Part 3 — Administrative Amendments to the California Electrical Code
Oakland Municipal Code · 2026-09 edition · updated 2026-09-29 · Oakland
15.04.2.300 - Reference to Article I.¶
Refer to Article I—General Administrative Amendments of this Chapter.
(Ord. No. 13861, § 4, 9-15-2025)
15.04.2.305 - Title.¶
These regulations shall be known as the "Oakland Amendments Of The California Electrical Code," may be cited as such, and will be referred to herein as "this Chapter," "this Code," or "the Oakland Building Construction Code."
(Ord. No. 13861, § 4, 9-15-2025)
15.04.2.310 - Purpose.¶
A.
The purpose of this Code is to provide minimum standards to safeguard life or limb, property and public welfare by regulating and controlling the design, construction, installation, quality of materials, location, operation, maintenance and use of electrical systems, equipment, machinery, fixtures, and appliances within this jurisdiction.
B.
The purpose of this Code is not to create or otherwise establish or designate any particular class or group of people who will or should be especially protected or benefited by the terms of this Code.
(Ord. No. 13861, § 4, 9-15-2025)
15.04.2.315 - Scope.¶
A.
The provisions of this Code shall apply to the installation, alteration, repair, relocation, replacement, addition, use, or maintenance of electrical systems, equipment, machinery, fixtures and appliances. Additions, alterations, repairs and replacement of electrical systems or equipment shall comply with the provisions for new equipment and systems.
B.
Where, in any specific case, different sections of this Code specify different materials, methods of construction or other requirements, the most restrictive shall govern. When there is a conflict between a general requirement and a specific requirement, the specific requirement shall be applicable.
(Ord. No. 13861, § 4, 9-15-2025)
15.04.2.320 - Existing electrical systems.¶
A.
Additions, alterations, replacements, or repairs may be made to any electrical system without requiring existing electrical system to comply with all the requirements of this Code, provided the addition, alteration, replacement, or repair conform to the requirements for a new electrical system or equipment. Additions, alterations, replacements, or repairs shall not cause an existing system to become dangerous, hazardous, or otherwise unsafe.
B.
Electrical systems and equipment lawfully in existence at the time of the adoption of this Code may have their use, maintenance or repair continued if the use, maintenance or repair is in accordance with the original design and location and no hazard to life or limb, property, or public welfare has been created by such electrical system.
C.
Electrical systems and equipment which are a part of any building or structure undergoing a change in use or occupancy, as defined in the California Building Code, shall comply will all requirements of this Code which may be applicable to the new use or occupancy.
D.
All electrical systems, equipment, materials and appurtenances, both existing and new, and all parts thereof shall be maintained in proper operating condition. All devices or safeguards which are required by this Code shall be maintained in conformance with the code edition under which installed. The property owner or designated agent shall be responsible for maintenance of electrical systems and equipment. To determine compliance with this subsection, the Building Official may cause an electrical system or equipment to be inspected.
E.
Electrical systems or equipment which are a part of buildings or structures moved into or within this jurisdiction shall comply with the provisions of this Code for new installations.
(Ord. No. 13861, § 4, 9-15-2025)
15.04.2.325 - Alternate materials and methods of construction.¶
A.
The provisions of this Code are not intended to prevent the use of any material or method of construction not specifically prescribed by this Code provided any such alternate has been approved and the use authorized by the Building Official.
B.
The Building Official may authorize any alternate, provided the Building Official finds the proposed design is satisfactory for the intended use and complies with the provisions of this Code and that the material, method or work offered is for the purpose intended, at least equivalent to that prescribed by this Code in suitability, strength, effectiveness, fire resistivity, durability, ampacity, and safety.
C.
The Building Official shall require sufficient evidence or proof be submitted to substantiate claims made regarding the use of alternates. The details of any approval actions for an alternate shall be retained by the Building Official for the period required for retention of public records.
(Ord. No. 13861, § 4, 9-15-2025)
15.04.2.330 - Modifications.¶
Whenever there are practical difficulties involved in carrying out the provisions of this Code, the Building Official may grant modifications for individual cases. The Building Official shall first find that a special individual reason makes the strict letter of this Code impractical, and the modification does not lessen health life and fire safety requirements. The details of actions granting modifications shall be recorded and shall be retained by the Building Official for the period required for retention of public records.
(Ord. No. 13861, § 4, 9-15-2025)
15.04.2.335 - Tests.¶
Whenever there is insufficient evidence of compliance with the provisions of this Code, or evidence that a material or method does not conform to the requirements of this Code or in order to substantiate claims for alternate materials or methods, the Building Official may require tests as evidence of compliance to be made at no expense to the jurisdiction. Test methods shall be as specified in this Code or by other recognized test standards. In the absence of recognized and accepted test methods, the Building Official shall specify the testing procedures. All tests shall be performed by an approved agency. Reports of tests shall be retained by the Building Official for the period required for retention of public records.
(Ord. No. 13861, § 4, 9-15-2025)
15.04.2.340 - Powers and duties of the Building Official.¶
A.
The Building Official is authorized and directed to enforce all the provisions of this Code. For such purposes, the Building Official shall have the powers of a law enforcement officer. The Building Official shall have the power to render interpretations of this Code and to adopt and enforce rules and regulations supplemental to this Code as may be deemed necessary in order to clarify the application of the provisions of this Code. Such interpretations, rules and regulations shall conform with the intent and purpose of this Code.
B.
In accordance with the prescribed procedures and with the approval of the appointing authority, the Building Official may appoint such number of technical officers, inspectors, other employees, or agents as shall be authorized from time to time. The Building Official may deputize such inspectors or employees as may be necessary to carry out the functions of the Code Enforcement Agency.
C.
When it is necessary to make an inspection to enforce the provisions of this Code, or when the Building Official has reasonable case to believe that there exists in a building or upon a premises a condition which is contrary to or in violation of this Code which makes the building or premises unsafe, hazardous, or dangerous, the Building Official may enter the building or premises at reasonable times to inspect or to perform the duties imposed by this Code, provided that if such building or premises is occupied that credentials be presented to the occupant and entry requested. If such building or premises is unoccupied and unsecured, the Building Official shall first make a reasonable effort to locate the property owner or other person having charge or control of the building or premises and request entry. If entry is refused, the Building Official shall have recourse to the remedies provided by law to secure entry.
D.
When any work is being done contrary to the provisions of this Code, the Building Official may order the work stopped by notice in writing served on any persons engaged in the doing or causing such work to be done and such persons shall forthwith stop work until authorized by the Building Official to proceed with the work.
E.
The Building Official shall have the authority to disconnect electrical utility service or energy supplies to a building, structure, premises, or equipment regulated by this Code in case of emergency where necessary to eliminate an immediate hazard to life or limb, property, or public welfare. The Building Official shall, whenever possible, notify the serving utility, the property owner and occupant of the building, structure or premises of the decision to disconnect prior to taking such action, and shall notify such serving utility, property owner and occupant for the building, structure or premises in writing of such disconnection immediately thereafter.
