Earlier editions: 2026-09
Title 16 — BUILDINGS AND CONSTRUCTION
Cupertino Municipal Code Ch. 16.04 Building Code
Cupertino Municipal Code · 2026-10 edition · updated 2026-10-05 · Cupertino
Cite as: Cupertino Municipal Code Chapter 16.04 · Text as of 2026-10-05
16.04.010 Adoption of the 2025 California Building Code, Volumes 1 and 2, based on the…¶
A. Except as otherwise provided in this chapter, the provisions of the 2025 California Building Code, Volumes 1 and 2 inclusive, and specified Appendices and each and all of the regulations, provisions, conditions and terms of the code are referred to as if fully set forth in this chapter, except such portions as are hereinafter deleted, modified or amended by this ordinance, and are by such adopted by reference.
B. One (1) copy of each volume of the code therefor is on file in the office of the Building Official pursuant to Health and Safety Code Section 18942 and is made available for public inspection.
(Ord. 22-2245, part, 2022; Ord. 19-2189, § 1 (part), 2019; Ord. 25-2278, Att. A (part), 2025)
16.04.015 (Reserved)¶
16.04.040 Section 104 - Duties and Powers of Building Official.¶
Adopt Section [A] 104 of the 2025 California Building Code as follows:
[A] 104.1 General. The building official is hereby authorized and directed to enforce the provisions of this code.
[A] 104.2 Determination of compliance. The building official shall have the authority to determine compliance with this code, to render interpretations of this code and to adopt policies and procedures in order to clarify the application of its provision. Such interpretations, policies and procedures:
Shall be in compliance with the intent and purpose of this code
Shall not have the effect of waiving requirements specifically provided for in this code.
[A] 104.2.1 Listed Compliance. Where this code or a referenced standard requires equipment, materials, products or services to be listed and a listing standard is specified, the listing shall be based on the specified standard. Where a listing standard is not specified, the listing shall be based on an approved listing criteria. Listings shall be germane to the provision requiring the listing. Installation shall be in accordance with the listing and the manufacturer’s instruction, and where required to verify compliance, the listing standard and manufacturer's instructions shall be made available to the building official.
[A] 104.2.2 Technical assistance. To determine compliance with this code, the building official is authorized to determine compliance with this code, to require the owner or owner’s authorized agent to provide a technical opinion and report
[A] 104.2.2.1 Cost. A technical opinion and report shall be provided without charge to the jurisdiction.
[A] 104.2.2.2 Preparer qualifications. The technical opinion and report shall be prepared by a qualified engineer, specialist, laboratory or specialty organization acceptable to the building official. The building official is authorized to require design submittals to be prepared by, and bear the stamp of, a registered design professional.
[A] 104.2.2.3 Content. The technical opinion and report shall analyze the properties of the design, operation or use of the building or premises and the facilities and appurtenances situated thereon to identify and propose necessary recommendations.
[A] 104.2.2.4 Tests. Where there is insufficient evidence of compliance with the provisions of this code, the building official shall have the authority to require tests as evidence of compliance. Test methods shall be as specified in this code or by other recognized test standards. In the absence of recognized test standards, the building official shall approve the testing procedures. Such tests shall be performed by a party acceptable to the building official.
[A] 104.2.3 Alternative materials, design and methods of construction and equipment. The provisions of this code are not intended to prevent the installation of any material or to prohibit any design or method of construction not specifically prescribed by the code, provided that any such alternative has been approved. Exception: Performance based alternative materials, designs or methods of construction and equipment complying with the International Code Council Performance Code. This exception shall not apply to alternative structural materials or to alternative structural designs.
[A] 104.2.3.1 Approval authority. An alternative material, design or method of construction shall be approved where the building official finds that the proposed alternative is satisfactory and complies with Sections 104.2.3 through 104.2.3.7, as applicable.
