Sec. 18.32.010. - Reimbursement agreement; funding procedures.

(a)

No charge, area of benefit or local benefit district shall be established unless and until a public hearing is held thereon by the city council and the city council finds that the fee or charge and the area of benefit or local benefit district is reasonably related to the cost of such supplemental improvements and the actual ultimate beneficiaries thereof.

(b)

In addition to the notice required by section 66451.3 of the Government Code, written notice of the hearing shall be given to the subdivider and to those who own property within the proposed area of benefit as shown on the latest equalized assessment role, and the potential users of the supplemental improvements insofar as they can be ascertained at the time. Such notices shall be mailed by the city clerk at least ten days prior to the date established for the hearing.

(Code 1972, § 18.32.010; Ord. No. 543, § 1(part), 1981)

Sec. 18.32.020. - Drainage fees.

(a)

This section is adopted pursuant to section 66483 et seq. of the Government Code, which provides for the payment of fees for the construction of drainage facilities, as a condition to the division of land.

(b)

Whenever land that is proposed to be divided lies within the boundaries of the Perris Valley Master Area Drainage Plan ("Area Drainage Plan"), a drainage fee in the amount required by the plan for the area, as adopted or thereafter amended, shall be required as a condition of approval of the division of land in that drainage area.

(c)

When fee is to be paid.

(1)

Drainage fees shall be paid at the time of the filing of the final map or parcel map, or as a condition of the waiver of the filing of a parcel map; provided, however, at the option of the land divider the fee may be paid, in pro rata amounts, at the time of the issuance of grading permits for the approved parcels or at the time of issuance of building permits if no grading permits are issued for the parcels. The amount of the drainage fee required to be paid shall be the amount that is in effect for the area drainage plan at the time of actual payment of the fee.

(2)

If the land divider elects to have payment at the time of issuance of a grading or building permit, the recorded final map or parcel map or certificate of compliance evidencing the waiver of the filing of a parcel map shall specifically state that payment of a drainage fee is repaired to be paid prior to issuance of a grading permit or building permit for the parcels that have been created by the land division. In addition, a separate instrument shall be recorded by the land divider in the office of the county recorder, at the time of the filing of the final map or parcel map or certificate of compliance evidencing the waiver of the parcel map, which gives notices that a drainage fee is required to be paid by any person that owns such parcels prior to issuance of a grading or building permit.

(d)

If the drainage fee is paid at the time of the final map or parcel map or certificate of compliance evidencing the waiver of the parcel map, it shall be paid to the finance director. If the drainage fee is paid at the time of issuance of a grading or building permit, it shall be paid to the finance director. All fees that are collected shall thereafter be deposited into a local drainage facilities fund maintained under the jurisdiction of the county flood control and water conservation district (C "District"). A separate fund shall be established by

the district for the area drainage plan. Money in such funds shall be expended for construction or reimbursement for construction, including acquisition of right-of-way necessary for construction, of the drainage facilities serving the drainage area for which the fees are collected, or to reimburse the district for the cost of engineering and administrative services to design and construct and acquire any necessary right-of-way for the facilities.

(e)

In the discretion of the district, considerations such as dedication of right-of-way, actual construction, or design work by a civil engineer may be accepted in lieu of the payment of drainage fees, upon a determination that the alternative is acceptable and is equal to or greater in value than the required fee.

(f)

Money may be advanced by the district to design or construct drainage facilities or to acquire necessary right-of-way within an adopted drainage area; thereafter, money so advanced may be reimbursed to the district from the fund for the local drainage area in which the facilities are located.

(g)

When required for the implementation of an adopted area plan, an agreement may be entered into between a developer and the district whereby the developer may advance money for the construction of facilities, or design or construct facilities within a local drainage area, provided that the sole security to the developer for repayment of money or other consideration advanced shall be subsequently accruing to the local drainage facilities fund for the drainage area in which the facilities are located. Reimbursement shall be for the amount agreed upon in advance only and shall not include interest or other charges. The agreement shall expire 15 years after the date it was entered into, and any subsequent money paid into the fund shall accrue to the fund without obligation to developers whose agreements have expired.

