, RMC 13.45 | Child care home — In which 7 or more children receive in-home care, annually, plus per child fee | 100 | Annual |
| COR1/40605, RMC 7.04.032, Ord. 8-03, RMC 13.45 | Child care home per child fee — Per child, annually | 100 | Annual |
| COR1/40605, RMC 7.24.100 , Ord. 8-03, RMC 13.45 | Close-out sale — Application fee (for 30 days) | 100 | Annual |
| COR1/40605, RMC 7.04.260 , Ord. 8-03, RMC 13.45 | Contractor/ |
100 | Annual |
| COR1/40605, RMC 7.04.030, Ord. 8-03, RMC 13.45 | Additional amounts per quarter, per employee who will be working on the job at any time in the City of Richmond, up to 25 | 100 | Annual |
| COR1/40605, RMC 7.04.030, Ord. 8-03, RMC 13.45 | Additional amount for each employee, over 25, quarterly | 100 | Annual |
| COR1/40605, RMC 7.04.050, Ord. 8-03, RMC 13.45 | Hawker — Daily, if article sold is not a patent or other medicine | 100 | Annual |
| COR1/40605, RMC 7.04.050, Ord. 8-03, RMC 13.45 | Hawker — Daily, patent or other medicine | 100 | Annual |
| COR1/40605, RMC 7.04.125, Ord. 8-03, RMC 13.45 | Hazardous waste facilities — Fee shall not exceed ten percent of facility's annual gross receipts, quarterly | 100 | Annual |
| COR1/40605, RMC 7.04.050, Ord. 8-03, RMC 13.45 | Itinerant show — Daily | 100 | Annual |
| COR1/40605, RMC 7.04.090, Ord. 8-03, RMC 13.45 | Juke box — Payable annually or semiannually, per machine, per year | 100 | Annual |
| COR1/40605, RMC 7.28.030.b, Ord. 8-03, RMC 13.45 , RMC 7.04.137 | Junkyard application fee (in addition to basic fee schedule) | 100 | Annual |
| COR1/40605, RMC 7.04.090, Ord. 8-03, RMC 13.45 | Mechanical musical instruments — $18/semiannually or | 100 | Annual |
| COR1/40605, RMC 7.04.090, Ord. 8-03, RMC 13.45 | Mechanical musical instruments — $36 annually, per instrument | 100 | Annual |
| RMC 11.56.040.b/ |
Mechanical or electronic amusement device police permit — One calendar year (prorated for calendar quarters), per device (plus conditional use permit paid to Planning Department) | 100 | Annual |
| COR1/40605, RMC 7.76.040 , Ord. 8-03, RMC 7.04.138, RMC 13.45 | Mobilehome park — Per mobilehome lot, annually | 100 | Annual |
| Motion picture theater — Based on gross receipts, annually: | 100 | Annual | |
| COR1/40605, RMC 7.04.040, Ord. 8-03, RMC 13.45 | Up to $20,000 annually | 100 | Annual |
| COR1/40605, RMC 7.04.040, Ord. 8-03 | >$20,000 annually, add $3 for each $1,000 or fraction thereof over $20,000 | 100 | Annual |
| COR1/40605, RMC 7.04.135.a, Ord. 8-03, RMC 13.45 | Oil drilling — Daily | 100 | Annual |
| COR1/40605, RMC 7.04.135.c, Ord. 8-03, RMC 13.45 | Oil production/ |
100 | Annual |
| COR1/40605, Ord. 8-03, RMC 7.04.135.b, RMC 13.45 | Oil production — First year, per well | 100 | Annual |
| COR1/40605, Ord. 8-03, RMC 7.04.135.b, RMC 13.45 | Oil production — Each year thereafter, per well | 100 | Annual |
| COR1/40605, RMC 7.04.100 , RMC 7.40.020-c, Ord. 8-03, RMC 13.45 | Peddler/ |
100 | Annual |
| COR1/40605, RMC 7.04.100 , Ord. 8-03, RMC 7.40.020-c, RMC 13.45 | Peddler/ |
100 | Annual |
| COR1/40605, RMC 7.40.040 /7.40.042 | Peddler/ |
100 | Annual |
| COR1/40605, RMC 7.04.210 , RMC 13.45 , Ord. 8-03 | Peddler/ |
100 | Annual |
| COR1/40605, RMC 7.04.210 , RMC 13.45 , Ord. 8-03 | Peddler/ |
100 | Annual |
| Ord. 8-03, RMC 7.04.105, RMC 13.45 , RMC 7.40.030 | Peddlers and solicitors police permit (plus business license permit) | 100 | Annual |
| Ord. 8-03, RMC 7.04.105, RMC 13.45 , RMC 7.40.030.d | Peddlers and solicitors police permit renewal (plus business license permit) | 100 | Annual |
| COR1/40605, RMC 7.04.110 , Ord. 8-03, RMC 13.45 | Photographs, enlargements, frames, coupons, and orders for taking photographs — Semiannual | 100 | Annual |
| COR1/40605, RMC 7.04.110 , Ord. 8-03, RMC 13.45 | Photographs, enlargements, frames, coupons, and orders for taking photographs — Per day | 100 | Annual |
| COR1/40605, RMC 7.04.080, Ord. 8-03, RMC 13.45 | Pool or billiard room — Per table, annually | 100 | Annual |
| COR1/40605, RMC 7.04.051, Ord. 8-03, RMC 13.45 | Racing forms application fee (vendor) | 100 | Annual |
| COR1/40605, RMC 7.04.051, Ord. 8-03, RMC 13.45 | Racing forms (vendor) — Quarterly | 100 | Annual |
| COR1/40605, RMC 7.04.050, Ord. 8-03, RMC 13.45 | Rodeo — Daily | 100 | Annual |
| COR1/40605, RMC 7.04.060, Ord. 8-03, RMC 13.45 | Shooting gallery — Annually | 100 | Annual |
| COR1/40605, RMC 7.04.120 , Ord. 8-03, RMC 13.45 | Taxicab — Per cab | 100 | Annual |
| COR1/40605, RMC 7.04.092, Ord. 8-03, RMC 13.45 | Weight scales — Per scale, annually | 100 | Annual |
| Delinquency (late) fee (business license renewal) | |||
| COR1/40605, RMC 7.04.290, Ord. 8-03 | Days 1-30 | 100 | Annual |
| COR1/40605, RMC 7.04.290, Ord. 8-03 | Days 31-60 | 100 | Annual |
| COR1/40605, RMC 7.04.290, Ord. 8-03 | Over 60 days | 100 | Annual |
| Cable | Cable | Cable | Cable |
| RMC 7.94.042-7 | Telecommunications registration and review fee | 100 | Annual |
| Videotapes — Charged at cost for time and materials. Average approximate cost begins at $25.00 for one tape, $40.00 for two tapes (same footage) (materials and man hours) | 100 | Annual | |
| Cannabis | Cannabis | Cannabis | Cannabis |
| Cannabis Fees | Cannabis Fees | Cannabis Fees | Cannabis Fees |
| Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 | Application completeness review — $1,019.00 per application | 100 | As Needed |
| Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 | Conditional use permit — $12,611.00 per application | 100 | As Needed |
| Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 | Cannabis business permit — $4,262.00 per application | 100 | As Needed |
| Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 | Retail storefront — $3,365.00 per permit | 100 | Annually |
| Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 | Retail delivery — $3,365.00 per permit | 100 | Annually |
| Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 | Distribution — $3,365.00 per permit | 100 | Annually |
| Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 | Manufacturing — $3,587.00 per permit | 100 | Annually |
| Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 | Specialty/ |
100 | Annually |
| Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 | Small cultivation — $3,587.00 per permit | 100 | Annually |
| Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 | Medium cultivation — $3,809.00 per permit | 100 | Annually |
| Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 | Large cultivation — $4,030.00 per permit | 100 | Annually |
| Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 | Nursery cultivation — $3,365.00 per permit | 100 | Annually |
| Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 | Processor cultivation — $3,365.00 per permit | 100 | Annually |
| Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 | Testing — $3,365.00 per permit | 100 | Annually |
| Ord. 08-23, RMC 6.38.110 , § 5; RMC 13.45 | Reinspection fee — $1,463.00 per inspection | 100 | As Needed |
| City Attorney | City Attorney | City Attorney | City Attorney |
| COR1/40907, RMC 2.40.110 , RMC 2.34.040.32d | Photocopying, per page (8½″ × 11″) | 100 | Annual |
| Departmental and project legal support services | 100 | Annual | |
| City Clerk | City Clerk | City Clerk | City Clerk |
| RMC 2.34.040.32a, Ord. 2-03, E.O. 03-03 | Appeal Filing Fees — Appeal a decision to a City Board | 100 | Annual |
| COR1/40907, RMC 2.40.110 , RMC 2.34.040.32d | Photocopying, per page (8½″ × 11″) | 100 | Annual |
| RMC 1.04.070 | Richmond Municipal Code full copy | 100 | Annual |
| RMC 1.04.070 | Richmond Municipal Code supplements | 100 | Annual |
| City Manager | City Manager | City Manager | City Manager |
| COR1/40907, RMC 2.40.110 , RMC 2.34.040.32d | Photocopying, per page (8½″ × 11″) | 100 | Annual |
| Special event permit application | 100 | Annual | |
| Community and Economic Development | Community and Economic Development | Community and Economic Development | Community and Economic Development |
| RMC 13.55.080 | Economic development fees — Application, commitment, financing, etc. (negotiated at estimated or actual cost) | 100 | Annual |
| RMC 13.55.100 | Rents, payments, fees, charges, and interest | 100 | Annual |
| RMC 6.02.180 | In lieu fees — Per noninclusionary units (unit is a dwelling or multifamily unit) | 100 | Annual |
| Richmond Community Development Department | |||
| Housing Division Fees/ |
|||
| Subordination Processing Fee | Subordination Processing Fee | Subordination Processing Fee | Subordination Processing Fee |
| RMC 6.40.170-1, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 | Single Family/ |
100% | As Needed |
| RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 | Multi-Family (Developer) Property less than 10 years old | 100% | As Needed |
| RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 | Multi-Family (Developer) Property 10+ years old | 100% | As Needed |
| RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 | Redraw Fee (Revisions) Single Family/ |
100% | As Needed |
| RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 | Redraw Fee (revisions) Multi-Family (Developer) | 100% | As Needed |
| Demand Statement | Demand Statement | Demand Statement | Demand Statement |
| RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 | Demand Statement | 100% | As Needed |
| Re-conveyance Fee | Re-conveyance Fee | Re-conveyance Fee | Re-conveyance Fee |
| RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 | Property less than 10 years old | 100% | As Needed |
| RMC 6.02.180; RMC 2.34.040 , Ord. 3-04 | Property 10+ years old | 100% | As Needed |
| Recording Fee | Recording Fee | Recording Fee | Recording Fee |
| RMC 6.02.180; RMC 2.34.040 , Ord. 3-04 | Recording Fee per property | 100% | As Needed |
| Notary Fee | Notary Fee | Notary Fee | Notary Fee |
| RMC 2.34.040 , Ord. 3-04 | Notary Fee per property | 100% | As Needed |
| Marina Shores Property Management Subordination Processing Fee | |||
| RMC 6.40.170-1, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 | Single Family/ |
100% | As Needed |
| RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 | Redraw Fee (Revisions) Single Family/ |
100% | As Needed |
| Demand Statement | Demand Statement | Demand Statement | Demand Statement |
| RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 | Demand Statement | 100% | As Needed |
| Re-conveyance Fee | Re-conveyance Fee | Re-conveyance Fee | Re-conveyance Fee |
| RMC 6.40.170-2, RMC 2.34.040-42c, RMC 6.02.180, Res. 142-86 | Property less than 10 years old | 100% | As Needed |
| RMC 6.02.180; RMC 2.34.040 , Ord. 3-04 | Property 10+ years old | 100% | As Needed |
| Other Fees | Other Fees | Other Fees | Other Fees |
| Fees by external department/ |
100% | As Needed | |
| Legal Review Fees | 100% | As Needed | |
| Employment and Training | Employment and Training | Employment and Training | Employment and Training |
| Voucher Program | Voucher Program | Voucher Program | Voucher Program |
| 1700 EZ hiring tax credit voucher — Per voucher/ |
100 | Annual | |
| 1700 EZ hiring tax credit voucher — Per voucher/ |
100 | Annual | |
| 1700 EZ hiring tax credit voucher expediting fee | 100 | Annual | |
| 1700 EZ hiring tax credit voucher look-up fee | 100 | Annual | |
| Engineering | Engineering | Engineering | Engineering |
| COR1/47035, RMC 2.34.040.123a, Ord. 21-03 | Sale of plans and specifications for construction jobs — From $10—$55 (cost for printing and mailing) | 100 | Annual |
| COR1/41505, RMC 12.04.120 , RMC 12.04.130 , RMC 12.48.090j, RMC 2.34.040.12c, Ord. 21-03 | Fees for work performed by City Engineer — Includes work performed under the provisions of the Improvement Acts of the State of California governing streets, avenues, etc.; cost of City employee time (Utility cut inspections, etc.) and overhead | 100 | Annual |
| Section 1 - Encroachment Permits | Section 1 - Encroachment Permits | Section 1 - Encroachment Permits | Section 1 - Encroachment Permits |
| COR1/40820, RMC 2.34.040.12a, Ord. 21-03, E.O. 90-012 | Encroachment agreement — Public right-of-way (see building regulations for private encroachment agreement) | 100 | Annual |
| COR1/40820, RMC 12.28.130 , RMC 2.34.040.12b, Ord. 21-03 | Encroachment permit/ |
100 | Annual |
| Sidewalk Dining | Sidewalk Dining | Sidewalk Dining | Sidewalk Dining |
| Encroachment permit application review for outdoor service on public sidewalks, minimum non-refundable | 100 | Annual | |
| New encroachment permit for outdoor service on public sidewalks (first year, annual fee) | 100 | Annual | |
| - plus additional fees for in-ground improvements within the public ROW (0—100 SF) | 100 | Annual | |
| - plus in-ground improvements for square footage thereafter (over 100 SF) | 100 | Annual | |
| Renew Encroachment Permit for outdoor service on public sidewalks (annual fee) | 100 | Annual | |
| - plus additional fees for in-ground improvements within the public ROW (0—100 SF) | 100 | Annual | |
| - plus in-ground improvements for square footage thereafter (over 100 SF) | 100 | Annual | |
| Section 2 - Transportation Permits | Section 2 - Transportation Permits | Section 2 - Transportation Permits | Section 2 - Transportation Permits |
| COR1/40819, RMC 2.34.040.8 | Oversized load (transportation permit/ |
100 | Annual |
| Annual permit — Per vehicle (transportation permit/ |
100 | Annual | |
| Section 6 - Other Engineering Permits | Section 6 - Other Engineering Permits | Section 6 - Other Engineering Permits | Section 6 - Other Engineering Permits |
| Traffic control plan review | 100 | Annual | |
| Curb painting and handicap parking requests—Review to determine allowance of handicap, restricted/ |
100 | Annual | |
| Letter of map revision/ |
100 | Annual | |
| Easement dedication (utility) | 100 | Annual | |
| Consultant services | 100 | Annual | |
| Section 7 - Review of Planning Application | |||
| Initial engineering review | 100 | Annual | |
| Street vacation | 100 | Annual | |
| Section 8 - Hourly Rates | Section 8 - Hourly Rates | Section 8 - Hourly Rates | Section 8 - Hourly Rates |
| Fees for work performed by city staff — Includes work performed in excess of the standard fees listed or for services not otherwise listed. | |||
| City Engineer | 100 | Annual | |
| Capital Projects Manager | 100 | Annual | |
| Senior Civil Engineer | 100 | Annual | |
| Associate Civil Engineer | 100 | Annual | |
| Engineer II | 100% | Annual | |
| Engineer I | 100% | Annual | |
| Engineer Asset Administrator | 100% | Annual | |
| Construction Inspector II | 100 | Annual | |
| Construction Inspector I | 100 | Annual | |
| Maintenance of Construction of Sidewalks | |||
| COR1/40730, RMC 12.36.060 , RMC 12.36.170-a, RMC 2.34.040.40a(1), Ord. 21-03 | Permit, $75 plus amount per sq. ft. (see below) | 100 | Annual |
| COR1/40730, RMC 12.36.170-b, RMC 2.34.040.40a(2), Ord. 21-03 | Per sq. ft. (in addition to permit) | 100 | Annual |
| RMC 12.28.180 | Resurfacing — Cost, plus 25% | 100 | Annual |
| Section 9 - Fees for Duplication | Section 9 - Fees for Duplication | Section 9 - Fees for Duplication | Section 9 - Fees for Duplication |
| Fees for Duplication | Fees for Duplication | Fees for Duplication | Fees for Duplication |
| COR1/47035, RMC 2.34.040.123b, Ord. 21-03, RMC 2.40.110 | Regular and legal size, per page | 100 | Annual |
| COR1/47035, RMC 2.34.040.123d, Ord. 21-03 | Plan size, per page | 100 | Annual |
| Plotting — Refer to GIS fees for custom maps and predefined maps | 100 | Annual | |
| Digital imaging fee — Parcel map, tract map or improvement plans, plus | 100 | Annual | |
| Per sheet to be imaged | 100 | Annual | |
| Miscellaneous Fees | Miscellaneous Fees | Miscellaneous Fees | Miscellaneous Fees |
| RMC 2.34.040.123b, Ord. 21-03, RMC 2.40.110 | Bike plan check—Per hour | 100 | As Needed |
| Finance | Finance | Finance | Finance |
| RMC 1.12.010 , Ord. 16-84 N.S., RMC 2.34.040-121 | Charges for bad checks/ |
100 | Annual |
| Mitigation Fee | 100 | Annual | |
| RMC 2.34.040.123 | Copy of financial statement, each | 100 | Annual |
| RMC 2.34.040.123 | Copy of budget book, each | 100 | Annual |
| Credit Card Fees | Credit Card Fees | Credit Card Fees | Credit Card Fees |
| Ord. 17-20, RMC 13.45 | 2% Processing fee for all credit card payments | 100 | As Needed |
| Business Tax Division | Business Tax Division | Business Tax Division | Business Tax Division |
| New Business Registration Fee | 100% | As Needed | |
| Fire Department RMC 8.16.040 Revises Section 103.2.1.1.1 of UFC to allow the City to collect fees solely to defray actual cost. Multiple fees may apply to one project. | |||
| Occupancies | Occupancies | Occupancies | Occupancies |
| Pre-Inspection Fees (Group R2 Occupancies) | |||
| Residential occupancies: | |||
| HSC 13235(a) | <=25 | 100 | Annual |
| HSC 13235(a) | >25 | 100 | Annual |
| Assembly Occupancies | Assembly Occupancies | Assembly Occupancies | Assembly Occupancies |
| With stage: | |||
| COR/40905, UFC Art. 1 , RMC 2.34.040.59a(1), Ord. 21-03, E.O. 94-59 | 1,000 or more occupant load** | 100 | Annual |
| COR/40905, UFC Art. 1 , RMC 2.34.040.59a(2), Ord. 21-03, E.O. 94-59 | Less than 1,000 occupant load** | 100 | Annual |
| Without stage: | |||
| COR/40905, UFC Art. 1 , RMC 2.34.040.59a(3), Ord. 21-03, E.O. 94-59 | 300 or more occupant load** | 100 | Annual |
| COR/40905, UFC Art. 1 , RMC 2.34.040.59a(4), Ord. 21-03, E.O. 94-59 | Without stage, 201-299 occupant load** | 100 | Annual |
| COR/40905, UFC Art. 1 , RMC 2.34.040.59a(5), Ord. 21-03, E.O. 94-59 | Without stage, 101-200 occupant load** | 100 | Annual |
| COR/40905, UFC Art. 1 , RMC 2.34.040.59a(6), Ord. 21-03, E.O. 94-59 | Without stage, 50-100 occupant load** | 100 | Annual |
| COR/40905, UFC Art. 1 , RMC 2.34.040.59a(7), Ord. 21-03, E.O. 94-59 | Stadiums, grandstands, reviewing stands** | 100 | Annual |
| Business Establishments with Moderate Hazards | |||
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58a(1), Ord. 21-03, E.O. 94-58 | Repair garage, without flame or flammable liquids** | 100 | Annual |
| COR1/40909, RMC 8.16.050 , RMC 2.34.040.58a(2), Ord. 21-03, E.O. 94-58 | Service station, including marine and private stations** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58a(3), Ord. 21-03, E.O. 94-58 | Automotive wrecking yard** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58a(4), Ord. 21-03, E.O. 94-58 | Junk yard, waste material, scrap** | 100 | Annual |
| COR1/40909, RMC 8.16.050 , RMC 2.34.040.58a(5), Ord. 21-03, E.O. 94-58 | Clinic, where fire clearance required for licensing** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58a(6), Ord. 21-03, E.O. 94-58 | Lumber yard, in excess of 100,000 board feet** | 100 | Annual |
| COR1/40909, RMC 8.16.050 , RMC 2.34.040.58a(7), Ord. 21-03, E.O. 94-58 | Printing plant or shop** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58a(8), Ord. 21-03, E.O. 94-58 | Waste material handling plant** | 100 | Annual |
| Protective Social Care (Group) Homes — Ages 18—64 (a.k.a. Group Homes) | |||
| Nonambulatory: | |||
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59b(1), Ord. 21-03, E.O. 94-59 | 40 or more occupants** | 100 | Annual |
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59b(2), Ord. 21-03, E.O. 94-59 | 13-39 occupants** | 100 | Annual |
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59b(3), Ord. 21-03, E.O. 94-59 | 7-12 occupants** | 100 | Annual |
| COR/40905, HSC 1566.2, RMC 2.34.040.59b(4), Ord. 21-03, E.O. 94-59 | 1-6 occupants** | 100 | Annual |
| Ambulatory: | |||
