Chapter 17.155 — SPECIAL REGULATIONS APPLYING TO MINING AND QUARRYING EXTRACTIVE

Oakland Municipal Code · 2026-09 edition · updated 2026-09-29 · Oakland

17.155.010 - Purpose and intent.

The City of Oakland recognizes that, historically, the extraction of minerals has benefited the economic well-being of the City and the needs of society and that the reclamation of mined lands is necessary to prevent or minimize adverse effects on the environment and to protect the public health and safety. The City also recognizes that surface mining within the City occurs in a diverse, established, urban environment, which presents unique health, safety and welfare issues and where geologic, topographic, climatic, biological, and other conditions are significantly different than in less urbanized areas. Therefore, reclamation operations and the applicable specifications, inspections, reporting, monitoring must be appropriate to the surrounding conditions.

The purpose and intent of this Section is to regulate surface mining operations as required by California's Surface Mining and Reclamation Act of 1975 (Public Resources Code Sections 2710 et seq.), as amended, hereinafter referred to as "SMARA", Public Resources Code (PRC) Section 2207 (relating to annual reporting requirements), and State Mining and Geology Board regulations (hereinafter referred to as "State regulations") for surface mining and reclamation practice (California Code of Regulations [CCR], Title 14, Division 2, Chapter 8, Subchapter 1, Sections 3500 et seq.), to ensure that:

A.

Reclamation activities eliminate hazards to public health and safety and restore mined lands to a standard that is safe, stable, and usable for development of reuses that will enhance the community;

B.

Adverse environmental effects are prevented or minimized in accordance with CEQA and other applicable requirements;

C.

Reclamation activities further adopted City goals, plans, policies, objectives and regulations, including, without limitation the City's General Plan;

D.

Reclamation activities appropriately consider values relating to recreation, watershed, wildlife, range and forage, and aesthetic enjoyment.

(Ord. No. 13172, § 3(Exh. A), 7-2-2013)

17.155.020 - Definitions.

The definitions set forth in this Section shall govern the construction of this Chapter.

"Area of Regional Significance" means an area designated by the State Mining and Geology Board which is known to contain a deposit of minerals, the extraction of which is judged to be of prime importance in meeting future needs for minerals in a particular region of the State within which the minerals are located and which, if prematurely developed for alternate incompatible land uses, could result in the premature loss of minerals that are of more than local significance.

"Area of Statewide Significance" means an area designated by the board which is known to contain a deposit of minerals, the extraction of which is judged to be of prime importance in meeting future needs for minerals in the State and which, if prematurely developed for alternate incompatible land uses, could result in the permanent loss of minerals that are of more than local or regional significance.

"Approved Plan" means a land use and/or development plan and all conditions of approval and adopted mitigation measures, as approved by the City pursuant to Title 17 of the Oakland Municipal Code.

"Borrow Pits" mean excavations created by the surface mining of rock, unconsolidated geologic deposits or soil to provide material (borrow) for fill elsewhere.

"City" means City of Oakland.

"City Council" means City Council of the City of Oakland.

"Compatible Land Uses" means land uses inherently compatible with mining and/or that require a minimum public or private investment in structures, land improvements, and which may allow mining because of the relative economic value of the land and its improvements. Examples of such uses may include, but shall not be limited to, very low density residential, geographically extensive but low impact industrial, recreational, agricultural, silvicultural, grazing, and open space.

"General Plan" means the General Plan of the City of Oakland.

"Haul Road" means a road along which material is transported from the area of excavation to the processing plant or stock pile area of the surface mining operation.

"Idle" means surface mining operations curtailed for a period of one (1) year or more, by more than ninety (90) percent of the operation's previous maximum annual mineral production, with the intent to resume those surface mining operations at a future date.

"Incompatible Land Uses" means land uses inherently incompatible with mining and/or that require public or private investment in structures, land improvements, and landscaping and that may prevent mining because of the greater economic value of the land and its improvements. Examples of such uses may

include, but shall not be limited to, high density residential, low density residential with high unit value, public facilities, geographically limited but impact intensive industrial, and commercial.

"Mined Lands" mean the surface, subsurface, and ground water of an area in which surface mining operations will be, are being, or have been conducted, including private ways and roads appurtenant to any such area, land excavations, workings, mining waste, and areas in which structures, facilities, equipment, machines, tools or other materials or property which result from, or are used in, surface mining operations are located.

"Minerals" means any naturally occurring chemical element or compound, or groups of elements and compounds, formed from inorganic processes and organic substances, including, but not limited to, coal, peat, and bituminous rock, but excluding geothermal resources, natural gas, and petroleum.

"Operator" means any person who is engaged in surface mining operations, or who contracts with others to conduct operations on his or her behalf, except a person who is engaged in surface mining operations as an employee with wages as his or her sole compensation.

"Reclamation" means the combined process of land treatment that minimizes water degradation, air pollution, damage to aquatic or wildlife habitat, flooding, erosion, and other adverse effects from surface mining operations, including adverse surface effects incidental to underground mines, so that mined lands are reclaimed to a usable condition which is readily adaptable for alternate land uses and create no danger to public health or safety. The process may extend to affected lands surrounding mined lands, and may require backfilling, grading, resoiling, revegetation, soil compaction, stabilization, or other measures.

"Reclamation Plan" means a plan for reclamation of mined lands as specified by SMARA.

"Stream Bed Skimming" means excavation of sand and gravel from stream bed deposits above the mean summer water level or stream bottom, whichever is higher.

"Surface Mining Operations" means all, or any part of, the process involved in the mining of minerals on mined lands by removing overburden and mining directly from the mineral deposits, open-pit mining of minerals naturally exposed. mining by the auger method, dredging and quarrying, or surface work incident to an underground mine. Surface mining operations include, but are not limited to, in place distillation or retorting or leaching, the production and disposal of mining waste, prospecting and exploratory activities, borrow pitting, streambed skimming, and segregation and stockpiling of mined materials (and recovery of same).

"Use Permit" means a conditional use permit or other land use permit for mining activities.

(Ord. No. 13172, § 3(Exh. A), 7-2-2013)

17.155.030 - Incorporation by reference.

The provisions of SMARA (PRC § 2710 et seq.), PRC Section 2207, and State regulations CCR § 3500 et seq., as those provisions and regulations may be amended from time to time, are made a part this Section by reference with the same force and effect as if the provisions therein were specifically and fully set out herein, excepting that when the provisions of this Section are more restrictive than correlative State provisions, this Section shall prevail.

(Ord. No. 13172, § 3(Exh. A), 7-2-2013)

17.155.040 - Scope.

Except as provided in this Section, no person shall conduct surface mining operations unless a Reclamation Plan and financial assurances for reclamation have first been approved by the City. Any applicable exemption from this requirement does not automatically exempt or limit a project or activity from the application of other regulations, ordinances or policies of City, including but not limited to, the application of CEQA. the requirements of an Approved Plan or other permits, the payment of development impact fees, or the imposition of other dedications and exactions as may be permitted under the law. The provisions of this Section shall apply to all lands within the City, public and private.

This Section shall not apply to the following activities, subject to the above-referenced exceptions:

A.

Excavations or grading conducted for farming or on-site construction or for the purpose of restoring land following a flood or natural disaster.

B.

Onsite excavation and onsite earthmoving activities which are an integral and necessary part of an approved construction project that are undertaken to prepare a site for construction of structures, landscaping, or other land improvements, including the related excavation, grading, compaction, or the creation of fills, road cuts, and embankments, whether or not surplus materials are exported from the site, subject to all of the following conditions:

All required permits for the construction, landscaping, or related land improvements have been approved by a public agency or agencies in accordance with applicable provisions of State law and locally adopted plans and ordinances, including, but not limited to, the California Environmental Quality Act ("CEQA", Public Resources Code, Division 13, § 21000 et seq.).

The City's approval and CEQA review (if applicable) of the construction project included the onsite excavation and onsite earthmoving activities.

The approved construction project is consistent with the General Plan and zoning of the site.

Surplus materials shall not be exported from the site unless and until actual construction work has commenced and shall cease if the City determines, in its discretion, that construction activities have terminated, have been indefinitely suspended, or are no longer being actively pursued.

