Chapter 1 — ADMINISTRATIVE AND BUILDING CODE
§ 8-13
Ontario Municipal Code · 2026-09 edition · updated 2026-09-27 · Ontario
Sec. 8-13.101. Findings of fact.¶
(a) The flood hazard areas of Ontario, California are subject to periodic inundation which may result in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public
expenditures for flood protection and relief, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare. (b) These flood losses are caused by the cumulative effect of obstructions in areas of special flood hazards which increase flood heights and velocities, and when inadequately anchored, damage uses in other areas. Uses that are inadequately floodproofed, elevated or otherwise protected from flood damage also contribute to the flood loss. (§ 1, Ord. 2409, eff. February 4, 1988)
Sec. 8-13.102. Statement of purpose.¶
It is the purpose of this chapter to promote the public health, safety, and general welfare and to minimize public and private losses due to flood conditions in specific areas by provisions designed: (a) To protect human life and health; (b) To minimize the expenditure of public money for costly flood control projects; (c) To minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public; (d) To minimize prolonged business interruptions; (e) To minimize damages to public facilities and utilities, such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in areas of special flood hazard; (f) To help maintain a stable tax base by providing for the second use and development of areas of special flood hazard so as to minimize future flood blight areas; (g) To insure that potential buyers are notified that property is in an area of special flood hazard; and (h) To insure that those who occupy the areas of special flood hazard assume responsibility for their actions. (§ 1, Ord. 2409, eff. February 4, 1988)
Sec. 8-13.103. Methods of reducing flood losses.¶
In order to accomplish its purposes, this chapter includes methods and provisions for: (a) Restricting or prohibiting uses which are dangerous to health, safety, and property due to water or erosion hazards, or which result in damaging increase in erosion or flood heights or velocities; (b) Requiring that uses vulnerable to floods, including facilities which serve such uses be protected against flood damage at the time of initial construction; (c) Controlling the alteration of natural floodplains, stream channels, and natural protective barriers which help accommodate or channel flood waters; (d) Controlling filling, grading, dredging, and other development which may increase flood damage; and (e) Preventing or regulating the construction of flood barriers which will unnaturally divert flood waters or which may increase flood hazards in other areas. (§ 1, Ord. 2409, eff. February 4, 1988)
Article 2. Definitions
Sec. 8-13.201. Definitions.¶
Unless specifically defined below, words or phrases used in this chapter shall be interpreted so as to give them the meaning they have in common usage and to give this chapter its most reasonable application.
(a) “Appeal” means a request for a review of the Floodplain Administrator’s interpretation of any provision of this chapter or a request for a variance. (b) “Area of shallow flooding” means a designated AO or AH Zone on the Flood Insurance Rate Map (FIRM). The base flood depths range from one (1) foot to three (3) feet; a clearly defined channel does not exist; the path of flooding is unpredictable and indeterminate; and velocity flow may be evident. (c) “Area of special flood-related erosion hazard” means the area subject to severe flood-related erosion losses. The area is designated Zone E on the Flood Insurance Rate Map (FIRM). (d) “Area of special flood hazard.” See “Special flood hazard area.” (e) “Area of special mudslide (i.e., mudflow) hazard” means the area subject to severe mudslides (i.e., mudflows). The area is designated as Zone M on the flood Insurance Rate Map (FIRM). (f) “Base flood” means the flood having a one percent chance of being equaled or exceeded in any given year (also called the “100-year flood”). (g) "Base flood elevation" means the elevation of the base flood, including wave height, relative to the National Geodetic Vertical Datum (NGVD), North American Vertical Datum (NAVD) or other datum specified on the Flood Insurance Rate Map (FIRM). (h) "Basement" means any area of the building having its floor subgrade (below ground level) on all sides. (i) "Breakaway walls" means any type of walls, whether solid or lattice, and whether constructed of concrete, masonry, wood, metal, plastic or any other suitable building material which is not part of the structural support of the building and which is designed to break away under abnormally high tides or wave action without causing any damage to the structural integrity of the building on which they are used or any buildings to which they might be carried by flood waters. A breakaway wall shall have a safe design loading resistance of not less than ten (10) and no more than twenty (20) pounds per square foot. Use of breakaway walls must be certified by a registered engineer or architect and shall meet the following conditions: (1) Breakaway wall collapse shall result from a water load less than that which would occur during the base flood; and (2) The elevated portion of the building shall not incur any structural damage due to the effects of wind and water loads acting simultaneously in the event of the base flood. (j) "Development" means any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations. (k) "Flood" or "flooding" means a general and temporary condition of partial or complete inundation of normally dry land areas from (1) the overflow of flood waters; (2) the unusual and rapid