Chapter 12.20 — STREET CONSTRUCTION AND CONSTRUCTION REGULATIONS
Redlands Municipal Code · 2026-09 edition · updated 2026-09-27 · Redlands
12.20.010: DEFINITIONS:¶
12.20.020: CONFORMANCE WITH PLANS AND CITY SPECIFICATIONS:¶
12.20.030: MORATORIUM AREAS; NO PERMIT SHALL BE ISSUED:¶
12.20.040: PERMIT TO BE KEPT AT WORK SITE:¶
12.20.050: DURATION AND VALIDITY:¶
12.20.060: DIRECTOR; SUPERVISION AND INSPECTION:¶
12.20.070: DIRECTOR; NOTICE OF COMMENCEMENT OF WORK:¶
12.20.080: DIRECTOR; AUTHORITY TO PERMIT CONTINUANCE:¶
12.20.090: LIABILITY AND INDEMNIFICATION:¶
12.20.100: WORKMANSHIP AND PERFORMANCE WARRANTY FEE:¶
12.20.110: ADDITIONAL FEES FOR EXCAVATION:¶
12.20.120: UNDERGROUND SERVICE ALERT:¶
12.20.130: BARRICADES AND WARNING SIGNS REQUIRED:¶
12.20.140: LIMITS UPON EXCAVATION IN THE PUBLIC RIGHT OF WAY:¶
12.20.150: STOP WORK ORDER, PERMIT MODIFICATION AND PERMIT REVOCATION:¶
12.20.160: RESTORATION OF THE PUBLIC RIGHT OF WAY:¶
12.20.170: REPAIR BY THE DEPARTMENT:¶
12.20.180: EMERGENCY REPAIR BY THE DEPARTMENT:¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code