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59b(5), Ord. 21-03, E.O. 94-59 | 40 or more occupants** | 100 | Annual |
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59b(6), Ord. 21-03, E.O. 94-59 | 13—39 occupants** | 100 | Annual |
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59b(7), Ord. 21-03, E.O. 94-59 | 7—12 occupants** | 100 | Annual |
| COR/40905, HSC 1566.2, RMC 2.34.040.59b(8), Ord. 21-03, E.O. 94-59 | 1—6 occupants** | 100 | Annual |
| Educational Facilities, Privately-Owned | Educational Facilities, Privately-Owned | Educational Facilities, Privately-Owned | Educational Facilities, Privately-Owned |
| Private school: | |||
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59c(1), Ord. 21-03, E.O. 94-59 | Grades 1-12, 50 or more students** | 100 | Annual |
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59c(2), Ord. 21-03, E.O. 94-59 | Private school, Grades 1-12, 1-49 students** | 100 | Annual |
| Private day care: | |||
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59c(3), Ord. 21-03, E.O. 94-59 | 50 or more children** | 100 | Annual |
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59c(4), Ord. 21-03, E.O. 94-59 | 15-49 children** | 100 | Annual |
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59c(5), Ord. 21-03, E.O. 94-59 | 8-14 children** | 100 | Annual |
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59c(6), Ord. 21-03, E.O. 94-59 | State preschool, 13-49 children** | 100 | Annual |
| Adult day care facility: | |||
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59d(1), Ord. 21-03, E.O. 94-59 | 50 + occupants | 100 | Annual |
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59d(2), Ord. 21-03, E.O. 94-59 | 15-49 occupants** | 100 | Annual |
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59d(3), Ord. 21-03, E.O. 94-59 | 8-14 occupants** | 100 | Annual |
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59d(4), Ord. 21-03, E.O. 94-59 | 1-7 occupants** | 100 | Annual |
| Occupancies Where Hazardous Materials are Handled | |||
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58b(1), Ord. 21-03, E.O. 94-58 | Chemical plant, 5,000 square feet or less, per building** | 100 | Annual |
| COR1/40909, UFC Art. 1 , E.O. 94-58, RMC 2.34.040.58b(3), Ord. 21-03 | Each additional 10,000 square feet or fraction** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58c(1), Ord. 21-03, E.O. 94-58 | Chemical warehouse, 5,000 square feet or less, per building** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58c(3), Ord. 21-03,E.O.94-58 | Each additional 10,000 square feet or fraction** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58d, Ord. 21-03,E.O.94-58 | Compressed gas sales/ |
100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58e(1), Ord. 21-03,E.O.94-58 | Compressed/ |
100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58e(3), Ord. 21-03,E.O.94-58 | Each additional 10,000 square feet or fraction** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58f, Ord. 21-03,E.O.94-58 | Dry cleaning plant** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58g, Ord. 21-03,E.O.94-58 | Dry cleaners** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58h(1), Ord. 21-03,E.O.94-58 | Laboratory, 5,000 square feet or less per building** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58h(3), Ord. 21-03,E.O.94-58 | Each additional 10,000 square feet or fraction** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58i(1), Ord. 21-03,E.O.94-58 | Bulk plant, 10 acres or less** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58i(3), Ord. 21-03,E.O.94-58 | Each additional 20 acres or fraction** | 100 | Annual |
| COR1/40909, RMC 2.34.040.58j(1), Ord. 21-03,E.O.94-58 | Cabinet or furniture refinishing, 5,000 square feet or less per building** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58j(3), Ord. 21-03,E.O.94-58 | Each additional 10,000 square feet or fraction** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58k(1), Ord. 21-03,E.O.94-58 | Distillery, 5,000 square feet or less per building** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58k(2), Ord. 21-03,E.O.94-58 | Each additional 10,000 square feet or fraction** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58l(1), Ord. 21-03,E.O.94-58 | Flammable finish application, spray, electrostatic, dip, organic coatings, 5,000 square feet or less** | 100 | Annual |
| COR1/40909, RMC 8.16.050 , RMC 2.34.040.58l(3), Ord. 21-03,E.O.94-58 | Each additional 10,000 square feet or fraction** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58m(1), Ord. 21-03,E.O.94-58 | Flammable/ |
100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58m(3), Ord. 21-03,E.O.94-58 | Each additional 10,000 square feet or fraction** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58n, Ord. 21-03,E.O.94-58 | Refinery** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58o, Ord. 21-03,E.O.94-58 | Tire recapping** | 100 | Annual |
| Dust or combustible fiber producing operations: | |||
| COR1/40909, RMC 8.16.050 , UFC Art. 1 ,E.O.94-58, Ord. 21-03, RMC 2.34.040.58p(1) | 5,000 sq. ft. or less per building** | 100 | Annual |
| COR1/40909, RMC 2.34.040.58p(3), Ord. 21-03,E.O.94-58, UFC Art. 1 | Each additional 10,000 square feet or fraction** | 100 | Annual |
| Highly combustible storage: | |||
| COR1/40909, RMC 2.34.040.58q(1), Ord. 21-03,E.O.94-58 | 5,000 sq. ft. or less** | 100 | Annual |
| COR1/40909, RMC 2.34.040.58q(3), Ord. 21-03,E.O.94-58 | Each additional 10,000 square feet or fraction** | 100 | Annual |
| High-piled combustible stock: | |||
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58r(1), Ord. 21-03,E.O.94-58 | 5,000 sq. ft. or less per building** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58r(3), Ord. 21-03,E.O.94-58 | Each additional 10,000 square feet or fraction** | 100 | Annual |
| Woodworking establishment (where dust is generated): | |||
| COR1/40909, RMC 8.16.050 , RMC 2.34.040.58s(1), Ord. 21-03,E.O.94-58 | 5,000 sq. ft. or less** | 100 | Annual |
| COR1/40909, RMC 8.16.050 , RMC 2.34.040.58s(3), Ord. 21-03,E.O.94-58 | Each additional 10,000 square feet or fraction** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58,E.O.94-58 | Automotive body repair shop (Not a B1)** | ||
| Semiconductor fabrication facility: | |||
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58t(1), Ord. 21-03,E.O.94-58 | 1,000 sq. ft. or less per building** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.58t(3), Ord. 21-03,E.O.94-58 | Each additional 10,000 square feet or fraction** | 100 | Annual |
| Institutional Occupancies | Institutional Occupancies | Institutional Occupancies | Institutional Occupancies |
| Nursery, hospital, or nursing home (nonambulatory): | |||
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59e(1), Ord. 21-03,E.O.94-59 | 100 or more patients** | 100 | Annual |
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59e(2), Ord. 21-03,E.O.94-59 | 21-99 patients** | 100 | Annual |
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59e(3), Ord. 21-03,E.O.94-59 | 7-20 patients** | 100 | Annual |
| COR/40905, HSC 13143.5, RMC 2.34.040.59e(4), Ord. 21-03,E.O.94-59 | Nursery, full-time care, 6 or fewer under age 6** | 100 | Annual |
| Nursing or children's home (ambulatory): | |||
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59f(1), Ord. 21-03,E.O.94-59 | 100 or more guests** | 100 | Annual |
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59f(2), Ord. 21-03,E.O.94-59 | 21-99 guests** | 100 | Annual |
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59f(3), Ord. 21-03,E.O.94-59 | 7-20 guests** | 100 | Annual |
| COR/40905, HSC 13143.5, RMC 2.34.040.59f(4), Ord. 21-03,E.O.94-59 | 6 or fewer** | 100 | Annual |
| Jail or mental hospital: | |||
| COR/40905, HSC 3143.6.2(b), RMC 2.34.040.59g(1), Ord. 21-03,E.O.94-59 | 100 or more inmates** | 100 | Annual |
| COR/40905, HSC 3143.6.2(b), RMC 2.34.040.59g(2), Ord. 21-03,E.O.94-59 | 21-99 inmates** | 100 | Annual |
| COR/40905, HSC 3143.6.2(b), RMC 2.34.040.59g(3), Ord. 21-03,E.O.94-59 | 1-20 inmates** | 100 | Annual |
| COR/40905, HSC 3143.6.2(b), RMC 2.34.040.59g(4), Ord. 21-03,E.O.94-59 | Holding cell (per cell)** | 100 | Annual |
| Residential Occupancies | Residential Occupancies | Residential Occupancies | Residential Occupancies |
| Hotel or apartment house: | |||
| COR/40905, RMC 2.34.040.59h(1), Ord. 21-03,E.O.94-59 | 250 or more units** | 100 | Annual |
| COR/40905, RMC 2.34.040.59h(2), Ord. 21-03,E.O.94-59 | 100-249 units** | 100 | Annual |
| COR/40905, RMC 2.34.040.59h(3), Ord. 21-03,E.O.94-59 | 15-99 units** | 100 | Annual |
| COR/40905, RMC 2.34.040.59h(4), Ord. 21-03,E.O.94-59 | 6-14 units** | 100 | Annual |
| COR/40905, RMC 2.34.040.59h(5), Ord. 21-03,E.O.94-59 | 5 or fewer units** | 100 | Annual |
| COR/40905, HSC 13146.2(b), RMC 2.34.040.59i, Ord. 21-03, E.O.94-59 | Family day care (ambulatory, 7-12)** | 100 | Annual |
| Special Services | Special Services | Special Services | Special Services |
| COR/40905, RMC 8.16.050 , RMC 2.34.040.59j, Ord. 21-03, E.O.94-59 | Callback — Unnecessary delay or return to be handled as a third follow-up inspection (see ″Follow-up inspection — Third and subsequent″ below) | 100 | Annual |
| COR/40905, RMC 2.34.040.59k(1), Ord. 21-03, E.O.94-59 | Consultation,½-hour minimum | 100 | Annual |
| COR/40905, RMC 2.34.040.59k(2), Ord. 21-03,E.O.94-59 | Consultation, per hour | 100 | Annual |
| COR1/40907, RMC 2.40.110 , RMC 2.34.040.123, GVT C 6257 | Photocopying, per page (8-½ × 11) | 100 | Annual |
| False Alarms (for third and subsequent): | |||
| COR/40905, RMC 2.34.040.59l(1), Ord. 21-03,E.O.94-59 | Third (unintentional, within a 6-month period) | 100 | Annual |
| COR/40905, RMC 2.34.040.59l(1), Ord. 21-03,E.O.94-59 | Each occurrence thereafter | 100 | Annual |
| RMC 8.16.050 | Fire company mercantile inspection | 100% | As Needed |
| Fire file review—To gain access to any fire file to review, including but not limited to the following: Incident reports including California Fire Incident Report System, property history, inspection history, and facility system history | 100 | Annual | |
| COR/40905, RMC 2.34.040.59m, Ord. 21-03, E.O.94-59 | Fire hydrant flow test | 100 | Annual |
| Fire Protection System Signaling Service: | |||
| Building Owner (Parent) Fire Permit | 100 | As Needed | |
| AB-38 Inspections | 100 | As Needed | |
| COR/40905, RMC 2.34.040.59n(1), Ord. 21-03,E.O.94-59 | Registration and 1st year of service fee | 100 | Annual |
| COR/40905, RMC 2.34.040.59n(2), Ord. 21-03,E.O.94-59 | Annual service fee | 100 | Annual |
| COR/40905, RMC 2.34.040.59n(3), Ord. 21-03,E.O.94-59 | Follow-up inspection | 100 | Annual |
| COR/40905, HSC 13217, RMC 2.34.040.59n(4), Ord. 21-03,E.O.94-59 | High-rise certification | 100 | Annual |
| COR/40905, RMC 8.16.050 , RMC 2.34.040.59n(5), Ord. 21-03,E.O.94-59 | Halon concentrate test | 100 | Annual |
| COR/40905, RMC 8.16.050 , RMC 2.34.040.59n(6), Ord. 21-03 | Knox box administrative processing fee (in addition to the device fee that is paid to the Knox Company) | 100 | Annual |
| COR/40905, RMC 2.34.040.59o(1), Ord. 21-03 | Photograph, 3″ × 5″, each | 100 | Annual |
| COR/40905, RMC 2.34.040.59o(2), Ord. 21-03 | Photograph, 8″ × 10″, each | 100 | Annual |
| COR/40905, RMC 2.34.040.59p(1), Ord. 21-03 | Standby, single person, per hour | 100 | Annual |
| COR/40905, RMC 2.34.040.59p(2), Ord. 21-03 | Standby, fire company, per hour | 100 | Annual |
| COR/40905, RMC 2.34.040.59p(3), Ord. 21-03 | Training, per trainer, per hour | 100 | Annual |
| Plan Review Fees | Plan Review Fees | Plan Review Fees | Plan Review Fees |
| Building Plans | Building Plans | Building Plans | Building Plans |
| COR1/40910, RMC 2.34.040.10a, Ord. 21-03, E.O.94-10 | Fire plan review fee/ |
100 | Annual |
| RMC 2.34.040.10a(1), Ord. 21-03 | Per sq. ft. of new construction (plus base fire plan review fee) | 100 | Annual |
| COR1/40910, RMC 2.34.040.10a(2), Ord. 21-03,E.O.94-10 | Residential tenant improvement or remodeling, per sq. ft. (plus base fire plan review fee) | 100 | Annual |
| COR1/40910, RMC 8.16.040 , RMC 2.34.040.10a(3), Ord. 21-03,E.O.94-10 | Commercial, minimum charge | 100 | Annual |
| COR1/40910, RMC 8.16.040 , RMC 2.34.040.10a(4), Ord. 21-03,E.O.94-10 | Residential single-family dwelling | 100 | Annual |
| COR1/40910, RMC 8.16.040 , RMC 2.34.040.10a(5), Ord. 21-03,E.O.94-10 | Apartments, condos, etc., per unit | 100 | Annual |
| Preliminary plan review/ |
100 | Annual | |
| Single-family home review—Tenant improvements for additions and alterations (does not include review of fire sprinkler systems). Fees include ½ hour plan review | 100 | Annual | |
| Development Plans | Development Plans | Development Plans | Development Plans |
| COR1/40910, RMC 2.34.040.10b(1), Ord. 21-03,E.O.94-10 | Subdivision, fewer than 10 lots | 100 | Annual |
| COR1/40910, RMC 2.34.040.10b(2), Ord. 21-03,E.O.94-10 | Subdivision, 10 or more lots, base fee | 100 | Annual |
| COR1/40910, RMC 2.34.040.10b(2),E.O.94-10 | Each lot in excess of 10 | 100 | Annual |
| COR1/40910, RMC 2.34.040.10b(3), Ord. 21-03,E.O.94-10 | Controlled development, 1 hour minimum, per hour (example: Planning Dept. referrals, EIR review, tentative maps) | 100 | Annual |
| Fire Detection and Signaling Systems | Fire Detection and Signaling Systems | Fire Detection and Signaling Systems | Fire Detection and Signaling Systems |
| COR1/40910, RMC 2.34.040.59q(1), Ord. 21-03 | Automatic fire detection system, base fee, plus ** | 100 | Annual |
| COR1/40910, RMC 2.34.040.59q(2), Ord. 21-03 | Per story fee** | 100 | Annual |
| COR1/40910 | Per device fee** | 100 | Annual |
| COR1/40910, RMC 2.34.040.59q(3), Ord. 21-03 | Household fire detection system** | 100 | Annual |
| COR1/40910, RMC 2.34.040.59q(4), Ord. 21-03 | Manual alarm system, base fee, plus** | 100 | Annual |
| COR1/40910, RMC 2.34.040.59q(5), Ord. 21-03 | Per story fee** | 100 | Annual |
| COR1/40910 | Per device fee** | 100 | Annual |
| COR1/40910, RMC 2.34.040.59q(6), Ord. 21-03 | Local supervisory system, separate** | 100 | Annual |
| COR1/40910, RMC 2.34.040.59q(7), Ord. 21-03 | Firefighter's telephone system, base fee, plus** | 100 | Annual |
| COR1/40910, RMC 2.34.040.59q(8), Ord. 21-03 | Per story fee** | 100 | Annual |
| COR1/40910, RMC 2.34.040.59q(9), Ord. 21-03 | High-rise life safety system, base fee** | 100 | Annual |
| COR1/40910, RMC 2.34.040.59q(10), Ord. 21-03 | Plus per story fee** | 100 | Annual |
| Fire Extinguishing Systems | Fire Extinguishing Systems | Fire Extinguishing Systems | Fire Extinguishing Systems |
| RMC 2.34.040.59r(1), Ord. 21-03 | Dry chemical system | 100 | Annual |
| COR1/40910, RMC 2.34.040.59r(2), Ord. 21-03 | Halon system/ |
100 | Annual |
| COR1/40910, RMC 2.34.040.59r(3), Ord. 21-03 | Standpipe/ |
100 | Annual |
| COR1/40910 | Plus per head count fee | 100 | Annual |
| COR1/40910, RMC 2.34.040.59r(4), Ord. 21-03 | 25-99 heads | 100 | Annual |
| COR1/40910, RMC 2.34.040.59r(5), Ord. 21-03 | 4-24 heads | 100 | Annual |
| COR1/40910, RMC 2.34.040.59r(6), Ord. 21-03 | 3 or fewer heads | 100 | Annual |
| Underground for sprinklers | 100 | Annual | |
| COR1/40910, RMC 2.34.040.59r(7), Ord. 21-03 | Hood and duct system | 100 | Annual |
| COR1/40910, RMC 2.34.040.59r(8), Ord. 21-03 | Hydrant system, each | 100 | Annual |
| COR1/40910, RMC 2.34.040.59r(9), Ord. 21-03 | Spray booth | 100 | Annual |
| Gas Systems | Gas Systems | Gas Systems | Gas Systems |
| COR1/40910, RMC 2.34.040.59s(1), Ord. 21-03 | Bulk oxygen system** | 100 | Annual |
| COR1/40910, RMC 2.34.040.59s(2), Ord. 21-03 | Gaseous hydrogen system** | 100 | Annual |
| COR1/40910, RMC 2.34.040.59s(3), Ord. 21-03 | Liquid hydrogen system** | 100 | Annual |
| COR1/40910, RMC 2.34.040.59s(4), Ord. 21-03 | Medical gas system** | 100 | Annual |
| COR1/40910, RMC 2.34.040.59s(5), Ord. 21-03 | Welding and cutting piped system** | 100 | Annual |
| Venting Systems | Venting Systems | Venting Systems | Venting Systems |
| COR1/40910, RMC 2.34.040.59t(1), Ord. 21-03 | Explosion venting system | 100 | Annual |
| COR1/40910, RMC 2.34.040.59t(2), Ord. 21-03 | Smoke and heat venting system | 100 | Annual |
| COR1/40910, RMC 2.34.040.59t(3), Ord. 21-03 | Smoke management system | 100 | Annual |
| Special Uses/ |
Special Uses/ |
Special Uses/ |
Special Uses/ |
| COR1/40909, RMC 2.34.040.59t(4), Ord. 21-03 | Ammonium Nitrate storage, over 1,000 pounds** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59t(5), Ord. 21-03 | Bowling alley refinishing | 100 | Annual |
| COR1/40909, RMC 2.34.040.59t(6), Ord. 21-03 | Burning permit, recreational | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59t(7), Ord. 21-03 | Cellulose Nitrate storage** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59t(8), Ord. 21-03 | Combustible fiber/ |
100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59t(9), Ord. 21-03 | Each additional 10,000 sq. ft. or fraction** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59t(10), Ord. 21-03 | Compressed, flammable gas storage** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59t(11), Ord. 21-03 | Cryogenics** | 100 | Annual |
| COR1/40909, HSC 12101, RMC 2.34.040.59t(12), Ord. 21-03 | Explosive or blasting agent, storage, use, or transportation, per 100 pounds or less** | 100 | Annual |
| COR1/40909, RMC 2.34.040.59t(13), Ord. 21-03 | Over 100 pounds** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59t(14), Ord. 21-03 | Fireworks — Public display, set piece display | 100 | Annual |
| COR1/40909, HSC 12640, RMC 2.34.040.59t(15), Ord. 21-03 | Fireworks — Aerial display | 100 | Annual |
| Firework aerial display—Youth scouts/ |
100 | Annual | |
| Flammable or Combustible Liquids (UFC Art. 1 ) | |||
| COR1/40909, RMC 2.34.040.59u(1), Ord. 21-03 | Aboveground tank installation/ |
100 | Annual |
| COR1/40909, RMC 2.34.040.59u(2), Ord. 21-03 | Repair, alteration or extension of piping, plus | 100 | Annual |
| COR1/40909, RMC 2.34.040.59u(3), Ord. 21-03 | Hourly rate for over specified field time | 100 | Annual |
| COR1/40909, RMC 2.34.040.59u(4), Ord. 21-03 | Alcohol still** | 100 | Annual |
| COR1/40909, RMC 2.34.040.59u(5), Ord. 21-03 | Dispensing inside or outside of a building** | 100 | Annual |
| COR1/40909, RMC 2.34.040.59u(6), Ord. 21-03 | Lining or interior coating of tank | 100 | Annual |
| COR1/40909, RMC 2.34.040.59u(7), Ord. 21-03 | Loading or unloading facility** | 100 | Annual |
| COR1/40909, RMC 2.34.040.59u(8), Ord. 21-03 | Retail sales** | 100 | Annual |
| COR1/40909, RMC 2.34.040.59u(9), Ord. 21-03 | Storage, cabinet** | 100 | Annual |
| COR1/40909, RMC 2.34.040.59u(10), Ord. 21-03 | Storage, inside a building** | 100 | Annual |
| COR1/40909, RMC 2.34.040.59u(11), Ord. 21-03 | Storage, outside a building** | 100 | Annual |
| COR1/40909, RMC 2.34.040.59u(12), Ord. 21-03 | Storage, storeroom** | 100 | Annual |
| Underground Storage | Underground Storage | Underground Storage | Underground Storage |
| COR1/40909, RMC 2.34.040.59v(1), Ord. 21-03 | Abandonment in place | 100 | Annual |
| COR1/40909, RMC 2.34.040.59v(2), Ord. 21-03 | Installation of underground tank, per tank | 100 | Annual |
| COR1/40909, RMC 2.34.040.59v(3), Ord. 21-03 | Plus hourly rate over specified time | 100 | Annual |
| COR1/40909, RMC 2.34.040.59v(4), Ord. 21-03 | Removal of underground tank, per tank | 100 | Annual |
| COR1/40909, RMC 2.34.040.59v(5), Ord. 21-03 | Plus hourly rate over specified time | 100 | Annual |
| COR1/40909, RMC 2.34.040.59v(6), Ord. 21-03 | Repair, alteration or extension of piping | 100 | Annual |
