Earlier editions: 2026-09
Title 16 — BUILDINGS AND CONSTRUCTION›Chapter 16.58 — GREEN BUILDING STANDARDS CODE
Cupertino Municipal Code § 4.106 Green Building Standards Code
Cupertino Municipal Code · 2026-10 edition · updated 2026-10-05 · Cupertino
Cite as: Cupertino Municipal Code § 4.106 · Text as of 2026-10-05
4.106.4 Electric vehicle (EV) charging for new construction.¶
New construction shall comply with Section 4.106.4.1 or 4.106.4.2. Electric vehicle supply equipment (EVSE) shall be installed in accordance with the California Electrical Code. Calculation for spaces shall be rounded up to the nearest whole number.
Exceptions:
- On a case-by-case basis, where the local enforcing agency has determined EV charging and infrastructure are not feasible based upon one or more of the following conditions:
Get a plain-English answer with a citation back to this text.
Ask AI about this code