accumulation of runoff of surface waters from any source; and/or (3) the collapse or subsidence of land along the shore of a lake or other body of water as a result of erosion or undermining caused by waves or currents of water exceeding anticipated cyclical levels or suddenly caused by an unusually high water level in a natural body of water, accompanied by a severe storm, or by an unanticipated force of nature, such as flash flood or an abnormal tidal surge, or by some similarly unusual and unforeseeable event which results in flooding as defined in this definition. (l) "Flood Boundary and Floodway Map" means the official map on which the Federal Emergency Management Agency or Federal Insurance Administration has delineated both the areas of flood hazard and the floodway. (m) "Flood Insurance Rate Map (FIRM)" means the official map on which the Federal Emergency Management Agency or Federal Insurance Administration has delineated both the areas of special flood hazards and the risk premium zones applicable to the community. (n) "Flood Insurance Study" means the official report provided by the Federal Insurance Administration that includes flood profiles, the FIRM, the Flood Boundary and Floodway Map, and the water surface elevation of the base flood.
(o) "Floodplain" or "flood-prone area" means any land area susceptible to being inundated by water from any source (see definition of "flooding"). (p) "Floodplain management" means the operation of an overall program of corrective and preventive measures for reducing flood damage including but not limited to emergency preparedness plans, flood control works and floodplain management regulations. (q) "Floodplain management regulations" means zoning ordinances, subdivision regulations, building codes, health regulations, special purpose ordinances (such as floodplain ordinance, grading ordinance and erosion control ordinance) and other applications of police power. The term describes such state and local regulations in any combination thereof, which provide standards for the purpose of flood damage prevention and reduction. (r) "Floodproofing" means any combination of structural and nonstructural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents. (s) "Floodway" means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot. Also referred to as "regulatory floodway." (t) "Functionally dependent use" means a use which cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities, but does not include long- term storage or related manufacturing facilities. (u) "Highest adjacent grade" means the highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure. (v) "Lowest floor" means the lowest floor of the lowest enclosed area (including basement). An unfinished or flood resistant enclosure, usable solely for parking of vehicles, building access or storage in an area other than a basement area is not considered a building's lowest floor; provided, that such enclosure is not built so as to render the structure in violation of the applicable non-elevation design requirements of this chapter. (w) "Manufactured home" means a structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when connected to the required utilities. For floodplain management purposes, the term "manufactured home" also includes park trailers, travel trailers and other similar vehicles placed on a site for greater than one hundred eighty (180) consecutive days. "Manufactured home" does not include a "recreational vehicle." (x) "Manufactured home park or subdivision" means a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for sale or rent. (y) "Mean sea level" means, for purposes of the National Flood Insurance Program, the National Geodetic Vertical Datum (NGVD) of 1929 or other datum, to which base flood elevations shown on a community's Flood Insurance Rate Map are referenced. (z) "New construction" means, for floodplain management purposes, structures for which the "start of construction" commenced on after the effective date of a floodplain management regulation adopted by this community. (aa) "One hundred year flood" or "100-year flood" means a flood which has a one percent (1%) annual probability of being equaled or exceeded. It is identical to the "base flood," which will be the term used throughout this chapter. (bb) "Person" means an individual or his agent, firm, partnership, association or corporation, or agent of the aforementioned groups, or this state or its agencies or political subdivisions. (cc) "Recreational vehicle" means a vehicle which is all of the following: (1) Built on a single chassis; (2) Four hundred (400) square feet or less when measured at the largest horizontal projection;
(3) Designed to be self-propelled or permanently towable by a light-duty truck; and (4) Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use. (dd) "Remedy a violation" means to bring the structure or other development into compliance with state or local floodplain management regulations, or, if this is not possible, to reduce the impacts of its noncompliance. Ways that impacts may be reduced include protecting the structure or other affected development from flood damages, implementing the enforcement provisions of this chapter or otherwise determining future similar violations, or reducing federal financial exposure with regard to the structure or other development. (ee) "Riverine" means relating to, formed by, or resembling a river (including tributaries), stream, brook, and the like. (ff) "Special flood hazard area (SFHA)" means an area having special flood or flood-related erosion hazards, and shown on an FHBM or FIRM as Zone A, AO, A1-30, AE, A99, or AH. (gg) "Start of construction" includes substantial improvement, and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, placement, or