Skip to content

Earlier editions: 2026-09

Title 13 — PUBLIC UTILITIES›Chapter 13.12 — SEWERS

Morro Bay Municipal Code Art. IV Industrial Wastewater Discharge Permits

Morro Bay Municipal Code · 2026-10 edition · updated 2026-10-04 · Morro Bay

Cite as: Morro Bay Municipal Code Article IV · Text as of 2026-10-04

13.12.400 - Wastewater discharge permit categories.

Industrial wastewater discharge permits shall be issued under the following categories as determined by the utilities division/department manager after review of the permit application as described in section 13.12.440 of this chapter. The utilities division/department manager may determine, upon review of the permit application, that no permit is required for certain small industries and commercial users.

A. General industrial/commercial user permits (Class "G" dischargers). General industrial/commercial user permits may be issued to certain small industries and some commercial users whose industrial discharges do not significantly impact the POTW, degrade wastewater quality or contaminate sludge. Industries that have the potential to discharge a non-domestic or process waste stream, but at the present time discharge only sanitary waste, may also be included in this group.

B. Significant industrial user (SIU) permits (Class "S" dischargers). SIU permits shall be issued to those industries which are determined by the utilities division/department manager to be significant industrial users (SIUs) as defined in subsection 13.12.130(UU) of this chapter. The utilities division/department manager may require other users to obtain an SIU permit as necessary to carry out the purposes of this chapter.

C. Food facility (FF) permits (Class "F" dischargers). All food facilities will be classified as Class "F" dischargers.

(Ord. No. 642, § 1, 1-26-21)

Exceptions & meaning →

13.12.410 - Industrial wastewater discharge permit requirement.

A. No significant industrial user shall discharge wastewater into the POTW without first obtaining an industrial wastewater discharge permit from the utilities division/department manager, except that a significant industrial user that has filed a timely application pursuant to section of this chapter may continue to discharge for the time period specified therein.

B. The utilities division/department manager may require other users to obtain industrial wastewater discharge permits as necessary to carry out the purposes of this chapter.

C. Obtaining an industrial wastewater discharge permit does not relieve a permittee of its obligation to comply with all federal and state pretreatment standards or requirements or with any other requirements of federal, state, and local law.

(Ord. No. 642, § 1, 1-26-21)

Exceptions & meaning →

13.12.420 - Industrial wastewater discharge permitting—Existing connections.

Any user required to obtain an industrial wastewater discharge permit who was discharging wastewater into the POTW prior to February 25, 2021 and who wishes to continue such discharges in the future, shall, within sixty days after February 25, 2021, apply to the utilities division/department manager for an industrial wastewater discharge permit in accordance with Section 13.12.440 of this chapter, and shall not cause or allow discharges to the POTW to continue after one hundred eighty days after February 25, 2021, except in accordance with an industrial wastewater discharge permit issued by the utilities division/department manager.

(Ord. No. 642, § 1, 1-26-21)

Exceptions & meaning →

13.12.430 - Industrial wastewater discharge permitting—New connections.

Any user required to obtain an industrial wastewater discharge permit who proposes to begin or recommence discharging into the POTW must obtain such permit prior to the beginning or recommencing of such discharge. An application for this industrial wastewater discharge permit, in accordance with Section 13.12.440 of this chapter, must be filed at least sixty days prior to the date upon which any discharge will begin or recommence.

(Ord. No. 642, § 1, 1-26-21)

Exceptions & meaning →

13.12.440 - Industrial wastewater discharge permit application contents.

A. All users required to obtain an industrial wastewater discharge permit must submit a permit application. The utilities division/department manager may require users to submit all or some of the following information as part of a permit application:

  1. Identifying Information.

a. The name and address of the facility, including the name of the operator and owner.

b. Contact information, description of activities, facilities, and plant production processes on the premises.

  1. Environmental Permits. A list of any environmental control permits held by or for the facility.

  2. Description of Operations.

a. A brief description of the nature, average rate of production (including each product produced by type, amount, processes, and rate of production), and standard industrial classifications of the operation(s) carried out by such user. This description should include a schematic process diagram, which indicates points of discharge to the POTW from the regulated processes.

b. Types of wastes generated, and a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW.

c. Number and type of employees, hours of operation, and proposed or actual hours of operation.

d. Type and amount of raw materials processed (average and maximum per day).

e. Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge.

  1. Time and duration of discharges.

  2. The location for monitoring all wastes covered by the permit.

  3. Flow Measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in subsection 13.12.210(A) of this chapter.

  4. Measurement of Pollutants.

a. The categorical pretreatment standards applicable to each regulated process and any new categorically regulated processes for existing sources.

b. The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the utilities division/department manager, of regulated pollutants in the discharge from each regulated process.

c. Instantaneous, daily maximum, and long-term average concentrations, or mass, where required, shall be reported.

d. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in Section 13.12.670 of this chapter. Where the standard requires compliance with any BMPs or pollution prevention alternative, the user shall submit documentation as required by the utilities division/department manager or the applicable standards to determine compliance with the standard.

e. Sampling must be performed in accordance with procedures set out in Section 13.12.680 of this chapter.

  1. Any other information as may be deemed necessary by the utilities division/department manager to evaluate the permit application.

B. Incomplete or inaccurate applications will not be processed and will be returned to the user for revision.

(Ord. No. 642, § 1, 1-26-21)

Exceptions & meaning →

13.12.450 - Application signatories and certifications.

A. All wastewater discharge permit applications, user reports and certification statements must be signed by an authorized representative of the user and contain the certification statement in subsection 13.12.695(A) of this chapter.

B. If the designation of an authorized representative is no longer accurate because a different individual or position has responsibility for the overall operation of the facility or overall responsibility for environmental matters for the company, a new written authorization satisfying the requirements of this section must be submitted to the utilities division/department manager prior to or together with any reports to be signed by an authorized representative.

C. A facility determined to be a non-significant categorical industrial user by the utilities division/department manager pursuant to subsection 13.12.130(UU)(3) of this chapter must annually submit the signed certification statement in subsection 13.12.695(B) of this chapter.

(Ord. No. 642, § 1, 1-26-21)

Exceptions & meaning →

13.12.460 - Industrial wastewater discharge permit decisions.

The utilities division/department manager will evaluate the data furnished by the user and may require additional information. Within sixty days of receipt of a complete permit application, the utilities division/department manager will determine whether to issue an industrial wastewater discharge permit. The utilities division/department manager may deny any application for an industrial wastewater discharge permit.

(Ord. No. 642, § 1, 1-26-21)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Morro Bay Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.