C.

Permitted operation of a plant site used for mineral processing, including associated onsite structures, equipment, machines, tools, or other materials, including the onsite stockpiling and onsite recovery of mined materials, subject to all of the following conditions:

The plant site is located on lands designated for industrial or commercial uses in the City's general plan.

The plant site is located on lands zoned industrial or commercial, or are contained within a zoning category intended exclusively for industrial activities by the City.

None of the minerals being processed is being extracted onsite.

All reclamation work has been completed pursuant to the approved Reclamation Plan for any mineral extraction activities that occurred onsite after January 1, 1976.

D.

Prospecting for, or the extraction of, minerals for commercial purposes and the removal of overburden in total amounts of less than one thousand (1,000) cubic yards in any one location of one (1) acre or less.

E.

Surface mining operations that are required by federal law in order to protect a mining claim, as specified in Public Resources Code Section 2714(e).

F.

Any other surface mining operations that the State Mining and Geology Board determines to be of an infrequent nature and which involve only minor surface disturbances.

G.

The solar evaporation of sea water or bay water for the production of salt and related minerals.

H.

Emergency excavations or grading conducted by the Department of Water Resources or the Reclamation Board for the purpose of averting, alleviating, repairing, or restoring damage to property due to imminent or recent floods, disasters or other emergencies.

I.

Road construction and maintenance for timber or forest operations, as specified in Public Resources Code Section 2714(j)(1); and

J.

Excavation, grading, or other earthmoving activities in an oil or gas field, as specified in Public Resources Code Section 2714(k).

(Ord. No. 13172, § 3(Exh. A), 7-2-2013)

17.155.050 - Vested rights.

No person who obtained a vested right to conduct surface mining operations prior to January 1, 1976, shall be required to secure a permit to mine, so long as the vested right continues and as long as no substantial changes have been made in the mining operation except in accordance with SMARA, State regulations, this Section and any other applicable requirements. Where a person with vested rights has continued surface mining in the same area subsequent to January 1, 1976, he shall obtain City approval of a Reclamation Plan covering the mined lands disturbed by such subsequent surface mining. In those cases where an overlap exists (in the horizontal and/or vertical sense) between pre- and post-Act mining, the Reclamation Plan shall call for reclamation proportional to that disturbance caused by the mining after the effective date of the Act (January 1, 1976), as determined by the City to be necessary or appropriate to accommodate reuse of the proposed site according to City plans, policies, ordinances, and other applicable requirements.

All other requirements of State law, this Section or an approved plan shall apply to vested mining operations.

(Ord. No. 13172, § 3(Exh. A), 7-2-2013)

17.155.060 - Process.

A.

Applications under the requirement for an Approved Plan or Reclamation Plan for surface mining or land reclamation projects shall include, at a minimum, each of the elements required by SMARA (§ 2772-2773) and State regulations, and any other requirements determined, in the discretion of the Planning Director or designee, to be necessary or appropriate to facilitate an evaluation of the proposed Reclamation Plan.

B.

Within thirty (30) days of the acceptance of a complete application for a Reclamation Plan or as a requirement of an Approved Plan for surface mining operations and/or a Reclamation Plan, the Planning and Building Department shall notify the State Department of Conservation of the filing of the application(s). Whenever mining operations are proposed in the one hundred (100) year flood plain of any stream, as shown in Zone A of the Flood Insurance Rate Maps issued by the Federal Emergency Management Agency ("FEMA"), and within one (1) mile, upstream or downstream, of any State highway bridge, the Planning and Building Department shall also notify the State Department of Transportation ("Caltrans") that the application has been received.

C.

The Planning and Building Department shall process the application(s) in accordance with the California Environmental Quality Act (Public Resources Code Sections 21000 et seq.) and the City's environmental review guidelines.

D.

Subsequent to the appropriate environmental review, the Planning and Building Department shall prepare a staff report with recommendations for consideration by the City Planning Commission. The City Planning Commission shall hold at least one (1) noticed public hearing on Use Permit and/or Reclamation Plan. Notice shall be given by mail or delivery to all owners and occupants of real property in the City limits within three hundred (300) feet of the property involved; provided, however, that failure to send notice to any such owner where his or her address is not shown on the last available equalized assessment roll shall not invalidate the affected proceedings. All such notices shall be given not less than seventeen (17) days prior to the date set for the hearing. At the conclusion of such hearing or hearings, the Planning Commission shall recommend to the City Council that it should approve, approve with changes, or deny the subject Reclamation Plan and/or Use Permit.

E.

The City Council shall hold at least one (1) noticed public hearing on a Use Permit and/or Reclamation Plan. Notice shall be given by mail or delivery to all owners and occupants of real property in the City limits within three hundred (300) feet of the property involved; provided, however, that failure to send notice to any such owner where his or her address is not shown on the last available equalized assessment roll shall not invalidate the affected proceedings. All such notice shall be given not less than seventeen (17) days prior to the date set for the hearing.

F.

Prior to final approval of a Reclamation Plan, financial assurances (as provided in this Chapter), any amendments to the Reclamation Plan, existing financial assurances, or those financial assurances required as part of an Approved Plan, the City Council shall certify to the State Department of Conservation that the Reclamation Plan and/or financial assurance complies with the applicable requirements of State law, and submit the plan, assurance, or amendments to the State Department of Conservation for review.

Pursuant to PRC § 2774(d), the State Department of Conservation shall be given thirty (30) days to review and comment on the Reclamation Plan and forty-five (45) days to review and comment on the financial assurance. The Planning and Building Department shall evaluate written comments received, if any, from the State Department of Conservation during the comment periods. Staff shall prepare a response describing the disposition of the major issues raised by the State for the City Council's approval. In particular, when the Planning and Building Department's position is at variance with the recommendations and objections raised in the State's comments, the response shall address, in detail, why specific comments and suggestions were not accepted. Copies of any written comments received and responses prepared by the Planning and Building Department shall be promptly forwarded to the operator/applicant.

G.

The City Council shall then take action to approve, conditionally approve, or deny Use Permit and/or Reclamation Plan, and to approve the financial assurances pursuant to PRC § 2770(d) or any other requirement of an Approved Plan.

H.

The Planning and Building Department shall forward a copy of each approved Use Permit for mining operations, an Approved Plan and/or approved Reclamation Plan, and a copy of the approved financial assurances to the State Department of Conservation. By July 1 of each year, the Planning and Building Department shall submit to the State Department of Conservation for each active or idle mining operation a copy of the Approved Plan, or Reclamation Plan amendments, as applicable, or a statement that there have been no changes during the previous year.

(Ord. No. 13763, § 5, 10-3-2023; Ord. No. 13172, § 3(Exh. A), 7-2-2013)

17.155.070 - Standards for reclamation.

A.

All Reclamation Plans shall comply with the provisions of SMARA (§ 2772 and § 2773) and State regulations (CCR § 3500-3505). Reclamation Plans approved after January 15, 1993, Reclamation Plans for proposed new mining operations, and any substantial amendments to previously approved Reclamation Plans, shall also comply with the requirements for reclamation performance standards (CCR § 3700-3713).

B.

The City may impose additional performance standards as developed either in review of individual projects, as warranted, through the formulation and adoption of Citywide performance standards or through an Approved Plan.

C.

Reclamation activities shall be initiated at the earliest possible time on those portions of the mined lands that will not be subject to further disturbance. Interim reclamation may also be required for mined lands that have been disturbed and that may be disturbed again in future operations. Reclamation may be done on an annual basis, in stages compatible with continuing operations, or on completion of all excavation, removal, or fill, as approved by the City. Each phase of reclamation shall be specifically described in the Reclamation Plan and shall include (a) the beginning and expected ending dates for each phase; (b) all reclamation activities required; (c) criteria for measuring completion of specific reclamation activities; and (d) estimated costs for completion of each phase of reclamation.

D.

The information, analysis and other specifications submitted as part of the Reclamation Plan shall demonstrate that the improvements and financial assurances are sufficient to reclaim the site in a condition that meets all applicable State and City standards, and that is appropriate for the proposed reuse of the site and consistent with the land use and other applicable policies of the General Plan.