[A] 104.2.3.2 Application and disposition. Where required, a request to use an alternative material, design or method of construction shall be submitted in writing to the building official for approval. Where the alternative material, design or method of construction is not approved, the building official shall respond in writing, stating the reasons for alternative was not approved.
[A] 104.2.3.3 Compliance with code intent. An alternative material, design or method of construction shall comply with the intent of the provisions of this code.
[A] 104.2.3.4 Equivalency criteria. An alternative material, design or method of construction shall, for the purpose intended, be not less than the equivalent of that prescribed in this code with respect to all of the following, as applicable:
Quality.
Strength.
Effectiveness.
Durability.
Safety, other than fire safety.
Fire Safety.
[A] 104.2.3.5 Tests. Tests conducted to demonstrate equivalency in support of an alternative material, design or method of construction application shall be of a scale that is sufficient to predict performance of the end use configuration. Tests shall be performed by a party acceptable to the building official.
[A] 104.2.3.5.1 Fire Tests. Tests conducted to demonstrate equivalent fire safety in support of an alternative material, design or method of construction application shall be of a scale that is sufficient to predict fire safety performance of the end use configuration. Tests shall be performed by a party acceptable to the building official.
[A] 104.2.3.6 Reports. Supporting data, where necessary to assist in the approval of materials or assemblies not specifically provided for in this code, shall comply with Sections 104.2.3.6.1 and 104.2.3.6.2.
[A] 104.2.3.6.1 Evaluation reports. Evaluation reports shall be issued by an approved agency and use of the evaluation report shall require approval by the building official for the installation. The alternate material, design or method of construction and product evaluated shall be within the scope of the building official’s recognition of the approved agency. Criteria used for the evaluation shall be identified within the report and, where required, provided to the building official.
[A] 104.2.3.6.2 Other reports. Reports not complying with Section 104.2.3.6.1 shall describe criteria, including but not limited to any reference testing or analysis, used to determine compliance with code intent and justify code equivalence. The report shall be prepared by a qualified engineer, specialist, laboratory or specialty organization acceptable to the building official. The building official is authorized to require design submittals to be prepared by, and bear the stamp of, a registered deign professional.
[A] 104.2.3.7 Peer review. The building official is authorized to require submittal of a peer review report in conjunction with a request to use an alternative material, design or method of construction, prepared by a peer reviewer that is approved by the building official.
[A] 104.2.4 Modifications. Where there are practical difficulties involved in carrying out the provisions of this code, the building official shall have the authority to grant modifications for individual cases, provided that the building official shall first find that one or more special individual reasons make the strict letter of this code impractical, and that the modification is in compliance with the intent and purpose of this code and that such modification does not lessen health, accessibility, life and fire safety or structural requirements. The details of the written request for and action granting modifications shall be recorded and entered in the files of the department of building safety.
[A] 104.2.4.1 Flood hazard areas. The building official shall not grant modifications to any provision required in flood hazard areas as established by Section 1612.3 unless a determination has been made that:
A showing of good and sufficient cause that the unique characteristics of the size, configuration or topography of the site render the elevation standards of Section 1612 inappropriate.
A determination that failure to grant the variance would result in exceptional hardship by rendering the lot undevelopable.
A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety or extraordinary public expense; cause fraud on or victimization of the public; or conflict with existing laws or ordinances.
A determination that the variance is the minimum necessary to afford relief, considering the flood hazard.
Submission to the applicant of written notice specifying the difference between the design floor elevation and the elevation to which the building is to be built, stating that the cost of flood insurance will be commensurate with the increased risk resulting from the reduced floor elevation and stating that construction below the design flood elevation increases risks to life and property.
[A] 104.3 Applications and permits. The building official shall receive applications, review construction documents, issue permits, inspect the premises for which such permits have been issued and enforce compliance with the provisions of this code.