| COR1/40909, RMC 2.34.040.59v(7), Ord. 21-03 | Plus hourly rate over specified time | 100 | Annual |
| COR1/40909, RMC 2.34.040.59v(8), Ord. 21-03 | Installation or replacement of fuel dispenser/ |
100 | Annual |
| COR1/40909, RMC 2.34.040.59v(9), Ord. 21-03 | Plus hourly rate over specified time | 100 | Annual |
| Miscellaneous | Miscellaneous | Miscellaneous | Miscellaneous |
| COR1/40905, UFC Art. 1 , RMC 2.34.040.59x, Ord. 21-03 | Fruit ripening | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59y, Ord. 21-03 | Fumigation or thermal, insecticidal fogging | 100 | Annual |
| Gunpowder: | |||
| COR1/40909, HSC 12640, RMC 2.34.040.59z(1), Ord. 21-03 | 100 pounds or less** | 100 | Annual |
| COR1/40909, 19CCR 1565.1, RMC 2.34.040.59z(2), Ord. 21-03 | Over 100 pounds** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59aa, Ord. 21-03 | Highly toxic pesticides** | 100 | Annual |
| High-piled combustible stock: | |||
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59ab(1), Ord. 21-03 | 12,000 sq. ft. or less** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59ab(2), Ord. 21-03 | Over 12,000 sq. ft.** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59ac, Ord. 21-03 | Liquefied petroleum gas — Dispensing (per tank)** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59ad(1), Ord. 21-03 | Tank installation, less than 2,000 gal/ |
100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59ad(2), Ord. 21-03 | Tank installation, 2,000 gallons or more | 100 | Annual |
| COR1/40909, RMC 2.34.040.59ae, Ord. 21-03 | Portable containers approved for food prep./disp.** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59af, Ord. 21-03 | Magnesium working** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59ag, Ord. 21-03 | Mall, covered and atrium, special uses, displays and assembly** | 100 | Annual |
| COR1/40909, UFC APP. II-C, RMC 2.34.040.59ah, Ord. 21-03 | Marine hotwork, single operations (extended permit fee established by fire prevention)** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59ai, Ord. 21-03 | Match storage (over 864,000 matches)** | 100 | Annual |
| COR1/40909, RMC 2.34.040.59aj, Ord. 21-03 | Miscellaneous permits (other than those specifically listed)** | 100 | Annual |
| COR1/40909, RMC 2.34.040.59ak, Ord. 21-03 | Model rocket — Firing | 100 | Annual |
| COR1/40909, RMC 2.34.040.59al, Ord. 21-03 | Model rocket — Retail sale** | 100 | Annual |
| COR1/40909, RMC 2.34.040.59am, Ord. 21-03 | Open flame device** | 100 | Annual |
| COR1/40909, RMC 2.34.040.59an, Ord. 21-03 | Oven, industrial baking or drying** | 100 | Annual |
| COR1/40909, RMC 8.08.050 , RMC 2.34.040.59ao, Ord. 21-03 | Commercial incinerator** | 100 | Annual |
| COR1/40909, UFC ART, RMC 2.34.040.59ap, Ord. 21-03 | Radioactive materials** | 100 | Annual |
| Operation of a Mechanical Refrigeration System/ |
|||
| COR1/40909, RMC 2.34.040.59aq(1), Ord. 21-03 | 0-500,000 pounds** | 100 | Annual |
| COR1/40909, RMC 2.34.040.59aq(2), Ord. 21-03 | Over 500,000 pounds** | 100 | Annual |
| Tents or Air Supported Structures: | |||
| COR1/40909, RMC 2.34.040.59ar(1), Ord. 21-03 | 200-699 sq. ft. | 100 | Annual |
| COR1/40909, RMC 2.34.040.59ar(2), Ord. 21-03 | 700-4199 sq. ft. | 100 | Annual |
| COR1/40909, RMC 2.34.040.59ar(3), Ord. 21-03 | 4,200 sq. ft. or more | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59as, Ord. 21-03 | Toxic gas** | 100 | Annual |
| COR1/40909, UFC Art. 1 , RMC 2.34.040.59at, Ord. 21-03 | Welding and cutting — Single operations, extended permit fee established by fire prevention** | 100 | Annual |
| ** Fire Department fees are based on the calendar year and will be prorated based on application date. | |||
| HSC = California Health and Safety Code. UFC = Uniform Fire Code. 19CCR = Title 19, California Code of Regulations, State Fire Marshal. | |||
| Permits are nontransferable, and fees are nonrefundable. Failure to pay invoiced fees within 30 days shall result in a 20 percent late payment charge. In the case of multiple annual permits, permits may be issued for a shorter period and prorated on the basis of a 1/12 th charge for each month and portion thereof. Occupancy permit fees cover one annual inspection and one follow-up inspection. Plan review fees cover the plan review and normal field inspections of usual duration. |
Fire Department Prevention Bureau Fees
| GROUP | AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES | FEE |
|---|---|---|
| A one (1) time fee is based on size of occupancy. | ||
| Aerial Pre-Plan: | Aerial Pre-Plan: | |
| APP - 1 | Small (elementary school size or smaller) | $695.00 |
| APP - 2 | Medium (middle school size or smaller) | $803.00 |
| APP - 3 | Larger (high school size or smaller) | $910.00 |
| APP - 4 | Extra Large (cost will vary depending on overall size) | |
| General Aerial preplans shall comply with the following requirements: Please review section RMC 8.16.040 Fire Prevention Code & Section 404 of CFC (California Fire Code) for complete requirements. | ||
| Where Required Occupancies: | ||
| 1. Group A (Assembly) - An aerial pre-plan is required for assembly occupancies having an occupant load of 300 or more and larger than 5,000 square feet. If occupancy is attached to commercial complex larger than 10,000 square feet than an aerial pre-plan is required. | ||
| Exception: Other than Group A occupancy used exclusively for the purpose of religious worship having an occupant load less than 2,000 | ||
| 2. Group B (Business) - Occupant load of 500 or more persons | ||
| 3. Group E (Educational) - Schools | ||
| 4. Group F (Factory) - Occupant load of 500 or more persons | ||
| 5. Group H (High Hazards) - Including any facility in the Contra Costa Health Services Hazardous Material Program | ||
| 6. Group I (Institutional) - Hospitals, nursing homes, Jails, etc…) | ||
| 7. Group R - 1, Hotels & motels (transient) - 20 or more sleeping units | ||
| 8. Group R - 2, Apartments, hotels & motels (non-transient), Live/ |
||
| 9. Group R - 4, Licensed Care Facilities (referrer to | ||
| 10. High-rise buildings | ||
| 11. Group M (mercantile) buildings i.e. Department stores, markets, retail or wholesales stores having an occupant load of 500 or more person | ||
| 12. Covered malls exceeding 50,000 square feet | ||
| 13. Open malls exceeding 50,000 square feet | ||
| 14. Underground buildings | ||
| 15. Buildings with atrium and having an occupancy in Group A, E or M |
| GROUP | LICENSED CARE FACILITIES - 24 HOUR | FEE |
|---|---|---|
| Occupant Load Greater than six (6) - up to six (6) Nonambulatory Occupant Load less than seven (7) | ||
| LCF - 1 | Base Fee: | $239.00 |
| LCF - 2 | Plus each additional unit/ |
$5.00 |
| Infant-care facility for children 2½ years of age and younger | ||
| LCF - 3 | Base Fee: | $239.00 |
| LCF - 4 | Plus each additional unit/ |
$5.00 |
| GROUP | LICENSED CARE FACILITIES - LESS 24 HOUR | FEE |
|---|---|---|
| ***OCCUPANT LOAD GREATER THAN SIX (6) OR MORE *** | ||
| Adult or Day Care Facility (Nonambulatory Person) | ||
| LCF - 5 | Base Fee: | $239.00 |
| LCF - 6 | Plus per unit/ |
$5.00 |
| Adult or Child Large Family Day Care | Adult or Child Large Family Day Care | |
| LCF - 7 | Base Fee: | $239.00 |
| LCF - 8 | Plus per unit/ |
$5.00 |
| Adult or Child Day Care Center | Adult or Child Day Care Center | |
| LCF - 9 | Base Fee: | $239.00 |
| LCF - 10 | Plus per unit/ |
$5.00 |
| LCF - 11 | Licensed Clinic | $239.00 |
| LCF - 12 | Pre-Inspection Fees - 850 Form | $239.00 |
| GROUP | EDUCATIONAL (PRIVATE SCHOOL) OCCUPANCY | FEE |
|---|---|---|
| To operate and maintain a school | To operate and maintain a school | |
| EDU - 1 | Occupant load less than 50 | $297.00 |
| EDU - 2 | Occupant load 50—149 | $417.00 |
| EDU - 3 | Occupant load 150—499 | $494.00 |
| EDU - 4 | Occupant load 500 or more | $595.00 |
| GROUP | INSTITUTIONAL OCCUPANCIES | FEE |
|---|---|---|
| INS - 1 | HOSPITAL (medical, surgical & psychiatric) and Nursing Homes | $477.00 |
| INS - 1.1 | Plus $5.00 per patient/ |
$5.00 |
| INS - 2 | Out Patient Clinics greater than 5 patients | $239.00 |
| INS - 2.1 | Plus $5.00 per patient/ |
$5.00 |
| INS - 3 | Inspection of Police Services facilities (holding cells) & DOJ Review (Includes the approval of Evacuation & Life Safety Procedures). | $238.00 |
| INS - 4 | Inspection of adult and/ |
$892.00 |
| GROUP | RESIDENTIAL OCCUPANCIES | FEE |
|---|---|---|
| HOTEL/ |
||
| RES - 1 | *250 or more units | $838.00 |
| RES - 2 | *100—249 units | $504.00 |
| RES - 3 | *15—99 units | $251.00 |
| RES - 4 | *6—14 units | $205.00 |
| RES - 5 | *5 or Less units | $112.00 |
| *Fees applied per building |
| GROUP | BUSINESS OCCUPANCIES | FEE |
|---|---|---|
| MULTI-BUSINESS OCCUPANCIES: | ||
| BUS - 1 | 35 or more Suites | $413.00 |
| BUS - 2 | 25—34 Suites | $354.00 |
| BUS - 3 | 15—24 Suites | $295.00 |
| BUS - 4 | 6—14 Suites | $236.00 |
| BUS - 5 | 5 or Less Suites | $177.00 |
| GROUP | HIGH RISE | FEE |
|---|---|---|
| HR - 1 | High Rise To inspect a Hi-Rise building (State certification inspection) - Pre 1974 | $2,030.00 |
| High Rise | ||
| HR-2 | To inspect a Hi-Rise building (State certification inspection) - Post 1974 | $520.00 |
| HR-2.1 | ($.005 per square foot) | $.005 sq. ft. |
| Mid-Rise To inspect and test life safety systems (i.e., smoke management) and where such systems are installed in lieu of fire department access or when required for the mitigation of other life safety issues or requirements. | ||
| HR-3 | Life safety system test | $520.00 |
| HR-3.1 | ($.05 per square foot) | $.05 sq. ft. |
| MLB-3 | Low-Rise - One to Two Floors(s) To Inspect and test life safety systems (i.e. fire alarm, sprinkler, smoke control) with a minimum 4 hours inspection time (includes re-inspection) | $932.00 |
| GROUP | SPECIAL SERVICE TASK | FEE |
|---|---|---|
| Callback, Third, and/ |
||
| SST - 1 | Callback or Third (3 rd ) follow-up or subsequent inspection. | $239.00 |
| GROUP | AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES | FEE |
|---|---|---|
| SST - 1.1 | Additional inspection time during normal business hours - $119.00 per half hour. | $119.00 |
| SST - 1.2 | Additional inspection time after normal business hours - $239.00 per hour. | $239.00 |
| SST - 1.3 | Overtime and weekend inspections: Three-hour $717.00 minimum fee. | $717.00 |
| SST - 1.4 | Fire Company Mercantile Inspection | $117.00 |
| SST - 2 | Consultation: ½ hour minimum | $119.00 |
| SST - 3 | Per hour | $239.00 |
| SST - 4 | Copying: Per Page | $.20 |
| False Alarms: Initial notice to correct any malfunctions with alarm system | No Charge | |
| SST - 5 | For 1 st (within six-month period - Jan 1 st - Jun 30 th or Jul 1 st - Dec 31 st ) | $267.00 |
| SST - 6 | 2 nd - (within six-month period - Jan 1 st - Jun 30 th or Jul 1 st - Dec 31 st ) | $535.00 |
| SST - 7 | 3 rd - and/ |
$1,070.00 |
| SST - 8 | Fire Hydrant Flow Test | $477.00 |
| Fire Protection System Signaling Service | ||
| SST - 9 | Registration and 1 st Year service fee | $239.00 |
| SST - 9.1 | Annual Service Fee | $42.00 |
| SST - 10 | High Rise Certification | $3,102.00 |
| SST - 11 | Halon Concentration Test | $477.00 |
| SST - 12 | Knox Box Service | $40.00 |
| SST - 13 | Standby: Single person per hour | $239.00 |
| SST-13.1 | Fire Engine Company per hour | $717.00 |
| Training/ |
||
| SST - 14 | Minimum instructional fee. | $477.00 |
| Fees include two (2) hours of training/ |
||
| SST-14.1 | Each additional hour. | $239.00 |
| SST - 15 | Fire File Review To Gain access to any fire file to review including but not limited to the following; incident reports including California Fire Incident Report System, property history, inspection history, and facility system history. | $27.00 |
| SST - 16 | Business License Inspection B or M Occupancy less than 2,000 square feet | $119.00 |
| GROUP | PRELIMINARY PLAN REVIEW - CONSULTATIONS/ |
FEE |
|---|---|---|
| PR - 1 | In office design review/ |
$119.00 |
| PR - 1.2 | Out of office design and/ |
$477.00 |
| Review of fire & life safety measures for building(s). | ||
| PR - 1.3 | Fees include one (1) hours plan review and one (1) site inspection. | $477.00 |
| PR - 21 | Additional plan review time or inspection, per half hour. | $119.00 |
| GROUP | SUBDIVISION - PLAN REVIEW | FEE |
|---|---|---|
| Major Subdivision Plan Review (5 or More Lots/ |
||
| PR - 2 | Review of subdivision for access, hydrant placement. | $717.00 |
| Fees include two (2) hours plan review and one (1) visual inspection. | ||
| PR - 2.1 | Each additional site inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Minor Subdivision Plan Review (1 to 4 Lots/ |
||
| PR - 2.2 | Review of subdivision for access, hydrant placement. | $358.00 |
| Fees include ½ hour plan review and one (1) visual inspection. | ||
| PR - 2.2.1 | Each additional inspection. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| PR - 2.3 | Single Family Home Review - access & water supply | |
| Review of plans for access and water supply. | $358.00 | |
| PR - 2.3.1 | Single Family Home Review -Tenant Improvement for additions and Modifications | |
| Fees include ½ hour plan review and one (1) visual inspection. | $118.00 | |
| (Does not include review of fire sprinkler systems - see Sec PR 5.4) | ||
| PR - 2.4 | Each additional inspection. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| GROUP | BUILDING CONSTRUCTION - NEW BUILDINGS & TENANT IMPROVEMENTS | FEE |
|---|---|---|
| New Construction or Building Additions Plan Review (See PR 11.1) | ||
| PR - 3 | Minimum plan review base fee. | $717.00 |
| PR - 3.1 | Plus $.08 per square foot in excess of 2,000 sq. ft. | $.08 sq. ft. |
| Fee includes two (2) hours of plan review and one (1) field inspection. | ||
| PR - 3.1.2 | Additional inspections per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| PR - 3.2 | Tenant Improvement Plan Review (for building additions see PR 3.1) | |
| PR - 3.2.1 | Minimum plan review base fee. | $477.00 |
| Plus $.08 per square foot in excess of 2,000 sq. ft. | $.08 sq. ft. | |
| PR - 3.2.2 | Fee includes one (1) hour plan review and one (1) field inspection. | |
| PR-20 | Additional inspections per hour. | $239.00 |
| PR-21 | Re-submittals or revisions. | $239.00 |
| Additional plan review time, per half hour | $119.00 |
| GROUP | WATER SUPPLY - FIRE SERVICE MAINS - FIRE HYDRANTS | FEE |
|---|---|---|
| Fire Service - Emergency Repair | ||
| PR - 4 | Review of underground piping, placement, and size. | $477.00 |
| Fees include one (1) hour plan review and one (1) visual inspection. | ||
| PR - 4.1 | Each additional inspection. | $239.00 |
| PR - 17 | Additional plan review time, per half hour. | $ 119.00 |
| Install, Repair Private Fire Service Hydrants and/ |
||
| PR - 4.2 | Minimum plan review base fee of system. | $477.00 |
| Fees include one (1) hour plan review and one (1) visual inspection. | ||
| PR - 4.2.1 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Fire service main installation also requires hydro and flush. See 4.3 & 4.4 |
| GROUP | AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES | FEE |
|---|---|---|
| Flush - Private Fire Service System | ||
| PR - 4.3 | Minimum inspection base fee. | $239.00 |
| Fee includes one (1) hour onsite inspection time. | ||
| PR - 4.3.1 | Each additional inspection per hour. | $239.00 |
| Hydrostatic Test - Private Fire Service System | ||
| PR - 4.4 | Minimum inspection/ |
$477.00 |
| Fee includes one (1) hour onsite test time. | ||
| PR - 4.4.1 | Each additional inspection per hour. | $239.00 |
| Water Flow Information Field Test | ||
| PR - 4.5 | Minimum field test base fee. | $477.00 |
| (Fee includes field testing for available fire flow for Hydrant and Fire Sprinkler Systems) | ||
| PR - 4.5.1 | Additional or multiple flow tests per ½ hour. | $119.00 |
| GROUP | FIRE PROTECTION SYSTEMS | FEE |
|---|---|---|
| Tenant Improvement Fire Sprinklers (without calculations) | ||
| PR - 5 | Minimum plan review base fee. | $477.00 |
| PR - 5.1.1 | Plus $1.00 per head in excess of 10 heads. | $1.00 |
| Fee includes one (1) hour of plan review and one (1) field inspection. | ||
| PR - 5.1.2 | Additional inspections per hour (i.e. weld-o-let, hydro, visual, etc…) | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Tenant Improvement Fire Sprinklers (with calculations) | ||
| PR - 5.2 | Minimum plan review base fee. | $595.00 |
| PR-5.2.1 | Plus $1.00 per head in excess of 10 heads. | $1.00 |
| Fee includes 1.5 hours of plan review and one (1) field inspection. | ||
| PR-5.2.2 | Each additional inspection per hour (i.e. weld-o-let, hydro, visual, etc…) | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| New Commercial Fire Sprinkler System (13 & 13R systems) | ||
| PR - 5.3 | Minimum plan review base fee per riser. | $954.00 |
| PR-5.3.1 | Plus $1.00 per sprinkler head. | $1.00 |
| Fee includes two (2) hours plan review and two (2) field inspections. | ||
| PR-5.3.2 | Each additional inspection per hour (i.e. weld-o-let, hydro, visual, etc…) | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Residential Fire Sprinkler System (single family home) | ||
| PR - 5.4 | Minimum plan review base fee. | $537.00 |
| Fee includes one (1) hour of plan review and 1 water service flush, 1 overhead hydro & 1 final. | ||
| PR-5.4.1 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Residential Fire Sprinkler System (multiple homes) | ||
| PR - 5.5 | Minimum plan review base fee per model. | $595.00 |
| For model only - fee includes one (1) hour of plan review and 1 water service flush, 1 overhead hydro & 1 final. | ||
| PR-5.5.1 | Each additional lot (flush, hydrostatic test and final) | $358.00 |
| PR-5.5.2 | Each Additional inspection per hour (i.e. models, individual homes) | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Standpipe System | ||
| PR - 5.6 | Minimum plan review base fee. | $717.00 |
| Fee includes plan review and one (1) field inspection. | ||
| PR-5.6.1 | Each additional inspection per hour (i.e. hydro, flush, flow test, etc…) | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Spray Booth (includes booth and fire extinguishing system) | ||
| PR - 5.7 | Minimum plan review base fee. | $717.00 |
| Fee includes two (2) hours plan review and one (1) field inspection. | ||
| PR-5.7.1 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Pre-Action Fire Suppression System | ||
| PR - 5.8 | Minimum plan review base fee. | $717.00 |
| Fee includes one (1) hours plan review and two (2) field inspection. | ||
| *(Fire alarm review (6.1) not included) | ||
| PR-5.8.1 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Fixed Fire Suppression System - (wet/ |
||
| PR - 5.9 | Minimum plan review base fee. | $477.00 |
| PR-5.9.1 | Each additional separate system at same location. | $239.00 |
| Fee Includes plan review and one (1) field inspection. | ||
| PR-5.9.2 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Clean Agent Fire Suppression System | ||
| PR - 5.10 | Minimum plan review base fee. | $954.00 |
| Fee includes one (1) hour plan review and up to 3 hours of inspection time. | ||
| *(does not include fire alarm plan review - see Sec. PR 6.1) | ||
| PR-5.10.1 | Each Additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Fire Pump Installation | ||
| PR - 5.11 | Minimum plan review base fee. | $1,670.00 |
| Fee includes two (2) hours plan review and up to five (5) hours field inspection time. | ||
| *(does not include review of generator or separate fuel storage tank) | ||
| PR-5.11.1 | Each Additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Commercial Cooking (Hood and Duct) Fire Suppression System | ||
