Skip to content

Chapter 12.20 — STREET CONSTRUCTION AND CONSTRUCTION REGULATIONS

Redlands Municipal Code · 2026-09 edition · updated 2026-09-27 · Redlands

12.20.010: DEFINITIONS:

12.20.020: CONFORMANCE WITH PLANS AND CITY SPECIFICATIONS:

12.20.030: MORATORIUM AREAS; NO PERMIT SHALL BE ISSUED:

12.20.040: PERMIT TO BE KEPT AT WORK SITE:

12.20.050: DURATION AND VALIDITY:

12.20.060: DIRECTOR; SUPERVISION AND INSPECTION:

12.20.070: DIRECTOR; NOTICE OF COMMENCEMENT OF WORK:

12.20.080: DIRECTOR; AUTHORITY TO PERMIT CONTINUANCE:

12.20.090: LIABILITY AND INDEMNIFICATION:

12.20.100: WORKMANSHIP AND PERFORMANCE WARRANTY FEE:

12.20.110: ADDITIONAL FEES FOR EXCAVATION:

12.20.120: UNDERGROUND SERVICE ALERT:

12.20.130: BARRICADES AND WARNING SIGNS REQUIRED:

12.20.140: LIMITS UPON EXCAVATION IN THE PUBLIC RIGHT OF WAY:

12.20.150: STOP WORK ORDER, PERMIT MODIFICATION AND PERMIT REVOCATION:

12.20.160: RESTORATION OF THE PUBLIC RIGHT OF WAY:

12.20.170: REPAIR BY THE DEPARTMENT:

12.20.180: EMERGENCY REPAIR BY THE DEPARTMENT:

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Redlands Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.