(Ord. No. 13172, § 3(Exh. A), 7-2-2013)

17.155.080 - Statement of responsibility.

The person submitting the Reclamation Plan shall sign a statement accepting responsibility for reclaiming the mined lands in accordance with the Reclamation Plan. Said statement shall be kept by the Planning and Building Department in the mining operation's permanent record. Prior to sale or transfer of the operation, the new operator shall submit a signed statement of responsibility as well as evidence required to demonstrate the financial assurance requirement set forth in this Section or the Planning and Building Department for placement in the permanent record.

(Ord. No. 13763, § 5, 10-3-2023; Ord. No. 13172, § 3(Exh. A), 7-2-2013)

17.155.090 - Findings for approval.

A.

Approved Plans. In addition to any findings required by the Approved Plan or for surface mining operations, a finding shall be included that the project complies with the provisions of SMARA and State regulations.

B.

Reclamation Plans. For Reclamation Plans, the following findings shall be required:

That the Reclamation Plan complies with SMARA Sections 2772 and 2773, and any other applicable provisions;

That the Reclamation Plan complies with applicable requirements of State regulations (CCR § 3500-3505, and § 3700-3713).

That the Reclamation Plan and potential use of reclaimed land pursuant to the plan are consistent with this Section, the City's General Plan and any applicable resource plan, element or an Approved Plan.

That the Reclamation Plan has been reviewed pursuant to CEQA and the City's environmental review guidelines, and all significant adverse impacts from reclamation of the surface mining operations are mitigated to the maximum extent feasible.

That the land and/or resources such as water bodies to be reclaimed will be restored to a condition that is compatible with, and blends in with, the surrounding natural environment, topography, and other resources, or that suitable off-site development will compensate for related disturbance to resource values.

That the Reclamation Plan will restore the mined lands to a safe, stable and usable condition which is readily adaptable for alternative land uses consistent with the General Plan, and other City Approved Plans, policies, ordinances and regulations.

That a written response to the State Department of Conservation has been prepared, describing the disposition of major issues raised by that department. Where the City's position is at variance with the recommendations and objections raised by the State Department of Conservation, said response shall address, in detail, why specific comments and suggestions were not accepted.

(Ord. No. 13172, § 3(Exh. A), 7-2-2013)

17.155.100 - Financial assurances.

A.

To ensure that reclamation will proceed in accordance with the approved Reclamation Plan, the City shall require as a condition of approval security which will be released upon satisfactory performance. The applicant may pose security in the form of a surety bond, trust fund, irrevocable letter of credit from an accredited financial institution, or other method acceptable to the City and the State Mining and Geology Board as specified in State regulations, and which the City determines are adequate to perform reclamation in accordance with the surface mining operation's approved Reclamation Plan and/or an Approved Plan. Financial assurances shall be made payable to City and the State Department of Conservation.

B.

Financial assurances will be required to ensure compliance with elements of the Reclamation Plan, including but not limited to, revegetation and landscaping requirements, restoration of aquatic or wildlife habitat, restoration of water bodies and water quality, slope stability and erosion and drainage control, disposal of hazardous materials, and other measures, if determined necessary by the Planning and Building Department to comply with the requirements of an Approved Plan.

C.

Cost estimates for the financial assurance shall be submitted to the Planning Department for review and approval prior to the operator securing financial assurances. The Planning Director shall forward a copy of the cost estimates, together with any documentation received supporting the amount of the cost estimates, to the State Department of Conservation for review. If the State Department of Conservation does not comment within forty-five (45) days of receipt of these estimates, it shall be assumed that the cost estimates are adequate, unless the City has reason to determine that additional costs may be incurred. The Planning Director shall have the discretion to approve the financial assurance if it meets the requirements of this Chapter, SMARA, State regulations and any requirements of an Approved Plan.

D.

The amount of the financial assurance shall be based upon the estimated costs of reclamation to a safe, stable and usable condition in accordance with an Approved Plan for the years or phases stipulated in the

approved Reclamation Plan, including any maintenance of reclaimed areas as may be required, subject to adjustment for the actual amount required to reclaim lands disturbed by surface mining activities since January 1, 1976, and new lands to be disturbed in the upcoming year. Cost estimates should be prepared by a California registered Professional Engineer and/or other similarly licensed and qualified professionals retained by the operator and approved by the Planning Director. The estimated amount of the financial assurance shall be based on an analysis of physical activities necessary to implement the approved Reclamation Plan in accordance with an Approved Plan for the site, the unit costs for each of these activities, the number of units of each of these activities, and the actual administrative costs. Financial assurances to ensure Reclamation Plan implementation and compliance with revegetation, restoration of water bodies, restoration of aquatic or wildlife habitat, and any other applicable element of the approved Reclamation Plan shall be based upon cost estimates that include, but may not be limited to, labor, equipment, materials, mobilization of equipment, administration, monitoring, inspections and reasonable profit by a commercial operator other than the permittee. A contingency factor of ten percent (10%) shall be added to the cost of financial assurances.

E.

In projecting the costs of financial assurances, it shall be assumed without prejudice or insinuation that the surface mining operation could be abandoned by the operator and, consequently, the City or State Department of Conservation may need to contract with a third party commercial company for reclamation of the site.

F.

The financial assurances shall remain in effect for the duration of the surface mining operation and any additional period until reclamation is completed (including any maintenance required).

G.

The amount of financial assurances required of a surface mining operation for any one year shall be adjusted annually to account for new lands disturbed by surface mining operations, inflation, and reclamation of lands accomplished in accordance with the approved Reclamation Plan. The financial assurances shall include estimates to cover reclamation for existing conditions and anticipated activities during the upcoming year, excepting that the permittee may not claim credit for reclamation scheduled for completion during the coming year.

H.

Revisions to financial assurances shall be submitted to the Planning Director each year prior to the anniversary date for approval of the financial assurances. The financial assurance shall cover the cost of existing disturbance and anticipated activities for the next calendar year, including any required interim reclamation. If revisions to the financial assurances are not required, the operator shall explain, in writing, why revisions are not required.

(Ord. No. 13763, § 5, 10-3-2023; Ord. No. 13172, § 3(Exh. A), 7-2-2013)

17.155.110 - Interim management plans.

A.

Within ninety (90) days of a surface mining operation becoming idle, the operator shall submit to the Planning and Building Department a proposed Interim Management Plan (IMP). The proposed IMP shall fully comply with the requirements of SMARA, including but not limited to all Approved Plan conditions, and shall provide measures the operator will implement to maintain the site in a stable condition, taking into consideration public health and safety. The proposed IMP shall be submitted on forms provided by the Planning and Building Department, and shall be processed as an amendment to the Reclamation Plan. IMPs shall not be considered a project for the purposes of environmental review.

B.

Financial assurances for idle operations shall be maintained as though the operation were active, or as otherwise approved through the idle mine's IMP.

C.

Upon receipt of a complete proposed IMP, the Planning and Building Department shall forward the IMP to the State Department of Conservation for review. The IMP shall be submitted to the State Department of Conservation at least thirty (30) days prior to approval by the Planning Director.

D.

Within sixty (60) days of receipt of the proposed IMP, or a longer period mutually agreed upon by the Planning Director and the operator, the Planning Director shall review and approve or deny the IMP in accordance with this Chapter. The operator shall have thirty (30) days, or a longer period mutually agreed upon by the operator and the Planning Director, to submit a revised IMP. The Planning Director shall approve or deny the revised IMP within sixty (60) days of receipt. If the Planning Director denies the revised IMP, the operator may appeal that action to the City Council. The decision of the City Council shall be final.

E.

The IMP may remain in effect for a period not to exceed five (5) years, at which time the City Council may renew the IMP for another period not to exceed five (5) years, or require the surface mining operator to commence reclamation in accordance with its approved Reclamation Plan.

(Ord. No. 13763, § 5 10-3-2023; Ord. No. 13172, § 3(Exh. A), 7-2-2013)

17.155.120 - Annual report requirements.