F.
When the Building Official determines that any equipment, or portion thereof, regulated by this Code has become unsafe, hazardous, or dangerous to life or limb, property, or public welfare, the Building Official shall order in writing that the equipment either be removed or restored to a safe condition, as appropriate, within a fixed time. Persons shall not use or maintain defective equipment after receiving a notice. When an electrical system or equipment is to be disconnected, written notice indicating the causes therefore shall be given within twenty-four (24) hours to the serving utility, the property owner and occupant of the building, structure or premises. When any electrical equipment or system is maintained in violation of this Code, and in violation of a notice issued as provided in this Section, the Building Official shall institute an appropriate action to prevent, restrain, correct or abate the violation.
G.
Persons shall not make connections from an energy or power supply nor supply energy or power to any equipment regulated by this Code which has been disconnected or ordered to be disconnected by the Building Official or the use of which has been ordered to be discontinued by the Building Official until the Building Official authorizes the reconnection and use of such equipment.
H.
The Building Official or his or her authorized representative, charged with the enforcement of this Code, acting in good faith and without malice in the discharge of the duties required by this Code or other pertinent law or ordinance shall not thereby be rendered personally liable for damages that may accrue to persons or property as a result of an act or by reason of an act or omission in the discharge of such duties. A suit brought against the Building Official or another employee, representative, official, officer, agent, or volunteer of the City of Oakland because of such act or omission performed by the Building Official or another employee, representative, official, officer, agent, or volunteer of the City of Oakland in the enforcement of any provision of such codes or other pertinent laws or ordinances implemented through the enforcement of this Code or enforced by the Code Enforcement Agency shall be defended by this jurisdiction until final termination of such proceedings, and any judgment resulting therefrom shall be assumed by the City of Oakland.
This Code shall not be construed to relieve from or lessen the responsibility of any person owning, operating or controlling any electrical system or equipment regulated herein for damages to persons or property caused by defects, nor shall the Code Enforcement Agency or the City of Oakland be held as assuming any such liability by reason of the inspections authorized by this Code or any permits or certificates issued under this Code.
I.
The Building Official may request, and shall receive the assistance and cooperation of other officials of this jurisdiction so far as is required in the discharge of the duties required by this Code or other pertinent law or ordinance.
(Ord. No. 13861, § 4, 9-15-2025)
15.04.2.345 - General standards; appeals; violations.¶
A.
General Standards. Refer to Section 15.04.1.115 of this Chapter.
B.
Appeals. Refer to Section 15.04.1.125 of this Chapter.
C.
Violations. Refer to Section 15.04.1.130 of this Chapter.
(Ord. No. 13861, § 4, 9-15-2025)
15.04.2.350 - Application for permit.¶
A.
Refer to Section 15.04.1.135 of this Chapter.
B.
Except as permitted in Subsection C of this Section, no electrical system or equipment regulated by this Code shall be installed, altered, repaired, replaced or remodeled unless a separate electrical permit or "combination permit" has been obtained from the Building Official for each separate building or structure.
C.
Refer to National Electrical Code (NEC) Article 90-2(a).
D.
Exemption from, the permit requirements of this Code shall not be deemed to grant authorization for work to be done in violation of the provisions of this Code or other laws or ordinances of this jurisdiction.
E.
A plant permit may be issued by the Building Official to a person not holding a California State Electrical Contractor License but who is regularly employed as an electrician in a plant or business. The permit shall be issued upon written application from the owner or manager of the plant or business in which the person is employed. The application shall certify that the proposed permittee is competent to perform the electrical work and shall certify that all work will be performed under the requirements of this Chapter.
All electrical work shall be done under the direction and supervision of the permittee. All electrical work, excepting the maintenance and repair of existing electrical installation and repair, shall be done only under permits issued as otherwise required under this Article. The owner or manager of any plant or business employing the permittee shall immediately notify the Building Official in writing upon termination of the permittee and such notification shall cancel the plant permit.
Evidence of any electrical work being done under the plant permit that is in violation of any provisions of this Chapter shall be grounds for immediate suspension or cancellation of the permit by the Building Official. The plant permit is renewable on an annual basis from the date of issuance for a fee established by the Master Fee Schedule.
F.
A meter reset permit shall be issued by the Building Official to any person for the purpose of reconnecting a supply of service or reinstalling a meter whenever the serving utility shall disconnect electrical service supply or remove any electrical meter to a structure or building for a period of ninety (90) days or more in a residential occupancy or thirty (30) days or more in a commercial or industrial occupancy. An inspection of the occupancy and other pertinent facilities is required. The serving utility will be authorized by the Building Official to reconnect the supply of service or reinstall any meter upon the condition that the occupancy is found to be void of hazardous or unsafe conditions.
Any hazardous or unsafe conditions found will require that an electrical permit (or combination permit) be obtained, as elsewhere contained in this Chapter, to correct those same conditions. The meter reset permit does not cover electrical work as elsewhere contained in this Chapter. Meter reset permit fee is established by the Master Fee Schedule.
(Ord. No. 13861, § 4, 9-15-2025)
15.04.2.355 - Information on submittals; signing and sealing of documents; persons who…¶
plans.
A.
Information on Submittals. Refer to Section 15.04.1.140 of this Chapter.
B.
Reserved.
C.
Signing and Sealing of Plans and Other Submittal Documents. Refer to Section 15.04.1.145 of this Chapter.
D.
Persons Who May Prepare Plans. Refer to Section 15.04.1.150 of this Chapter.
(Ord. No. 13861, § 4, 9-15-2025)
15.04.2.360 - Permit issuance.¶
A.
The application, plans, diagrams, calculations, specifications, computations and other data filed by an applicant for permit shall be reviewed by the Building Official. Such data may be reviewed by other departments of this and other jurisdictions to verify compliance with applicable laws under their jurisdiction. When the Building Official finds that the work described in an application for a permit and the plans, diagrams, computations, calculations, specifications and other data filed therewith conform to the requirements of this Code and other pertinent laws, ordinances and conditions of compliance for the abatement of violations of this Code and other codes and ordinances and that the fees, charges, costs and assessments specified in the Master Fee Schedule, as well as all penalties, have been paid, the Building Official shall issue a permit therefore to the applicant.
When issuing a permit where plans are required, the Building Official shall endorse in writing or stamp the plans as provided in the California Building Code. Such approved plans shall not be changed, modified or altered without authorization from the Building Official, and all work regulated by this Code shall be done in accordance with the approved plans.
The Building Official may issue a permit for the construction of a part of an electrical system before the entire plans and specifications for the whole system have been submitted or approved, provided adequate information and detailed statements have been filed complying with all pertinent requirements of this Code. The holder of a partial permit may proceed without assurance that the permit for the entire building, structure or electrical system will be granted.