other improvement was within one hundred eighty (180) days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading, and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. (hh) "Structure" means a walled and roofed building, including a gas or liquid storage tank, that is principally above ground, as well as a manufactured home. (ii) "Substantial damage" means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before-damaged condition would equal or exceed fifty percent (50%) of the market value of the structure before the damage occurred. (jj) (1) "Substantial improvement" means any repair, reconstruction, or improvement of a structure, the cost of which equals or exceeds fifty percent (50%) of the market value of the structure either: (i) Before the improvement or repair is started; or (ii) If the structure has been damaged and is being restored, before the damage occurred. (2) For the purposes of this definition, "substantial improvement" is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the structure. The term does not, however, include either: (i) Any project for improvement of a structure to comply with existing state or local health, sanitary, or safety code specifications which are solely necessary to assure safe living conditions; or (ii) Any alteration of a structure listed on the National Register of Historic Places or a State Inventory of Historic Places. (kk) "Variation" means a grant of relief from the requirements of this chapter, which permits construction in a manner which would otherwise be prohibited by this chapter. (ll) "Variance" means a grant of relief from the requirements of this chapter, which permits construction in a manner which would otherwise be prohibited by this chapter." (mm) "Violation" means the failure of a structure or other development to be fully compliant with the community's floodplain management regulations. A structure or other development without the elevation certificate, other
certifications, or other evidence of compliance required in this chapter is presumed to be in violation until such time as that documentation is provided. (§ 1, Ord. 2409, eff. February 4, 1988, as amended by § 1, Ord. 2991, eff. July 17, 2014, § 2, Ord. 3271, eff. April 4, 2024)
Article 3. General Provisions
Sec. 8-13.301. Lands to which this chapter applies.¶
This chapter shall apply to all areas of special flood hazards, areas of flood-related erosion hazards and areas of mudslide (i.e., mudflow) hazards within the jurisdiction of the City. (§ 1, Ord. 2409, eff. February 4, 1988)
Sec. 8-13.302. Base for establishing the areas of special flood hazard.¶
The areas of special flood hazard, areas of flood- related erosion hazards and areas of mudslide (i.e., mudflow) hazards identified by the Federal Emergency Management Agency or the Federal Insurance Administration in a scientific and engineering report entitled "Flood Insurance Study for Ontario, California, dated December 2, 1980," with an accompanying Flood Insurance Rate Map, and all later revisions thereof, is hereby adopted by reference and declared to be a part of this chapter. The Flood Insurance Study is on file in the office of the City Engineer, City Hall, 303 East “B” Street, Ontario, California. This Flood Insurance Study is the minimum area of applicability of this chapter and may be supplemented by studies or other areas which allow implementation of this chapter and which are recommended to the City Council by the Floodplain Administrator. (§ 1, Ord. 2409, eff. February 4, 1988)
Sec. 8-13.303. Compliance.¶
No structure or land shall hereafter be constructed, located, extended, converts or altered without full compliance with the terms of this chapter and other applicable regulations. Violations of the provisions of this chapter by failure to comply with any of its requirements (including violations of conditions and safeguards established in connection with conditions) shall constitute a misdemeanor. Nothing herein shall prevent the City Council from taking such lawful action as is necessary to prevent or remedy any violation. (§ 1, Ord. 2409, eff. February 4, 1988)
Sec. 8-13.304. Abrogation and greater restrictions.¶
This chapter is not intended to repeal, abrogate, or impair any existing easements, covenants, or deed restrictions. However, where this chapter and another ordinance, easement, covenant, or deed restriction conflict or overlap, whichever imposes the more stringent restrictions shall prevail. (§ 1, Ord. 2409, eff. February 4, 1988)
Sec. 8-13.305. Interpretation.¶
In the interpretation and application of this chapter, all provisions shall be: (a) Considered as minimum requirements; (b) Liberally construed in favor of the governing body; and
(c) Deemed neither to limit nor repeal any other powers granted under state statutes. (§ 1, Ord. 2409, eff. February 4, 1988)
Sec. 8-13.306. Warning and disclaimer of liability.¶
The degree of flood protection required by this chapter is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur on rare occasions. Flood heights may be increased by man-made or natural causes. This chapter does not imply that land outside the areas of special flood hazards and areas of mudslide (i.e., mudflow) hazards or uses permitted within such areas will be free from flooding or flood damage. This chapter shall not create liability on the part of the City, any officer or employee thereof, or the Federal Insurance Administration for any flood damages that result from reliance on this chapter or any administrative decision lawfully made thereunder. (§ 1, Ord. 2409, eff. February 4, 1988)
Sec. 8-13.307. Severability.¶