| PR - 5.12 | Minimum plan review base fee. | $477.00 |
| GROUP | AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES | FEE |
|---|---|---|
| PR-5.12.1 | Each additional system review $239.00 each. | $239.00 |
| Fee includes one (1) hour plan review and one (1) hour of inspection time. | ||
| PR-5.12.2 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Smoke & Heat Vents | ||
| PR - 5.13 | Minimum plan review base fee. | $477.00 |
| Fee includes one (1) hour plan review and one (1) hour of inspection time. | ||
| PR -5.13.1 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Smoke Management/ |
||
| PR - 5.14 | Minimum plan review base fee. | $1,670.00 |
| Fee includes two (3) hours plan review and up to four (4) hours field inspection time. | ||
| PR-5.14.1 | Each Additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Explosion Control (includes: vents, dust collection, etc…) | ||
| PR - 5.15 | Minimum plan review base fee. | $954.00 |
| Fee includes two (2) hours plan review & up to two (2) hours field inspection time. | ||
| PR-5.15.1 | Each Additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| GROUP | FIRE ALARM SYSTEM | FEE |
|---|---|---|
| Fire Alarm System | ||
| PR - 6 | Minimum plan review base fee. | $595.00 |
| PR - 6.1 | Plus $11.00 per initiating & notification device. | $11.00 |
| Fee includes two (2) hours plan review and up to one (1) hour field inspection time. | ||
| PR - 6.1.1 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| PR - 6.1.2 | Pre-wire inspections assessed at $239.00 per hour. | $239.00 |
| Dedicated Function Fire Alarm System (i.e. sprinkler monitoring, elevator recall, etc…) | ||
| PR - 6.2 | Minimum plan review base fee. | $477.00 |
| Fee includes one (1) hour plan review and one (1) hour of field inspection time. | ||
| PR-6.2.1 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Fire Alarm Panel Replacement Only | ||
| PR - 6.3 | Minimum plan review base fee. | $477.00 |
| Fee includes one (1) hour plan review and up to one (1) hour field inspection time. | ||
| PR - 6.3.1 | Each additional inspection per hour. | $179.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| High-Rise Fire Alarm (new and/ |
||
| PR - 6.4 | Minimum plan review base fee. | $1,909.00 |
| PR - 6.4.1 | Plus $11.00 per initiating device & notification device. | $11.00 |
| Fee includes four (4) hours plan review and up to four (4) hours field inspection time. | ||
| PR - 6.4.2 | Each additional inspection per hour. | $239.00 |
| PR - 6.4.3 | Each per-wire inspection where required. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour | $119.00 |
| GROUP | FLAMMABLE & COMBUSTIBLE LIQUIDS (TANKS - PIPING & DISPENSING ) | FEE |
|---|---|---|
| Install Underground Tanks | ||
| PR - 7 | Minimum plan review base fee. | $477.00 |
| Fee includes one (1) hour of plan review of tank location and One (1) hour of site inspection time. | ||
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Remove (Repair, Modify, Extend Piping) Underground Tank | ||
| PR - 7.1 | Minimum plan review base fee. | $717.00 |
| Fee includes one (1) hour plan review and two (2) hours of inspection/ |
||
| PR-7.1.1 | Each additional inspection/ |
$239.00 |
| Install (Repair, Modify, Extend Piping) Aboveground Tank | ||
| PR - 7.2 | Minimum plan review base fee. | $477.00 |
| PR - 7.2.1 | Each additional tank. | $239.00 |
| Fee includes one (1) hour plan review and one (1) hour of inspection/ |
||
| PR - 7.2.2 | Each additional inspection. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Abandon Underground Tank in Place | ||
| PR - 7.3 | Minimum plan review base fee. | $717.00 |
| Fee includes one (1) hour plan review and two (2) hours of inspection/ |
||
| PR - 7.3.1 | Each additional inspection/ |
$239.00 |
| Environmental Upgrade (vapor recovery and processing systems, spill control, secondary containment and environmental agency requirements) | ||
| PR - 7.4 | Minimum plan review base fee. | $477.00 |
| Each additional inspection per hour. | ||
| PR - 7.4.1 | Fee includes one (1) hour plan review and one (1) hour of inspection time. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Apply Interior Coating to Flammable Liquid Tanks | ||
| PR - 7.5 | Minimum plan review base fee. | $717.00 |
| Fee includes one (1) hour plan review and two (2) hours of inspection/ |
||
| PR - 7.5.1 | Each additional inspection/ |
$239.00 |
| GROUP | COMPRESSED GAS SYSTEMS: LPG/ |
FEE |
|---|---|---|
| Container Exchange Programs; LPG Tank Installation Without Dispensing | ||
| PR - 8 | Minimum plan review base fee. | $477.00 |
| Fee includes one (1) hour of plan review and one (1) site inspection time. | ||
| PR - 8.1 | Each additional inspection per hour. | $239.00 |
| GROUP | AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES | FEE |
|---|---|---|
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Install, Modify, Repair LPG - CNG - Hydrogen (Tank Install and/ |
||
| PR - 8.2 | Minimum plan review base fee. | $835.00 |
| Fee includes 1½ hours of plan review and two (2) hours site inspection time. | ||
| PR - 8.2.1 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Install, Modify, Repair Medical or Compressed Gas Systems | ||
| PR - 8.3 | Minimum plan review base fee. | $835.00 |
| Fee includes 1 ½ hours of plan review and two (2) site inspections. | ||
| PR - 8.3.1 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Install, Modify, Repair Cryogenics Fixed Installation | ||
| PR - 8.4 | Minimum plan review base fee. | $835.00 |
| Fee includes 1½ hours of plan review and two (2) site inspections. | ||
| PR - 8.4.1 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Install, Modify, Repair Compressed Gas Storage | ||
| PR - 8.5 | Minimum plan review base fee. | $477.00 |
| Fee includes one (1) hour of plan review and one (1) field inspection. | ||
| PR - 8.5.1 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| GROUP | SPECIAL HAZARDS - HAZARDOUS | FEE |
|---|---|---|
| Battery Systems | ||
| PR - 9 | Minimum plan review base fee. | $477.00 |
| Fee includes one (1) hour of plan review and one (1) field inspection. | ||
| PR - 9.1 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Dust Collection Systems | ||
| PR - 9.2 | Minimum plan review base fee. | $595.00 |
| Fee includes one (1) hour of plan review and two (2) site inspections. | ||
| PR - 9.2.1 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Explosives Storage | ||
| PR - 9.3 | Minimum plan review base fee. | $954.00 |
| Fee includes two (2) hours of plan review and two (2) site inspections. | ||
| PR - 9.3.1 | Each additional inspection per hour. | $239.00 |
| PR - 16 | Re-submittals or revisions. | $239.00 |
| PR - 21 | Additional plan review time, per half hour. | $119.00 |
| Hazardous Materials Compliance Review | ||
| PR - 9.4 | Minimum review of MSDS, HMMP and/ |
$239.00 |
| Fees include one (1) hour of review time. | ||
| PR - 9.4.1 | Additional plan review time, per half hour. | $119.00 |
| Hazardous Materials - Storage/ |
||
| PR - 9.5 | Minimum plan review base fee. | $954.00 |
| Fee includes two (2) hours of plan review and two (2) site inspections. | ||
| PR - 9.5.1 | Each additional system minimum two (2) hours of plan review. | $477.00 |
| PR - 9.5.2 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Install, Modify, Repair Mechanical Refrigeration Systems | ||
| PR - 9.6 | Minimum plan review base fee. | $717.00 |
| Fee includes one (1) hour of plan review and two (2) site inspections. | ||
| PR - 9.6.1 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| GROUP | HIGH PILE RACK STORAGE SYSTEMS | FEE |
|---|---|---|
| High-Pile or Rack Storage | ||
| PR - 10 | Minimum plan review base fee. | $717.00 |
| Fee includes 1½ hours of plan review and 1½ hours site inspections. | ||
| PR-10.1 | Field inspection time will be charged per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $ 119.00 |
| Temporary Access Roads & Water Supply | ||
| Install a Temporary Access Road - Residential and Commercial | ||
| PR - 11 | Minimum plan review base fee for one and two homes. | $239.00 |
| PR-11.1 | Minimum plan review for large developments and commercial projects. | $477.00 |
| Fee includes one (1) hour of plan review and one (1) field inspection. | ||
| PR-11.1.2 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Install a Temporary Water Supply System | ||
| PR - 12 | Minimum plan review base fee. | $477.00 |
| Fee includes one (1) hour plan review and one (1) hour field inspection. | ||
| PR-12.1 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Miscellaneous Submittals - Alternative Means and Methods | ||
| Miscellaneous Submittals or Plans Review | ||
| Plans or submittals not described elsewhere. | ||
| PR - 13 | Minimum plan review base fees up to two hours. | $477.00 |
| PR-13.1 | Additional plan review time will be charged on hourly basis. | $239.00 |
| Fee includes one (1) hour of plan review and one (1) field inspection. | ||
| PR-13.1.2 | Each additional inspection per hour. | $239.00 |
| PR-20 | Re-submittals or revisions. | $239.00 |
| PR-21 | Additional plan review time, per half hour. | $119.00 |
| Alternative Means and Methods Requests or Code Interpretation Review |
| GROUP | AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES | FEE |
|---|---|---|
| PR - 13.2 | Minimum review base fee. | $477.00 |
| Fee includes 2 hours of plan review/ |
||
| PR-21 | >Additional plan review time, per half hour. | $119.00 |
| GROUP | EXPEDITE PLAN REVIEW REQUEST & ADDITIONAL CHARGES/ |
FEE |
|---|---|---|
| Reviews Expedited as a Result of Working without Approved Plans | ||
| Working without approved plans - Minimum plan review fees (overtime) | ||
| PR - 14 | Three (3) hours - plus applicable plan review fees. | $717.00 |
| PR-14.1 | (Additional plan review time, $239.00 per hour) | $239.00 |
| PR-14.2 | Expedited Plans - reviewed after normal business hours, three-hour minimum. | $717.00 |
| PR -14.3 | (Additional plan review time, $ 239.00 per hour) | $239.00 |
| All revisions will be performed on an expedited/ |
||
| Total fees assessed will be the sum of all applicable plan review fees including expedite/ |
||
| Demolition Permit pursuant to Chapter 33, CFC | ||
| PR - 15 | Fees include ½ hour plan review and ½ hour site review | $239.00 |
| If cutting & welding is being done during demo PTO 11.1 ($239) needs to be added *PTO 11.1 separate fee |
| GROUP | BULK/ |
FEE |
|---|---|---|
| Fees will be based on construction permit required for routine maintenance/ |
||
| Install, Modify, Repair, Replace Fireproofing | ||
| PR - 16 | Minimum plan review base fees up to two hours. | $477.00 |
| PR-20.1 | Additional plan review time will be charged on hourly basis. | $239.00 |
| Fee includes one (1) hour of plan review and one (1) field inspection. | ||
| PR-20.2 | Each additional inspection per hour. | $239.00 |
| PR -20 | Re-submittals or revisions. | $239.00 |
| PR - 21 | Additional plan review time, per half hour. | $119.00 |
| Install, Modify, Repair and/ |
||
| PR - 17 | Minimum plan review base fees up to two hours. | $477.00 |
| PR-21.1 | Additional plan review time will be charged on hourly basis. | $239.00 |
| Fee includes one (1) hour of plan review and one (1) field inspection. | ||
| PR-21.2 | Each additional inspection per hour. | $239.00 |
| PR -20 | Re-submittals or revisions. | $239.00 |
| PR - 21 | Additional plan review time, per half hour. | $119.00 |
| Install, Modify, Repair, Replace Piping for Systems Containing Hazardous Materials | ||
| PR - 18 | Minimum plan review base fees up to two hours. | $477.00 |
| PR-18.1 | Additional plan review time will be charged on hourly basis. | $239.00 |
| Fee includes one (1) hour of plan review and one (1) field inspection. | ||
| PR-18.2 | Each additional inspection per hour. | $239.00 |
| PR -20 | Re-submittals or revisions. | $239.00 |
| PR - 21 | Additional plan review time, per half hour. | $119.00 |
| Install, Modify, Repair Pump Installed In Hazardous Material Process System | ||
| PR - 19 | Minimum plan review base fees up to two hours. | $477.00 |
| PR-19.1 | Additional plan review time will be charged on hourly basis. | $239.00 |
| Fee includes one (1) hour of plan review and one (1) field inspection. | ||
| PR-19.2 | Each additional inspection per hour. | $239.00 |
| PR -20 | Re-submittals or revisions. | $239.00 |
| PR - 21 | Additional plan review time, per half hour. | $119.00 |
| Additional Charges and Inspection Time | ||
| PR - 20 | Re-submittals or revisions. | $239.00 |
| PR - 21 | Additional plan review time, $119.00 per half hour. | $119.00 |
| GROUP | PERMIT TO OPERATE - SPECIAL USE/ |
FEE |
|---|---|---|
| PTO - 1 | Aerosol Products Permit to store, manufacture or handle an aggregate quantity of Level 2 or Level 3 aerosol products in excess of 500 pounds net weight. | $239.00 |
| PTO - 2 | Amusement Buildings - Permit to operate a special amusement building. | $239.00 |
| PTO - 3 | Aviation Facilities - Required to use a group H or S occupancy for aircraft servicing or repair and aircraft fuel-servicing vehicles. (Does not include permit for hot work, flammable/ |
$417.00 |
| PTO - 4 | Carbon Dioxide Systems used in Beverage Dispensing Application - Permit is required for carbon dioxide systems used in beverage dispensing applications having more than 100 pounds of carbon dioxide. | $239.00 |
| Carnivals and Fairs - Permit is required to conduct a carnival or fair. | ||
| PTO - 5.0 | Inspections conducted during normal work hours - (1.25 hours) | $297.00 |
| PTO - 5.1 | Additional inspection time during normal business hours per ½ hour. | $119.00 |
| PTO - 5.2 | After hours inspection time per ½ hour. | $239.00 |
| PTO - 5.3 | Overtime & Weekend inspections - three (3) hours minimum. | $717.00 |
| PTO - 5.4 | Float, Parade: Per Float | $119.00 |
| PTO - 6 | Cellulose Nitrate Film - Permit for the storage, use and handling in public assembly. | $358.00 |
| Combustible Dust-Producing Operations/ |
||
| PTO - 7 | Less than 5,000 square feet | $294.00 |
| PTO - 7.1 | Each additional 5,000 square feet or fraction thereof | $239.00 |
| PTO - 8 | Combustible Fibers/ |
$417.00 |
| PTO - 9 | Compressed Flammable Gases (In Excess of amounts in Table 105.6.9 CFC) Each 200 cubic feet of flammable gas or Each 1,000 cubic feet of inert or simple asphyxiant Highly toxic - Any Amount Oxidizing (including oxygen - 504 cubic feet) | $297.00 |
| Compressed/ |
||
| PTO - 9.1 | 5,000 square feet or less | $538.00 |
| GROUP | AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES | FEE |
|---|---|---|
| PTO - 9.2 | Each additional 5,000 sq. feet or fraction thereof | $538.00 |
| PTO - 10 | Covered & Open Mall Buildings Permit for the placement/ |
$297.00 |
| PTO - 11 | Cryogenic Fluids Permit to produce, store, transport on site, handle or dispense amounts in excess of Table 105.6.11. CFC - California Fire Code | $297.00 |
| PTO - 12 | Cutting & Welding (fixed facility operations) Permit to conduct welding, cutting & similar operations using electric or gas equipment. | $297.00 |
| PTO - 12.1 | Single Operation (Permit is valid for 180 days) | $239.00 |
| PTO - 13 | Dry Cleaning Permit to operate is dry cleaning operations or to change to a more hazardous cleaning solvent in existing equipment. | $297.00 |
| PTO - 13.1 | Dry Cleaning Plant Permit to operate a dry cleaning plant operation . | $297.00 |
| PTO - 14 | Exhibits & Trade Shows - Permit is required to operate exhibits and trade shows. | $239.00 |
| Explosives or Blasting Agent: Storage, Use or Transportation Permit is required for the manufacturing storage, handling, sales or use of any quantity of explosives, explosive materials | ||
| PTO - 15 | 100 lbs. or less | $417.00 |
| PTO - 15.1 | Over 100 lbs. | $717.00 |
| PTO - 15.2 | Ammonium Nitrate Storage | $417.00 |
| PTO - 15.3 | Gunpowder Sales - 100 lbs. or less | $239.00 |
| PTO - 15.4 | Gunpowder Sales - Over 100 lbs. | $477.00 |
| PTO - 16 | Fire Hydrants and Valves - Private Permit to remove from service or the operation of a private fire hydrant and valves. A change to existing hydrant systems requires plan review and approval. (Refer to Plan Review - Private Fire Service System Page 8, PR 4.2) | $239.00 |
| Flammable & Combustible Liquids: Storage or Use | ||
| PTO - 17 | Repair, Modification or Extension of Piping (Plus $233/hour over specified field time) | $ 239.00 |
| Flammable/ |
||
| PTO - 17.1 | Class I liquids in excess of 5 gallons - Inside | $297.00 |
| PTO - 17.2 | Class I liquids in excess of 10 gallons - Outside | $417.00 |
| PTO - 17.3 | Class II or Class III A liquids in excess of 25 gallons - Inside | $297.00 |
| PTO - 17.4 | Class II or Class III A liquids in excess of 60 gallons - Outside | $417.00 |
| PTO - 17.5 | Flammable/ |
$297.00 |
| Flammable/ |
||
| PTO - 17.6 | 5,000 square feet or less | $417.00 |
| PTO - 17.7 | Each additional 5,000 square feet or fraction of | $417.00 |
| PTO - 17.8 | Flammable/ |
$595.00 |
| PTO - 17.9 | Flammable/ |
$297.00 |
| PTO-17.10 | Flammable/ |
$417.00 |
| PTO-17.11 | Printing Plant or Shop Permit to print items using flammable/ |
$239.00 |
| Highly Combustible Storage | ||
| PTO-17.12 | 5,000 square feet or less | $472.00 |
| PTO-17.13 | Each additional 5,000 square feet or fraction thereof | $297.00 |
| PTO - 18 | Floor Finishing's Permit to use Class I or Class II liquids for the refinishing of flooring in excess of 350 square feet. | $297.00 |
| PTO - 19 | Fruit & Crop Ripening Permit to operate a fruit or crop ripening facility or conduct a fruit ripening process using ethylene gas. | $239.00 |
| PTO - 20 | Fumigation & Insecticidal Fogging Permit to operate a business of fumigation or thermal insecticidal fogging and to maintain a room, vault or chamber in which a toxic or flammable fumigant is used. | N/C |
| Hazardous Materials Permit to store, transport on site, dispense, use or handle hazardous materials in amounts in excess of Table 105.6.21 CFC - California Fire Code | ||
| PTO - 21 | 1 - 5 Products | $239.00 |
| PTO - 21.1 | 5 - 10 Products | $595.00 |
| PTO - 21.2 | 11 or more Products | $1,193.00 |
| Chemical Plant | ||
| PTO - 21.3 | 5,000 square feet or less | $538.00 |
| PTO - 21.4 | Each additional 5,000 square feet or fraction thereof | $538.00 |
| PTO - 21.5 | Radioactive Material (any amount) | $477.00 |
| Chemical Warehouse | ||
| PTO - 21.6 | 5,000 square feet or less | $297.00 |
| PTO - 21.7 | >Each additional 5,000 square feet or fraction thereof | $297.00 |
| Laboratory | ||
| PTO - 21.8 | 5,000 square feet or less | $538.00 |
| PTO - 21.9 | Each additional 5,000 square feet or fraction thereof | $538.00 |
| Bulk Plant/ |
||
| PTO-21.10 | 10 acres or less | $2,598.00 |
| PTO-21.11 | Each additional 10 acres or fraction thereof | $2,598.00 |
| Bulk Transfer | ||
| PTO-21.12 | 10 acres or less | $2,598.00 |
| PTO-21.13 | Each additional 10 acres or fraction thereof | $2,598.00 |
| Process Transfer | ||
| PTO-21.14 | 10 acres or less | $2,598.00 |
| PTO-21.15 | Each additional 10 acres or fraction thereof | $2,598.00 |
| PTO - 22 | HPM (Hazardous Production Material) Facilities - Semiconductor manufacturer Permit to store, handle or use hazardous production materials. | $1,193.00 |
| High Pile Storage (Permit for the use of a building or portion thereof) | ||
| PTO - 23 | In excess of 500 square feet - less than 5,000 square feet | $669.00 |
| PTO - 23.1 | Each additional 5,000 square feet or fraction thereof | $ 477.00 |
