Title III — LAND USE AND DEVELOPMENT›Division 2›Chapter 8.1›Article III — DRAINAGE FEES
7-5. Preservation of Ecological and Scenic Features
Humboldt County Zoning Code · 2026-07 edition · updated 2026-07-09 · Humboldt County
To the maximum extent possible, the preservation and enhancement of all native shrubs, trees, flora and other ecological and scenic features shall be considered.
8. Sewage Disposal and Water Supply.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — Humboldt County Zoning Code
Humboldt County Zoning Code
- Title III
-
▸ Title III — LAND USE AND DEVELOPMENT
Overview-
▸ Division 2
Overview- Chapter 2.5 — Design for Solar Access
- Chapter 9 — Development Impact Fee Mill Creek Marketplace
- Chapter 2.5 — DESIGN FOR SOLAR ACCESS
- Chapter 3.5
- Chapter 5 — ACTION ON TENTATIVE SUBDIVISION MAPS
- Chapter 5.5 — LOT LINE ADJUSTMENT
- Chapter 6 — FINAL AND PARCEL MAPS
- Chapter 7 — REVERSION TO ACREAGE BY FINAL MAP OR PARCEL MAP
- Chapter 7.5 — MERGER OF PARCELS
- Chapter 8 — ENFORCEMENT AND PENALTIES FOR VIOLATION
-
▸ Chapter 8.1
Overview- Article I — ADOPTION OF PLAN; APPLICATION; FINDINGS; DEFINITIONS
- Article II — MINIMUM REQUIREMENTS
-
▸ Article III — DRAINAGE FEES
Overview- 1-1. Administration
- 1-2. Maintainability
- 2-1. Basic Design Objectives
- 2-2. Design Speed
- 3-1. Access Openings
- 3-2. Driveways
- 3-3. Scenic Values in Planning and Design
- 3-4. Erosion and Water Pollution
- 4-1. Integrating the County Classification System into the Roa…
- 4-2. Guidelines for Determining Roadway Categories
- 5-2. Circulation Element
- 5-3. Centerlines
- 5-4. Non-Access Strips
- 5-5. Street Center Sections
- 6-1. Street Names
- 6-2. Signs
- 7-1. General
- 7-2. Exceptions to Lot Frontage Requirements
- 7-3. Double Frontage Lots
- 7-4. Corner Lots
- 7-5. Preservation of Ecological and Scenic Features
- 8-1. Sewer Connections
- 8-2. Water
- 8-4. Deeded Water Rights
- Chapter 9 — DEVELOPMENT IMPACT FEE MILL CREEK MARKETPLACE
- Chapter 9.1
- Chapter 10 — FIRE DISTRICT DEVELOPMENT IMPACT FEES
- Division 3
- Division 4
- Division 5
- Division 6
- Division 7
- Division 8
- Division 9
- Division 10
- Division 11
-