Surface mining operators shall forward an annual surface mining report to the State Department of Conservation and to the City Planning and Building Department on a date established by the State Department of Conservation, on forms furnished by the State Mining and Geology Board. New mining operations shall file an initial surface mining report and any applicable filing fees with the State Department of Conservation within thirty (30) days of permit approval, or before commencement of operations, whichever is sooner. Any applicable fees, together with a copy of the annual inspection report, shall be forwarded to the State Department of Conservation at the time of filing the annual surface mining report.

(Ord. No. 13763, § 5, 10-3-2023; Ord. No. 13172, § 3(Exh. A), 7-2-2013)

17.155.130 - Inspections.

The Planning Director, through the Building Department Inspection Services Division or other agency or other designee, shall arrange for inspection of a surface mining operation within six (6) months of receipt of the Annual Report required in Section 12, to determine whether the surface mining operation is in compliance with applicable requirements, including, without limitation, the Approved Plan, Reclamation Plan, approved financial assurances, and State regulations. In no event shall less than one (1) inspection be conducted in any calendar year. Said inspections may be made by a State-registered geologist, State- registered civil engineer, State-licensed landscape architect, or State-registered forester, who is experienced in land reclamation and who has not been employed by the mining operation in any capacity during the previous twelve (12) months, or other qualified specialists, as selected by the Planning Director. All inspections shall be conducted using a form approved and provided by the State Mining and Geology Board.

The Planning and Building Department shall notify the State Department of Conservation within thirty (30) days of completion of the inspection that said inspection has been conducted, and shall forward a copy of said inspection notice and any supporting documentation to the mining operator. The operator shall be solely responsible for all costs of inspections required by the City in furtherance of this Section in accordance with the City master fee schedule or other applicable fee agreements or requirements.

(Ord. No. 13763, § 5, 10-3-2023; Ord. No. 13172, § 3(Exh. A), 7-2-2013)

17.155.140 - Violations and penalties.

If the Planning Director, through the Building Department Inspection Services Division or other designee, based upon an annual inspection or otherwise confirmed by an inspection of the mining operation, determines that a surface mining operation is not in compliance with this Section, the Approved Plan, the Reclamation Plan or other applicable requirements, the City shall follow the procedures set forth in Public Resources Code, Sections 2774.1 and 2774.2 concerning violations and penalties.

(Ord. No. 13172, § 3(Exh. A), 7-2-2013)

17.155.150 - Appeals.

A decision by the City Council to either approve or deny a Reclamation Plan pursuant to this Section shall be considered a final agency action.

(Ord. No. 13172, § 3(Exh. A), 7-2-2013)

17.155.160 - Fees.

The City shall establish such fees as it deems necessary to cover the reasonable costs incurred in implementing this Section and the State regulations, including but not limited to, processing of applications, annual reports, inspections, monitoring, enforcement and compliance. These fees may be set forth in the City master fee schedule; however, failure to include such fees in the master fee schedule shall not limit the City's ability to impose fees it determines are necessary or desirable to fulfill the purposes of this Section, State regulations and other applicable requirements. Such fees shall be paid by the operator, as required by the City, at the time of filing of the Reclamation Plan application, as a part of a fee

agreement through an Approved Plan or at such other times as are determined by the City to be appropriate in order to ensure that all reasonable costs of implementing this Section are borne by the mining operator.

