Skip to content

Chapter 15 — SUBDIVISIONS›Article III — PROCEDURES›Division 3 — FINAL MAPS AND PARCEL MAPS

SEC. 15-50. PREPARATION OF AND APPLICATION FOR FINAL MAP OR PARCEL MAP.

Oxnard Planning Code · 2026-07 edition · updated 2026-09-23 · Oxnard

(A) An application for a final map or parcel map shall not be deemed complete until the following items have been submitted to the city:

(1) All the certificates required by the Subdivision Map Act, completed and signed, and where necessary acknowledged, excepting those signatures required of the county clerk, and the city clerk;

  • (2) A title report and soils report required by conditional approval of the tentative map;

  • (3) Final improvement plans approved by the city engineer; and

  • (4) All items, signatures and approvals necessary for compliance with sections 15-52 through 15-54.

  • (B) Unless waived by mutual agreement between the subdivider and the city, upon compliance with this section, the time period specified in section 15-55 shall begin.

  • (`64 Code, Sec. 27-41) (Ord. No. 1570, 1795, 2367, 3049)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Oxnard Planning Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.