(h)

The area drainage plan, the required facilities and the drainage fee in any adopted plan may be amended by the city council at any time upon a determination that it is necessary to do so in order to correctly reflect the drainage area, the required facilities or estimated cost of the facilities.

(Code 1972, § 18.32.020; Ord. No. 543, § 1(part), 1981; Ord. No. 629, § 2, 1985; Ord. No. 704, § 1, 1987)

Sec. 18.32.021. - Drainage fees—Homeland/Romoland Area Drainage Plan.

(a)

This section is adopted pursuant to section 66483 et seq. of the Government Code, which provides for the payment of fees for the construction of drainage facilities, as a condition to the division or development of land.

(b)

Whenever land that is proposed to be divided or developed lies within the boundaries of the Homeland/Romoland Area Drainage Plan ("Area Drainage Plan"), a drainage fee in the amount required by the plan for the area, as adopted or thereafter amended, shall be required as a condition of approval of the division and development of land in that drainage area.

(c)

When fee is to be paid.

(1)

Drainage fees shall be paid at the time of the filing of the final map or parcel map, or as a condition of the waiver of the filing of a parcel map; provided, however, at the option of the land divider or developer, as the case may be, the fee may be paid, in pro rata amounts, at the time of the issuance of grading permits for

the approved parcels or at the time of issuance of building permits if no grading permits are issued for the parcels. The amount of the drainage fee required to be paid shall be the amount that is in effect for the area drainage plan at the time of actual payment of the fee.

(2)

If the land divider or developer, as the case may be, elects to have payment at the time of issuance of a grading or building permit, the recorded final map or parcel map or certificate of compliance evidencing the waiver of the filing of a parcel map shall specifically state that payment of a drainage fee is repaired to be paid prior to issuance of a grading permit or building permit for the parcels that have been created by the land division. In addition, a separate instrument shall be recorded by the land divider or developer, as the case may be, in the office of the county recorder, at the time of the filing of the final map or parcel map or certificate of compliance evidencing the waiver of the parcel map, which gives notices that a drainage fee is required to be paid by any person that owns such parcels prior to issuance of a grading or building permit.

(d)

If the drainage fee is paid at the time of the final map or parcel map or certificate of compliance evidencing the waiver of the parcel map, it shall be paid to the finance director. If the drainage fee is paid at the time of issuance of a grading or building permit, it shall be paid to the finance director. All fees that are collected shall thereafter be deposited into a local drainage facilities fund maintained under the jurisdiction of the county flood control and water conservation district ("District"). A separate fund shall be established by the district for the area drainage plan. Money in such funds shall be expended for construction or reimbursement for construction, including acquisition of right-of-way necessary for construction, of the drainage facilities serving the drainage area for which the fees are collected, or to reimburse the district for the cost of engineering and administrative services to design and construct and acquire any necessary right-of-way for the facilities.

(e)

In the discretion of the district, considerations such as dedication of right-of-way, actual construction, or design work by a civil engineer may be accepted in lieu of the payment of drainage fees, upon a determination that the alternative is acceptable and is equal to or greater in value than the required fee.

(f)

Money may be advanced by the district to design or construct drainage facilities or to acquire necessary right-of-way within an adopted drainage area; thereafter, money so advanced may be reimbursed to the district from the fund for the local drainage area in which the facilities are located.

(g)

When required for the implementation of an adopted area plan, an agreement may be entered into between a land divider or developer, as the case may be, and the district whereby the land divider or developer, as the case may be, may advance money for the construction of facilities, or design or construct facilities within a local drainage area, provided that the sole security to the land divider or developer, as the case may be, for repayment of money or other consideration advanced shall be subsequently accruing to the local drainage facilities fund for the drainage area in which the facilities are located. Reimbursement shall

be for the amount agreed upon in advance only and shall not include interest or other charges. The agreement shall expire 15 years after the date it was entered into, and any subsequent money paid into the fund shall accrue to the fund without obligation to land dividers or developers, as the case may be, whose agreements have expired.

