Earlier editions: 2026-09
Title 13 — PUBLIC UTILITIES›Chapter 13.12 — SEWERS
Morro Bay Municipal Code Art. VIII Compliance Monitoring
Morro Bay Municipal Code · 2026-10 edition · updated 2026-10-04 · Morro Bay
Cite as: Morro Bay Municipal Code Article VIII · Text as of 2026-10-04
13.12.800 - Right of entry—Inspection and sampling.¶
The utilities division/department manager shall have the right to enter the premises of any user to determine whether the user is complying with all requirements of this chapter and any industrial wastewater discharge permit or order issued hereunder. Users shall allow the utilities division/department manager ready access to all parts of the premises for the purposes of inspection, sampling, records examination and copying, and the performance of any additional duties.
A. Where a user has security measures in force which require proper identification and clearance before entry into its premises, the user shall make necessary arrangements with its security guards so that, upon presentation of suitable identification, the utilities division/department manager shall be permitted to enter without delay for the purposes of performing specific responsibilities.
B. The utilities division/department manager shall have the right to set up on the user's property, or require installation of, such devices as are necessary to conduct sampling and/or metering of the user's operations.
C. The utilities division/department manager may require the user to install monitoring equipment as necessary. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the user at its own expense. All devices used to measure wastewater flow and quality shall be calibrated at a frequency established by the utilities division/department manager, but no less than the frequency recommended by the manufacturer.
D. Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the user at the written or verbal request of the utilities division/department manager and shall not be replaced. The costs of clearing such access shall be borne by the user.
E. Unreasonable delays in allowing the utilities division/department manager access to the user's premises shall be a violation of this chapter.
(Ord. No. 642, § 1, 1-26-21)
Get a plain-English answer with a citation back to this text.
Ask AI about this code