This chapter and the various parts thereof are declared to be severable. Should any section of this chapter be declared by the courts to be unconstitutional or invalid, such decision shall not affect the validity of the chapter as a whole, or any portion thereof other than the section so declared to be unconstitutional or invalid. (§ 1, Ord. 2409, eff. February 4, 1988)
Article 4. Administration
Sec. 8-13.401. Establishment of development permit.¶
A development permit shall be obtained before construction or development begins within any area of special flood hazards, areas of flood-related erosion hazards or areas of mudslide (i.e. mudflow) established in § 8-13.302. Application for a development permit shall be made on forms furnished by the Floodplain Administrator and may include, but not be limited to: plans in duplicate drawn to scale showing the nature, location, dimensions, and elevation of the area in question, existing or proposed structures, fill, storage of materials, drainage facilities; and the location of the foregoing. Specifically, the following information is required: (a) Proposed elevation, in relation to the mean sea level, of the lowest habitable floor (including the basement) of all structures; in Zone AO, elevation of highest adjacent grade and proposed elevation of lowest floor of all structures; (b) Proposed elevation, in relation to mean sea level, to which any structure will be floodproofed; (c) All appropriate certifications listed in § 8-13.403(d) of this chapter; and (d) Description of the extent to which any watercourse will be altered or relocated as a result of proposed development. (§ 1, Ord. 2409, eff. February 4, 1988)
Sec. 8-13.402. Designation of the Floodplain Administrator.¶
The Development Director is hereby appointed to administer and implement this chapter by granting or denying development permits in accordance with its provisions. (§ 1, Ord. 2409, eff. February 4, 1988)
Sec. 8-13.403. Duties and responsibilities of the Floodplain Administrator.¶
The duties and responsibilities of the Floodplain Administrator shall include, but not be limited to: (a) Permit review. (1) Review all development permits to determine that the permit requirements of this chapter have been satisfied; (2) All other required state and federal permits have been obtained; (3) The site is reasonably safe from flooding; (4) The proposed development does not adversely affect the carrying capacity of the floodway. For purposes of this chapter, “adversely affects” means that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point; (5) Require applicants who submit hydrologic and hydraulic engineering analyses to support permit applications to submit to FEMA the data and information necessary to maintain the Flood Insurance Rate Maps when the analyses indicate changes in base flood elevations, flood hazard area boundaries, or floodway designations; such submissions shall be made within six (6) months of such data becoming available. (b) Use of other base flood data, when base flood elevation data has not been provided in accordance with § 8- 13.302, the Floodplain Administrator shall obtain, review, and reasonably utilize any base flood elevation and floodway data available from a federal, state, or other source in order to administer Article 5. Any such information shall be submitted to the City Council for adoption. (c) Whenever a watercourse is to be altered or relocated: (1) Notify adjacent communities and the California Department of Water Resources prior to such alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Insurance Administration; (2) Require that the flood carrying capacity of the altered or relocated portion of said watercourse is maintained. (d) Obtain and maintain for public inspection and make available as needed: (1) The certification required in § 8-13.501 (c)(1) (floor elevations); (2) The certification required by § 8-13.501 (c)(2) (elevations in areas of shallow flooding); (3) The certification required in § 8-13.501 (c)(3)(iii) (elevation or floodproofing of non- residential structures); (4) The certification required in § 8-13.501 (c)(4)(i) or (ii) (wet floodproofing standards); (5) The certified elevation required in § 8-13.503(b) (subdivision standards); (6) The certification required in § 8-13.505(a) (floodway encroachments); and (7) The reports required in § 8-13.506(d) (mudflow standards). (e) Make interpretations where needed, as to the exact location of the boundaries of the areas of special flood hazards, areas of flood related erosion hazards or areas of mudslide (i.e., mudflow) (for example, where there appears to be a conflict between a mapped boundary and actual field conditions). The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in Article 6. (f) Substantial improvement and substantial damage determinations. For applications for building permits to improve buildings and structures, including alterations, movement, enlargement, replacement, repair, additions, rehabilitations, renovations, substantial improvements, repairs of substantial damage, and any other improvement of or work on such buildings and structures, the Building Official, in coordination with the Floodplain Administrator, shall: (1) Require the applicant to obtain an appraisal of the market value prepared by a qualified independent appraiser, of the building or structure before the start of construction of the proposed work to the satisfaction of the Building Official; in the case of repair, the market value of the building or structure shall be the market value before the damage occurred and before any repairs are made. (2) Compare the cost to perform the improvement, the cost to repair the damaged building to its pre-damaged condition, or the combined costs of improvements and repairs, when applicable, to the market value of the building or structure.