| PTO - 24 | Hot Work Operations Permit for hot work including, but not limited to the following: | $239.00 |
| PTO - 24 | 1. Public exhibitions/ |
$239.00 |
| PTO - 24 | 2. Inside a building not tied to construction permit. | $239.00 |
| PTO - 24 | 3. Welding booths (fixed site location). | $239.00 |
| PTO - 24 | 4. Within a wildfire risk area. | $239.00 |
| PTO - 24 | 5. Application of roof coverings with the use of an open flame device. | $239.00 |
| PTO - 24 | 6. Where approved, the fire code official shall issue a permit to carry out a hot work program. Refer to CFC 105.6.24 #6 for the remaining information. | $239.00 |
| Hot Work Operations - Marine single [use] | ||
| PTO - 24.1 | Inspections conducted during normal work hours - (1.25 hours) | $297.00 |
| PTO - 24.2 | Additional inspection time during normal business hours per ½ hour. | $119.00 |
| PTO - 24.3 | After hours inspection time per ½ hour. | $239.00 |
| PTO - 24.4 | Overtime & Weekend inspections - three (3) hours minimum. | $717.00 |
| PTO - 25 | Industrial Ovens Permit to operate an industrial oven | $417.00 |
| PTO - 25.1 | Commercial Incinerators | $417.00 |
| PTO - 26 | Lumber Yard & Woodworking Plants Permit for the storage or the processing of lumber exceeding 100,000 board feet | $477.00 |
| PTO - 27 | Liquid or Gas Fueled vehicles or Equipment in Assembly Buildings Permit to display, operate or demonstrate liquid or gas fueled vehicles or equipment in assembly buildings. | $239.00 |
| Liquid Propane (LP) Gas - Per Tank | ||
| PTO - 28 | Permit for exchange of cylinders only - no refilling. | $239.00 |
| PTO - 28.1 | Permit to dispense, store, install and use LPG. (less than 2K gallons) | $297.00 |
| PTO - 28.2 | Permit to dispense, store, install and use LPG. (more than 2K gallons) | $477.00 |
| PTO - 28.3 | To operate a plant/ |
$477.00 |
| PTO - 28.4 | Each additional 5,000 square feet or fraction thereof | $477.00 |
| PTO - 29 | Magnesium Permit to melt, cast, heat treat or grind more than 10 pounds. | $358.00 |
| PTO - 30 | Miscellaneous Combustible Storage Permit to store in any building or upon any premises in excess of 2,500 cubic feet gross volume of combustible empty packing cases, boxes, barrels or similar containers, rubber tires, rubber, cork, wood or plastic pallets or similar combustible materials. | $477.00 |
| PTO - 31 | Motor Fuel-Dispensing Facilities Permit is required for the operations of automobile (service stations), marine and fleet motor fuel-dispensing facilities. | $417.00 |
| PTO - 31.1 | Tank Vehicle Dispensing Permit is required for the fueling of motor vehicles at approved locations from a tank vehicle. Also includes the limited or temporary fueling operations for special events (i.e. fueling or watercraft from shore, piers, floats, or barges) | $239.00 |
| PTO - 32 | Open Burning Permit is required for the kindling or maintaining of an open fire or fire on any public street, alley, road, or other public or private ground. Exception: Recreational | $239.00 |
| PTO - 33 | Open Flames & Torches Permit is required to remove paint with a torch; or to use a torch or open flame device | $239.00 |
| PTO - 34 | Open Flames & Candles Permit for the use of open flames inside restaurants, public assemblies and/ |
$239.00 |
| PTO - 35 | Organic Coatings Permit for organic-coating manufacturing operation producing more than 1 gallon of an organic coating in one day. | $239.00 |
| Places of Assembly Exception: Other than Group A occupancy used exclusively for the purpose of religious worship having an occupant load less than 2,000 | ||
| PTO - 36 | *ASSEMBLY: With stage, 1,000 or more occupant load | $595.00 |
| PTO - 36.1 | *ASSEMBLY: With stage, less than 1,000 occupant load | $595.00 |
| PTO - 36.2 | *ASSEMBLY: Without stage, 300 or more occupant load | $494.00 |
| PTO - 36.3 | ASSEMBLY: Without stage, 201-299 occupant load | $477.00 |
| PTO - 36.4 | Without stage, 101-200 occupant load | $427.00 |
| PTO - 36.5 | Without stage, 50-100 occupant load | $297.00 |
| PTO - 37 | Private Fire Hydrants Permit is required for the removal from service, use or operation of private fire hydrants | $239.00 |
| Pyrotechnic Special Effects Material Permit to use fireworks, pyrotechnics inside . | ||
| PTO - 38 | Inspections during normal work hours - (2 hours) | $477.00 |
| PTO - 38.1 | Additional inspection time during normal business hours @ $ 119.00 per ½ hour | $119.00 |
| PTO - 38.2 | Additional inspection time after normal business hours @ $ 239.00 per hour | $239.00 |
| PTO - 38.3 | Overtime and weekend inspections: Three hour minimum fee - $ 717.00. | $717.00 |
| PTO - 39 | Pyroxylin Plastics Permit for storage and handling of more than 25 lbs. of cellulose nitrate (pyroxylin) | $239.00 |
| PTO - 40 | Refrigeration Operation Equipment Permit to operate a mechanical refrigeration unit or system | $358.00 |
| Repair Garages Permit for operation of repair garages | ||
| PTO - 41 | 1 - 4 repair bays | $297.00 |
| PTO - 41.1 | 5 - 8 repair bays | $358.00 |
| PTO - 41.2 | Greater than 8 repair bays | $417.00 |
| PTO - 42 | Rooftop Heliports Permit to operate a rooftop heliport. | $239.00 |
| Spraying or Dipping - Finish Application Permit to conduct spraying or dipping operations utilizing flammable or combustible liquids or the application of combustible powders. | ||
| PTO - 43 | 5000 square feet or less | $472.00 |
| PTO - 43.1 | Each additional 5,000 square feet or fraction thereof | $297.00 |
| PTO - 44 | Storage of Scrap Tires & Tire Byproducts Permit to establish, conduct or maintain storage of scrap tires and tire byproducts that exceeds 2,500 cubic feet of total volume of scrap tires, and for indoor storage of tires and tire byproducts. | $417.00 |
| Temporary Membrane Structures & Tents Permit to operate an air-supported or temporary membrane structure including tents and canopies: | ||
| PTO - 45 | 399—699 square feet | $119.00 |
| PTO - 45.1 | 699—4,199 square feet | $239.00 |
| PTO - 45.2 | Greater than 5,000 square feet | $358.00 |
| PTO - 45.3 | Additional inspection time during normal business hours @ $119.00 per ½ hour | $119.00 |
| PTO - 45.4 | Additional inspection time after normal business hours @ $239.00 per hour | $239.00 |
| PTO - 45.5 | Overtime and weekend Inspections: Three-hour minimum fee - $717.00 | $717.00 |
| PTO - 45.6 | Extended Period of Use Permit to extend the use of a tent, canopy or air supported structure for an additional 180 days. (1 Extension of use per structure) | $239.00 |
| PTO - 46 | Tire-Rebuilding Plants Permit to operate and maintain a tire rebuilding plant | $417.00 |
| PTO - 47 | Waste Handling Permit to operation of wrecking yards, junk yards and waste material-handling facilities | $446.00 |
| PTO - 48 | Wood Products Permit is required to store chips, hogged material, wood or other combustible pallets, lumber or plywood in excess of 200 cubic feet (6 m3). | $417.00 |
| Additional Permits | ||
| PTO - 49 | 1. Production Facilities - Change use or occupancy or allow the attendance of a live audience, or for wrap parties. | $477.00 |
| PTO - 49.1 | 2. Pyrotechnics & Special Effects - Use of pyrotechnics special effects for the use of motion picture, television and commercial production. | $477.00 |
| PTO - 49.2 | 3. Live Audiences - Install seating for live audiences (production studios & sound stages) | $239.00 |
| PTO - 50 | Temporary Assembly - Permit is required 10 days prior to conduct an event that will assemble more than 1,000 people. Any event that has more than 3,000 people shall require two personnel from the Fire Prevention Division for the duration of the event to ensure compliance of all codes are adhered to. Fees include one (1) hour site plan review and one (1) hour site inspection A floor plan outlining but not limited to the following is required. | |
| PTO - 50.1 | 1. Number of people expected to attend | $461.00 |
| PTO - 50.1 | 2. Number of exits | $461.00 |
| PTO - 50.1 | 3. Location of fire extinguishers | $461.00 |
| PTO - 50.1 | 4. Location of tables & chairs | $461.00 |
| PTO - 50.1 | 5. Location of stage | $461.00 |
| PTO - 50.1 | 6. Location of tents requires separate permit - PTO - 43 | $461.00 |
| PTO - 50.1 | 7. Location of cooking area(s) | $461.00 |
| PTO - 50.1 | 8. Location of any open flames used for cooking or decorating | $461.00 |
| PTO - 51 | Christmas Tree Sales - Permit to operate a Christmas Tree lot. | $239.00 |
| PTO - 52 | Asbestos Removal - Permit to conduct asbestos removal operations. | $239.00 |
| PTO - 53 | Battery System Storage Permit to operate stationary lead-acid battery systems having liquid capacity of more than 50 gallons | $239.00 |
| Firework Aerial Display Permit to use fireworks, pyrotechnics outside. | ||
| PTO - 54 | Inspections during normal work hours - (2.5 hours) | $1,416.00 |
| PTO-54.1 | Additional inspection time during normal business hours @ $ 119.00 per ½ hour | $119.00 |
| PTO-54.2 | Additional inspection time after normal business hours @ $ 239.00 per hour | $239.00 |
| PTO-54.3 | Overtime and weekend inspections: Three hour minimum fee - $717.00. | $717.00 |
| PTO-54.4 | Set Piece Display | $477.00 |
| PTO - 55 | Model Rocket Permit to operate/ |
$358.00 |
| PTO -55.1 | Retail Sale | $119.00 |
| PTO - 55.2 | Youth Scouts/ |
$27.00 |
| PTO - 56 | Temporary Water Supply Permit is required to use a temporary water supply for construction of residential projects. | $239.00 |
| PTO - 57 | Tire Storage & Scrap Tires Permit to store tires in excess of 1,000 cubic feet inside buildings (per Ch. 25 - CFC) | $297.00 |
| PTO - 58 | Change of Occupancy/ |
$290.00 |
| GROUP | NOTES | FEE |
|---|---|---|
| Permits are non-transferrable and fees are non-refundable. | ||
| Failure to pay invoice fees within 30 days shall result in a 20 percent late payment charge. | ||
| In the case of multiple annual permits, permits may be issued for shorter periods and prorated on the basis of a 1/12 th charge for each month and portion thereof. | ||
| N - 1 | Failure to obtain operational permit | $522.00 |
| N - 2 | Extended Period of Use Permit to extend the use of a permit for an additional 180 days | $239.00 |
| GROUP | MOTOR VEHICLE INCIDENT | FEE |
|---|---|---|
| MVI - 1 | Provide hazardous materials assessment and scene stabilization. This will be the most common "invoice level." This occurs almost every time a RFD apparatus responds to an accident/ |
$400.00 |
| MVI - 2 | Includes MVI 1 services as well as clean up and material used (absorbents) for hazardous fluid clean up and disposal. Invoiced at this level if the RFD unit has to clean up any gasoline or other automotive fluids that are spilled as a result of the accident/ |
$425.00 |
| GROUP | AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES | FEE |
|---|---|---|
| MVI - 3 | (Vehicle Fire) Provide scene safety, fire suppression, breathing air, rescue tools, hand tools, hose, tip use, foam, structure protection, and clean up gasoline or other automotive fluids that are spilled as a result of the accident/ |
$450.00 |
| MVI - 4 | Includes MVI 1 & 2 services as well as extrication (heavy rescue tools, ropes, airbags, cribbing etc.). Invoiced at this level when RFD unit has to extricate anyone from the vehicle(s) using any equipment. No invoice if the patient is simply unconscious and an RFD unit is able to open the door to access the patient. This level is to be invoiced only if equipment is deployed. | $1,800.00 |
| MVI - 5 | Includes MVI 1, 2, & 4 services as well as multi RFD unit response | $ 2,000.00 |
| GROUP | HAZARDOUS MATERIAL INCIDENT | FEE |
|---|---|---|
| HZM-1 | Basic Response: Invoice will include engine response, first responder assignment, and certified hazmat team and appropriate equipment, perimeter establishment, evacuations, set-up and command. | $700.00 |
| HZM - 2 | Intermediate Response: Invoice will include engine response, first responder assignment, certified hazmat team and appropriate equipment, perimeter establishment, evacuations, set-up and command, Level A or B suit donning, breathing air and detection equipment. Set-up and removal of decontamination center. | $2,500.00 |
| HZM - 3 | Advanced Response: Invoice will include engine response, first responder assignment, hazmat certified team and appropriate equipment, perimeter establishment, evacuations, first responder set-up and command, Level A or B suit donning, breathing air and detection equipment and robot deployment. Set-up and removal of decontamination center, detection equipment, recovery and identification of material. Disposal and environment clean up. Includes above in addition to any disposal fees of material and contaminated equipment and material used at scene. Includes 3 hours of on scene time. | $5,900.00 |
| HZM-3.1 | Each additional hour @$300.00 per hazardous material team. | $300.00 |
| GROUP | PIPELINE INCIDENTS/ |
FEE |
|---|---|---|
| PLI - 1 | Basic Response: Invoice will include engine response and first responder assignment, perimeter establishment, evacuations, first responder set-up and command. | $400.00 |
| PLI - 2 | Intermediate Response: Invoice will include engine response, first responder assignment, and appropriate equipment, perimeter establishment, evacuations, first responder set-up and command. May include HAZMAT team, Level A or B suit donning, breathing air and detection equipment. | $1,000.00 |
| PLI - 3 | Advanced Response: Invoice will include engine response, first responder assignment, and appropriate equipment, perimeter establishment, evacuations, first responder set-up and command. May include HAZMAT team, Level A or B suit donning, breathing air and detection equipment. Supervise and/ |
Itemized |
| GROUP | FIRE INVESTIGATOR RESPONSE | FEE |
|---|---|---|
| INV - 1 | Includes the following: Scene Investigation, Investigation Report, Scene Documentation based on per hour. The claim begins when the Fire Investigator responds to the incident and is billed for logged time only. | $239.00 |
| GROUP | WATER INCIDENT RESPONSE | FEE |
|---|---|---|
| WIR - 1 | Basic Response: Invoice will include engine response, first responder assignment, perimeter establishment, evacuations, first responder set-up and command, scene safety and investigation (including possible patient contact, hazard control). This will be the most common "billing level." This occurs almost every time RFD Victory responds to a water incident. | $400.00 |
| WIR - 1.1 | *Plus $50 per hour, per rescue person (minimum 3 fire personnel) | $50.00* |
| WIR - 2 | Intermediate Response: Includes WIR 1 services as well as clean up and material used (sorbents), minor hazardous clean up and disposal. Invoiced at this level if the RFD has to clean up small amounts of gasoline or other fluids that are spilled as a result of the incident. Billed at $800.00 plus $50.00 per hour, per rescue person. | $800.00 |
| WIR - 2.1 | *Plus $50 per hour, per rescue person (minimum 3 fire personnel) | $50.00* |
| WIR - 3 | Advanced Response: Includes WIR 1 and WIR 2 services, including HAZMAT team, set up and removal of decontamination center, detection equipment, recovery and identification of material. Disposal and environment clean up. Includes above in addition to any disposal fees of material and contaminated equipment and material used at scene. | $2,000.00 |
| WIR-3.1 | *Plus $50 per hour, per rescue person (minimum 3 fire personnel) | $50.00* |
| WIR-3.2 | *Plus $100 per hour, per HAZMAT team member | $100.00* |
| WIR - 4 | RFD reserves the right to invoice for individual event with customized mitigation rates including itemized, per person, at various response levels and for itemized products and equipment used. |
| GROUP | FIRE INCIDENT RESPONSE | FEE |
|---|---|---|
| FIR - 1 | Per engine response, per hour (includes captain, engineer and firefighter) | $400.00 |
| FIR - 2 | Breathing Support Unit, per hour (includes captain, engineer and firefighter) | $400.00 |
| FIR - 3 | Per truck response, per hour (includes captain, engineer and firefighter) | $500.00 |
| FIR - 4 | Miscellaneous equipment billed | $300.00 |
| FIR - 5 | RFD reserves the right to invoice for individual event with customized mitigation rates including itemized, per person, at various response levels and for itemized products and equipment used. | |
| GROUP | FIRE INCIDENT RESPONSE CHIEF LEVEL RESPONSE | FEE |
| GROUP | AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES | FEE |
|---|---|---|
| CLR - 1 | Chief of Department, per hour | $188.00 |
| CLR - 2 | Deputy Fire Chief, per hour | $167.00 |
| CLR - 3 | Battalion Chief, per hour | $102.00 |
| CLR - 4 | Fire Marshal, per hour | $125.00 |
| CLR - 5 | Deputy Fire Marshal, per hour | $102.00 |
| Fund Ctr./Muni. Code | Description of Service | Percentage of Costs to be Recovered | Review Schedule |
|---|---|---|---|
| GIS Geographic Information Systems | GIS Geographic Information Systems | GIS Geographic Information Systems | GIS Geographic Information Systems |
| General Services | General Services | General Services | General Services |
| Labor — Chargeable on any service listed under GIS when the project takes more than one hour (custom map), any customization is required (predefined map, mapping series), or any other GIS-related customer service is requested. The rate is hourly-based ($72), and is chargeable by quarter-hour increments ($18). | 100 | Annual | |
| Custom Map | Custom Map | Custom Map | Custom Map |
| Plotter | Plotter | Plotter | Plotter |
| 8½″ × 11″ (ANSI-A) or 11″ × 17″ (ANSI-B) | 100 | Annual | |
| Additional prints (per print) (max. 5) | 100 | Annual | |
| With orthophotos | 100 | Annual | |
| With orthophotos, additional prints (per print) (max. 5) | 100 | Annual | |
| 17″ × 22″ (ANSI-C) | 100 | Annual | |
| Additional prints (per print) (max. 5) | 100 | Annual | |
| With orthophotos | 100 | Annual | |
| With orthophotos, additional prints (per print) (max. 5) | 100 | Annual | |
| 22″ × 34″ (ANSI-D) | 100 | Annual | |
| Additional prints (per print) (max. 5) | 100 | Annual | |
| With orthophotos | 100 | Annual | |
| With orthophotos, additional prints (per print) (max. 5) | 100 | Annual | |
| 34″ × 44″ (ANSI-E) | 100 | Annual | |
| Additional prints (per print) (max. 5) | 100 | Annual | |
| With orthophotos | 100 | Annual | |
| With orthophotos, additional prints (per print) (max. 5) | 100 | Annual | |
| All scales, electronic format copies (e.g., pdf) on CD/ |
100 | Annual | |
| Printer | Printer | Printer | Printer |
| 8½″ × 11″ color | 100 | Annual | |
| Additional prints (per print) (max. 5) | 100 | Annual | |
| With orthophotos | 100 | Annual | |
| With orthophotos, additional prints (per print) (max. 5) | 100 | Annual | |
| 11″ × 17″ | 100 | Annual | |
| Additional prints (per print) (max. 5) | 100 | Annual | |
| With orthophotos | 100 | Annual | |
| With orthophotos, additional prints (per print) (max. 5) | 100 | Annual | |
| All scales, electronic format copies (e.g., pdf) on CD/ |
100 | Annual | |
| Electronic Map | Electronic Map | Electronic Map | Electronic Map |
| CD — All scales, stand-alone (i.e., w/ |
100 | Annual | |
| ftp — All scales, stand-alone (i.e., w/ |
100 | Annual | |
| CD/ |
100 | Annual | |
| Note: The default format for electronic maps is pdf | |||
| Predefined Map | Predefined Map | Predefined Map | Predefined Map |
| Plotter | Plotter | Plotter | Plotter |
| 8½″ × 11″ (ANSI-A) or 11″ × 17″ (ANSI-B) or 17″ × 22″ (ANSI-C) | 100 | Annual | |
| Additional prints (max. 5) | 100 | Annual | |
| With orthophotos | 100 | Annual | |