(h)

The area drainage plan, the required facilities and the drainage fee in any adopted plan may be amended by resolution of the city council at any time upon a determination that it is necessary to do so in order to correctly reflect the drainage area, the required facilities or estimated cost of the facilities.

(Ord. No. 1364, § 5, 6-12-2018)

Sec. 18.32.022.Drainage - fees—San Jacinto River Area Drainage Plan.

(a)

This section is adopted pursuant to section 66483 et seq. of the Government Code, which provides for the payment of fees for the construction of drainage facilities, as a condition to the division of land.

(b)

Whenever land that is proposed to be divided or developed lies within the boundaries of the San Jacinto River Area Drainage Plan ("Area Drainage Plan"), a drainage fee in the amount required by the plan for the area, as adopted or thereafter amended, shall be required as a condition of approval of the division of land in that drainage area.

(c)

When fee is to be paid.

(1)

Drainage fees shall be paid at the time of the filing of the final map or parcel map, or as a condition of the waiver of the filing of a parcel map; provided, however, at the option of the land divider or developer, as the case may be, the fee may be paid, in pro rata amounts, at the time of the issuance of grading permits for the approved parcels or at the time of issuance of building permits if no grading permits are issued for the parcels. The amount of the drainage fee required to be paid shall be the amount that is in effect for the area drainage plan at the time of actual payment of the fee.

(2)

If the land divider or developer, as the case may be, elects to have payment at the time of issuance of a grading or building permit, the recorded final map or parcel map or certificate of compliance evidencing the waiver of the filing of a parcel map shall specifically state that payment of a drainage fee is repaired to be paid prior to issuance of a grading permit or building permit for the parcels that have been created by the land division. In addition, a separate instrument shall be recorded by the land divider or developer, as the case may be, in the office of the county recorder, at the time of the filing of the final map or parcel map or

certificate of compliance evidencing the waiver of the parcel map, which gives notices that a drainage fee is required to be paid by any person that owns such parcels prior to issuance of a grading or building permit.

(d)

If the drainage fee is paid at the time of the final map or parcel map or certificate of compliance evidencing the waiver of the parcel map, it shall be paid to the finance director. If the drainage fee is paid at the time of issuance of a grading or building permit, it shall be paid to the finance director. All fees that are collected shall thereafter be deposited into a local drainage facilities fund maintained under the jurisdiction of the county flood control and water conservation district ("District"). A separate fund shall be established by the district for the area drainage plan. Money in such funds shall be expended for construction or

reimbursement for construction, including acquisition of right-of-way necessary for construction, of the drainage facilities serving the drainage area for which the fees are collected, or to reimburse the district for the cost of engineering and administrative services to design and construct and acquire any necessary right-of-way for the facilities.

(e)

In the discretion of the district, considerations such as dedication of right-of-way, actual construction, or design work by a civil engineer may be accepted in lieu of the payment of drainage fees, upon a determination that the alternative is acceptable and is equal to or greater in value than the required fee.

(f)

Money may be advanced by the district to design or construct drainage facilities or to acquire necessary right-of-way within an adopted drainage area; thereafter, money so advanced may be reimbursed to the district from the fund for the local drainage area in which the facilities are located.

(g)

When required for the implementation of an adopted area plan, an agreement may be entered into between a land divider or developer, as the case may be, and the district whereby the land divider or developer, as the case may be, may advance money for the construction of facilities, or design or construct facilities within a local drainage area, provided that the sole security to the land divider or developer, as the case may be, for repayment of money or other consideration advanced shall be subsequently accruing to the local drainage facilities fund for the drainage area in which the facilities are located. Reimbursement shall

be for the amount agreed upon in advance only and shall not include interest or other charges. The agreement shall expire 15 years after the date it was entered into, and any subsequent money paid into the fund shall accrue to the fund without obligation to land dividers or developers, as the case may be, whose agreements have expired.