(3) Determine and document whether the proposed work constitutes substantial improvement or repair of substantial damage. (4) Notify the applicant when it is determined that the work constitutes substantial improvement or repair of substantial damage and that compliance with the flood resistant construction requirements of the building code is required and notify the applicant when it is determined that work does not constitute substantial improvement or repair of substantial damage. (g) Take action to remedy violations of this chapter as specified in § 8-13.303 of this chapter. (§ 1, Ord. 2409, eff. February 4, 1988, §§ 3, 4, Ord. 3271, eff. April 4, 2024)
Article 5. Provisions for Flood Hazard Reduction
Sec. 8-13.501. Standards of construction.¶
In all areas of special flood hazards, the following standards are required: (a) Anchoring. (1) All new construction and substantial improvements shall be anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. (2) All manufactured homes shall meet the anchoring standards of § 8-13.504. (b) Construction materials and methods. (1) All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage. (2) All new construction and substantial improvements shall be constructed using methods and practices that minimize flood damage. (3) All new construction and substantial improvements shall be constructed with electrical, heating, ventilation, plumbing and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. (4) Require within Zones AH or AO adequate drainage paths around structures on slopes to guide flood waters around and away from proposed structures. (c) Elevation and floodproofing. (1) New construction and substantial improvements of any structure shall have the lowest habitable floor, including basement, elevated to at least one (1) foot above the base flood elevation. Nonresidential structures may meet the standards in § 8-13.501(c)(3). Upon the completion of the structure, the elevation of the lowest floor, including basement, shall be certified by a registered professional engineer or surveyor, or verified by the community building inspector to be properly elevated. Such certification or verification shall be provided to the Building Official. (2) New construction and substantial improvement of any structure in Zone AH or AO shall have the lowest floor, including basement, elevated above the highest adjacent grade at least one (1) foot higher than the depth number specified in feet on the FIRM, or at least two (2) feet if no depth number is specified. Nonresidential structures may meet the standards in § 8-13.501(c)(3). Upon the completion of the structure, the elevation of the lowest floor, including basement, shall be certified by a registered professional engineer or surveyor, or verified by the community building inspector to be properly elevated. Such certification or verification shall be provided to the Building Official. (3) Nonresidential construction shall either be elevated in conformance with § 8-13.501(c)(1) or (2) or, together with attendant utility and sanitary facilities: (i) Be floodproofed so that the structure is watertight with walls substantially impermeable to the passage of water to a minimum of one (1) foot above the base flood elevation;
(ii) Have structural components capable of resisting hydrostatic and hydrodynamic loads and effects of buoyancy; (iii) Be certified by a registered professional engineer or architect that the standards of this subsection are satisfied. Such certification shall be provided to the Floodplain Administrator. (4) Require, for all new construction and substantial improvements, that fully enclosed areas below the lowest floor that are subject to flooding shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this requirement must either be certified by a registered professional engineer or architect or meet or exceed the following minimum criteria: (i) Either a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. The bottom of all openings shall be no higher than one foot above grade. Openings may be equipped with screens, louvers, valves or other coverings or devices provided that they permit the automatic entry and exit of floodwaters; or (ii) Be certified to comply with a local floodproofing standard approved by the Federal Insurance Administration. (5) Manufactured homes shall also meet the standards in § 8-13.504. (§ 1, Ord. 2409, eff. February 4, 1988, § 5, Ord. 3271, eff. April 4, 2024)
Sec. 8-13.502. Standards for utilities.¶
(a) All new and replacement water supply and sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the system and discharge from systems into flood waters. (b) On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding. (§ 1, Ord. 2409, eff. February 4, 1988)