(Ord. No. 13172, § 3(Exh. A), 7-2-2013)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Oakland Municipal Code
Oakland Municipal Code
  1. Article I — POWERS AND FORM OF GOVERNMENT
  2. Article II — THE COUNCIL
  3. Article III — THE MAYOR
  4. Article IV — CITY OFFICERS
  5. Article V — THE CITY MANAGER
  6. Article VI — ADMINISTRATIVE ORGANIZATION
  7. Article VII — PORT OF OAKLAND
  8. Article VIII — FISCAL ADMINISTRATION
  9. Article IX — PERSONNEL ADMINISTRATION
  10. Article X — FRANCHISES, LICENSES, PERMITS, LEASES AND SALES
  11. Article XI — ELECTIONS
  12. Article XII — GENERAL PROVISIONS
  13. Article XIV — RESERVED
  14. Article XV — RESERVED
  15. Article XVI — THE CHILDREN'S INITIATIVE OF 2018
  16. Article XX — OAKLAND MUNICIPAL EMPLOYEES' RETIREMENT SYSTEM
  17. Article XXI — MISCELLANEOUS
  18. Article XXVI — Added By: Stats. 1951; POLICE AND FIRE RETIREME…
  19. Article XXVII — Added By: Stats. 1955 OFF-STREET VEHICULAR PAR…
  20. Title 1 — GENERAL PROVISIONS
  21. Article I — Bidding Contracting and Purchasing
  22. Article II — City Policy Regarding Banks and Firms Which Do Bu…
  23. Chapter 2.05 — OAKLAND MUSEUM OF CALIFORNIA COLLECTION ACQUISI…
  24. Chapter 2.06 — PROMPT PAYMENT
  25. Chapter 2.07 — GRANT AWARD APPROVAL
  26. Chapter 2.08 — CIVIL SERVICE RULES AND PROCEDURES
  27. Chapter 2.10 — FIREARMS AND AMMUNITION PROCUREMENT AND DISPOSAL
  28. Chapter 2.12 — DEBARMENT PROGRAM
  29. Chapter 2.16 — MAP OF CITY COUNCIL DISTRICTS
  30. Article I — In General
  31. Article II — Public Access to Meetings
  32. Article III — Public Information
  33. Article IV — Policy Implementation
  34. Chapter 2.22 — CITY PROHIBITED FROM DOING BUSINESS WITH FEDERA…
  35. Chapter 2.23 — SANCTUARY CITY CONTRACTING AND INVESTMENT ORDIN…
  36. Chapter 2.24 — PUBLIC ETHICS COMMISSION
  37. Chapter 2.25 — CITY OF OAKLAND GOVERNMENT ETHICS ACT
  38. Chapter 2.26 — TICKET DISTRIBUTION POLICY
  39. Chapter 2.28 — LIVING WAGE ORDINANCE
  40. Chapter 2.29 — CITY AGENCIES, DEPARTMENTS AND OFFICES
  41. Chapter 2.30 — EQUAL ACCESS TO SERVICES
  42. Chapter 2.32 — EQUAL BENEFITS ORDINANCE
  43. Chapter 2.34 — IDENTIFICATION CARDS
  44. Chapter 2.36 — WORKER RETENTION AT LARGE-SCALE HOSPITALITY BUS…
  45. Chapter 2.38 — OAKLAND WHISTLEBLOWER ORDINANCE
  46. Chapter 2.40 — PROHIBITION ON NEPOTISM IN CITY EMPLOYMENT
  47. Chapter 2.41 — ACQUISITION AND LEASE OF REAL PROPERTY BY CITY
  48. Article I — General Provisions
  49. Article II — Sale of City-Owned Real Property, Generally
  50. Article III — Lease of City-Owned Real Property, Generally
  51. Article IV — Sale or Lease of City-Owned Real Property for Dev…
  52. Article V — Special Licenses and Leases
  53. Chapter 2.43 — GRANT OF PUBLIC UTILITY FRANCHISES
  54. Chapter 2.44 — DEPARTMENT OF WORKPLACE AND EMPLOYMENT STANDARDS
  55. Chapter 2.45 — OAKLAND POLICE COMMISSION
  56. Chapter 2.46 — COMMUNITY POLICE REVIEW AGENCY
  57. Chapter 2.47 — PUBLIC SAFETY PLANNING AND OVERSIGHT COMMISSION
  58. Chapter 2.48 — WILDFIRE PREVENTION COMMISSION
  59. Title 3 — MUNICIPAL ELECTIONS
  60. Article I — General Provisions
  61. Article II — Elections for Elective Office
  62. Chapter 3.12 — THE CITY OF OAKLAND CAMPAIGN REFORM ACT
  63. Article I — Findings and Purpose
  64. Article II — Definitions
  65. Article III — Contribution Limitations
  66. Article IV — Political Communications
  67. Article VI — Electronic Filing and Recordkeeping Requirements
  68. Article VII — Violations Related to Enforcement
  69. Article VIII — Agency Responsibility and Authority
  70. Article VIII — Enforcement
  71. Article IX — Miscellaneous Provisions
  72. Chapter 3.13 — LIMITED PUBLIC FINANCING ACT OF 2024
  73. Article III — Election Campaign Fund
  74. Article IV — Eligibility for Public Financing
  75. Article V — Disbursement of Public Financing
  76. Chapter 3.14 — OAKLAND FALSE ENDORSEMENT IN CAMPAIGN LITERATURE
  77. Article III — Prohibition on False Endorsements
  78. Article IV — Enforcement
  79. Article V — Miscellaneous
  80. Article I — Findings and Purpose.
  81. Article III — Agency Duties
  82. Article IV — Democracy Dollars
  83. Article V — Limits and Restrictions
  84. Article VI — Enforcement
  85. Article VII — Miscellaneous
  86. Chapter 3.16 — CONFLICT OF INTEREST CODE
  87. Chapter 3.20 — THE CITY OF OAKLAND LOBBYIST REGISTRATION ACT
  88. Article II — Definitions and Interpretation of This Act
  89. Article III — Registration of Lobbyists
  90. Article IV — Disclosure of Lobbying Activities
  91. Article V — Prohibitions
  92. Article VI — Enforcement and Penalties
  93. Title 4 — REVENUE AND FINANCE
  94. Article I — General Provisions and Definitions
  95. Article II — Issuance of Bonds
  96. Article III — Miscellaneous Provisions
  97. Chapter 4.52 — SUGAR-SWEETENED BEVERAGE DISTRIBUTION TAX
  98. Chapter 4.54 — AFFORDABLE HOUSING AND INFRASTRUCTURE BOND LAW
  99. Article III — Miscellaneous Bond Provisions
  100. Article IV — Anti-Displacement and Affordable Housing Bond Law…
  101. Chapter 4.56 — VACANT PROPERTY TAX
  102. Chapter 4.58 — OAKLAND ZOO ANIMAL CARE, EDUCATION AND IMPROVEM…
  103. Title 5 — BUSINESS TAXES, PERMITS AND REGULATIONS
  104. Article II — UDCB Permit Requirement and Process
  105. Article III — Standards and Requirements
  106. Article IV — Code Enforcement
  107. Article V — Noticing Procedure for Removal
  108. Chapter 5.20 — CLOSE-OUT SALES
  109. Chapter 5.22 — DANCE HALLS
  110. Chapter 5.24 — FILMING PERMITS
  111. Chapter 5.26 — FIREARMS DEALERS
  112. Chapter 5.28 — FLYING FIELDS, HELIPORTS AND HELISTOPS
  113. Chapter 5.30 — FOR-HIRE VEHICLES
  114. Chapter 5.32 — FRANCHISES
  115. Chapter 5.33 — HOME MORTGAGE LENDING
  116. Chapter 5.34 — HOTEL RATES AND REGISTRATION REQUIREMENTS
  117. Chapter 5.36 — MASSAGE ESTABLISHMENT AND MASSAGE THERAPISTS
  118. Chapter 5.38 — MATTRESSES
  119. Chapter 5.40 — MECHANICAL AND ELECTRONIC GAMES
  120. Chapter 5.42 — MINIATURE GOLF COURSES
  121. Chapter 5.43 — OAKLAND ARTISAN MARKETPLACE
  122. Chapter 5.44 — OUTDOOR AMUSEMENT CENTERS
  123. Chapter 5.46 — PAWNBROKERS, SECONDHAND DEALERS, SCRAP DEALERS …
  124. Chapter 5.48 — PEDDLERS AND SOLICITORS
  125. Chapter 5.50 — POOL ROOMS AND BOWLING ALLEYS
  126. Chapter 5.51 — FOOD VENDING PROGRAM
  127. Article II — Standards and Requirements
  128. Article III — Enforcement, Revocation and Abatement
  129. Chapter 5.52 — PRIVATE PATROL SERVICES AND PRIVATE WATCHMAN
  130. Chapter 5.54 — RENDERING
  131. Chapter 5.56 — RIDING ACADEMIES
  132. Chapter 5.58 — SCHOOL STORES
  133. Chapter 5.60 — SKATING RINKS
  134. Chapter 5.62 — STREET CARS
  135. Chapter 5.64 — TAXICABS
  136. Chapter 5.66 — THEATERS
  137. Chapter 5.68 — TRAMPOLINE CENTERS
  138. Chapter 5.70 — MISCELLANEOUS BUSINESS REGULATIONS
  139. Chapter 5.72 — RECREATIONAL VEHICLE ON UNDEVELOPED PROPERTY PI…