(h)

The area drainage plan, the required facilities and the drainage fee in any adopted plan may be amended by the city council at any time upon a determination that it is necessary to do so in order to correctly reflect the drainage area, the required facilities or estimated cost of the facilities.

(Ord. No. 1365, § 4, 6-12-2018)

Sec. 18.32.030. - Bridges and major thoroughfares.

(a)

Authority. This section is adopted pursuant to section 66484 of the California Government Code which provides for the payment of fees to defray the actual or estimated costs for the construction of bridges and major thoroughfares as a condition of approval of a final map or as a condition of issuing a building permit.

(b)

Area of benefit. Whenever land that is proposed to be divided or for which a building permit is sought, lies within the boundaries of an "area of benefit," as hereinafter defined and established, a fee in the amount specified by the final resolution (as hereinafter defined) establishing the area of benefit as adopted or thereafter amended, shall be required as a condition of approval and recordation of any final map or parcel map or of the issuance of a building permit. No property shall be assessed a fee under this section for both a final map or parcel map and a building permit.

(c)

Definitions. The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this subsection, except where the context clearly indicates a different meaning:

Bridge means a bridge identified in the circulation element and the transportation or flood control provisions of the general plan which identify railways, freeways, streams, or canyons for which bridge crossings are required on the general plan or local roads, if the circulation element, transportation or flood control provisions have been adopted by the local agency 30 days prior to the filing of a map or application for building permit.

Construction means design, acquisition of right-of-way, administration of construction contracts and actual construction, including, but not limited to, the design and construction of medians and sidewalks (including landscaping) and other facilities which are a part of said bridges and major thoroughfares.

Final resolution means the resolution defined in subsection (f)(1) of this section, which resolution designates the area of benefit and assesses the fee permitted by this section.

Initial resolution means the resolution defined in subsection (d)(1) of this section, which resolution sets the date of the public hearing on the fee permitted by this section.

Major thoroughfare means those major thoroughfares identified in the circulation element of the general plan whose primary purpose is to carry through traffic and provide a network connecting to the state highway system if the circulation element has been adopted by the local agency 30 days prior to the filing of a map or an application for building permit.

(d)

Public hearing to establish an area of benefit.

(1)

The city council shall, by resolution (initial resolution), set a public hearing at any time to determine whether an area of benefit is to be established, to designate the boundaries of an area of benefit, to identify the major thoroughfare and/or bridge within the area of benefit that are to be constructed, to determine the costs of construction, whether actual or estimated, and to establish the method for allocation of costs to the area of benefit and apportionment of a fee to be collected from owners of real property within the area of benefit. The area of benefit may include land or improvements in addition to the land or improvements which are the subject of any map or building permit application to be considered at the hearing.

(2)

The city clerk shall notice the public hearing pursuant to section 65091 of the California Government Code. The notice shall contain the information required by section 65094 of the California Government Code and shall set forth the preliminary information related to the boundaries of the area of benefit, identifying the major thoroughfare and/or bridge to be constructed and the estimated cost of each, and set forth the proposed method of apportioning the fee among property owners. The notice shall describe the proposed protest procedure.

(e)

Public hearing; protest.

(1)

At the public hearing, the city council shall consider the proposed boundary map that outlines the area to be included within the area of benefit, designates those bridges and/or major thoroughfares to be constructed, the cost estimate with regard to each improvement, and the method for apportioning fees within the area of benefit.

