Skip to content

Title 13 — WATER AND SEWERS

Chapter 13.78 — COMMUNITY SEWER SYSTEMS—SEWAGE TREATMENT WORKS

Madera County Municipal Code · 2026-09 edition · updated 2026-10-02 · Madera County

13.78.010 - Plant location.

The locations of sewage treatment works shall be subject to the approval of the director of public health and the county planning commission.

(Ord. 279 § 150, 1963).

Exceptions & meaning →

13.78.020 - Quality of effluent.

The degree of treatment and quality of effluent shall be based upon the requirements of the health department.

(Ord. 279 § 151, 1963).

Exceptions & meaning →

13.78.030 - Basis for design loading.

The design of sewage treatment works on the basis of organic loading is required. A biochemical oxygen demand (BOD) loading of 0.25 pounds per capita per day is required. The works shall also be reviewed on the basis of volumetric loading using the flow requirement of Section 13.12.070.

(Ord. 279 § 152, 1963).

Exceptions & meaning →

13.78.040 - Treatment processes.

A detailed description of each process and design data shall be submitted for approval by the director of public health and the county engineer.

(Ord. 279 § 153, 1963).

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Madera County Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.