Skip to content

Chapter 15 — SUBDIVISIONS›Article V — IMPROVEMENTS AND STANDARDS›Division 2 — STANDARDS

SEC. 15-149. SIDEWALKS, CURBS.

Oxnard Planning Code · 2026-07 edition · updated 2026-09-23 · Oxnard

Each sidewalk, curb, gutter, cross gutter, pavement, sanitary sewer line, water main, culvert and drainage structure shall be installed by the subdivider in the manner shown on the improvement plans and described in the specifications contained in this article and the official specifications of the city at the time of construction. (`64 Code, Sec. 27-84) (Ord. No. 1570)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Oxnard Planning Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.