| With orthophotos, additional prints (max. 5) | 100 | Annual | |
| 22″ × 34″ (ANSI-D) | 100 | Annual | |
| Additional prints (max. 5) | 100 | Annual | |
| With orthophotos | 100 | Annual | |
| With orthophotos, additional prints (max. 5) | 100 | Annual | |
| 34″ × 44″ (ANSI-E) | 100 | Annual | |
| Additional prints (max. 5) | 100 | Annual | |
| With orthophotos | 100 | Annual | |
| With orthophotos, additional prints (max. 5) | 100 | Annual | |
| All scales, electronic format copies (e.g., pdf) on CD/ |
100 | Annual | |
| 8½″ × 11″ color | 100 | Annual | |
| Additional prints (max. 5) | 100 | Annual | |
| With orthophotos | 100 | Annual | |
| With orthophotos, additional prints (max. 5) | 100 | Annual | |
| 8½″ × 11″ black and white | 100 | Annual | |
| Additional prints (max. 5) | 100 | Annual | |
| With orthophotos | 100 | Annual | |
| With orthophotos, additional prints (max. 5) | 100 | Annual | |
| 11″ × 17″ | 100 | Annual | |
| Additional prints (max. 5) | 100 | Annual | |
| With orthophotos | 100 | Annual | |
| With orthophotos, additional prints (max. 5) | 100 | Annual | |
| All scales, electronic format copies (e.g., pdf) on CD/ |
100 | Annual | |
| Electronic Map | Electronic Map | Electronic Map | Electronic Map |
| CD — All scales, stand-alone (i.e., w/ |
100 | Annual | |
| ftp — All scales, stand-alone (i.e., w/ |
100 | Annual | |
| CD/ |
100 | Annual | |
| Note: The default format for electronic maps is pdf | |||
| Mapping Series | Mapping Series | Mapping Series | Mapping Series |
| Basemap series — Basic (L) (on CD) | 100 | Annual | |
| Basemap series — Medium (M) (on CD) | 100 | Annual | |
| Basemap series — Complex (H) (on CD) | 100 | Annual | |
| Note: Mapping series are not available as of December 2003. However, they are under development and the fee structure is intended to anticipate their future release. | |||
| Harbor | Harbor | Harbor | Harbor |
| Fees collected in association with the harbor and marina are governed by Westrac, who sets the fees. The City receives a percentage of the fees collected. RMC Chapters 5.08.080 and 5.16.090 allow fees. | |||
| Library | Library | Library | Library |
| COR1/41015, RMC 2.34.040-84 | Processing fee for lost or damaged books, videos, CDs, DVDs, audio cassettes and audio books with barcodes | 100 | Annual |
| COR1/41015, RMC 2.34.040-84 | Replacement fee for magazines circulated with a generic blue or yellow card (materials checked out with a barcode are charged the item's list price), plus processing fee for items without barcodes | 100 | Annual |
| Replacement charge processing fee for items without a barcode | 100 | Annual | |
| COR1/41015, RMC 2.34.040-85 | Replacement charge for lost or damaged library card | 100 | Annual |
| COR1/41015, RMC 2.34.040-85 | Look up charge for adult library card number in the on-line catalog when ready to check-out | 100 | Annual |
| COR1/41015, RMC 2.34.040-85 | Look up charge for a juvenile card number in the on-line catalog when ready to check-out | 100 | Annual |
| COR1/41015, RMC 2.34.040-86 | Extended search charge, including juvenile materials and juvenile borrowers | 100 | Annual |
| COR1/41015, Reso. 23-03 | Overdue fine, adult materials, $0.20 daily/ |
100 | Annual |
| 100 | Annual | ||
| COR1/41015, Reso. 23-03 | Overdue fine, juvenile materials, $0.10 daily/ |
100 | Annual |
| 100 | Annual | ||
| COR1/41015 | Overdue fine, videos and DVD, $1.00 daily/ |
100 | Annual |
| 100 | Annual | ||
| COR1/41015 | Overdue fine, reference materials: Adult and Juvenile, $6.00 daily, maximum $60 | 100 | Annual |
| 100 | Annual | ||
| COR1/41015, RMC 2.34.040-88 | Adult guest card to use the public PC for time period specified by library policy | 100 | Annual |
| COR1/41015, RMC 2.34.040-84 | Lost or damaged books, videos, DVDs, CDs, cassettes, and magazines (checked out with the barcodes) are charged the list price of the item plus processing fee for items with barcodes | 100 | Annual |
| COR1/41015 | Rental: Library Community Room (Madeline F. Whittlesey Room), one booking/ |
100 | Annual |
| Deposit—$125 minimum (may be higher) | 100 | As Needed | |
| Paratransit Services (Fees are supplemented by grant funding; therefore, they are not adjusted based on ECI) | |||
| Paratransit Services | |||
| RMC 2.34.040-103 | Taxi scrip — $10 for $30 worth of scrip | 100 | Annual |
| RMC 2.34.040-103 | Transit service — One way (late cancels, no-shows, and not-ready fee of $2.50, full ticket price, applies) | 100 | Annual |
| RMC 2.34.040-103 | Special purpose group trip — $50 | 100 | Annual |
| RMC 2.34.040-103 | Transit service — Book of 10 tickets (one ticket for a one-way trip) | 100 | Annual |
| One way — Advance reservation (one to ten days in advance) — Day trip (7:00 AM to 6:59 PM) | 100 | Annual | |
| One way — Advance reservation (one to ten days in advance) — After hours trip (7:00 PM to 6:59 AM) | 100 | Annual | |
| One way — Same day reservation (reservation is same day as the pick up 12:00 AM to 11:59 PM) — Day trip (7:00 AM to 6:59 PM) | 100 | Annual | |
| One way — Same day reservation (reservation is same day as the pick up 12:00 AM to 11:59 PM) — After hours trip (7:00 PM to 6:59 AM) | 100 | Annual | |
| One way trip — Late cancellation (cancellation one hour before pick up) or no show (client is not at pick up location, is not ready, cancels trip at the door, or refuses to take trip) fee. {The fee is the cost of booked trip.} | 100 | Annual | |
| Planning Fee Legend: (D) = Deposit fee, (F) = Flat fee | |||
| Environmental (CEQA) Review | Environmental (CEQA) Review | Environmental (CEQA) Review | Environmental (CEQA) Review |
| Mitigated negative declaration (city performs work) (F) | 100 | Annual | |
| Mitigated negative declaration (city administration of contractor) (F) | 100 | Annual | |
| Environmental Impact Report (city administration of contractor) (F) | 100 | Annual | |
| Mitigation monitoring — First year (F) | 100 | Annual | |
| Mitigation monitoring — Each subsq year (F) | 100 | Annual | |
| Environmental Impact Report (EIR) | Environmental Impact Report (EIR) | Environmental Impact Report (EIR) | Environmental Impact Report (EIR) |
| RMC 2.34.040.23a, Ord. 2-03, E.O. 03-03 | Mitigation monitoring — Billed at $125/hour to recover actual cost | 100 | Annual |
| RMC 2.34.040.23a, E.O. 03-03 | Mitigation monitoring deposit (refundable) — $1,000 minimum deposit, deposit may be higher based on the project size | 100 | Annual |
| RMC 2.34.040.23b, Ord. 2-03, E.O. 03-03 | Fish and game — Negative declaration | 100 | Annual |
| RMC 2.34.040.23c, Ord. 2-03, E.O. 03-03 | Fish and game — EIR | 100 | Annual |
| COR1/40813, E.O. 03-03, RMC 2.34.040.24 | Initial study application review — Billed at $125/hour to recover actual cost | 100 | Annual |
| COR1/40813, E.O. 03-03, RMC 2.34.040.24 | Initial study application review deposit (refundable) — $1,000 minimum deposit, deposit may be higher based on the project size | 100 | Annual |
| E.O. 03-03, RMC 2.34.040-23 | Environmental Impact Report (E.I.R.) | 100 | Annual |
| COR1/40814, RMC 2.34.040.23d, Ord. 2-03, E.O. 03-03 | Environmental appeal | 100 | Annual |
| E.O. 03-03, RMC 2.34.040-29 | General plan amendment review — Billed at $125/hour to recover actual cost | 100 | Annual |
| E.O. 03-03, RMC 2.34.040-29 | General plan amendment review deposit (refundable) — $2,000 minimum deposit, deposit may be higher based on the project size | 100 | Annual |
| COR1/40808, E.O. 03-03, RMC 2.34.040-17 | Rezoning review — Billed at $125/hour to recover actual cost | 100 | Annual |
| E.O. 03-03, RMC 2.34.040-17 | Rezoning review deposit — $2,000 minimum deposit, deposit may be higher based on project size | 100 | Annual |
| Variance Review: | |||
| COR1/40806, E.O. 03-03, RMC 2.34.040-14 | Minor variance project | 100 | Annual |
| COR1/40806, E.O. 93-014, RMC 2.34.040-14 | Major variance project | 100 | Annual |
| Subdivision Review | Subdivision Review | Subdivision Review | Subdivision Review |
| Preliminary plan (F) | 100 | Annual | |
| Development plan (F) | 100 | Annual | |
| COR1/40809, E.O. 93-018, RMC 2.34.040-18 | Lot line adjustment review | 100 | Annual |
| COR1/40811, E.O. 93-020, RMC 2.34.040-20 | Tentative parcel map review | 100 | Annual |
| E.O. 03-03, RMC 2.34.040.20a, Ord. 2-03 | Certificate of compliance | 100 | Annual |
| RMC 2.34.040-21a, Ord. 2-03, RMC 15.08.130.4, E.O. 03-03 | Subdivision tentative map review — Billed at $125/hour to recover actual cost | 100 | Annual |
| RMC 2.34.040-21a, E.O. 03-03 | Subdivision tentative map review deposit — $1,000 minimum deposit, may be higher based on project size | 100 | Annual |
| RMC 15.08.125-2b, E.O. 03-03, RMC 2.34.040.21b, Ord. 2-03 | Vesting tentative map review — Billed at $125/hour to recover actual cost | 100 | Annual |
| E.O. 03-03, RMC 2.34.040.21b | Vesting tentative map review deposit — 1,000 minimum deposit, may be higher based on project size | 100 | Annual |
| COR1/41545, E.O. 03-03, RMC 2.34.040.21c, Ord. 2-03 | Preliminary plan review — Billed at $125/hour to recover actual cost | 100 | Annual |
| E.O. 03-03, RMC 2.34.040.21c, Ord. 2-03 | Preliminary plan review deposit — $1,000 minimum deposit, may be higher based on project size | 100 | Annual |
| RMC 2.34.040.21d, Ord. 2-03, E.O. 03-03 | Development plan review — Billed at $125/hour to recover actual cost | 100 | Annual |
| RMC 2.34.040.21d, Ord. 2-03, E.O. 03-03 | Development plan review deposit — $1,000 minimum deposit, may be higher based on project size | 100 | Annual |
| COR1/40815, E.O. 03-03, RMC 2.34.040.21e, Ord. 2-03 | PA-Preliminary development plan review — Billed at $125/hour to recover actual cost | 100 | Annual |
| E.O. 03-03, RMC 2.34.040.21e | PA-Preliminary development plan review deposit — $2,000 minimum deposit, may be higher based on project size | 100 | Annual |
| COR1/40816, E.O. 03-03, RMC 2.34.040.21f, Ord. 2-03 | PA-Tentative development plan review — Billed at $125/hour to recover actual cost | 100 | Annual |
| COR1/40816, E.O. 03-03, RMC 2.34.040.21f | PA-Tentative development plan review deposit — $2,000 minimum deposit, may be higher based on project size | 100 | Annual |
| COR1/40817, E.O. 03-03 | PA-Final development plan review — Billed at $125/hour to recover actual cost | 100 | Annual |
| E.O. 03-03 | PA-Final development plan review deposit — $2,000 minimum deposit, may be higher based on project size | 100 | Annual |
| Use Permit Review | Use Permit Review | Use Permit Review | Use Permit Review |
| Conditional Use Permit | Conditional Use Permit | Conditional Use Permit | Conditional Use Permit |
| Conditional use permit — Temporary use (F) | 100 | Annual | |
| Conditional use permit — Amendment (F) | 100 | Annual | |
| RMC 2.34.040.16a, Ord. 2-03, E.O. 03-03 | Mobile vendor | 100 | Annual |
| RMC 2.34.040.16b/ |
Minor project — 1 to 4 units residential or under 1,200 sq. ft. commercial and quality as CEQA exemption | 100 | Annual |
| RMC 2.34.040.16d/ |
Major project — 4 or more units residential or above 1,200 sq. ft. commercial or projects requiring initial study, billed at $125/hour to recover actual cost | 100 | Annual |
| RMC 2.34.040.16 and 16a-e, E.O. 03-03 | Major project deposit — $2,000 minimum deposit, may be higher based on project size | 100 | Annual |
| Design Review | Design Review | Design Review | Design Review |
| Plan check (Exempt projects: 500 sq. ft. or fewer) | |||
| RMC 15.04.930.040E | Administrative design review — 501-1,200 sq. ft. floor area under 15 ft. in height | 100 | Annual |
| RMC 2.34.040.19a, Ord. 2-03, E.O. 03-03, RMC 15.04.930.090E | Design review 1 — Projects 501-1,200 sq. ft. floor area not satisfying administrative design review criteria | 100 | Annual |
| RMC 2.34.040.19b, Ord. 2-03, E.O. 03-03, RMC 15.04.930.090E | Design review 2 — Projects 1,201 sq. ft. and larger, hourly | 100 | Annual |
| RMC 2.34.040.19c, Ord. 2-03, E.O. 03-03, RMC 15.04.930.090E | Design review 2 deposit — Projects 1,201 sq. ft. and larger | 100 | Annual |
| Engineering Review Fees | Engineering Review Fees | Engineering Review Fees | Engineering Review Fees |
| Engineering review — Parcel map (0—5 lots) (F) | 100 | Annual | |
| Engineering review — Final map (6—25 lots) (F) | 100 | Annual | |
| Engineering review — Final map (26—100 lots) (F) | 100 | Annual | |
| Engineering review — Final map (101—200 lots) (F) | 100 | Annual | |
| Sign Review | Sign Review | Sign Review | Sign Review |
| RMC 2.34.040.4a, Ord. 2-03, E.O. 03-03, RMC 15.06.040.2 | Signs — 1 to 2 signs | 100 | Annual |
| RMC 2.34.040.4b, Ord. 2-03, E.O. 03-03, RMC 15.06.040.2 | Signs — 3 or more, billed at $125/hour to recover actual cost | 100 | Annual |
| RMC 2.34.040.4b, E.O. 03-03, RMC 15.06.040.2 | Signs deposit — 3 or more, $2,000 minimum deposit, may be higher based on project size | 100 | Annual |
| Sign-Change of Copy (F) — $55 | 100 | As Needed | |
| Miscellaneous | Miscellaneous | Miscellaneous | Miscellaneous |
| E.O. 93-132, RMC 2.34.040.14a, Ord. 2-03 | Fence height exception review | 100 | Annual |
| Non-residential Fence (F) — $219 | 100 | As Needed | |
| COR1/41510, E.O. 03-03, RMC 2.34.040.22 | Street vacation review | 100 | Annual |
| E.O. 93-131, RMC 2.34.040.14b, Ord. 2-03 | Special use permit review — Billed at $125/hour to recover actual cost | 100 | Annual |
| E.O. 93-131, RMC 2.34.040.14b | Special use permit review deposit — $2,000 minimum deposit, may be higher based on project size | 100 | Annual |
| RMC 15.04.945.D, RMC 2.34.040.17a, Ord. 2-03, E.O. 03-03 | Zoning administrator review | 100 | Annual |
| Appeal Fees: | |||
| E.O. 03-03, RMC 2.34.040.32a | City Council appeal (fee received by City Clerk's office) | 100 | Annual |
| E.O. 03-03, RMC 2.34.040.32b, Ord. 2-03 | Administrative appeal | 100 | Annual |
| E.O. 03-03, RMC 2.34.040.32c, Ord. 2-03 | Planning Commission study session — Billed at $125/hour to recover actual cost | 100 | Annual |
| E.O. 03-03, RMC 2.34.040.32c, Ord. 2-03 | Planning Commission study session deposit — $1,000 minimum deposit, may be higher based on project size | 100 | Annual |
| RMC 2.34.040.29a, Ord. 2-03, E.O. 03-03 | Specific plan amendment — Billed at $125/hour to recover actual cost | 100 | Annual |
| RMC 2.34.040.29a, E.O. 03-03 | Specific plan amendment deposit — $2,000 minimum deposit, may be higher based on project size | 100 | Annual |
| RMC 2.34.040.17b, Ord. 2-03, E.O. 03-03 | Zoning compliance | 100 | Annual |
| E.O. 03-03 | Plan retrieval | 100 | Annual |
| E.O. 03-03, RMC 2.34.040.16f, Ord. 2-03 | Time extensions permit application | 100 | Annual |
| Staff research — Includes rebuild letters and all other zoning related correspondence and research, hourly | 100 | Annual | |
| Staff research deposit | 100 | Annual | |
| Pre-application review — Development 5,000 sq. ft. and fewer, hourly | 100 | Annual | |
| Pre-application review large project — Development 5,001 sq. ft. and larger, hourly | 100 | Annual | |
| Pre-application review large project deposit | 100 | Annual | |
| RMC 12.46.060 | Surface mining and reclamation performance bond — Refundable, annual (and conditional use permit RMC 12.46.040 ) | 100 | Annual |
| COR1/40907, RMC 2.40.110 , RMC 2.34.040.32d, Ord. 2-03, E.O. 03-03 | Photocopying, per page (8-½″ × 11″) | 100 | Annual |
| E.O. 03-03, RMC 2.34.040.32e, Ord. 3-02 | Sale of documents — Varies from $5 - $20 | 100 | Annual |
| E.O. 03-03, RMC 2.34.040.32f, Ord. 2-03 | Tape duplication | 100 | Annual |
| RMC 2.34.040.32g, Ord. 2-03, E.O. 03-03 | Mailing charge — For normal weight items. Heavier weight items will be weighed by mail room staff. | 100 | Annual |
| Planning Documents | Planning Documents | Planning Documents | Planning Documents |
| Form-based Code — $28 | 100 | As Needed | |
| Police | Police | Police | Police |
| RMC 7.106.110 , RMC 7.106.130 | Compliance inspection of alcohol and/ |
100 | Annual |
| RMC 7.106.110 , RMC 7.106.130 | Combined inspection of alcohol and tobacco retailer | 100 | Annual |
| RMC 7.106.110 , RMC 7.106.130 | Re-inspection of alcohol and/ |
100 | Annual |
| RMC 7.106.110 , RMC 7.106.130 | Underage sales investigation of alcohol and/ |
100 | Annual |
| COR1/40907, RMC 2.40.110 , RMC 2.34.040.32d | Photocopying, per page (8-½″ × 11″) | 100 | Annual |
| RMC 10.20.010 , RMC 2.40.110 , RMC 2.34.040.123 | Traffic accident report (federal state, county, municipalities, districts, and other political subdivisions exempt), per page | 100 | Annual |
| COR1/40921 | Booking fees (passed through to County) | 100 | Annual |
| RMC 14.72.050 | Traffic violations — In accordance with California Penal Code Section 19 | 100 | Annual |
| Photo Requests | Photo Requests | Photo Requests | Photo Requests |
| 3 × 5 | 100 | Annual | |
| 8 × 10 | 100 | Annual | |
| Fingerprinting | Fingerprinting | Fingerprinting | Fingerprinting |
| (also see ″Concealed Weapons Permit″) | |||
| RMC 2.34.040-50 | Resident, first card | 100 | Annual |
| RMC 2.34.040-50 | Resident, additional card | 100 | Annual |
| RMC 2.34.040-50 | Nonresident, first card | 100 | Annual |
| RMC 2.34.040-50 | Nonresident, additional card | 100 | Annual |
| RMC 2.34.040 | Lifescan fingerprinting service, resident | 100 | Annual |
| RMC 2.34.040 | Lifescan fingerprinting service, nonresident | 100 | Annual |
| RMC 2.34.040-48 | Prisoner medical transport (cost) | 100 | Annual |
| RMC 2.34.040-49 | Police clearances/ |
100 | Annual |
| False alarm charges (based on 6-month period) | |||
| COR1/41610, RMC 7.96.150, RMC 2.34.040-47 | 1st and 2nd false alarms | 100 | Annual |
| COR1/41610, RMC 7.96.150, RMC 2.34.040-47 | 3rd false alarm | 100 | Annual |
| COR1/41610, RMC 7.96.150, RMC 2.34.040-47 | 4th false alarm and each thereafter | 100 | Annual |
| Taxi Permits (Script Only) | Taxi Permits (Script Only) | Taxi Permits (Script Only) | Taxi Permits (Script Only) |
| RMC 7.68.090 | New driver | 100 | Annual |
| RMC 7.68.100 | Annual renewal | 100 | Annual |
| RMC 7.84.040 | Horse race permit fee | 100 | Annual |
| RMC 11.84.020 | Parade permit | 100 | Annual |
| Sound permit | 100 | Annual | |
| CAD printouts | 100 | Annual | |
| Communications dispatch tapes, each | 100 | Annual | |
| RMC 2.34.040-53 | Copy of interview video tapes, each | 100 | Annual |
| RMC 2.34.040-53 | Copy of interview cassette tapes, each | 100 | Annual |
| Vehicle Tow Fees | Vehicle Tow Fees | Vehicle Tow Fees | Vehicle Tow Fees |
| 22651(p) VC | Vehicle removal from highway, public or private land | 100 | Annual |
| 22651(i)(1) VC | Vehicle removal (nonrental) from highway or public land for 5 or more unpaid parking violations | 100 | Annual |
| 22651(o) VC | Vehicle found in private or public land with registration expired in excess of 6 months | 100 | Annual |
| 22651(k) VC | Vehicle parked or left standing on highway for more than 72 hours | 100 | Annual |
| RMC 14.40.050 | Vehicle parked on street or alley for more than 72 hours | 100 | Annual |
| RMC 11.76.100 | First vehicle abandoned, wrecked, dismantled that is a public nuisance or reduces property values | 100 | Annual |
| RMC 11.76.100 | Each additional vehicle abandoned, wrecked, dismantled that is a public nuisance or reduces property values | 100 | Annual |
| Tow Truck Permit | Tow Truck Permit | Tow Truck Permit | Tow Truck Permit |
| COR1/40765, RMC 7.72.080 | New driver — Annually | 100 | Annual |
| COR1/40765, RMC 7.72.080 | Renewal — Annually | 100 | Annual |
| Dealers in firearms | Dealers in firearms | Dealers in firearms | Dealers in firearms |
| Ord. 7.10040, RMC 2.34.040-51a | Dealers in firearms — Initial application fee | 100 | Annual |