(2)

At the public hearing, the city council shall consider testimony from interested persons, written protests and all relevant evidence submitted. All protests are to be in writing and may be filed with the city clerk in accordance with the notice described in subsection (d) of this section at any time prior to the close of the public hearing. Each protest must be filed by a person or entity owning property within the boundaries of the proposed area of benefit and describe the property with sufficient specificity that the parcel may be identified. If the person or entity filing the protest is not shown on the last equalized assessment roll as the owner of the parcel, the protest must contain or be accompanied by documentary evidence establishing ownership. A protest may be withdrawn in writing at any time prior to the conclusion of the public hearing.

(3)

If written protests are filed with the city clerk from persons or entities owning more than 50 percent of the land area to be included within the proposed area of benefit and, by the conclusion of the public hearing, a sufficient number of the protests have not been withdrawn so as to reduce the land whose owners are protesting to less than 50 percent, then all proceedings with regard to the area of benefit shall be abandoned and the city council shall not, for one year from the date of the hearing, commence or carry on any proceeding for the same improvements or area of benefit under the provisions of this section. If any majority protest is directed against only a portion of the designated improvement, then all further

proceeding under the provisions of this section to construct that portion of the designated improvement so protested against shall be barred for a period of one year, but the city council shall not be barred from commencing new proceedings not including any part of the designated improvements so protested against. The city council may, within a one-year period following a majority protest, commence new proceedings for the construction of the portion of the designated improvements so protested against, if it finds by the affirmative vote of four-fifths of its members, that the owners of more than one-half of the property to be benefited are in favor of going forward with such portion of the designated improvements.

(f)

Establishment of area of benefit and the fee.

(1)

The city council, by resolution (final resolution), within a reasonable time after the close of the public hearing, may establish the area of benefit and the fee. The final resolution shall set forth the boundaries of the area of benefit, specify the designated improvements to be constructed, the cost, actual or estimated, for each of the designated improvements, and establish the fee schedule by which the cost is to be apportioned among the parcels comprising the area of benefit, all as established at the hearing. The

decision of the city council represented by the final resolution shall be final. A certified copy of the final resolution shall be recorded in the office of the recorder of the county.

(2)

The apportioned fees shall be applicable to all property within the area of benefit and shall be payable as a condition of approval of a final map or as a condition of approving a building permit for the property or portions of the property.

(3)

The following limitations apply to the apportioned fees and area of benefit:

a.

The method of fee apportionment, in the case of major thoroughfares, shall not provide for higher fees on land which abuts the proposed improvement except where the abutting property is provided direct usable access to the major thoroughfare;

b.

If the area of benefit includes lands not subject to the payment of fees, the city council shall make provision for payment of the fees that would otherwise be chargeable to the lands from other sources. The designation of the alternate funding need not be addressed in the final resolution establishing the area of benefit;

c.

Payment of fees shall not be required unless the designated major thoroughfares are in addition to, or a reconstruction of any existing major thoroughfares serving the area of benefit at the time of the adoption of

the boundaries for the area of benefit; and

d.

Payment of fees shall not be required unless the designated bridge is an original bridge serving the area of benefit or an addition to any existing bridge facility serving the area of benefit at the time of the adoption of the boundaries of the area of benefit. Fees imposed by this section shall not be expended to reimburse the cost of existing bridge construction, unless these costs are incurred in connection with the construction of an addition to an existing bridge for which fees may be required.

(g)

Payment of fees. The fee applicable to the areas of benefit shall be paid as follows:

(1)

Fees shall be paid to the finance director of the city prior to the recordation of a final map subdivision or parcel map or the issuance of a building permit, as determined by the final resolution. (If the recordation of a final parcel map is waived, the fee shall be paid as a condition of the waiver prior to recordation of a certificate of compliance evidencing the waiver of the final parcel map.) The fees paid shall be based on the fee schedule in effect on date of payment.

(2)

For any parcel or lot created prior to the adoption of the final resolution, the fees shall be paid to the finance director as described in the final resolution.