  140. Chapter 5.80 — MEDICAL AND ADULT-USE CANNABIS DISPENSARY PERMITS
  141. Chapter 5.81 — MEDICAL AND ADULT-USE CANNABIS CULTIVATION, MAN…
  142. Chapter 5.90 — SKATE PARK FACILITIES
  143. Chapter 5.91 — LICENSURE OF TOBACCO RETAILERS
  144. Chapter 5.92 — CITY MINIMUM WAGE, SICK LEAVE, AND OTHER EMPLOY…
  145. Chapter 5.93 — HOTEL MINIMUM WAGE AND WORKING CONDITIONS
  146. Chapter 5.95 — HOSPITALITY AND TRAVEL WORKER RIGHT TO RECALL
  147. Chapter 5.96 — GROCERY WORKER HAZARD PAY
  148. Chapter 5.97 — CAP ON THE COMMISSIONS, CHARGES, AND FEES OF FO…
  149. Title 6 — ANIMALS
  150. Title 8 — HEALTH AND SAFETY
  151. Article I — Purpose and Introductory Sections
  152. Article II — Graffiti Public Nuisance and Unlawful
  153. Article III — Graffiti Abatement
  154. Article IV — Municipal Code Liability, Remedies, and Penalties…
  155. Article V — Sale of Graffiti Implements to Minors
  156. Article VI — State Graffiti Laws
  157. Article VII — Graffiti Abatement Funding and Rewards
  158. Article VIII — Administrative Appeals
  159. Article IX — Miscellaneous
  160. Article I — Findings and Purposes
  161. Article III — Illegal Dumping and Littering as Unlawful and Pu…
  162. Article IV — Administrative, Civil, and Criminal Liabilities a…
  163. Article V — Special Liabilities and Responsibilities
  164. Article VI — Community Service
  165. Article VII — Reward Fund
  166. Article VIII — Administrative Appeals
  167. Article IX — Miscellaneous Sections
  168. Chapter 8.12 — HAZARDOUS MATERIALS
  169. Chapter 8.14 — MEAT
  170. Chapter 8.16 — MILK AND MILK PRODUCTS
  171. Chapter 8.18 — NUISANCES
  172. Chapter 8.19 — WOOD-BURNING APPLIANCES
  173. Chapter 8.20 — PAY TELEPHONES
  174. Chapter 8.21 — AUTOMATED PURCHASING MACHINES
  175. Chapter 8.22 — RESIDENTIAL RENT ADJUSTMENTS AND EVICTIONS
  176. Article I — Residential Rent Adjustment Program
  177. Article II — Just Cause for Eviction Ordinance (Measure EE)
  178. Article III — Terminating Tenancy to Withdraw Residential Rent…
  179. Article IV — Rent Program Service Fee
  180. Article V — Tenant Protection Ordinance
  181. Article VI — TENANT MOVE OUT AGREEMENT ORDINANCE
  182. Article VII — UNIFORM RESIDENTIAL TENANT RELOCATION ORDINANCE
  183. Article VIII — RELOCATION PAYMENTS FOR OWNER OR RELATIVE MOVE-…
  184. Article IX — Equitable Access to Low-Income ("EQUAL") Housing …
  185. Chapter 8.24 — PROPERTY BLIGHT
  186. Chapter 8.25 — RONALD V. DELLUMS AND SIMBARASHE SHERRY FAIR CH…
  187. Chapter 8.26 — SCRAP YARD ABATEMENT PROCEDURES
  188. Chapter 8.28 — SOLID WASTE COLLECTION AND DISPOSAL AND RECYCLING
  189. Chapter 8.30 — SMOKING
  190. Chapter 8.32 — TOBACCO PRODUCT DISTRIBUTION RESTRICTIONS
  191. Chapter 8.36 — SWIMMING POOLS
  192. Chapter 8.38 — SANITATION
  193. Chapter 8.40 — MISCELLANEOUS HEALTH AND SAFETY REGULATIONS
  194. Chapter 8.42 — CERTIFIED UNIFIED PROGRAM AGENCY (CUPA)
  195. Chapter 8.44 — SECURITY FOR EVENTS AT THE OAKLAND-ALAMEDA COUN…
  196. Chapter 8.46 — MEDICAL CANNABIS
  197. Chapter 8.48 — VEHICLE-BASED SOLICITATION RESTRICTIONS
  198. Chapter 8.50 — EMERGENCY SERVICES ORGANIZATION AND DISASTER CO…
  199. Chapter 8.52 — ACCESS TO REPRODUCTIVE HEALTH CARE FACILITIES
  200. Chapter 8.54 — FORECLOSED AND DEFAULTED RESIDENTIAL PROPERTY R…
  201. Article I — Intent
  202. Article III — Registration
  203. Article IV — Inspection, Maintenance, and Security Requirements
  204. Article V — Enforcement
  205. Article VI — Appeal
  206. Chapter 8.56 — EMERGENCY RESPONSE SERVICES FEES PROGRAM
  207. Article I — Title and Purpose
  208. Article III — Scope and Exclusions
  209. Article IV — Registration, Inspection, and Abatement
  210. Chapter 8.60 — PROHIBITION ON THE STORING AND HANDLING OF COAL…
  211. Article II — Miscellaneous
  212. Chapter 8.62 — REGULATIONS ESTABLISHING PERMIT REQUIREMENTS AN…
  213. Chapter 8.64 — PROHIBITION ON COMBUSTION ENGINE-POWERED LEAF B…
  214. Chapter 8.66 — COMMUNICATIONS SERVICE PROVIDER CHOICE ORDINANCE
  215. Chapter 8.68 — REQUIREMENT OF PROOF OF A COVID-19 VACCINATION …
  216. Chapter 8.70 — NUISANCE VESSELS ON OAKLAND WATERS
  217. Chapter 8.72 — ELEVATOR MAINTENANCE IN RESIDENTIAL BUILDINGS
  218. Title 9 — PUBLIC PEACE, MORALS AND WELFARE
  219. Article I — Dangerous Weapons
  220. Article II — Firearms and Weapons Violence Prevention
  221. Article III — Prohibition on the Sale of Saturday Night Specia…
  222. Article V — Prohibition on the Sale of Compact Handguns
  223. Article VI — Tools of Violence and Vandalism at Demonstrations
  224. Article VII — Privately Manufactured Firearms, Unfinished Fram…
  225. Chapter 9.37 — UNSECURED FIREARMS AND AMMUNITION IN UNATTENDED…
  226. Chapter 9.38 — POSSESSION OF LARGE-CAPACITY MAGAZINES
  227. Chapter 9.39 — SAFE STORAGE OF FIREARMS IN A RESIDENCE
  228. Chapter 9.40 — DISCRIMINATION BASED ON AIDS
  229. Chapter 9.44 — DISCRIMINATION BASED ON SEXUAL ORIENTATION
  230. Chapter 9.45 — DISCRIMINATION BASED ON DIVERSE FAMILY AND RELA…
  231. Chapter 9.48 — HOUSING DISCRIMINATION ON THE BASIS OF CHILDREN
  232. Chapter 9.52 — SPECIAL EVENT PERMITS
  233. Chapter 9.56 — NUISANCE VEHICLES
  234. Article II — Procedures After Impoundment
  235. Article III — Miscellaneous
  236. Chapter 9.58 — LOITERING FOR THE PURPOSE OF ENGAGING IN ILLEGA…
  237. Chapter 9.60 — SLAVERY ERA DISCLOSURE
  238. Chapter 9.64 — REGULATIONS ON CITY'S ACQUISITION AND USE OF SU…
  239. Chapter 9.65 — REGULATIONS ON CITY'S ACQUISITION AND USE OF MI…
  240. Chapter 9.72 — CITY PARTICIPATION IN FEDERAL LAW ENFORCEMENT A…
  241. Title 10 — VEHICLES AND TRAFFIC
  242. Article I — Traffic Administration
  243. Article II — Enforcement and Obedience to Traffic Regulations
  244. Article III — Penalties
  245. Chapter 10.12 — TRAFFIC CONTROL DEVICES
  246. Chapter 10.16 — MISCELLANEOUS TRAFFIC CONTROL REGULATIONS
  247. Chapter 10.17 — MOTORIZED SCOOTERS AND POCKET BIKES
  248. Chapter 10.18 — DOCKLESS VEHICLE SHARE PROGRAM
  249. Chapter 10.20 — SPEED LIMITS
  250. Chapter 10.24 — PEDESTRIANS
  251. Chapter 10.28 — STOPPING, STANDING AND PARKING GENERALLY
  252. Chapter 10.32 — STOPPING, STANDING AND PARKING IN SPECIFIC STR…
  253. Chapter 10.36 — PARKING METER ZONES
  254. Chapter 10.40 — STOPPING FOR LOADING AND UNLOADING ONLY
  255. Chapter 10.44 — RESIDENTIAL PERMIT PARKING PROGRAM
  256. Chapter 10.45 — INTERIM MIXED USE PERMIT PARKING PROGRAM FOR T…
  257. Chapter 10.48 — PARKING FINES
  258. Chapter 10.52 — COMMERCIAL VEHICLES AND VEHICLE SIZE AND WEIGH…
  259. Chapter 10.53 — EXTRALEGAL LOAD TRANSPORTATION PERMITS
  260. Chapter 10.56 — AIRPORT GROUND TRAFFIC REGULATIONS
  261. Chapter 10.57 — OAKLAND INTERNATIONAL AIRPORT 200-YARD MARINE …
  262. Chapter 10.60 — VISION OBSCUREMENT AT INTERSECTIONS
  263. Chapter 10.64 — ABANDONED, WRECKED, DISMANTLED OR INOPERATIVE …