B.
One set of reviewed plans, diagrams, calculations, specifications and computations shall be retained by the Building Official until final approval of the work covered therein. One (1) set of approved plans and
specifications shall be returned to the applicant and said set shall be always kept on the site of the building or work during which the work authorized thereby is in progress.
C.
The issuance of a permit or approval of plans, calculations, specifications, diagrams, and computations shall not be construed to be a permit for, or an approval of any violation of any of the provisions of this Code or of other ordinances, rules, or regulations of the jurisdiction. Permits presuming to give authority to violate or cancel the provisions of this Code or of other ordinances, rules, or regulations of the jurisdiction shall not be valid.
The issuance of a permit based upon plans, calculations, specifications, computations and other data shall not prevent the Building Official from thereafter requiring the correction of errors in said plans, calculations, computations, specifications, and other data or from preventing building operations being carried on thereunder when in violation of this Code or of other ordinances of this jurisdiction.
(Ord. No. 13861, § 4, 9-15-2025)
15.04.2.365 - Expiration of permit application or issued permit; suspension or revocation; fees.¶
A.
Expiration of Permit Application or Issued Permit. Refer to Section 15.04.1.155 of this Chapter.
B.
Suspension or Revocation of Issued Permit. Refer to Section 15.04.1.160 of this Chapter.
C.
Fees. Refer to Section 15.04.1.165 of this Chapter.
(Ord. No. 13861, § 4, 9-15-2025)
15.04.2.370 - Inspections.¶
A.
Electrical equipment and systems for which permits are required by this Code shall be subject to inspection by the Building Official and such electrical equipment and systems shall remain accessible and exposed for inspection purposes until approved by the Building Official. It shall be the duty of the permit applicant to cause the electrical equipment and systems to remain accessible and exposed for inspection purposes. It shall the duty of the permit holder to have field personnel on site who are over the age of eighteen (18) and who have direct knowledge of the work and project and have competency to answer questions about the work performed. Neither the Building Official nor the City of Oakland shall be liable for expense entailed in the removal or replacement of any material required to permit inspection. When the installation of an electrical system or equipment is complete, an additional and final inspection shall be made. Electrical systems and equipment regulated by this Code shall not be connected to the energy supply lines until authorized by the Building Official.
Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this Code or of other ordinances, rules, or regulations of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of this Code or of other ordinances of the City of Oakland shall not be valid.
B.
The requirements of this Section shall not be considered to prohibit the operation of mechanical systems installed to replace existing equipment or fixtures serving an occupied portion of the building in the event a request for inspection of such equipment or fixture has been filed with the Building Official not more than forty-eight (48) hours after such replacement work is completed, and before any portion of such electrical system is concealed by any permanent portion of the building.
C.
It shall be the duty of the person doing the work authorized by a permit to notify the Building Official that such work is ready for inspection. Every request for inspection shall be filed at least one (1) working day before such inspection is desired. Such request may be in writing or by telephone at the option of the Building Official. It shall be the duty of the person requesting inspections required by this Code to provide access to and means for inspection of such work.
D.
In addition to the called inspections required by this Code, the Building Official may make or require other inspections of electrical work to ascertain compliance with the provisions of this Code and other laws which are enforced by the Code Enforcement Agency.
E.
A re-inspection fee may be assessed for each inspection or re-inspection when such portion of work for which inspection is requested is not complete or when required corrections have not been made. This provision is not to be interpreted as requiring re-inspection fees the first time a job is rejected for failure to comply with the requirements of this Code, but as controlling the practice of calling for inspections before the job is ready for inspection or re-inspection.
Re-inspection fees may be assessed, when the approved plans are not readily available to the inspector for failure to provide access on the date for which inspection is requested or for deviating from plans requiring the approval of the Building Official. Re-inspection fees shall be established and assessed in accordance with the Master Fee Schedule. In instances where reinspection fees have been assessed, no additional inspection of the work will be performed until the required fees have been paid.
(Ord. No. 13861, § 4, 9-15-2025)
15.04.2.375 - Connection approval.¶
A.
No person shall make connections from a source of energy to any electrical system or equipment regulated by this Code and for which a permit is required until approved by the Building Official.
B.
Whenever any person engaged in the distribution or sale of electrical energy shall set or install, or reset or reinstall, in, or about any building any meter for the measurement of electrical energy; or shall connect or reconnect supply or service to any installation of electrical equipment in, on, or about any building; or shall change the nominal voltage of supply for service to any installation of electrical equipment, in, on, or about any building; or shall change any such supply for service from two-wire to three-wire or vice versa, or from single phase to polyphase or vice versa, or from direct current to alternating current or vice versa, said person shall receive written authorization from the Building Official or the Building Official's designated representative, which authorization shall specify the location and address of the installation affected, provided, however, that said authorization need not be received with respect to any such meter installation or reinstallation or any such supply or service connection or reconnection, authorized by the Building Official or the Building Official's designated representative within thirty (30) days or more in residential occupancies or ninety (90) days or more in other occupancies of previous authorization; provided further that the Building Official may, at his or her discretion, waive temporarily or permanently any or all requirements of this Section by giving written notice of such waiver to all persons engaged in the distribution or sale of electrical energy; and said Building Official may likewise at any time revoke such waiver by written notice to all such persons.
C.
The Building Official may authorize temporary connection of the electrical equipment to the source of energy for the purpose of testing the equipment, or for use under a temporary certificate of occupancy.
D.
Provisions shall not be made for installing more than a single utility meter in the service equipment for a single-family dwelling, including other structures on the same property, without written authorization by the Building Official prior to their installation.
(Ord. No. 13861, § 4, 9-15-2025)
15.04.2.380 - Definitions.¶
In Article 100—Part A of the California Electrical Code, add the following definitions:
A.
Multiple Family Dwelling. Occupancies shall include Group R, Division 2 and Group I, Division 2, as defined and used in the California Building Code.
B.
Family Room. A room or area in a dwelling unit separate from and contiguous to a kitchen and not used for eating, sleeping or sanitation purposes.
C.
Recreation Room. Refer to Family Room.
D.
Show Window. Applicability shall further include all occupancies engaged in public commerce, including banking and real estate.
