Skip to content

Chapter 18.220 — SURFACE MINING AND RECLAMATION

Fremont Municipal Code · 2026-09 edition · updated 2026-10-02 · Fremont

18.220.010 Purpose and intent.

18.220.020 Definitions.

18.220.030 Incorporation by reference.

18.220.040 Scope.

18.220.050 Vested rights.

18.220.060 Process.

18.220.070 Standards for reclamation.

18.220.080 Statement of responsibility.

18.220.090 Findings for approval.

18.220.100 Financial assurances.

18.220.110 Interim management plans.

18.220.120 Annual report requirements.

18.220.130 Inspections.

18.220.140 Violations and penalties.

18.220.150 Appeals.

18.220.160 Fees.

18.220.170 Mineral resource protection.

18.220.180 Severability.

18.220.190 Effective date.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Fremont Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.