Sec. 8-13.503. Standards for subdivisions.¶
(a) All preliminary subdivision proposals shall identify the flood hazard area and the elevation of the base flood. (b) All final subdivision plans shall provide the elevation of proposed structure(s) and pads. If the site is filled above the base flood, the final pad elevation shall be certified by a registered professional engineer or surveyor and provided to the Floodplain Administrator. (c) All subdivision proposals shall be consistent with the need to minimize flood damage. (d) All subdivision proposals shall have public utilities and facilities, such as sewer, gas, electrical, and water systems, located and constructed to minimize flood damage. (e) All subdivisions shall provide adequate drainage to reduce exposure to flood hazards. (§ 1, Ord. 2409, eff. February 4, 1988)
Sec. 8-13.504. Standards for manufactured homes.¶
All new and replacement manufactured homes and additions to manufactured homes shall: (a) Be elevated so that the lowest floor is a minimum of one (1) foot above the base flood elevation; and (b) Be securely anchored to a permanent foundation system to resist flotation, collapse or lateral movement. (§ 1, Ord. 2409, eff. February 4, 1988, § 7, Ord. 3271, eff. April 4, 2024)
Sec. 8-13.505. Floodways.¶
Located within areas of special flood hazard established in § 8-13.302 are areas designated as floodways. Since the floodway is an extremely hazardous area due to the velocity of flood waters which carry debris, potential projectiles, and erosion potential, the following provisions apply: (a) Prohibit encroachments, including fill, new construction, substantial improvements, and other development unless certification by a registered professional engineer or architect is provided demonstrating that encroachments shall not result in any increase in flood levels during the occurrence of the base flood discharge. (b) If subsection (a) of this section is satisfied, all new construction and substantial improvements shall comply with all other applicable flood hazard reduction provisions of Article 5. (§ 1, Ord. 2409, eff. February 4, 1988)
Sec. 8-13.506. Mudslide- (i.e., mudflow-) prone areas.¶
(a) The Floodplain Administrator shall review permits for proposed construction or other development to determine if it is proposed within a mudslide area. (b) Permits shall be reviewed to determine that the proposed development is reasonably safe from mudslide hazards. Factors to be considered in making this determination include but are not limited to: (1) The type and quality of soils; (2) Evidence of ground water or surface water problems; (3) The depth and quality of any fill; (4) The overall slope of the site; and (5) The weight that any proposed development will impose on the slope. (c) Within areas which have mudslide hazards, the following requirements apply: (1) A site investigation and further review shall be made by persons qualified in geology and soils engineering; (2) The proposed grading, excavation, new construction and substantial improvements shall be adequately designed and protected against mudslide damages; (3) The proposed grading, excavations, new construction and substantial improvements do not aggravate the existing hazard creating either on-site or off-site disturbances; and (4) Drainage, planting, watering and maintenance shall not endanger slope stability. (d) Prior to the issuance of building permits, all properties within any Flood Zones inundated by the 100 year flood as designated on the latest edition of the Flood Insurance Rate Map shall demonstrate to the Flood Plain Administrator that any and all structures are adequately protected consistent with the most current provisions of the grading requirements set forth in the agencies latest edition of the adopted Building Codes. These requirements shall also include the following elements: (1) The location of foundation and utility systems of new construction and substantial improvements; (2) The location, drainage and maintenance of all excavations, cuts and fills and planted slopes; (3) Protective measures, including but not limited to retaining walls, buttress fills, subdrains, diverter terraces, benchings, and the like; and (4) Engineering drawings and specifications to be submitted for all corrective measures, accompanied by supporting soils engineering and geology reports. (§ 1, Ord. 2409, eff. February 4, 1988)
Sec. 8-13.507. Flood-related erosion-prone areas.¶
(a) The Floodplain Administrator shall require permits for proposed construction and other development within all flood-related erosion-prone areas as known to the community.