(Ord. No. 13861, § 4, 9-15-2025)
15.04.2.385 - Article 110-35 of CEC added.¶
In Article 110 of the California Electrical Code, add the following new article:
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — Oakland Municipal Code
- Article I — POWERS AND FORM OF GOVERNMENT
- Article II — THE COUNCIL
- Article III — THE MAYOR
- Article IV — CITY OFFICERS
- Article V — THE CITY MANAGER
- Article VI — ADMINISTRATIVE ORGANIZATION
- Article VII — PORT OF OAKLAND
- Article VIII — FISCAL ADMINISTRATION
- Article IX — PERSONNEL ADMINISTRATION
- Article X — FRANCHISES, LICENSES, PERMITS, LEASES AND SALES
- Article XI — ELECTIONS
- Article XII — GENERAL PROVISIONS
- Article XIV — RESERVED
- Article XV — RESERVED
- Article XVI — THE CHILDREN'S INITIATIVE OF 2018
- Article XX — OAKLAND MUNICIPAL EMPLOYEES' RETIREMENT SYSTEM
- Article XXI — MISCELLANEOUS
- Article XXVI — Added By: Stats. 1951; POLICE AND FIRE RETIREME…
- Article XXVII — Added By: Stats. 1955 OFF-STREET VEHICULAR PAR…
- Title 1 — GENERAL PROVISIONS
- Article I — Bidding Contracting and Purchasing
- Article II — City Policy Regarding Banks and Firms Which Do Bu…
- Chapter 2.05 — OAKLAND MUSEUM OF CALIFORNIA COLLECTION ACQUISI…
- Chapter 2.06 — PROMPT PAYMENT
- Chapter 2.07 — GRANT AWARD APPROVAL
- Chapter 2.08 — CIVIL SERVICE RULES AND PROCEDURES
- Chapter 2.10 — FIREARMS AND AMMUNITION PROCUREMENT AND DISPOSAL
- Chapter 2.12 — DEBARMENT PROGRAM
- Chapter 2.16 — MAP OF CITY COUNCIL DISTRICTS
- Article I — In General
- Article II — Public Access to Meetings
- Article III — Public Information
- Article IV — Policy Implementation
- Chapter 2.22 — CITY PROHIBITED FROM DOING BUSINESS WITH FEDERA…
- Chapter 2.23 — SANCTUARY CITY CONTRACTING AND INVESTMENT ORDIN…
- Chapter 2.24 — PUBLIC ETHICS COMMISSION
- Chapter 2.25 — CITY OF OAKLAND GOVERNMENT ETHICS ACT
- Chapter 2.26 — TICKET DISTRIBUTION POLICY
- Chapter 2.28 — LIVING WAGE ORDINANCE
- Chapter 2.29 — CITY AGENCIES, DEPARTMENTS AND OFFICES
- Chapter 2.30 — EQUAL ACCESS TO SERVICES
- Chapter 2.32 — EQUAL BENEFITS ORDINANCE
- Chapter 2.34 — IDENTIFICATION CARDS
- Chapter 2.36 — WORKER RETENTION AT LARGE-SCALE HOSPITALITY BUS…
- Chapter 2.38 — OAKLAND WHISTLEBLOWER ORDINANCE
- Chapter 2.40 — PROHIBITION ON NEPOTISM IN CITY EMPLOYMENT
- Chapter 2.41 — ACQUISITION AND LEASE OF REAL PROPERTY BY CITY
- Article I — General Provisions
- Article II — Sale of City-Owned Real Property, Generally
- Article III — Lease of City-Owned Real Property, Generally
- Article IV — Sale or Lease of City-Owned Real Property for Dev…
- Article V — Special Licenses and Leases
- Chapter 2.43 — GRANT OF PUBLIC UTILITY FRANCHISES
- Chapter 2.44 — DEPARTMENT OF WORKPLACE AND EMPLOYMENT STANDARDS
- Chapter 2.45 — OAKLAND POLICE COMMISSION
- Chapter 2.46 — COMMUNITY POLICE REVIEW AGENCY
- Chapter 2.47 — PUBLIC SAFETY PLANNING AND OVERSIGHT COMMISSION
- Chapter 2.48 — WILDFIRE PREVENTION COMMISSION
- Title 3 — MUNICIPAL ELECTIONS
- Article I — General Provisions
- Article II — Elections for Elective Office
- Chapter 3.12 — THE CITY OF OAKLAND CAMPAIGN REFORM ACT
- Article I — Findings and Purpose
- Article II — Definitions
- Article III — Contribution Limitations
- Article IV — Political Communications
- Article VI — Electronic Filing and Recordkeeping Requirements
- Article VII — Violations Related to Enforcement
- Article VIII — Agency Responsibility and Authority
- Article VIII — Enforcement
- Article IX — Miscellaneous Provisions
- Chapter 3.13 — LIMITED PUBLIC FINANCING ACT OF 2024
- Article III — Election Campaign Fund
- Article IV — Eligibility for Public Financing
- Article V — Disbursement of Public Financing
- Chapter 3.14 — OAKLAND FALSE ENDORSEMENT IN CAMPAIGN LITERATURE
- Article III — Prohibition on False Endorsements
- Article IV — Enforcement
- Article V — Miscellaneous
- Article I — Findings and Purpose.
- Article III — Agency Duties
- Article IV — Democracy Dollars
- Article V — Limits and Restrictions
- Article VI — Enforcement
- Article VII — Miscellaneous
- Chapter 3.16 — CONFLICT OF INTEREST CODE
- Chapter 3.20 — THE CITY OF OAKLAND LOBBYIST REGISTRATION ACT
- Article II — Definitions and Interpretation of This Act
- Article III — Registration of Lobbyists
- Article IV — Disclosure of Lobbying Activities
- Article V — Prohibitions
- Article VI — Enforcement and Penalties
- Title 4 — REVENUE AND FINANCE
- Article I — General Provisions and Definitions
- Article II — Issuance of Bonds
- Article III — Miscellaneous Provisions
- Chapter 4.52 — SUGAR-SWEETENED BEVERAGE DISTRIBUTION TAX
- Chapter 4.54 — AFFORDABLE HOUSING AND INFRASTRUCTURE BOND LAW
- Article III — Miscellaneous Bond Provisions
- Article IV — Anti-Displacement and Affordable Housing Bond Law…
- Chapter 4.56 — VACANT PROPERTY TAX
- Chapter 4.58 — OAKLAND ZOO ANIMAL CARE, EDUCATION AND IMPROVEM…
- Title 5 — BUSINESS TAXES, PERMITS AND REGULATIONS
- Article II — UDCB Permit Requirement and Process
- Article III — Standards and Requirements