(3)

All fees collected shall be deposited in a separate account designated for each area of benefit as provided in subsection (h) of this section. Any fees once collected shall not be returned, except as reimbursement for the construction of designated improvements pursuant to an agreement with the city.

(4)

Nothing in this section is intended to relieve a subdivider or applicant for a building permit from the requirements imposed under other provisions of this chapter or other city ordinances to dedicate and improve roads or bridges as a condition of approval of a tentative map or building permit.

(5)

Notwithstanding the provisions of subsections (g)(1) through (g)(4) of this section, payment of fees shall not be required for the following:

a.

Such additions, alterations, enlargements or erections of additional structures on the same lot or parcel of land as provided in the final resolution;

b.

Such accessory buildings and structures designated in the final resolution, which may include, but not be limited to, private garages, children's playhouses, radio and television receiving antennas, windmills, silos, tank houses, shops or barns, or buildings that are accessory to one-family or two-family dwellings;

c.

Residential, commercial, industrial or other development exempted from the fee pursuant to the final resolution;

d.

Outdoor advertising structures; and

e.

Wells.

(6)

An applicant or a subdivider who pays the fee required herein may receive credit for payment of a portion of the transportation uniform mitigation fees (TUMF) and development impact fees (DIF) of the city under certain conditions described in the final resolution.

(h)

Use of funds.

(1)

Fees shall be deposited by the finance director in a designated bridge or major thoroughfare fund. A separate fund shall be established for each designated bridge or major thoroughfare project; provided, however, that if the area of benefit is one in which more than one bridge or major thoroughfare is required to be constructed, a fund may be established covering all of the bridge or major thoroughfare projects in the area of benefit. Moneys in such fund shall be expended solely for the construction or reimbursement for construction of the improvement serving the area to be benefited and from which the fees comprising the fund were collected, or to reimburse the city for the cost of constructing the improvement.

(2)

The city may advance money from its general fund or road fund to pay the cost of constructing the designated bridge or major thoroughfare and may reimburse the general fund or road fund for such advances from the bridge or major thoroughfare funds established pursuant to this section.

(3)

The city may incur interest bearing indebtedness as provided in Government Code section 66484 for the construction of a designated bridge or a major thoroughfare planned pursuant to this section; provided, however, that the sole security for repayment of such indebtedness shall be money in the specific funds established for that designated bridge or major thoroughfares.

(4)

The city may reimburse a developer for construction of facilities within the area of benefit pursuant to an agreement with the city and as described in the proceedings and final resolution.

(i)

Amendments to the fee and area of benefit. The final resolution may be amended from time to time by the city council to reflect modifications in either the facilities to be constructed or the area to be included within the area of benefit due to alterations in land use and to reflect adjustments in the fee schedule necessitated by any amendment or increases in construction costs. The amendments shall be adopted by following the same procedure required to establish an area of benefit; provided, however, that to the extent the resolution only increases the proposed fee related to the same facilities within the same area of benefit and said fee is not higher than the maximum fee adopted by the final resolution, the city council may increase the fee by resolution without a public hearing.

(Code 1972, § 18.32.030; Ord. No. 1243, § 2, 2008)

Sec. 18.32.040. - Reservation of land; parks, recreational facilities, fire stations,…

The city may require that areas of real property within subdivisions be reserved for parks, recreational facilities, fire stations, libraries or other public uses, in accordance with chapter 4, article 4 of the Subdivision Map Act (commencing with section 66479).

(Code 1972, § 18.32.040; Ord. No. 543, § 1(part), 1981)

Sec. 18.32.050. - Park and recreation in lieu of fees.

In lieu of the reservation of land for park or recreation purposes as specified in section 18.32.040, the city may require the payment of fees in accordance with chapter 4, article 3 of the Subdivision Map Act (commencing with section 66477).

(Code 1972, § 18.32.050; Ord. No. 543, § 1(part), 1981)

CHAPTER 18.36. - ADJUSTMENT PLATS

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Perris Planning Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.