(b) Such permits shall be reviewed to determine whether the proposed site alterations and improvements will be reasonably safe from flood- related erosion and will not cause flood-related erosion hazards or otherwise aggravate the existing hazard. (c) If a proposed improvement is found to be in the path of flood-related erosion or would increase the erosion hazard, such improvement shall be relocated or adequate protective measures shall be taken to avoid aggravating the existing erosion hazard. (§ 1, Ord. 2409, eff. February 4, 1988)
Sec. 8-13.508. Standards for recreational vehicles.¶
(a) All recreational vehicles placed in SFHA Zones A1-30, AH or AE must either: (1) Be on the site for fewer than 180 consecutive days; (2) Be fully licensed and ready for highway use; or (3) Meet the permit requirements of Section 8-13.401 and the elevation and anchoring requirements for manufactured homes in Section 8-13.504. (b) For purposes of this section, a recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached additions. (§ 2, Ord. 2991, eff. July 17, 2014)
Article 6. Variance Procedure
Sec. 8-13.601. Appeal board.¶
(a) The City Council shall hear and decide appeals and requests for variance from the requirements of this chapter. (b) The City Council shall hear and decide appeals when it is alleged there is an error in any requirement, decision, or determination made by the Floodplain Administrator in the enforcement or administration of this chapter. (c) In passing upon such applications, the City Council shall consider all technical evaluations, all relevant factors, standards specified in other sections of this chapter; and: (1) The danger that materials may be swept onto other lands to the injury of others; (2) The danger to life and property due to flooding or erosion damage; (3) The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner; (4) The importance of the services provided by the proposed facility to the community; (5) The necessity to the facility of a waterfront location, where applicable; (6) The availability of alternative locations for the proposed use which are not subject to flooding or erosion damage; (7) The compatibility of the proposed use with existing and anticipated development; (8) The relationship of the proposed use to the comprehensive plan and floodplain management program for that area; (9) The safety of access to the property in time of flood for ordinary and emergency vehicles; (10) The expected heights, velocity, duration, rate of rise, and sediment transport of the flood waters expected at the site; and (11) The costs of providing governmental services during and after flood conditions, including maintenance and repair of public utilities and facilities such as sewer, gas, electrical and water systems, and streets and bridges.
(d) Upon consideration of the factors of subsection (c) of this section and the purposes of this chapter, the City Council may attach such conditions to the granting of variances as it deems necessary to further the purposes of this chapter. (e) The Floodplain Administrator shall maintain the records of all appeal actions and report any variances to the Federal Insurance Administration upon request. (§ 1, Ord. 2409, eff. February 4, 1988, § 6, Ord. 3271, eff. April 4, 2024)
Sec. 8-13.602. Conditions for variances.¶
(a) A variance is authorized to be issued for the repair, improvement, or rehabilitation of a historic structure upon a determination that the proposed repair, improvement, or rehabilitation will not preclude the structure's continued designation as a historic structure, and the variance is the minimum necessary to preserve the historic character and design of the structure. When the proposed work precludes the structure's continued designation as a historic structure, a variance shall not be granted and the structure and any repair, improvement, and rehabilitation shall be subject to the requirements of the building code in conjunction with the provisions of this article. (b) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result. (c) Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief. (d) Variances shall only be issued upon: (1) A showing of good and sufficient cause; (2) A determination that failure to grant the variance would result in exceptional hardship to the applicant; and (3) A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, or extraordinary public expense, create nuisances, cause fraud on or the victimization of the public, or conflict with existing local laws or ordinances. (e) Variances may be issued for new construction and substantial improvements and for other development necessary for the conduct of a functionally dependent use, provided that the provisions of subsections (a) through (d) of this section are satisfied and that the structure or other development is protected by methods that minimize flood damages during the base flood and create no additional threats to public safety. (f) Any applicant to whom a variance is granted shall be given written notice that the structure will be permitted to be built with a lowest floor elevation below the regulatory flood elevation and that the cost of flood insurance will be commensurate with the increased risk resulting from the reduced lowest floor elevation. A copy of the notice shall be recorded by the Floodplain Board in the office of the San Bernardino County Recorder and shall be recorded in a manner so that it appears in the chain of title of the affected parcel of land. (§ 1, Ord. 2409, eff. February 4, 1988, § 8, Ord. 3271, eff. April 4, 2024)
CHAPTER 14: HISTORIC BUILDING CODE, EXISTING BUILDING CODE AND REFERENCED STANDARDS*
CHAPTER 14: HISTORIC BUILDING CODE, EXISTING BUILDING CODE AND
REFERENCED STANDARDS*
- Sections 8-14.01 through 8-14.16, Historic Preservation, codified from Ord. 2509, eff. August 1, 1991, repealed by § 4, Ord. 2707, eff. December 16, 1999. Sections 8-14.01 through 8-14.03, Historic Building Code, Existing Building Code and Referenced Standards, codified from Ord. 3227, eff. January 5, 2023, as amended by § 12, Ord. 3321, eff. February 2026. 8-14.01 Adoption of California Historic Building Code 8-14.02 Adoption of California Existing Building Code 8-14.03 Adoption of California Referenced Standards 8-14.04 Alternative building standards for reuse projects
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — Ontario Municipal Code
- Title 1 — GENERAL PROVISIONS
- Title 1 — GENERAL PROVISIONS
- Chapter 1 — CITY COUNCIL
- Chapter 1 — BUSINESS LICENSING REGULATIONS
- Chapter 1 — AMBULANCES (REPEALED)
- Chapter 22 — PROHIBITIONS AGAINST CONSUMPTION OF ALCOHOLIC
- Chapter 22 — PROHIBITIONS AGAINST CONSUMPTION OF ALCOHOLIC BEV…
- Chapter 1 — ADVERTISING DISTRIBUTION
- Chapter 1 — ANIMALS AND FOWL
- Chapter 1 — AIRPORT RULES AND REGULATIONS
- Title 8 — BUILDING REGULATIONS
- Chapter 1 — DEVELOPMENT CODE
- Chapter 1 — PARKS, PARKWAYS, AND TRAILS
- Division 1.01 — Development Code Enactment, Consistency and Se…
- Division 1.02 — Development Code Interpretation and Enforcement
- Division 2.01 — Planning Agency
- Division 2.03 — Public Hearings
- Division 2.04 — Appeals
- Division 2.05 — City Initiated Modification or Revocation
- Division 2.06 — Performance Guarantees
- Division 3.02 — Nonconforming Signs
- Division 4.01 — Legislative Actions
- Division 4.02 — Discretionary Permits and Actions
- Division 4.03 — Ministerial (Administrative) Permits and Decis…
- Division 5.01 — Zoning Districts and Boundaries
- Division 5.02 — General Land Use Provisions
- Division 5.03 — Supplemental Land Use Regulations
- Division 6.01 — District Standards and Guidelines
- Division 6.03 — Off-Street Parking and Loading
- Division 6.04 — Congestion Management and Trip Reduction
- Division 6.05 — Landscaping
- Division 6.07 — Reserved
- Division 6.08 — Development Projects and Subdivisions
- Division 6.09 — Reserved
- Division 6.10 — Reserved
- Division 6.11 — Shopping Cart Retention and Storage
- Division 7.01 — Historic Preservation
- Division 8.01 — Sign Regulations
- Division 9.01 — Definitions
- Division 9.02 — Glossary
- Division 1.02 — Development Code Interpretation and Enforcement
- Division 1.02 — Development Code Interpretation and Enforcement
- Division 1.02 — Interpretation and Enforcement
- Division 1.02 — Interpretation and Enforcement
- Division 1.02 — Interpretation and Enforcement
- Division 2.05 — City Initiated Modification or Revocation
- Division 2.02 — Application Filing and Processing
- Division 2.05 — City Initiated Modification or Revocation
- Division 2.05 — City Initiated Modification or Revision
- Division 2.05 — City Initiated Modification or Revision
- Division 2.05 — City Initiated Modification or Revision
- Division 2.05 — City Initiated Modification or Revision
- Division 2.05 — City Initiated Modification or Revision
- Division 3.01 — Nonconforming Lots, Land Uses, and Structures
- Division 3.01 — Nonconforming Lots, Land Uses, and Structures
- Division 3.01 — Nonconforming Lots, Land Uses and Structures
- Division 4.03 — Ministerial (Administrative) Permits and Decis…
- Division 4.03 — Ministerial (Administrative) Permits and Decis…
- Division 4.03 — Ministerial Permits and Decisions
- Division 6.02 — Walls, Fences and Obstructions
- Division 6.06 — Street Naming and Address Numbering
- Division 6.02 — Walls, Fences, and Obstructions
- Division 6.06 — Street Naming and Street Address Numbering
- Division 8.01 — General Sign Provisions
- Division 8.01 — General Sign Provisions