Skip to content

Title 16 — BUILDING REGULATIONS

Part 3 — Development Projects

Palo Alto Municipal Code · 2026-09 edition · updated 2026-10-02 · Palo Alto

16.11.150 Regulated projects.

16.11.160 Source control measures for regulated projects.

16.11.170 Site design measures for regulated projects.

16.11.180 Stormwater treatment measures for regulated projects.

16.11.190 Certification of compliance for regulated projects.

16.11.200 Green infrastructure design and construction requirements.

16.11.210 Required hydromodification management measures for regulated projects.

16.11.220 Operation and maintenance of stormwater treatment measures and…

16.11.230 Low impact development source control and site design measures for projects…

16.11.240 Requirements for all development projects.

16.11.250 Requirements for loading docks.

16.11.260 Drainage designs standards for development projects.

16.11.270 Requirements for construction sites and activities.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Palo Alto Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.