[A] 104.3.1 Determination of substantially improved or substantially damaged existing buildings and structures in flood hazard areas. For applications for reconstruction, rehabilitation, repair, alteration, addition or other improvement of existing buildings or structures located in flood hazard areas, the building official shall determine if the proposed work constitutes substantial improvement or repair of substantial damage. Where the building official determines that the proposed work constitutes substantial improvement or repair of substantial damage, and where required by this code, the building official shall require the building to meet the requirements of Section 1612, or Section R306 of the California Residential Code, as applicable.
[A] 104.4 Right of entry. Where it is necessary to make an inspection to enforce the provisions of this code, or where the building official has reasonable cause to believe that there exists in a structure or on a premises a condition that is contrary to or in violation of this code that makes the structure or premises unsafe, dangerous or hazardous, the building official is authorized to enter the structure or premises at all reasonable times to inspect or to perform the duties imposed by this code. If such structure or premises is occupied, the building official shall present credentials to the occupant and request entry. If such structure or premises is unoccupied, the building official shall first make a reasonable effort to locate the owner, the owner’s authorized agent or other person having charge or control of the structure or premises and request entry. If entry is refused, the building official shall have recourse to every remedy provided by law to secure entry.
[A] Warrant. Where the building official has first obtained a proper inspection warrant or other remedy provided by law to secure entry, an owner, the owner’s authorized agent, occupant or person having charge, care or control of the structure or premises shall not fail or neglect, after a proper request is made as herein provided, to permit entry therein by the building official for the purposes of inspection and examination pursuant to this code.
[A] 104.5 Identification. The building official shall carry proper identification when inspecting structures or premises in the performance of duties under this code.
[A] 104.6 Notices and orders. The building official shall issue necessary notices or orders to ensure compliance with this code. Notices of violations shall be in accordance with Section 114.
[A] 104.7 Official records. The building official shall keep official records as required by Section 104.7.1 through 104.7.5. Such official records shall be retained for not less than 5 years or for as long as the building or structure to which such records relate remains in existence, unless otherwise provided by other regulations.
[A] 104.7.1 Approvals. A record of approvals shall be maintained by the building official and shall be available for public inspection during business hours in accordance with applicable laws.
[A] 104.7.2 Inspections. The building official shall keep a record of each inspection made, including notices and orders issued, showing the findings and disposition of each.
[A] 104.7.3 Code alternatives and modifications. Application for alternative materials, design and methods of construction and equipment in accordance with Section 104.2.3; modifications in accordance with Section 104.2.4; and documentation of the final decision of the building official for either shall be in writing and shall be retained in the official records.
[A] 104.7.4 Tests. The building official shall keep a record of tests conducted to comply with Sections 104.2.2.4 and 104.2.3.5.
[A] 104.7.5 Fees. The building official shall keep a record of fees collected and refunded in accordance with Section 109.
[A] 104.8 Liability. The building official, member of the board of appeals or employee charged with the enforcement of this code, while acting for the jurisdiction in good faith and without malice in the discharge of the duties required by this code or other pertinent law or ordinance, shall not thereby be rendered personally liable, either civilly or criminally, and is hereby relieved from personal liability for any damage accruing to persons or property as a result of any act or by reason of any act or omission in the discharge of official duties.
[A] 104.8.1 Legal defense. Any suit or criminal complaint instituted against any officer or employee because of an act performed by that officer or employee in the lawful discharge of duties under the provisions of this code or other laws or ordinances implemented through the enforcement of this code shall be defended by legal representatives of the jurisdiction until the final termination of the proceedings. The building official or any subordinate shall not be liable for costs in an action, suit or proceeding that is instituted in pursuance of the provisions of this code.
[A] 104.9 Approved materials and equipment. Materials, equipment and devices approved by the building official shall be constructed and installed in accordance with such approval.
[A] 104.9.1 Materials and equipment reuse. Materials, equipment and devices shall not be reused unless such elements are in good working condition and approved.