- Article IV — Code Enforcement
- Article V — Noticing Procedure for Removal
- Chapter 5.20 — CLOSE-OUT SALES
- Chapter 5.22 — DANCE HALLS
- Chapter 5.24 — FILMING PERMITS
- Chapter 5.26 — FIREARMS DEALERS
- Chapter 5.28 — FLYING FIELDS, HELIPORTS AND HELISTOPS
- Chapter 5.30 — FOR-HIRE VEHICLES
- Chapter 5.32 — FRANCHISES
- Chapter 5.33 — HOME MORTGAGE LENDING
- Chapter 5.34 — HOTEL RATES AND REGISTRATION REQUIREMENTS
- Chapter 5.36 — MASSAGE ESTABLISHMENT AND MASSAGE THERAPISTS
- Chapter 5.38 — MATTRESSES
- Chapter 5.40 — MECHANICAL AND ELECTRONIC GAMES
- Chapter 5.42 — MINIATURE GOLF COURSES
- Chapter 5.43 — OAKLAND ARTISAN MARKETPLACE
- Chapter 5.44 — OUTDOOR AMUSEMENT CENTERS
- Chapter 5.46 — PAWNBROKERS, SECONDHAND DEALERS, SCRAP DEALERS …
- Chapter 5.48 — PEDDLERS AND SOLICITORS
- Chapter 5.50 — POOL ROOMS AND BOWLING ALLEYS
- Chapter 5.51 — FOOD VENDING PROGRAM
- Article II — Standards and Requirements
- Article III — Enforcement, Revocation and Abatement
- Chapter 5.52 — PRIVATE PATROL SERVICES AND PRIVATE WATCHMAN
- Chapter 5.54 — RENDERING
- Chapter 5.56 — RIDING ACADEMIES
- Chapter 5.58 — SCHOOL STORES
- Chapter 5.60 — SKATING RINKS
- Chapter 5.62 — STREET CARS
- Chapter 5.64 — TAXICABS
- Chapter 5.66 — THEATERS
- Chapter 5.68 — TRAMPOLINE CENTERS
- Chapter 5.70 — MISCELLANEOUS BUSINESS REGULATIONS
- Chapter 5.72 — RECREATIONAL VEHICLE ON UNDEVELOPED PROPERTY PI…
- Chapter 5.80 — MEDICAL AND ADULT-USE CANNABIS DISPENSARY PERMITS
- Chapter 5.81 — MEDICAL AND ADULT-USE CANNABIS CULTIVATION, MAN…
- Chapter 5.90 — SKATE PARK FACILITIES
- Chapter 5.91 — LICENSURE OF TOBACCO RETAILERS
- Chapter 5.92 — CITY MINIMUM WAGE, SICK LEAVE, AND OTHER EMPLOY…
- Chapter 5.93 — HOTEL MINIMUM WAGE AND WORKING CONDITIONS
- Chapter 5.95 — HOSPITALITY AND TRAVEL WORKER RIGHT TO RECALL
- Chapter 5.96 — GROCERY WORKER HAZARD PAY
- Chapter 5.97 — CAP ON THE COMMISSIONS, CHARGES, AND FEES OF FO…
- Title 6 — ANIMALS
- Title 8 — HEALTH AND SAFETY
- Article I — Purpose and Introductory Sections
- Article II — Graffiti Public Nuisance and Unlawful
- Article III — Graffiti Abatement
- Article IV — Municipal Code Liability, Remedies, and Penalties…
- Article V — Sale of Graffiti Implements to Minors
- Article VI — State Graffiti Laws
- Article VII — Graffiti Abatement Funding and Rewards
- Article VIII — Administrative Appeals
- Article IX — Miscellaneous
- Article I — Findings and Purposes
- Article III — Illegal Dumping and Littering as Unlawful and Pu…
- Article IV — Administrative, Civil, and Criminal Liabilities a…
- Article V — Special Liabilities and Responsibilities
- Article VI — Community Service
- Article VII — Reward Fund
- Article VIII — Administrative Appeals
- Article IX — Miscellaneous Sections
- Chapter 8.12 — HAZARDOUS MATERIALS
- Chapter 8.14 — MEAT
- Chapter 8.16 — MILK AND MILK PRODUCTS
- Chapter 8.18 — NUISANCES
- Chapter 8.19 — WOOD-BURNING APPLIANCES
- Chapter 8.20 — PAY TELEPHONES
- Chapter 8.21 — AUTOMATED PURCHASING MACHINES
- Chapter 8.22 — RESIDENTIAL RENT ADJUSTMENTS AND EVICTIONS
- Article I — Residential Rent Adjustment Program
- Article II — Just Cause for Eviction Ordinance (Measure EE)
- Article III — Terminating Tenancy to Withdraw Residential Rent…
- Article IV — Rent Program Service Fee
- Article V — Tenant Protection Ordinance
- Article VI — TENANT MOVE OUT AGREEMENT ORDINANCE
- Article VII — UNIFORM RESIDENTIAL TENANT RELOCATION ORDINANCE
- Article VIII — RELOCATION PAYMENTS FOR OWNER OR RELATIVE MOVE-…
- Article IX — Equitable Access to Low-Income ("EQUAL") Housing …
- Chapter 8.24 — PROPERTY BLIGHT
- Chapter 8.25 — RONALD V. DELLUMS AND SIMBARASHE SHERRY FAIR CH…
- Chapter 8.26 — SCRAP YARD ABATEMENT PROCEDURES
- Chapter 8.28 — SOLID WASTE COLLECTION AND DISPOSAL AND RECYCLING
- Chapter 8.30 — SMOKING
- Chapter 8.32 — TOBACCO PRODUCT DISTRIBUTION RESTRICTIONS
- Chapter 8.36 — SWIMMING POOLS
- Chapter 8.38 — SANITATION
- Chapter 8.40 — MISCELLANEOUS HEALTH AND SAFETY REGULATIONS
- Chapter 8.42 — CERTIFIED UNIFIED PROGRAM AGENCY (CUPA)
- Chapter 8.44 — SECURITY FOR EVENTS AT THE OAKLAND-ALAMEDA COUN…
- Chapter 8.46 — MEDICAL CANNABIS
- Chapter 8.48 — VEHICLE-BASED SOLICITATION RESTRICTIONS
- Chapter 8.50 — EMERGENCY SERVICES ORGANIZATION AND DISASTER CO…
- Chapter 8.52 — ACCESS TO REPRODUCTIVE HEALTH CARE FACILITIES
- Chapter 8.54 — FORECLOSED AND DEFAULTED RESIDENTIAL PROPERTY R…
- Article I — Intent
- Article III — Registration
- Article IV — Inspection, Maintenance, and Security Requirements
- Article V — Enforcement
- Article VI — Appeal
- Chapter 8.56 — EMERGENCY RESPONSE SERVICES FEES PROGRAM
- Article I — Title and Purpose
- Article III — Scope and Exclusions
- Article IV — Registration, Inspection, and Abatement
- Chapter 8.60 — PROHIBITION ON THE STORING AND HANDLING OF COAL…
- Article II — Miscellaneous
- Chapter 8.62 — REGULATIONS ESTABLISHING PERMIT REQUIREMENTS AN…
- Chapter 8.64 — PROHIBITION ON COMBUSTION ENGINE-POWERED LEAF B…
- Chapter 8.66 — COMMUNICATIONS SERVICE PROVIDER CHOICE ORDINANCE