  264. Chapter 10.68 — EMPLOYER-BASED TRIP REDUCTION PROGRAM
  265. Chapter 10.70 — SOUTHEAST OAKLAND AREA TRAFFIC IMPACT FEE
  266. Article II — Payment of Fees
  267. Article III — Credits and Reimbursements
  268. Article IV — Fee Protests, Appeals, and Adjustments
  269. Chapter 10.71 — FREE-FLOATING ZONE PERMIT PROGRAM FOR CAR SHAR…
  270. Chapter 10.72 — DEDICATED SPACE PERMIT PROGRAM FOR CAR SHARING…
  271. Chapter 10.74 — SIDESHOWS
  272. Title 12 — STREETS, SIDEWALKS AND PUBLIC PLACES
  273. Article I — Assemblies
  274. Article II — Parades
  275. Chapter 12.50 — NEWSRACKS—CITY-WIDE CONTROLS
  276. Chapter 12.52 — SIDEWALK BENCHES
  277. Chapter 12.56 — SOUND AMPLIFICATION EQUIPMENT
  278. Chapter 12.60 — BICYCLES
  279. Chapter 12.61 — VULNERABLE ROAD AND SIDEWALK USER PROTECTION
  280. Article I — Generally
  281. Article II — Park Permits
  282. Title 13 — PUBLIC SERVICES
  283. Article I — Title, Purpose and General Provisions
  284. Article II — Discharge Regulations and Requirements
  285. Article III — Inspection and Enforcement
  286. Article IV — Coordination with Other Programs
  287. Article V — Appeals and Fees
  288. Title 14 — SIGNS
  289. Title 15 — BUILDINGS AND CONSTRUCTION
  290. Article I — General Administrative Amendments
  291. Part 1 — Administrative Amendments to the California Administr…
  292. Part 2 — Administrative Amendments to the California Building …
  293. Part 2.5 — Administrative Amendments to the California Residen…
  294. Part 3 — Administrative Amendments to the California Electrica…
  295. Article 110-35 — SAFETY
  296. Part 4 — Administrative Amendments to the California Mechanica…
  297. Part 5 — Administrative Amendments to the California Plumbing …
  298. Part 7 — Administrative Amendments to the California Wildland …
  299. Part 8 — Administrative Amendments to the California Historica…
  300. Part 10 — Administrative Amendments to the California Existing…
  301. Part 12 — Administrative Amendments to the California Referenc…
  302. Part 1 — Reserved
  303. Part 2 — California Building Code Non-Administrative Technical…
  304. Chapter 16B — PRIVATE DRIVEWAY ACCESS BRIDGES
  305. Chapter 18B — GRADING, EXCAVATIONS, AND FILLS
  306. Part 2.5 — California Residential Code Non-Administrative (Tec…
  307. Part 3 — California Electrical Code Non-Administrative (Techni…
  308. Part 4 — California Mechanical Code Non-Administrative (Techni…
  309. Part 5 — California Plumbing Code Non-Administrative (Technica…
  310. Part D — Disposal of Rainwater Drainage
  311. Part 7 — California Wildland-Urban Interface Code Non-Administ…
  312. Part 8 — California Historical Building Code Non-Administrativ…
  313. Part 10 — California Existing Building Code Non-Administrative…
  314. Part 12 — California Referenced Standards Code Non-Administrat…
  315. Chapter 15.06 — OAKLAND AMENDMENTS TO THE CALIFORNIA ENERGY AN…
  316. Part 6 — Administrative Amendments to the California Energy Code
  317. Part 11 — Administrative Amendments to the California Green Bu…
  318. Article III — Non-Administrative (Technical) Amendments
  319. Chapter 15.08 — OAKLAND BUILDING MAINTENANCE CODE
  320. Article I — Scope
  321. Article II — Enforcement
  322. Article III — Fees and Inspections
  323. Article IV — Definitions
  324. Article V — Habitable Space
  325. Article VI — Structural
  326. Article VII — Mechanical and Electrical
  327. Article VIII — Exiting
  328. Article IX — Fire Protection
  329. Article X — Substandard and Public Nuisance Buildings
  330. Article XI — Declaration of Public Nuisance—Substandard
  331. Article XII — Administrative Hearing
  332. Article XIII — Lead Hazard Control and Abatement
  333. Article XIV — Delay of Enforcement for Accessory Dwelling Units
  334. Article XV — Delay of Enforcement for Joint Live Work Quarters
  335. Chapter 15.10 — PUBLIC NOTICE OF CITY OF OAKLAND'S INTENT TO C…
  336. Chapter 15.12 — OAKLAND FIRE CODE
  337. Part 1 — GENERAL PROVISIONS
  338. Chapter 2 — DEFINITIONS
  339. Chapter 3 — GENERAL REQUIREMENTS
  340. Chapter 5 — FIRE SERVICE FEATURES
  341. Chapter 6 — BUILDING SERVICES AND SYSTEMS
  342. Chapter 9 — FIRE PROTECTION SYSTEMS
  343. Chapter 10 — MEANS OF EGRESS
  344. Chapter 11 — CONSTRUCTION REQUIREMENTS FOR EXISTING BUILDINGS
  345. Chapter 12 — ENERGY SYSTEMS
  346. Chapter 28 — LUMBERYARDS AND AGRO-INDUSTRIAL, SOLID BIOMASS AN…
  347. Chapter 33 — FIRE SAFETY DURING CONSTRUCTION AND DEMOLITION
  348. Chapter 49 — REQUIREMENTS FOR WILDLAND-URBAN INTERFACE AREAS
  349. Chapter 50 — HAZARDOUS MATERIALS - GENERAL PROVISIONS
  350. Chapter 53 — COMPRESSED GASES
  351. Chapter 56 — EXPLOSIVES AND FIREWORKS
  352. Chapter 57 — FLAMMABLE AND COMBUSTIBLE LIQUIDS
  353. Chapter 58 — FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS
  354. Chapter 60 — HIGHLY TOXIC AND TOXIC MATERIALS
  355. Chapter 80 — REFERENCED STANDARDS
  356. Chapter 15.16 — FIRE-DAMAGED AREA PROTECTION AND IMPROVEMENT R…
  357. Chapter 15.18 — FIRE SUPPRESSION, PREVENTION, AND PREPAREDNESS…
  358. Chapter 15.20 — GEOLOGIC REPORTS
  359. Chapter 15.24 — EARTHQUAKE-DAMAGED STRUCTURES
  360. Chapter 15.26 — MANDATORY SEISMIC SCREENING OF MULTIPLE STORY …
  361. Article II — Administrative
  362. Article III — Technical
  363. Chapter 15.27 — MANDATORY SEISMIC EVALUATION AND RETROFIT OF C…
  364. Article I — SCOPE
  365. Article II — COMPLIANCE
  366. Article III — ADMINISTRATIVE
  367. Article IV — TECHNICAL
  368. Chapter 15.28 — UNREINFORCED MASONRY BUILDINGS
  369. Chapter 15.30 — VOLUNTARY SEISMIC STRENGTHENING FOR RESIDENTIA…
  370. Article III — Non-Administrative
  371. Article IV — Financial Incentives
  372. Chapter 15.32 — DANGEROUS BUILDINGS AND STRUCTURES
  373. Article I — Title
  374. Article II — Administrative
  375. Article III — Solar Energy System Requirements
  376. Chapter 15.34 — CONSTRUCTION AND DEMOLITION DEBRIS COLLECTION,…
  377. Chapter 15.35 — GREEN BUILDING REQUIREMENTS FOR CITY BUILDING …
  378. Article I — Green Building Practices
  379. Article II — Civic Bay-Friendly Landscaping Requirements for A…
  380. Chapter 15.36 — DEMOLITION PERMITS
  381. Chapter 15.37 — ALL-ELECTRIC CONSTRUCTION IN NEWLY CONSTRUCTED…
  382. Chapter 15.40 — BUILDING NUMBERS
  383. Chapter 15.44 — MOVING BUILDINGS
  384. Chapter 15.48 — SETBACK LINES
  385. Chapter 15.52 — VIEWS
  386. Chapter 15.56 — HOUSEBOATS
  387. Chapter 15.60 — CODE COMPLIANCE RELOCATION PROGRAM
  388. Chapter 15.62 — AFFORDABLE HOUSING TRUST FUND
  389. Chapter 15.63 — OAKLAND RESIDENT/WORKER PREFERENCES AND REQUIR…
  390. Article I — Preferences in Multifamily Affordable Housing Proj…
  391. Article II — Requirements for First-Time Homebuyer Program
  392. Chapter 15.64 — BEDROOM WINDOW SECURITY BAR AND SMOKE DETECTOR…
  393. Chapter 15.68 — JOBS/HOUSING IMPACT FEE
