Chapter 12.16 — STREET REPAIR AND CONSTRUCTION PERMITS
Redlands Municipal Code · 2026-09 edition · updated 2026-09-27 · Redlands
12.16.030: City Departments Exempt¶
12.16.010: REQUIRED; WHEN:¶
12.16.020: EMERGENCY WORK EXCEPTED:¶
12.16.030: CITY DEPARTMENTS EXEMPT:¶
12.16.040: APPLICATION; FORM:¶
12.16.045: ACTION ON APPLICATIONS FOR PERMITS TO EXCAVATE:¶
12.16.050: FILING OF DRAWINGS, PROFILES, SPECIFICATIONS:¶
12.16.060: EXCEPTIONS FOR FILING OF DRAWING OR PLAT:¶
12.16.070: ADDITIONAL MAPS AND DRAWINGS:¶
12.16.080: TUNNELING; BACKFILL SPECIFICATIONS:¶
12.16.090: CONFORMANCE TO PLANS AND SPECIFICATIONS REQUIRED:¶
12.16.100: PERMIT DEMONSTRATES LAWFUL RIGHT TO USE OF STREET:¶
12.16.110: APPLICATION; CHANGES BY ENGINEER:¶
12.16.120: CONDITIONS OF ISSUANCE; GROUNDS FOR DENIAL:¶
12.16.130: DENIAL FOR FINDING OF PUBLIC DETRIMENT:¶
12.16.140: PERMIT NOT TO GRANT FRANCHISE, RIGHT OR PRIVILEGE:¶
12.16.150: COMPLIANCE WITH ORDINANCES NOT EXCUSED:¶
12.16.160: PERMIT SUBJECT TO CITY AND PUBLIC RIGHTS:¶
12.16.170: HOUSE CONNECTION PERMIT; EXPIRATION:¶
12.16.180: SEWER CONNECTION EXCAVATION; TIME FOR FILLING:¶
12.16.190: FAILURE TO FINISH WORK; COMPLETION BY ENGINEER:¶
12.16.200: FAILURE TO RESTORE DAMAGE:¶
12.16.210: WORK DELAY; PERMIT CANCELLATION:¶
12.16.220: REVOCATION; AUTHORITY:¶
12.16.230: CITY PREROGATIVE WHERE WORK CONFLICTS:¶
12.16.240: REVOCATION FOR BREACH OF CONDITION:¶
12.16.250: LIABILITY FOR DAMAGE:¶
12.16.260: PERMIT FEE REQUIRED:¶
12.16.270: INSPECTION FEE REQUIRED:¶
12.16.280: MINIMUM FEE:¶
12.16.290: DEPOSIT REQUIRED:¶
12.16.300: EFFECT OF SPECIAL ASSESSMENT:¶
12.16.310: PENALTY FOR WORK BEFORE SECURING PERMIT:¶
12.16.320: CITY LIABILITY FOR ENGINEER'S EXPENSE:¶
12.16.330: BILLING OF DEPARTMENTS:¶
12.16.340: ACCOUNTING:¶
12.16.350: GENERAL DEPOSIT; MAINTENANCE:¶
12.16.360: GENERAL DEPOSIT; AMOUNT:¶
12.16.370: BOND IN LIEU OF DEPOSIT:¶
12.16.380: BOND; APPROVAL:¶
12.16.390: BOND; AMOUNT:¶
12.16.400: BOND; RENEWAL AND MAINTENANCE:¶
12.16.410: INSUFFICIENT BOND; ENGINEER ACTION:¶
12.16.420: REFUND OF UNNECESSARY PERMIT FEE OR SPECIAL DEPOSIT:¶
12.16.430: PERMIT FEE FORFEITURE FOR FAILURE TO WORK:¶
12.16.440: REFUND OF GENERAL DEPOSIT:¶
12.16.450: EXONERATION OF BOND:¶
12.16.460: FORM OF EXONERATION:¶
12.16.470: INDEMNIFICATION OF CITY:¶
12.16.480: PERMITTEE RIGHT TO DEFEND CITY:¶
12.16.490: NOTICE OF DAMAGE:¶
12.16.500: NOTICE; COMPUTATION OF TIME:¶
12.16.510: NOTICE; FAILURE NOT TO AFFECT PERMITTEE LIABILITY:¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code