- Chapter 8.68 — REQUIREMENT OF PROOF OF A COVID-19 VACCINATION …
- Chapter 8.70 — NUISANCE VESSELS ON OAKLAND WATERS
- Chapter 8.72 — ELEVATOR MAINTENANCE IN RESIDENTIAL BUILDINGS
- Title 9 — PUBLIC PEACE, MORALS AND WELFARE
- Article I — Dangerous Weapons
- Article II — Firearms and Weapons Violence Prevention
- Article III — Prohibition on the Sale of Saturday Night Specia…
- Article V — Prohibition on the Sale of Compact Handguns
- Article VI — Tools of Violence and Vandalism at Demonstrations
- Article VII — Privately Manufactured Firearms, Unfinished Fram…
- Chapter 9.37 — UNSECURED FIREARMS AND AMMUNITION IN UNATTENDED…
- Chapter 9.38 — POSSESSION OF LARGE-CAPACITY MAGAZINES
- Chapter 9.39 — SAFE STORAGE OF FIREARMS IN A RESIDENCE
- Chapter 9.40 — DISCRIMINATION BASED ON AIDS
- Chapter 9.44 — DISCRIMINATION BASED ON SEXUAL ORIENTATION
- Chapter 9.45 — DISCRIMINATION BASED ON DIVERSE FAMILY AND RELA…
- Chapter 9.48 — HOUSING DISCRIMINATION ON THE BASIS OF CHILDREN
- Chapter 9.52 — SPECIAL EVENT PERMITS
- Chapter 9.56 — NUISANCE VEHICLES
- Article II — Procedures After Impoundment
- Article III — Miscellaneous
- Chapter 9.58 — LOITERING FOR THE PURPOSE OF ENGAGING IN ILLEGA…
- Chapter 9.60 — SLAVERY ERA DISCLOSURE
- Chapter 9.64 — REGULATIONS ON CITY'S ACQUISITION AND USE OF SU…
- Chapter 9.65 — REGULATIONS ON CITY'S ACQUISITION AND USE OF MI…
- Chapter 9.72 — CITY PARTICIPATION IN FEDERAL LAW ENFORCEMENT A…
- Title 10 — VEHICLES AND TRAFFIC
- Article I — Traffic Administration
- Article II — Enforcement and Obedience to Traffic Regulations
- Article III — Penalties
- Chapter 10.12 — TRAFFIC CONTROL DEVICES
- Chapter 10.16 — MISCELLANEOUS TRAFFIC CONTROL REGULATIONS
- Chapter 10.17 — MOTORIZED SCOOTERS AND POCKET BIKES
- Chapter 10.18 — DOCKLESS VEHICLE SHARE PROGRAM
- Chapter 10.20 — SPEED LIMITS
- Chapter 10.24 — PEDESTRIANS
- Chapter 10.28 — STOPPING, STANDING AND PARKING GENERALLY
- Chapter 10.32 — STOPPING, STANDING AND PARKING IN SPECIFIC STR…
- Chapter 10.36 — PARKING METER ZONES
- Chapter 10.40 — STOPPING FOR LOADING AND UNLOADING ONLY
- Chapter 10.44 — RESIDENTIAL PERMIT PARKING PROGRAM
- Chapter 10.45 — INTERIM MIXED USE PERMIT PARKING PROGRAM FOR T…
- Chapter 10.48 — PARKING FINES
- Chapter 10.52 — COMMERCIAL VEHICLES AND VEHICLE SIZE AND WEIGH…
- Chapter 10.53 — EXTRALEGAL LOAD TRANSPORTATION PERMITS
- Chapter 10.56 — AIRPORT GROUND TRAFFIC REGULATIONS
- Chapter 10.57 — OAKLAND INTERNATIONAL AIRPORT 200-YARD MARINE …
- Chapter 10.60 — VISION OBSCUREMENT AT INTERSECTIONS
- Chapter 10.64 — ABANDONED, WRECKED, DISMANTLED OR INOPERATIVE …
- Chapter 10.68 — EMPLOYER-BASED TRIP REDUCTION PROGRAM
- Chapter 10.70 — SOUTHEAST OAKLAND AREA TRAFFIC IMPACT FEE
- Article II — Payment of Fees
- Article III — Credits and Reimbursements
- Article IV — Fee Protests, Appeals, and Adjustments
- Chapter 10.71 — FREE-FLOATING ZONE PERMIT PROGRAM FOR CAR SHAR…
- Chapter 10.72 — DEDICATED SPACE PERMIT PROGRAM FOR CAR SHARING…
- Chapter 10.74 — SIDESHOWS
- Title 12 — STREETS, SIDEWALKS AND PUBLIC PLACES
- Article I — Assemblies
- Article II — Parades
- Chapter 12.50 — NEWSRACKS—CITY-WIDE CONTROLS
- Chapter 12.52 — SIDEWALK BENCHES
- Chapter 12.56 — SOUND AMPLIFICATION EQUIPMENT
- Chapter 12.60 — BICYCLES
- Chapter 12.61 — VULNERABLE ROAD AND SIDEWALK USER PROTECTION
- Article I — Generally
- Article II — Park Permits
- Title 13 — PUBLIC SERVICES
- Article I — Title, Purpose and General Provisions
- Article II — Discharge Regulations and Requirements
- Article III — Inspection and Enforcement
- Article IV — Coordination with Other Programs
- Article V — Appeals and Fees
- Title 14 — SIGNS
- Title 15 — BUILDINGS AND CONSTRUCTION
- Article I — General Administrative Amendments
- Part 1 — Administrative Amendments to the California Administr…
- Part 2 — Administrative Amendments to the California Building …
- Part 2.5 — Administrative Amendments to the California Residen…
- Part 3 — Administrative Amendments to the California Electrica…
- Article 110-35 — SAFETY
- Part 4 — Administrative Amendments to the California Mechanica…
- Part 5 — Administrative Amendments to the California Plumbing …
- Part 7 — Administrative Amendments to the California Wildland …
- Part 8 — Administrative Amendments to the California Historica…
- Part 10 — Administrative Amendments to the California Existing…
- Part 12 — Administrative Amendments to the California Referenc…
- Part 1 — Reserved
- Part 2 — California Building Code Non-Administrative Technical…
- Chapter 16B — PRIVATE DRIVEWAY ACCESS BRIDGES
- Chapter 18B — GRADING, EXCAVATIONS, AND FILLS
- Part 2.5 — California Residential Code Non-Administrative (Tec…
- Part 3 — California Electrical Code Non-Administrative (Techni…
- Part 4 — California Mechanical Code Non-Administrative (Techni…
- Part 5 — California Plumbing Code Non-Administrative (Technica…
- Part D — Disposal of Rainwater Drainage
- Part 7 — California Wildland-Urban Interface Code Non-Administ…
