Skip to content

Chapter 6Article 1 — ADMINISTRATIVE PROVISIONS

§ 6-18. Special inspections.

Escondido Zoning Code · 2026-05 edition · updated 2026-07-25 · Escondido

  • Sec. 6-18.1. General. In addition to e inspections required by section 6-17, the owner or the registered design professional in responsible charge acting as the owner's agent shall employ one or more special inspectors who shall provide inspections during construction of the types of work listed in the Building Code for Special Inspections.

  • Sec. 6-18.2. Waiver of Special Inspection. The building official may waive the requirement for the employment of a special inspector if the construction is of a minor nature.

  • Sec. 6-18.3. Approved Fabricators. Special inspections required by this section and elsewhere in this code or the technical codes shall not be required where the work is done on the premises of a fabricator registered and approved by the building official to perform such work without special inspection. The certificate of registration shall be subject to revocation by the building official if it is found that work done pursuant to the approval is in violation of the technical codes. The approved fabricator shall submit a certificate of compliance to the building official and to the engineer or architect of record stating that the work was performed in accordance with the approved plans and specifications. The approved fabricator's qualifications shall be contingent on compliance with the following:

    • Sec. 6-18.3.1. The fabricator has developed and submitted a detailed fabrication procedural manual reflecting key quality control procedures which will provide a basis for inspection control of workmanship and the fabricator plant.

Downloaded from https://ecode360.com/ES4926 on 2026-05-23

City of Escondido, CA § 6-18

ESCONDIDO CODE

§ 6-19

  • Sec. 6-18.3.2. Verification of the fabricator's quality control capabilities, plant and personnel as outlined in the fabrication procedural manual shall be by an approved inspection or quality control agency.

  • Sec. 6-18.3.3. Periodic plant inspections shall be conducted by an approved inspection or quality control agency to monitor the effectiveness of the quality control program.

  • Sec. 6-18.3.4. It shall be the responsibility of the inspection or quality control agency to notify the approving authority in writing of any change to the procedural manual. Fabricator approval may be revoked for just cause. Reapproval of the fabricator shall be contingent on compliance with quality control procedures during the past year.

  • (Ord. 2008-02R, § 5, 2-6-08)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Escondido Zoning Code
Escondido Zoning Code
  1. Chapter 6
  2. Division 2 — Routing
  3. Division 2 — Weed and Rubbish Abatement Program
  4. Division 1 — Generally
  5. Division 1
  6. Division 2 — Variances and Administrative Adjustments
  7. Division 3 — Nonconforming Uses and Structures
  8. Division 4 — Amendments and Zone Changes
  9. Division 5 — Reasonable Accommodation
  10. Division 6 — Public Hearings, Notices, Fees and Appeals
  11. Division 7 — Enforcement and Penalties
  12. Division 8 — Plot Plans
  13. Division 9 — Zoning Administrator

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.