§ 7-1
Redondo Beach Municipal Code · 2026-07 edition · updated 2026-09-27 · Redondo Beach
§ 7-1.01. Permits required to excavate.¶
§ 7-1.02. Permit—Fee.¶
§ 7-1.03. Permits—Applications.¶
§ 7-1.04. Excavations to be located as shown on plats.¶
§ 7-1.05. Deposits.¶
§ 7-1.06. Permits—Issuance.¶
§ 7-1.07. Inspections.¶
§ 7-1.08. Inspection—Fee.¶
§ 7-1.09. Work done by City—Costs.¶
§ 7-1.10. Vehicular and pedestrian crossings.¶
§ 7-1.11. Storage of excavated materials.¶
§ 7-1.12. Maintenance of gutters.¶
§ 7-1.13. Barriers and lights.¶
§ 7-1.14. Prosecution of work.¶
§ 7-1.15. Defects in workmanship or materials.¶
§ 7-1.16. Deductions from deposits made.¶
§ 7-1.17. Return of deposits.¶
§ 7-1.18. Excavation work to be under the supervision of the City Engineer.¶
§ 7-1.19. Filing of maps.¶
§ 7-1.20. Excavations under sidewalks.¶
§ 7-1.21. Surplus materials removed.¶
§ 7-1.22. Exceptions.¶
§ 7-1.23. Emergency excavations.¶
§ 7-1.24. Permits granted subject to prior rights.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code