Pacifica Municipal Code Art. 3 Sewer Tapping Charges
Pacifica Municipal Code · 2026-10 edition · updated 2026-10-04 · Pacifica
Cite as: Pacifica Municipal Code Article 3 · Text as of 2026-10-04
Sec. 6-11.301. - Sewer tapping charges.¶
In addition to the charges set forth in other sections of this chapter, the following charge is hereby established for the sewer tap into the main City sewer for the connection of the plumbing of any building or structure to the sanitary sewer system of the City: Two Hundred Five and 50/100ths ($205.50) Dollars.
To provide for the construction cost increases due to inflation, on July 1 of each year, beginning September 1, 1987, the fee shall be adjusted on the basis of the Construction Cost Index (CCI) in the San Francisco Bay Area, published in the issue of the Engineering News Record (ENR) by McGraw-Hill Publication Company.
(§ 2, Ord. 476-86, eff. December 25, 1986)
Sec. 6-11.302. - Sewer tapping charges: Time of payment for proposed structures.¶
The sewer tapping charge set forth in this article shall be payable at or before the time a building permit is issued by the City for the construction of a proposed building or structure.
(§ 3, Ord. 476-86, eff. December 25, 1986)
Sec. 6-11.303. - Exceptions.¶
Properties for which sewer services have already been extended from the main sanitary sewer line to the property line and are judged to be in good operating and structural condition, or where main line and service connections are being installed by a contractor for subsequent acceptance by the City, shall be exempt from the payment of the charge set forth in this article.
(§ 4, Ord. 476-86, eff. December 25, 1986)