- Part 8 — California Historical Building Code Non-Administrativ…
- Part 10 — California Existing Building Code Non-Administrative…
- Part 12 — California Referenced Standards Code Non-Administrat…
- Chapter 15.06 — OAKLAND AMENDMENTS TO THE CALIFORNIA ENERGY AN…
- Part 6 — Administrative Amendments to the California Energy Code
- Part 11 — Administrative Amendments to the California Green Bu…
- Article III — Non-Administrative (Technical) Amendments
- Chapter 15.08 — OAKLAND BUILDING MAINTENANCE CODE
- Article I — Scope
- Article II — Enforcement
- Article III — Fees and Inspections
- Article IV — Definitions
- Article V — Habitable Space
- Article VI — Structural
- Article VII — Mechanical and Electrical
- Article VIII — Exiting
- Article IX — Fire Protection
- Article X — Substandard and Public Nuisance Buildings
- Article XI — Declaration of Public Nuisance—Substandard
- Article XII — Administrative Hearing
- Article XIII — Lead Hazard Control and Abatement
- Article XIV — Delay of Enforcement for Accessory Dwelling Units
- Article XV — Delay of Enforcement for Joint Live Work Quarters
- Chapter 15.10 — PUBLIC NOTICE OF CITY OF OAKLAND'S INTENT TO C…
- Chapter 15.12 — OAKLAND FIRE CODE
- Part 1 — GENERAL PROVISIONS
- Chapter 2 — DEFINITIONS
- Chapter 3 — GENERAL REQUIREMENTS
- Chapter 5 — FIRE SERVICE FEATURES
- Chapter 6 — BUILDING SERVICES AND SYSTEMS
- Chapter 9 — FIRE PROTECTION SYSTEMS
- Chapter 10 — MEANS OF EGRESS
- Chapter 11 — CONSTRUCTION REQUIREMENTS FOR EXISTING BUILDINGS
- Chapter 12 — ENERGY SYSTEMS
- Chapter 28 — LUMBERYARDS AND AGRO-INDUSTRIAL, SOLID BIOMASS AN…
- Chapter 33 — FIRE SAFETY DURING CONSTRUCTION AND DEMOLITION
- Chapter 49 — REQUIREMENTS FOR WILDLAND-URBAN INTERFACE AREAS
- Chapter 50 — HAZARDOUS MATERIALS - GENERAL PROVISIONS
- Chapter 53 — COMPRESSED GASES
- Chapter 56 — EXPLOSIVES AND FIREWORKS
- Chapter 57 — FLAMMABLE AND COMBUSTIBLE LIQUIDS
- Chapter 58 — FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS
- Chapter 60 — HIGHLY TOXIC AND TOXIC MATERIALS
- Chapter 80 — REFERENCED STANDARDS
- Chapter 15.16 — FIRE-DAMAGED AREA PROTECTION AND IMPROVEMENT R…
- Chapter 15.18 — FIRE SUPPRESSION, PREVENTION, AND PREPAREDNESS…
- Chapter 15.20 — GEOLOGIC REPORTS
- Chapter 15.24 — EARTHQUAKE-DAMAGED STRUCTURES
- Chapter 15.26 — MANDATORY SEISMIC SCREENING OF MULTIPLE STORY …
- Article II — Administrative
- Article III — Technical
- Chapter 15.27 — MANDATORY SEISMIC EVALUATION AND RETROFIT OF C…
- Article I — SCOPE
- Article II — COMPLIANCE
- Article III — ADMINISTRATIVE
- Article IV — TECHNICAL
- Chapter 15.28 — UNREINFORCED MASONRY BUILDINGS
- Chapter 15.30 — VOLUNTARY SEISMIC STRENGTHENING FOR RESIDENTIA…
- Article III — Non-Administrative
- Article IV — Financial Incentives
- Chapter 15.32 — DANGEROUS BUILDINGS AND STRUCTURES
- Article I — Title
- Article II — Administrative
- Article III — Solar Energy System Requirements
- Chapter 15.34 — CONSTRUCTION AND DEMOLITION DEBRIS COLLECTION,…
- Chapter 15.35 — GREEN BUILDING REQUIREMENTS FOR CITY BUILDING …
- Article I — Green Building Practices
- Article II — Civic Bay-Friendly Landscaping Requirements for A…
- Chapter 15.36 — DEMOLITION PERMITS
- Chapter 15.37 — ALL-ELECTRIC CONSTRUCTION IN NEWLY CONSTRUCTED…
- Chapter 15.40 — BUILDING NUMBERS
- Chapter 15.44 — MOVING BUILDINGS
- Chapter 15.48 — SETBACK LINES
- Chapter 15.52 — VIEWS
- Chapter 15.56 — HOUSEBOATS
- Chapter 15.60 — CODE COMPLIANCE RELOCATION PROGRAM
- Chapter 15.62 — AFFORDABLE HOUSING TRUST FUND
- Chapter 15.63 — OAKLAND RESIDENT/WORKER PREFERENCES AND REQUIR…
- Article I — Preferences in Multifamily Affordable Housing Proj…
- Article II — Requirements for First-Time Homebuyer Program
- Chapter 15.64 — BEDROOM WINDOW SECURITY BAR AND SMOKE DETECTOR…
- Chapter 15.68 — JOBS/HOUSING IMPACT FEE
- Chapter 15.72 — AFFORDABLE HOUSING IMPACT FEES
- Article II — Fee Requirements and Procedures
- Article III — On-Site and Off-Site Affordable Housing Options
- Article IV — Miscellaneous
- Chapter 15.74 — TRANSPORTATION AND CAPITAL IMPROVEMENTS IMPACT…
- Article III — Impact Fee Funds
- Article IV — Developer Constructed Facilities
- Article V — Miscellaneous
- Chapter 15.78 — PUBLIC ART REQUIREMENTS FOR PRIVATE DEVELOPMENT
- Title 16 — SUBDIVISIONS
- Title 17 — PLANNING
- Title 18 — SUSTAINABILITY
- Article I — Intent
- Article III — Green Building Compliance Standards
- Article IV — Entitlement Phase
- Article V — Construction Phase
- Chapter 18.04 — PROHIBITION OF THE CITY'S USE AND PURCHASE OF …
- Chapter 17.01 — GENERAL PROVISIONS OF PLANNING CODE AND GENERA…
- Chapter 17.03 — CITY PLANNING COMMISSION
- Chapter 17.05 — LANDMARKS PRESERVATION ADVISORY BOARD
- Chapter 17.07 — TITLE, PURPOSE AND SCOPE OF THE ZONING REGULAT…
- Chapter 17.09 — DEFINITIONS
- Chapter 17.10 — USE CLASSIFICATIONS
- Article I — General Classification Rules
- Part 1 — Residential Activity Types
- Part 2 — Civic Activity Types
- Part 3 — Commercial Activity Types
- Part 4 — Industrial Activity Types