| Dealers in firearms — Renewal application fee | 100 | Annual | |
| Peddlers and solicitors | Peddlers and solicitors | Peddlers and solicitors | Peddlers and solicitors |
| Ord. 8-03, RMC 7.04.105, RMC 13.45 , RMC 7.40.030 | Peddlers and solicitors police permit (plus business license permit) — Paid at business license unit | 100 | Annual |
| Ord. 8-03, RMC 7.04.105, RMC 13.45 , RMC 7.40.030.d | Peddlers and solicitors police permit renewal (plus business license permit) — Paid at business license unit | 100 | Annual |
| RMC 9.52.080 , RMC 2.34.040-46 | Community noise ordinance violation — Cost for administrative enforcement and noise testing | 100 | Annual |
| RMC 11.56.040.b/ |
Mechanical or electronic amusement device permit — One calendar year (prorated for calendar quarters), per device — Paid at business license unit | 100 | Annual |
| Concealed Weapons Permit | Concealed Weapons Permit | Concealed Weapons Permit | Concealed Weapons Permit |
| CA Penal Code 12050-12054(a) | Original permit application filing fee | 100 | Annual |
| CA Penal Code 12050-12054 | Fingerprint fee | 100 | Annual |
| CA Penal Code 12050-12054(a) | Permit renewal fee | 100 | Annual |
| CA Penal Code 12050-12054(b) | Permit amendment fee | 100 | Annual |
| Abatement | Abatement | Abatement | Abatement |
| COR1/40912, RMC 2.34.040.43a, Ord. 2-03, RMC 6.40.170 , 9.48.080, 9.50 , 11.76 , 11.78 , E.O. 03-04 | Inspection and notice | 100 | Annual |
| COR1/40912, RMC 2.34.040.43b, Ord. 2-03, E.O. 03-04 | Request for entry | 100 | Annual |
| COR1/40912, RMC 2.34.040.43c, Ord. 2-03, E.O. 03-04 | Inspection warrant | 100 | Annual |
| COR1/40912, RMC 2.34.040.43d, Ord. 2-03, E.O. 03-04 | Appeal | 100 | Annual |
| COR1/40912, RMC 2.34.040.43e, Ord. 2-03, E.O. 03-04 | Reinspection | 100 | Annual |
| COR1/40912, RMC 2.34.040.43f, Ord. 2-03, E.O. 03-04, RMC 11.76.060 | Administrative fee for clean-up | 100 | Annual |
| COR1/40912, RMC 2.34.040.43g, Ord. 2-03, E.O. 03-04 | Abatement warrant | 100 | Annual |
| COR1/40912, RMC 2.34.040.43h, Ord. 2-03, E.O. 03-04 | Collection | 100 | Annual |
| E.O. 03-04 | Lien and special assessment | 100 | Annual |
| E.O. 03-04 | Release of recordation | 100 | Annual |
| RMC 2.34.040-44, E.O. 03-04 | Auto abatement — Cost | 100 | Annual |
| COR1/40912, RMC 2.34.040.43o, Ord. 2-03, RMC 6.38.150-A, RMC 6.38.160-C, RMC 9.42.090 (Graffiti), 2.34.040-62, E.O. 03-04 | Actual abatement cost (varies with consideration given to amount of solid waste removed, materials used, etc.) | 100 | Annual |
| RMC 2.34.040.43o, E.O. 03-04 | Clean up (actual cost) | 100 | Annual |
| RMC 2.34.040.43o, E.O. 03-04 | Dumping (actual cost) | 100 | Annual |
| Vacant Dwellings or Buildings | Vacant Dwellings or Buildings | Vacant Dwellings or Buildings | Vacant Dwellings or Buildings |
| RMC 6.38.115 | Vacant Property Registration | Vacant Property Registration | Vacant Property Registration |
| COR1/40912, RMC 2.34.040.43i, Ord. 2-03, RMC 6.38.100-E, E.O. 03-04 | Permit to secure the building — Calculated based on cost evaluation and square footage | 100 | Annual |
| RMC 6.38.115 | Per month fee to cover the staff time and cost to monitor our chronically vacant property inventory | 100 | As Needed |
| COR1/40912, RMC 2.34.040.43j, Ord. 2-03, RMC 9.48.080, RMC 2.34.040-42b | Annual registration/ |
100 | Annual |
| COR1/40912, RMC 2.34.040.43k, Ord. 2-03, RMC 9.48.080-2A, E.O. 03-04 | Unimproved lot which cannot be improved — Annual, plus actual abatement costs | 100 | Annual |
| COR1/40912, RMC 2.34.040.43l, Ord. 2-03, RMC 9.48.080-2B, E.O. 03-04 | Unimproved lot, plus actual abatement costs | 100 | Annual |
| COR1/40912, RMC 2.34.040.43m, Ord. 2-03, RMC 9.48.080-2C, E.O. 03-04 | Improved lot with one structure containing less than four residential units, plus actual abatement costs | 100 | Annual |
| COR1/40912, RMC 2.34.040.43n, Ord. 2-03, RMC 9.48.080-2D, E.O. 03-04 | Improved lot with multiple structures or with residential structure containing four or more residential units, plus actual abatement costs | 100 | Annual |
| Recreation And Parks (Continued on attached ″Rental Extra Fee Listing″) | |||
| The fee structure is in place to encourage use, while allowing citizens to recover associated costs. The City of Richmond and some nonprofit organizations, West Contra Costa Unified School District, and residents may be eligible for discounts. See Comprehensive Recreation and Parks ″Rental Policy and Fee Schedule″ for additional information. All or portions of a facility use permit deposit may be withheld due to improper use and/ |
|||
| Rents | Rents | Rents | Rents |
| Rental Cancellation Fees | Rental Cancellation Fees | Rental Cancellation Fees | Rental Cancellation Fees |
| COR1/41201, RMC 10.16.060 , Reso. 160-01 | 28 days prior (100% refund) | 100 | Annual |
| COR1/41201, RMC 10.16.060 , Reso. 160-01 | 21 days prior to event (75% refund) | 100 | Annual |
| COR1/41201, RMC 10.16.060 , Reso. 160-01 | 14 days prior (50% refund) | 100 | Annual |
| COR1/41201, RMC 10.16.060 , Reso. 160-01 | 7 days prior (25% refund) | 100 | Annual |
| COR1/41201, RMC 10.16.060 , Reso. 160-01 | Less than 7 days (no refund) | 100 | Annual |
| Richmond Convention Center | Richmond Convention Center | Richmond Convention Center | Richmond Convention Center |
| Rental: Memorial Auditorium Main Floor | |||
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90a(1) | Deposit — (any time), $2,400 minimum (may be higher) | 100 | Annual |
| Set up and break down Fee (Only applies to Auditorium Complex, Auditorium Main Floor and Bermuda plus Catalina rentals), hourly — $200 | 100 | As Needed | |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90a(2) | Friday — Sunday, hourly | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90a(3) | Monday — Thursday, hourly | 100 | Annual |
| RMC 2.34.040-51, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90a(4) | Bingo, 8-hour max., daily | 100 | Annual |
| Rental: Convention Center Complex | |||
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90b(1) | Deposit — (any time), $2,400 minimum (may be higher) | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90b(2) | Friday — Sunday, hourly | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90b(3) | Monday — Thursday, hourly | 100 | Annual |
| Rental: Bermuda/ |
|||
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90c(1) | Deposit — $500 minimum (may be higher) | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90c(2) | Friday — Sunday (R), hourly | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90c(3) | Monday — Thursday (R), hourly | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90c(4) | Friday — Sunday (NR), hourly | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90c(5) | Monday — Thursday (NR), hourly | 100 | Annual |
| Rental: Terrace Rooms (C/ |
|||
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90d(1) | Deposit — $500 minimum (may be higher) | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90d(2) | R, hourly | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90d(3) | NR, hourly | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90d(4) | Additional Terrace Room, R, hourly | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90d(5) | Additional Terrace Room, NR, hourly | 100 | Annual |
| Rental: Convention Center Lobby | |||
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90e(1) | Deposit — $500 minimum (may be higher) | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90e(2) | Monday — Thursday, R, hourly | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90e(3) | Friday — Sunday, R, hourly | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90e(4) | Monday — Thursday, NR, hourly | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90e(5) | Friday — Sunday, NR, hourly | 100 | Annual |
| Rental: Convention Center Kitchen | |||
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90f(1) | Shared use (with event booking) | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90f(2) | Sole use (with event booking) | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90f(3) | Sole use (without event booking), 6-hour max. | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90f(4) | Deposit for sole use, without event booking | 100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90g(1) | Dressing room — Band/ |
100 | Annual |
| COR1/41201, RMC 10.16.040 , Reso. 160-01, Ord. 19-03, RMC 2.34.040.90g(2) | Individual dressing rooms — Upstairs, w/ event booking, per room | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.90h | Alcohol use — Resident (available at convention center and parks) | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.90h(2) | Alcohol use — Nonresident (available at convention center and parks) | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.90h(3) | Alcohol sold — Resident (available at convention center and parks) | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.90h(4) | Alcohol sold — Nonresident (available at convention center and parks) | 100 | Annual |
| COR1/41201, RMC 2.34.010 , Ord. 19-03, RMC 2.34.040.90i | Concert receipts (donations and/ |
100 | Annual |
| Community Center Rooms | Community Center Rooms | Community Center Rooms | Community Center Rooms |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94a(1) | Social hall — (R) (RRC and Sr.C), hourly | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94a(2) | Deposit, $350 minimum (may be higher) | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94b(1) | Social hall — (NR) (RRC and Sr.C) | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94b(2) | Deposit, $350 minimum (may be higher) | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94c(1) | Social hall — (R) (MLK and Nevin) | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94c(2) | Deposit, $350 minimum (may be higher) | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94d(1) | Social hall — (NR) (MLK and Nevin) | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94d(2) | Deposit, $350 minimum (may be higher) | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94e(1) | Social hall — (R) (BTA/ |
100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94e(2) | Deposit, $350 minimum (may be higher) | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94f(1) | Social hall — (NR) (BTA/ |
100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94f(2) | Deposit, refundable, $350 minimum (may be higher) | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94g(1) | Conference rooms — (R) (BTA/ |
100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94g(2) | Deposit, $100 minimum (may be higher) | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94h(1) | Conference rooms — (NR) hourly (BTA/ |
100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94h(2) | Deposit, $100 minimum (may be higher) | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94i | Washington Field House (by special approval only) | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94j(1) | Kitchen — (R) | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.94j(2) | Kitchen — (NR) | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.94j(3) | Concession fee (R) — Refer to Concession Policy, Section 8, Pg. 7 | 100 | Annual |
| Multi-Purpose Room - hourly (BTA, NEVIN & PT. RICHMOND) — $101 | 100 | As Needed | |
| Deposit — $250 minimum (may be higher) | |||
| Field Permits | Field Permits | Field Permits | Field Permits |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.66a(1) | Baseball/ |
50 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.66a(2) | League deposit, refundable | 100 | Annual |
| Ord. 19-03, RMC 2.34.040.66b(1), Reso. 160-01 | Baseball/ |
50 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.66b(2) | League deposit | 100 | Annual |
| Ord. 19-03, RMC 2.34.040.66c(1), Reso. 160-01 | Adult softball (R), hourly | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.66c(2) | League deposit | 100 | Annual |
| Ord. 19-03, RMC 2.34.040.66d(1), Reso. 160-01 | Adult softball (NR), hourly | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.66d(2) | League deposit | 100 | Annual |
| Ord. 19-03, RMC 2.34.040.66e(1), Reso. 160-01 | Adult baseball, hourly (NR and R) | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.66e(2) | League deposit | 100 | Annual |
| Ord. 19-03, RMC 2.34.040.66f(1), Reso. 160-01 | Soccer — Youth (R) | 50 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.66f(2) | On-going deposit | 100 | Annual |
| Ord. 19-03, RMC 2.34.040.66g(1), Reso. 160-01 | Soccer — Youth (NR), hourly | 50 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.66g(2) | On-going deposit | 100 | Annual |
| Ord. 19-03, RMC 2.34.040.66h(1), Reso. 160-01 | Soccer — Adults, resident, hourly | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.66h(2) | Deposit | 100 | Annual |
| Ord. 19-03, RMC 2.34.040.66i(1), Reso. 160-01 | Soccer — Adults (NR), hourly | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.66i(2) | League deposit | 100 | Annual |
| Ord. 19-03, RMC 2.34.040.66j, Reso. 160-01 | Lawn bowling green — By special arrangement | 100 | Annual |
| Ord. 19-03, RMC 2.34.040.66k(1), Reso. 160-01 | Tennis courts (R and NR), hourly | 75 | Annual |
| Ord. 19-03, RMC 2.34.040.66k(2), Reso. 160-01 | Deposit (NR) | 100 | Annual |
| Ord. 19-03, RMC 2.34.040.66l, Reso. 160-01 | Note: Tennis pro by special permit/ |
100 | Annual |
| Ord. 19-03, RMC 2.34.040.66m, Reso. 160-01 | Sand volleyball | 100 | Annual |
| Gymnasiums | Gymnasiums | Gymnasiums | Gymnasiums |
| COR1/41201, Ord. 19-03, RMC 2.34.040.67a(1), Reso. 160-01 | Gymnasium, hourly, (BTA/ |
100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.67a(2), Reso. 160-01 | Deposit | 100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.67b(1), Reso. 160-01 | Gymnasium hourly, (BTA/ |
100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.67b(2), Reso. 160-01 | Deposit | 100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.67c(1), Reso. 160-01 | Gymnasium, hourly, as social hall (BTA/ |
100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.67c(2), Reso. 160-01 | Deposit | 100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.67d(1), Reso. 160-01 | Gymnasium, hourly, as social hall (BTA/ |
100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.67d(2), Reso. 160-01 | Deposit | 100 | Annual |
| Park Reservations | Park Reservations | Park Reservations | Park Reservations |
| (All park/ |
|||
| Reso. 160-01 | Reservations for residents is free | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.68a | Deposit | 100 | Annual |
| Excluding Marina Bay, Nicholl, Barbara and Jay Vincent, Shimada-by special arrangement ONLY (permission required for amplified sound at all parks): | |||
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.68b | Resident groups for fundraisers/ |
100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.68c | Resident groups for fundraisers/ |
100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.68d | Resident groups for fundraisers/ |
100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.68e | Nonresident, hourly for under 100 hours | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.68f | 101-249 hours, nonresident, hourly | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.68g | 250+ hours, nonresident, hourly | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.68h | Deposit | 100 | Annual |
| Picnic Areas | Picnic Areas | Picnic Areas | Picnic Areas |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69a | Nicholl Park, resident, 1st 4 hours | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.68b | Nicholl Park, resident, each hour thereafter, hourly | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.68c | Deposit | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69d | Nicholl park, nonresident, 1st 4 hours | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69e | Nicholl park, nonresident, each hour thereafter, hourly | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69f | Deposit | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69g | Barbara and Jay Vincent, resident, 1st 4 hours | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69h | Barbara and Jay Vincent, resident, each hour thereafter, hourly | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69i | Deposit | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69j | Barbara and Jay Vincent, nonresident, 1st 4 hours | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69k | Barbara and Jay Vincent, nonresident, each hour thereafter, hourly | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69l | Deposit | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69m | Marina Bay Park, resident, per table | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69n | Deposit | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69o | Marina Bay Park, nonresident, per table | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69p | Deposit | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69q | Shimada Park, resident, per table and use | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69r | Deposit | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69s | Shimada Park, nonresident, per table and use | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.69t | Deposit | 100 | Annual |
| COR1/40913 | Pools | ||
| COR1/41201, Ord. 19-03, RMC 2.34.040.70a | Richmond plunge, pool rental, resident, hourly | 100 | Annual |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.70b | Deposit | 100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.70c, Reso. 160-01 | Richmond plunge, pool rental, nonresident, hourly | 100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.70d, Reso. 160-01 | Deposit | 100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.70e, Reso. 160-01 | Richmond plunge, pool lane rental, resident, hourly | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.70f | Deposit, club/ |
100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.70g, Reso. 160-01 | Richmond swim center, pool rental, resident, hourly | 100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.70h, Reso. 160-01 | Deposit | 100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.70i, Reso. 160-01 | Richmond swim center, pool rental, nonresident, hourly | 100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.70j, Reso. 160-01 | Deposit | 100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.70k, Reso. 160-01 | Richmond swim center, pool lane rental, resident, hourly | 100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.70l, Reso. 160-01 | Deposit (club/ |
100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.70m, Reso. 160-01 | Richmond swim center, pool lane rental, nonresident, hourly | 100 | Annual |
| COR1/41201, Ord. 19-03, RMC 2.34.040.70n, Reso. 160-01 | Deposit (club/ |
100 | Annual |
| Ord. 19-03, RMC 2.34.040.70o, Reso. 160-01 | Drop-in admission — Varies by season, type (recreation, laps, etc.) and age (youth vs. adult) | 100 | Annual |
| RSC Outdoor Picnic Area Only (No Pool), Monday to Thursday, rental only during Recreation Swim Session, maximum of 50 guests, seating for 36 at picnic tables — $90 | 100 | As Needed | |
| RSC Outdoor Picnic Area Only (No Pool), Friday to Sunday, rental only during Recreation Swim Session, maximum of 50 guests, seating for 36 at picnic tables — $113 | 100 | As Needed | |
| RSC Outside Pool plus Picnic Area, Monday to Thursday, hourly -two (2) hours minimum rental — $150 | 100 | As Needed | |