  394. Chapter 15.72 — AFFORDABLE HOUSING IMPACT FEES
  395. Article II — Fee Requirements and Procedures
  396. Article III — On-Site and Off-Site Affordable Housing Options
  397. Article IV — Miscellaneous
  398. Chapter 15.74 — TRANSPORTATION AND CAPITAL IMPROVEMENTS IMPACT…
  399. Article III — Impact Fee Funds
  400. Article IV — Developer Constructed Facilities
  401. Article V — Miscellaneous
  402. Chapter 15.78 — PUBLIC ART REQUIREMENTS FOR PRIVATE DEVELOPMENT
  403. Title 16 — SUBDIVISIONS
  404. Title 17 — PLANNING
  405. Title 18 — SUSTAINABILITY
  406. Article I — Intent
  407. Article III — Green Building Compliance Standards
  408. Article IV — Entitlement Phase
  409. Article V — Construction Phase
  410. Chapter 18.04 — PROHIBITION OF THE CITY'S USE AND PURCHASE OF …
  411. Chapter 17.01 — GENERAL PROVISIONS OF PLANNING CODE AND GENERA…
  412. Chapter 17.03 — CITY PLANNING COMMISSION
  413. Chapter 17.05 — LANDMARKS PRESERVATION ADVISORY BOARD
  414. Chapter 17.07 — TITLE, PURPOSE AND SCOPE OF THE ZONING REGULAT…
  415. Chapter 17.09 — DEFINITIONS
  416. Chapter 17.10 — USE CLASSIFICATIONS
  417. Article I — General Classification Rules
  418. Part 1 — Residential Activity Types
  419. Part 2 — Civic Activity Types
  420. Part 3 — Commercial Activity Types
  421. Part 4 — Industrial Activity Types
  422. Part 5 — Agricultural and Extractive Activity Types
  423. Part 1 — Residential Facility Types
  424. Part 2 — Nonresidential Facility Types
  425. Part 3 — Sign Types
  426. Part 4 — Telecommunications Facility Types
  427. Chapter 17.11 — OS OPEN SPACE ZONING REGULATIONS
  428. Chapter 17.13 — RH HILLSIDE RESIDENTIAL ZONES REGULATIONS
  429. Chapter 17.15 — RD DETACHED UNIT RESIDENTIAL ZONE REGULATIONS
  430. Chapter 17.17 — RM MIXED HOUSING TYPE RESIDENTIAL ZONES REGULA…
  431. Chapter 17.19 — RU URBAN RESIDENTIAL ZONES REGULATIONS
  432. Chapter 17.33 — CN NEIGHBORHOOD CENTER COMMERCIAL ZONES REGULA…
  433. Chapter 17.35 — CC COMMUNITY COMMERCIAL ZONES REGULATIONS
  434. Chapter 17.37 — CR REGIONAL COMMERCIAL ZONE REGULATIONS
  435. Chapter 17.65 — HBX HOUSING AND BUSINESS MIX COMMERCIAL ZONES …
  436. Chapter 17.72 — M-40 INDUSTRIAL ZONES REGULATIONS
  437. Chapter 17.73 — CIX, IG AND IO INDUSTRIAL ZONES REGULATIONS
  438. Chapter 17.74 — S-1 MEDICAL CENTER COMMERCIAL ZONE REGULATIONS
  439. Chapter 17.78 — S-3 RESEARCH CENTER COMMERCIAL ZONE REGULATIONS
  440. Chapter 17.80 — S-4 DESIGN REVIEW COMBINING ZONE REGULATIONS
  441. Chapter 17.84 — S-7 PRESERVATION COMBINING ZONE REGULATIONS
  442. Chapter 17.88 — S-9 FIRE SAFETY PROTECTION COMBINING ZONE REGU…
  443. Chapter 17.90 — S-10 SCENIC ROUTE COMBINING ZONE REGULATIONS
  444. Chapter 17.92 — S-11 SITE DEVELOPMENT AND DESIGN REVIEW COMBIN…
  445. Chapter 17.94 — S-12 RESIDENTIAL PARKING COMBINING ZONE REGULA…
  446. Chapter 17.95 — S-13 AFFORDABLE HOUSING COMBINING ZONE REGULAT…
  447. Chapter 17.107 — Density Bonus and Incentive Procedure and Sta…
  448. Chapter 17.96 — S-14 HOUSING SITES COMBINING ZONE REGULATIONS
  449. Chapter 17.97 — S-15 TRANSIT-ORIENTED DEVELOPMENT COMMERCIAL Z…
  450. Chapter 17.98 — S-16 INTERSTATE CORRIDOR COMMERCIAL ZONES REGU…
  451. Chapter 17.99 — S-17 DOWNTOWN RESIDENTIAL OPEN SPACE COMBINING…
  452. Article I — Title, Intent and Applicability of the D-DT Zones
  453. Article II — Special Permit Requirements
  454. Article III — Use Requirements
  455. Article IV — Development and Design Standards
  456. Article V — D-DT Combining Zones
  457. Chapter 17.102 — REGULATIONS APPLICABLE TO CERTAIN ACTIVITIES …
  458. Article I — Residential Activities
  459. Article II — Civic Activities
  460. Article III — Commercial Activities
  461. Article IV — Industrial Activities
  462. Article V — Agricultural and Extractive Activities
  463. Article VI — Residential Facilities
  464. Article VIII — Nonresidential Facilities
  465. Article IX — Sign Facilities
  466. Article X — Telecommunications Facilities
  467. Chapter 17.104 — GENERAL LIMITATIONS ON SIGNS
  468. Chapter 17.106 — GENERAL LOT, DENSITY, AND AREA REGULATIONS
  469. Chapter 17.107 — DENSITY BONUS AND INCENTIVE PROCEDURE
  470. Chapter 17.108 — GENERAL HEIGHT, YARD, AND COURT REGULATIONS
  471. Chapter 17.110 — BUFFERING REGULATIONS
  472. Chapter 17.112 — HOME OCCUPATION REGULATIONS
  473. Chapter 17.114 — NONCONFORMING USES
  474. Article II — Nonconforming Activities
  475. Article III — Nonconforming Facilities
  476. Chapter 17.116 — OFF-STREET PARKING AND LOADING REQUIREMENTS
  477. Article II — Off-Street Parking Requirements
  478. Article III — Exemptions and Reductions in Required Parking
  479. Article IV — Off-Street Loading Requirements
  480. Article V — Standards for Required Parking and Loading Facilit…
  481. Chapter 17.117 — BICYCLE PARKING REQUIREMENTS
  482. Article II — Standards for Required Bicycle Parking
  483. Article III — Minimum Number of Required Bicycle Parking Spaces
  484. Chapter 17.118 — RECYCLING SPACE ALLOCATION REQUIREMENTS
  485. Chapter 17.120 — PERFORMANCE STANDARDS
  486. Chapter 17.122 — REPLACEMENT HOUSING UNIT REGULATIONS
  487. Chapter 17.124 — LANDSCAPING AND SCREENING STANDARDS
  488. Chapter 17.126 — USABLE OPEN SPACE STANDARDS
  489. Chapter 17.128 — TELECOMMUNICATIONS REGULATIONS
  490. Chapter 17.130 — ADMINISTRATIVE PROCEDURES GENERALLY
  491. Chapter 17.131 — REASONABLE ACCOMMODATIONS POLICY AND PROCEDURES
  492. Chapter 17.132 — ADMINISTRATIVE APPEAL PROCEDURE
  493. Chapter 17.134 — CONDITIONAL USE PERMIT PROCEDURE
  494. Chapter 17.135 — SPECIAL USE PERMIT REVIEW PROCEDURE FOR THE O…
  495. Chapter 17.136 — DESIGN REVIEW PROCEDURE
  496. Chapter 17.138 — DEVELOPMENT AGREEMENT PROCEDURE
  497. Chapter 17.140 — PLANNED UNIT DEVELOPMENT PROCEDURE
  498. Chapter 17.142 — PLANNED UNIT DEVELOPMENT REGULATIONS
  499. Article I — Title, Purposes and Applicability
  500. Article II — Planned Unit Developments
  501. Chapter 17.144 — REZONING AND LAW CHANGE PROCEDURE
  502. Chapter 17.148 — VARIANCE AND EXCEPTION PROCEDURE
  503. Chapter 17.150 — FEE SCHEDULE
  504. Chapter 17.152 — ENFORCEMENT
  505. Chapter 17.153 — DEMOLITION, CONVERSION AND REHABILITATION REG…
  506. Chapter 17.154 — ZONING MAPS
  507. Chapter 17.155 — SPECIAL REGULATIONS APPLYING TO MINING AND QU…
  508. Chapter 17.156 — DEEMED APPROVED ALCOHOLIC BEVERAGE SALE REGUL…
  509. Article I — Title and Scope
  510. Article II — Definitions
  511. Article III — Deemed Approved Performance Standards
  512. Article IV — Deemed Approved Status Procedure
  513. Article V — Enforcement Procedure
  514. Chapter 17.157 — DEEMED APPROVED HOTEL AND ROOMING HOUSE REGUL…
  515. Chapter 17.158 — ENVIRONMENTAL REVIEW REGULATIONS
  516. Part 1 — General Provisions
  517. Part 2 — California Environmental Quality Act ("CEQA") Procedu…

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.