- Part 5 — Agricultural and Extractive Activity Types
- Part 1 — Residential Facility Types
- Part 2 — Nonresidential Facility Types
- Part 3 — Sign Types
- Part 4 — Telecommunications Facility Types
- Chapter 17.11 — OS OPEN SPACE ZONING REGULATIONS
- Chapter 17.13 — RH HILLSIDE RESIDENTIAL ZONES REGULATIONS
- Chapter 17.15 — RD DETACHED UNIT RESIDENTIAL ZONE REGULATIONS
- Chapter 17.17 — RM MIXED HOUSING TYPE RESIDENTIAL ZONES REGULA…
- Chapter 17.19 — RU URBAN RESIDENTIAL ZONES REGULATIONS
- Chapter 17.33 — CN NEIGHBORHOOD CENTER COMMERCIAL ZONES REGULA…
- Chapter 17.35 — CC COMMUNITY COMMERCIAL ZONES REGULATIONS
- Chapter 17.37 — CR REGIONAL COMMERCIAL ZONE REGULATIONS
- Chapter 17.65 — HBX HOUSING AND BUSINESS MIX COMMERCIAL ZONES …
- Chapter 17.72 — M-40 INDUSTRIAL ZONES REGULATIONS
- Chapter 17.73 — CIX, IG AND IO INDUSTRIAL ZONES REGULATIONS
- Chapter 17.74 — S-1 MEDICAL CENTER COMMERCIAL ZONE REGULATIONS
- Chapter 17.78 — S-3 RESEARCH CENTER COMMERCIAL ZONE REGULATIONS
- Chapter 17.80 — S-4 DESIGN REVIEW COMBINING ZONE REGULATIONS
- Chapter 17.84 — S-7 PRESERVATION COMBINING ZONE REGULATIONS
- Chapter 17.88 — S-9 FIRE SAFETY PROTECTION COMBINING ZONE REGU…
- Chapter 17.90 — S-10 SCENIC ROUTE COMBINING ZONE REGULATIONS
- Chapter 17.92 — S-11 SITE DEVELOPMENT AND DESIGN REVIEW COMBIN…
- Chapter 17.94 — S-12 RESIDENTIAL PARKING COMBINING ZONE REGULA…
- Chapter 17.95 — S-13 AFFORDABLE HOUSING COMBINING ZONE REGULAT…
- Chapter 17.107 — Density Bonus and Incentive Procedure and Sta…
- Chapter 17.96 — S-14 HOUSING SITES COMBINING ZONE REGULATIONS
- Chapter 17.97 — S-15 TRANSIT-ORIENTED DEVELOPMENT COMMERCIAL Z…
- Chapter 17.98 — S-16 INTERSTATE CORRIDOR COMMERCIAL ZONES REGU…
- Chapter 17.99 — S-17 DOWNTOWN RESIDENTIAL OPEN SPACE COMBINING…
- Article I — Title, Intent and Applicability of the D-DT Zones
- Article II — Special Permit Requirements
- Article III — Use Requirements
- Article IV — Development and Design Standards
- Article V — D-DT Combining Zones
- Chapter 17.102 — REGULATIONS APPLICABLE TO CERTAIN ACTIVITIES …
- Article I — Residential Activities
- Article II — Civic Activities
- Article III — Commercial Activities
- Article IV — Industrial Activities
- Article V — Agricultural and Extractive Activities
- Article VI — Residential Facilities
- Article VIII — Nonresidential Facilities
- Article IX — Sign Facilities
- Article X — Telecommunications Facilities
- Chapter 17.104 — GENERAL LIMITATIONS ON SIGNS
- Chapter 17.106 — GENERAL LOT, DENSITY, AND AREA REGULATIONS
- Chapter 17.107 — DENSITY BONUS AND INCENTIVE PROCEDURE
- Chapter 17.108 — GENERAL HEIGHT, YARD, AND COURT REGULATIONS
- Chapter 17.110 — BUFFERING REGULATIONS
- Chapter 17.112 — HOME OCCUPATION REGULATIONS
- Chapter 17.114 — NONCONFORMING USES
- Article II — Nonconforming Activities
- Article III — Nonconforming Facilities
- Chapter 17.116 — OFF-STREET PARKING AND LOADING REQUIREMENTS
- Article II — Off-Street Parking Requirements
- Article III — Exemptions and Reductions in Required Parking
- Article IV — Off-Street Loading Requirements
- Article V — Standards for Required Parking and Loading Facilit…
- Chapter 17.117 — BICYCLE PARKING REQUIREMENTS
- Article II — Standards for Required Bicycle Parking
- Article III — Minimum Number of Required Bicycle Parking Spaces
- Chapter 17.118 — RECYCLING SPACE ALLOCATION REQUIREMENTS
- Chapter 17.120 — PERFORMANCE STANDARDS
- Chapter 17.122 — REPLACEMENT HOUSING UNIT REGULATIONS
- Chapter 17.124 — LANDSCAPING AND SCREENING STANDARDS
- Chapter 17.126 — USABLE OPEN SPACE STANDARDS
- Chapter 17.128 — TELECOMMUNICATIONS REGULATIONS
- Chapter 17.130 — ADMINISTRATIVE PROCEDURES GENERALLY
- Chapter 17.131 — REASONABLE ACCOMMODATIONS POLICY AND PROCEDURES
- Chapter 17.132 — ADMINISTRATIVE APPEAL PROCEDURE
- Chapter 17.134 — CONDITIONAL USE PERMIT PROCEDURE
- Chapter 17.135 — SPECIAL USE PERMIT REVIEW PROCEDURE FOR THE O…
- Chapter 17.136 — DESIGN REVIEW PROCEDURE
- Chapter 17.138 — DEVELOPMENT AGREEMENT PROCEDURE
- Chapter 17.140 — PLANNED UNIT DEVELOPMENT PROCEDURE
- Chapter 17.142 — PLANNED UNIT DEVELOPMENT REGULATIONS
- Article I — Title, Purposes and Applicability
- Article II — Planned Unit Developments
- Chapter 17.144 — REZONING AND LAW CHANGE PROCEDURE
- Chapter 17.148 — VARIANCE AND EXCEPTION PROCEDURE
- Chapter 17.150 — FEE SCHEDULE
- Chapter 17.152 — ENFORCEMENT
- Chapter 17.153 — DEMOLITION, CONVERSION AND REHABILITATION REG…
- Chapter 17.154 — ZONING MAPS
- Chapter 17.155 — SPECIAL REGULATIONS APPLYING TO MINING AND QU…
- Chapter 17.156 — DEEMED APPROVED ALCOHOLIC BEVERAGE SALE REGUL…
- Article I — Title and Scope
- Article II — Definitions
- Article III — Deemed Approved Performance Standards
- Article IV — Deemed Approved Status Procedure
- Article V — Enforcement Procedure
- Chapter 17.157 — DEEMED APPROVED HOTEL AND ROOMING HOUSE REGUL…
- Chapter 17.158 — ENVIRONMENTAL REVIEW REGULATIONS
- Part 1 — General Provisions
- Part 2 — California Environmental Quality Act ("CEQA") Procedu…