| RSC Outside Pool plus Picnic Area, Friday to Sunday, hourly -two (2) hours minimum rental — $188 | 100 | As Needed | |
| COR1/41201, Reso. 160-01, Ord. 19-03, RMC 2.34.040.71 | Polling Place (county/ |
100 | Annual |
| Booths, Festivals and Other Special Events | |||
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.97a | Nonprofit information/ |
100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.97b | Nonprofit food vendor | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.97c | Commercial food vendor | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.97d | Commercial merchandise | 100 | Annual |
| Reso. 160-01, Ord. 19-03, RMC 2.34.040.97e | Office space, leased (by special arrangement) | 100 | Annual |
| Ord. 19-03, RMC 2.34.040.75, Reso. 160-01 | Adult recreation classes (includes leagues) | 100 | Annual |
| Ord. 19-03, RMC 2.34.040.76, Reso. 160-01 | Youth recreation classes (includes leagues) | 50 | Annual |
| Film Permits | Film Permits | Film Permits | Film Permits |
| Still Photography, daily — $50 | 100 | As Needed | |
| Music Videos, Industrial, Web Content, daily — $100 | 100 | As Needed | |
| Commercial, Corporate, Short Films, Feature, Television, daily — $150 | 100 | As Needed | |
| (NR) = Nonresident (R) = Resident | (NR) = Nonresident (R) = Resident | (NR) = Nonresident (R) = Resident | (NR) = Nonresident (R) = Resident |
| The fee structure is in place to encourage use, while allowing citizens to recover associated costs. The City of Richmond and some nonprofit organizations, West Contra Costa Unified School District, and residents may be eligible for discounts. See Comprehensive Recreation and Parks ″Rental Policy and Fee Schedule″ for additional information. All or portions of a facility use permit deposit may be withheld due to improper use and/ |
|||
| RENT PROGRAM | RENT PROGRAM | RENT PROGRAM | RENT PROGRAM |
| Residential Rental Housing Fee City to collect fees solely to defray actual cost | |||
| RMC 6.02.180, RMC 6.38.110 (a)(5), RMC Ch. 11.100 , RMC 11.100.030 (f), RMC 11.100.060 (e)(7) | The City shall be entitled to payment from any landlord for services rendered by the City of Richmond Rent Program. The amount of any fee, including late payment fee, and collection cost owed to the Rent Board of the City of Richmond shall be deemed a debt to the City of Richmond. The Rent Board shall charge and collect residential rental housing fees, including late payment fees, and may commence collection actions at any time, as may be furthered described by the Richmond Rent Board's regulations | 100 | As Needed |
| Delinquency | Delinquency | Delinquency | Delinquency |
| RMC 11.100.030 (f) | Any landlord who fails to file any required statement and pay the amount of the Residential Rental Housing Fee prescribed by City Council resolution within 30 days after it becomes due shall be deemed delinquent and shall be assessed the following late payment fee | 100 | As Needed |
| (1) Ten percent of the residential rental housing fee if the payment is made within one to 30 days after it became delinquent | |||
| (2) Twenty-five percent of the residential rental housing fee if the payment is made within 31—60 days after it became delinquent | |||
| (3) Fifty percent of the residential rental housing fee if the payment is made more than 60 days after it became delinquent | |||
| Such late payment fee shall become part of the residential rental housing fee then required to be paid under this section and enabling resolution | |||
| STORMWATER Stormwater collection system service fee, stormwater collection system collection fee (SEE building regulations, this fee is collected by building regulations) | |||
| C.3 Fees for projects which create or replace more than 10,000 square feet of impervious surface (fee is not applicable when a subdivision plan check fee is collected) | |||
| C.3 Stormwater control plan review | 100 | Annual | |
| C.6 Construction sites greater than 1 acre or determined to be a significant threat to water quality | |||
| C.6 SWPPP monthly inspection and compliance deposit (total refundable deposit = Monthly fee multiplied by construction duration in months) | 100 | Annual | |
| C.6 SWPPP monthly inspection and compliance (monthly fee to be multiplied by # months planned duration of construction) | 100 | Annual | |
| C.6 Construction sites less than 1 acre or determined not to be a significant threat to water quality | |||
| Monthly inspection (monthly fee to be multiplied by # months planned duration of construction) | 100 | Annual | |
| Stormwater plan review for projects not required to submit a SWCP | |||
| Plan review fee (1 hour) | 100 | Annual | |
| Stormwater Permit Fees | Stormwater Permit Fees | Stormwater Permit Fees | Stormwater Permit Fees |
| Stormwater Encroachment Permit — $479 | 100 | As Needed | |
| Hourly Rates | Hourly Rates | Hourly Rates | Hourly Rates |
| Fees for work performed by City staff — Includes work performed in excess of the standard fees listed or for services not otherwise listed. | |||
| City Engineer | 100 | Annual | |
| Wastewater-Stormwater General Manager | 100 | Annual | |
| Stormwater Program Manager | 100 | Annual | |
| Source Control Inspector III | 100 | Annual | |
| Source Control Inspector II | 100 | Annual | |
| Source Control Inspector I | 100 | Annual | |
| Engineer Asset Administrator | 100 | Annual | |
| Transportation - Parking Management Services | |||
| Shared Mobility Services | Shared Mobility Services | Shared Mobility Services | Shared Mobility Services |
| Dedicated Public Parking Stalls - Mobility Operators | |||
| Gas vehicles with dedicated parking public parking stalls | 100% | As Needed | |
| ZEV (zero emission vehicles) with dedicated public parking | 100% | As Needed | |
| Free Floating Car Share Vehicle Permits | Free Floating Car Share Vehicle Permits | Free Floating Car Share Vehicle Permits | Free Floating Car Share Vehicle Permits |
| Gas Vehicles (1 to 10 vehicles) | 100% | As Needed | |
| Gas Vehicles (More than 10 vehicles) | 100% | As Needed | |
| ZEV (1 to 10 vehicles) | 100% | As Needed | |
| ZEV (More than 10 vehicles) | 100% | As Needed | |
| Dedicated Car Share Vehicle Permits | Dedicated Car Share Vehicle Permits | Dedicated Car Share Vehicle Permits | Dedicated Car Share Vehicle Permits |
| Gas Vehicles - Operating from private property (1 to 10 vehicles) | 100% | As Needed | |
| Gas Vehicles - Operating from private property (More than 10 vehicles) | 100% | As Needed | |
| Gas vehicles - Parked/ |
100% | As Needed | |
| ZEV (1 to 10 vehicles) | 100% | As Needed | |
| ZEV (More than 10 vehicles) | 100% | As Needed | |
| Bike Share/ |
|||
| Permit Application Fee (staff costs to review permit) | 100% | As Needed | |
| Annual Permit Fee | 100% | As Needed | |
| Public Property Repair and Maintenance Endowment fee | 100% | As Needed | |
| Private Shuttle Providers | Private Shuttle Providers | Private Shuttle Providers | Private Shuttle Providers |
| Permit to Operate | Permit to Operate | Permit to Operate | Permit to Operate |
| Gas Vehicles | 100% | As Needed | |
| ZEV | 100% | As Needed | |
| Special Event transportation | 100% | As Needed | |
| Dedicated Right of Way loading zones | 100% | As Needed | |
| On Street Metered (Paid) Parking | On Street Metered (Paid) Parking | On Street Metered (Paid) Parking | On Street Metered (Paid) Parking |
| Public parking stalls | 100% | As Needed | |
| WASTEWATER Sewer service fees, Richmond Municipal Sewer District, sanitary sewer connection fee (see building regulations, this fee is collected by building regulations) | |||
| Richmond Municipal Sewer District/ sanitary sewer connection fee — See building regulations (the fee is received by building regulations) | 100 | Annual | |
| Sanitary System Sewer Charges | Sanitary System Sewer Charges | Sanitary System Sewer Charges | Sanitary System Sewer Charges |
| RMC 12.20.050 | Within City and within West County Wastewater District or Stege Sanitary District No. 1 — Annual | 100 | Annual |
| Within City and within Richmond Municipal Sewer District No. 1 — Single unit residential, annual | 100 | Annual | |
| RMC 12.20.050 | FY 03-04, per SSU | 100 | Annual |
| RMC 12.20.050 | FY 04-05, per SSU | 100 | Annual |
| RMC 12.20.050 | FY 05-06, per SSU | 100 | Annual |
| RMC 12.20.050 | FY 06-07, per SSU | 100 | Annual |
| RMC 12.20.050 | FY 07-08, per SSU | 100 | Annual |
| RMC 12.20.050 | FY 08-09, per SSU | 100 | Annual |
| Within City and within Richmond Municipal Sewer District No. 1 — Multi-unit residential, annual | |||
| RMC 12.20.050 | FY 03-04, per SSU | 100 | Annual |
| RMC 12.20.050 | FY 04-05, per SSU | 100 | Annual |
| RMC 12.20.050 | FY 05-06, per SSU | 100 | Annual |
| RMC 12.20.050 | FY 06-07, per SSU | 100 | Annual |
| RMC 12.20.050 | FY 07-08, per SSU | 100 | Annual |
| RMC 12.20.050 | FY 08-09, per SSU | 100 | Annual |
| Within City and within Richmond Municipal Sewer District No. 1 — Commercial and industrial, annual | |||
| RMC 12.20.050 | FY 03-04 — Not less than $182, based on water usage | 100 | Annual |
| RMC 12.20.050 | FY 04-05 — Not less than $186, based on water usage | 100 | Annual |
| RMC 12.20.050 | FY 05-06 — Not less than $223, based on water usage | 100 | Annual |
| RMC 12.20.050 | FY 06-07 — Not less than $227, based on water usage | 100 | Annual |
| RMC 12.20.050 | FY 07-08 — Not less than $232, based on water usage | 100 | Annual |
| RMC 12.20.050 | FY 08-09 — Not less than $237, based on water usage | 100 | Annual |
| Richmond Municipal Sewer District No. 1, commercial and industrial, annual | |||
| FY 11-12 $41.65 per IWU, $0.885 per lbs BOD and $0.408 per lbs TSS, but not less than $344, based on water usage | 100 | Annual | |
| FY 12-13 $43.73 per IWU, $0.929 per lbs BOD and $0.429 per lbs TSS, but not less than $361, based on water usage | 100 | Annual | |
| FY 13-14 $45.92 per IWU, $0.975 per lbs BOD and $0.450 per lbs TSS, but not less than $379 based on water usage | 100 | Annual | |
| Stormwater Management Program Charge | Stormwater Management Program Charge | Stormwater Management Program Charge | Stormwater Management Program Charge |
| RMC 12.20.050 | Within City and within West County Wastewater District or Stege Sanitary District No. 1 — Not less than $32, based on water usage, annual | 100 | Annual |
| RMC 12.20.050 | Within City and within Richmond Municipal Sewer District No. 1 — Single unit residential and multi-unit residential, not less than $32, based on water usage, annual | 100 | Annual |
| RMC 12.20.050 | Within City and within Richmond Municipal Sewer District No. 1 — Commercial and industrial, not less than $32, based on water usage, annual | 100 | Annual |
| Stormwater Permitting Program | Stormwater Permitting Program | Stormwater Permitting Program | Stormwater Permitting Program |
| RMC 12.20.050 (b.1) | Permit fee — Annual (includes biennial inspections) | 100 | Annual |
| RMC 12.20.050 (b.2) | Additional site visit inspection charge — Each site | 100 | Annual |
| RMC 12.20.050 (b.3) | Violation site visit inspection charge — Each site, when site includes monitoring, sampling or testing | 100 | Annual |
| RMC 12.20.050 (b.4) | Violation laboratory charges — Cost plus 10%, as needed | 100 | Annual |
| Wastewater Discharge Permitting Program | Wastewater Discharge Permitting Program | Wastewater Discharge Permitting Program | Wastewater Discharge Permitting Program |
| Baseline Monitoring Report Review for New Categorical Dischargers as defined in 40 CFR Chapter I, Subchapter N) charged at cost plus overhead | 100 | Annual | |
| Wastewater Permit Fees | Wastewater Permit Fees | Wastewater Permit Fees | Wastewater Permit Fees |
| First Violation — $250 | 100 | As Needed | |
| Second Violation — $500 | 100 | As Needed | |
| Third Violation — $1000 | 100 | As Needed | |
| Expedited Plan Review Fee (Min. 2 hours) — $1,080 | 100 | As Needed | |
| Wastewater Inspection Program | Wastewater Inspection Program | Wastewater Inspection Program | Wastewater Inspection Program |
| Additional site inspection fee charged at cost plus overhead | 100 | Annual | |
| Fats, Oils and Grease Program Fees | Fats, Oils and Grease Program Fees | Fats, Oils and Grease Program Fees | Fats, Oils and Grease Program Fees |
| Additional site inspection fee charged at cost plus overhead | 100 | Annual | |
| Food handling facilities with grinders and no treatment system — 10% surcharge will be added to the annual sewer service fees | 100 | Annual | |
| Wastewater Plan Review Fee | Wastewater Plan Review Fee | Wastewater Plan Review Fee | Wastewater Plan Review Fee |
| Additional staff time for plan review charged at cost plus overhead | 100 | Annual | |
| Expedited Plan Review Fee (Min 2 hours) — $1080 | 100 | As Needed | |
| Miscellaneous | Miscellaneous | Miscellaneous | Miscellaneous |
| Pre and post sewer lateral video review | 100 | Annual | |
| Hourly Rates | Hourly Rates | Hourly Rates | Hourly Rates |
| Fees for work performed by City staff — Includes work performed in excess of the standard fees listed or for services not otherwise listed. | |||
| City Engineer | 100 | Annual | |
| Wastewater-Stormwater General Manager | 100 | Annual | |
| Source Control Inspector III | 100 | Annual | |
| Source Control Inspector II | 100 | Annual | |
| Source Control Inspector I | 100 | Annual | |
| Engineer Asset Administrator | 100 | Annual | |
| SSU = Sewer service unit, IWU = Industrial waste unit, BOD = Five-day chemical oxygen demand in mg/ |
|||
| ** Fire Department fees are based on the calendar year and will be prorated based on application date. | |||
| *** ″+″ in the Fee column may signify that an separate/ |
|||
| Multiple fees from various departments may apply to the same project. | |||
| Deposits may be refundable based on condition. | |||
| RMC = Richmond Municipal Code, E.O. = Executive Order, Ord. = Ordinance, Reso. = Resolution, GVT C = California Government Code, HSC = California Health and Safety Code, UFC = Uniform Fire Code, 1994 Edition, 19CCR = Title 19 (California Code of Regulations, State Fire Marshal) | |||
| ″Proposed″ Column Key: | ″Proposed″ Column Key: | ″Proposed″ Column Key: | ″Proposed″ Column Key: |
| = fees being increased through means other than ECI. | |||
| = fees will be or have been submitted to Council under separate cover, from the overseeing dept. | |||
| (white box) | in ″Proposed″ column = fees increased within the last year and are not being considered for increase at this time | in ″Proposed″ column = fees increased within the last year and are not being considered for increase at this time | in ″Proposed″ column = fees increased within the last year and are not being considered for increase at this time |
| Description | Percentage of Costs | Proposed Fees |
|---|---|---|
| IMPACT FEES | IMPACT FEES | IMPACT FEES |
| Residential | Residential | Residential |
| Parks—Quimby (Subdivisions) | 100 | As Needed |
| Parks (Infill) | 100 | As Needed |
| Community/ |
100 | As Needed |
| Police Facilities | 100 | As Needed |
| Fire Protection Facilities | 100 | As Needed |
| Library Facilities | 100 | As Needed |
| Storm Drains | 100 | As Needed |
| Sewer Facilities | 100 | As Needed |
| Nonresidential | Nonresidential | Nonresidential |
| Office | 100 | As Needed |
| Police Facilities | 100 | As Needed |
| Fire Facilities | 100 | As Needed |
| Library Facilities | 100 | As Needed |
| Storm Drainage | 100 | As Needed |
| Sewer Facilities | 100 | As Needed |
| Industrial | 100 | As Needed |
| Police Facilities | 100 | As Needed |
| Fire Facilities | 100 | As Needed |
| Library Facilities | 100 | As Needed |
| Storm Drainage | 100 | As Needed |
| Sewer Facilities | 100 | As Needed |
| Warehousing | 100 | As Needed |
| Police Facilities | 100 | As Needed |
| Fire Facilities | 100 | As Needed |
| Library Facilities | 100 | As Needed |
| Storm Drainage | 100 | As Needed |
| Sewer Facilities | 100 | As Needed |
(b) The fees for the hereinabove services shall be as set forth in the "master fee schedule," a copy of which is on file with the Finance Director of the City.
(c) All fees and charges adopted or adjusted pursuant to this section shall take effect after: (1) the City Manager certifies in writing that all provisions of this section have been complied with; (2) the City Manager has published and posted the notice of adoption of adjustment of fees and charges as set forth below; and (3) the time in which an appeal to the City Council has expired or the appeal has been resolved by the City Council, whichever is later.
(d) The schedule of frequency of rate adjustments may be changed by the City Manager: (1) to adjust revenues sufficient to meet debt service coverage requirements of any bond, certificate, ordinance, resolution, indenture, contract or action under which securities have been issued by the City which contain any coverage factor requirement, and (2), if, in the City Manager's judgment, a gross inequity would be perpetrated by the existing rate schedule due to a new or unanticipated event.
(Amended by Ordinance Nos. 47-89 N.S., 3.91 N.S., 6.91 N.S., 16-93 N.S., 41-95 N.S., 2-97 N.S., 2-03 N.S., 19-03 N.S., 21-03 N.S., 3-04 N.S., 3-07 N.S. and 15-08 N.S.; Ord. No. 6-10 N.S., § 1, 2-2-2010; Ord. No. 8-10 N.S., § I, 2-16-2010; Ord. No. 17-11 N.S., § 1, 7-19-2011; Ord. No. 25-13 N.S., § 1, 12-17-2013; Ord. No. 15-14 N.S., § 1, 7-30-2014; Ord. No. 19-15 N.S., § 1, 7-21-2015; Ord. No. 8-16 N.S., § 1, 6-7-2016; Ord. No. 17-16 N.S., § 1, 12-6-2016; Ord. No. 16-17 N.S., §§ 1—4, 7-25-2017; Ord. No. 16-18 N.S., § 1, 6-26-2018; Ord. No. 21-18 N.S., §§ 3, 4, 7-17-2018; Ord. No. 17-20 N.S., § 1, 7-21-2020; Ord. No. 04-22 N.S., § 1, 3-1-2022; Ord. No. 08-23 N.S. , §§ 1, 2, 6-6-2023; Ord. No. 06-24 N.S., § 1, 6-4-2024; Ord. No. 13-25 N.S. , § 1, 6-3-2025)
2.34.050 - Publication and posting of fees and charges.¶
Upon the adoption or adjustment of any fees and charges hereunder, the City Manager shall have a notice of adoption or adjustment of fees and charges published twice in a newspaper of general circulation within the City, with at least five days intervening between the dates of the first and last publication, and posted in two conspicuous locations in the Richmond City Hall. Said notice shall provide a general explanation of fees and charges and shall provide notification of the right to appeal under Section 2.34.060. The City Manager shall make available to the public appropriate data indicating the cost, or estimated cost, required to support the adoption or adjustment of fees and charges.
2.34.060 - Appeal to City Council.¶
Any person who feels that any fee or charge determined and set by the City Manager is in excess of the percentage of costs reasonably borne to be recovered as set out in Section 2.34.040 may appeal in writing to the City Council within ten days after the date of the last publication of the notice of adoption or adjustment of fees and charges. Upon the filing of an appeal, the City Clerk shall set the matter for hearing before the City Council. Such hearing shall be held within 30 days after the date of filing of the appeal. Upon the conclusion of the hearing, the City Council shall declare its findings based upon the testimony and documents produced before it. The City Council may confirm, modify or reject any adoption or adjustment in fees and charges by the City Manager. The decision of the City Council shall be final.
(Source: Ordinance No. 38-89 N.S.)
Get a plain-English answer with a citation back to this text.
Ask AI about this code