Skip to content

Article 4 — Abatement by City

Redondo Beach Municipal Code · 2026-07 edition · updated 2026-09-27 · Redondo Beach

§ 9-21.401. Additional remedy.

§ 9-21.402. City Engineer to do work.

§ 9-21.403. Interference with repair or demolition work prohibited.

§ 9-21.404. Report of expense incurred.

§ 9-21.405. Processing and preparation costs.

§ 9-21.406. Notice of hearing.

§ 9-21.407. Recordation of notice of hearing.

§ 9-21.408. Protests and objections.

§ 9-21.409. Hearing of protests.

§ 9-21.410. Lien and personal obligation.

§ 9-21.411. Recording of lien.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Redondo Beach Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.