(Ord. 22-2245, part, 2022; Ord. 25-2278, Att. A (part), 2025)
16.04.050 Section 105 - Permits.¶
Amend and Adopt Section [A] 105 of the 2025 California Building Code as follows:
[A] 105.1 Required. Any owner or owner's authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by this code, or to cause any such work to be performed, shall first make application to the Building Official and obtain the required permit.
[A] 105.2 Work exempt from permit. Exemptions from permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of the City of Cupertino. Permits shall not be required for the following:
Building:
One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided the floor area is not greater than 120 square feet (11 m2). It is permissible that these structures still be regulated by Section 710A, despite exemption from permit.
Fences, other than swimming pool barriers, not over 7 feet (2134 mm) high.
Oil derricks.
Retaining walls that are not over 4 feet (1219 mm) in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge or impounding Class I, II or IIIA liquids.
Water tanks supported directly on grade if the capacity is not greater than 5,000 gallons (18,925 L) and the ratio of height to diameter or width is not greater than 2:1.
Sidewalks and driveways not more than 30 inches (762 mm) above adjacent grade, and not over any basement or story below and are not part of an accessible route.
Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work.
Temporary motion picture, television and theater stage sets and scenery.
Prefabricated swimming pools accessory to a group R-3 occupancy that are less than 24 inches (610 mm) deep, are not greater than 5,000 gallons (18,925 L) and are installed entirely about ground.
Shade cloth structures constructed for nursery or agricultural purposes, not including service systems.
Swing and other playground equipment accessory to detached one- and two-family dwellings.
Window awnings in Group R-3 and U occupancies, supported by an exterior wall that do not project more than 54 inches (1372 mm) from the exterior wall and do not require additional support.
Nonfixed and movable fixtures, cases, racks, counters and partitions not over 5 feet 9 inches (1753 mm) in height.
Electrical:
Repairs and maintenance: Minor repair work, including the replacement of lamps or the connection of approved portable electrical equipment to approved permanently installed receptacles.
Radio and television transmitting stations: The provisions of this code shall not apply to electrical equipment used for radio and television transmissions, but do apply to equipment and wiring for a power supply and the installation of towers and antennas.
Temporary testing systems: A permit shall not be required for the installations of any temporary system required for the testing or servicing of electrical equipment or apparatus.
Gas:
Portable heating appliance.
Replacement of any minor part that does not alter approval of equipment or make such equipment unsafe.
Mechanical:
Portable heating appliance.
Portable ventilation equipment.
Portable cooling unit.
Steam, hot or chilled water piping within any heating or cooling equipment regulated by this code.
Replacement of any part that does not alter its approval or make it unsafe.
Portable evaporative cooler.
Self-contained refrigeration system containing 10 pounds (4.54 kg) or less of refrigerant and actuated by motors of 1 horsepower (0.75 kW) or less.
Plumbing:
The stopping of leaks in drains, water, soil, waste or vent pipe, provided, however, that if any concealed trap, drain pipe, water, soil, waste or vent pipe becomes defective and it becomes necessary to remove and replace the same with new material, such work shall be considered as new work and a permit shall be obtained and inspection made as provided in this code.
The clearing of stoppages or the repairing of leaks in pipes, valves or fixtures and the removal and reinstallation of water closets, provided such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures.
[A] 105.2.1 Emergency repairs. Where equipment replacements and repairs must be performed in an emergency situation, the permit application shall be submitted within the next working business day to the building official.
[A] 105.2.2 Public service agencies. A permit shall not be required for the installation, alteration or repair of generation, transmission, distribution or metering or other related equipment that is under the ownership and control of public service agencies by established right.
[A] 105.3 Application for permit. To obtain a permit, the applicant shall first file an application therefor in writing on a form furnished by the City of Cupertino for that purpose. Such application shall:
Identify and describe the work to be covered by the permit for which application is made.
Describe the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building or work.
Indicate the use and occupancy for which the proposed work is intended.
Be accompanied by construction documents and other information as required in Section 107.
State the valuation of the proposed work.
Be signed by the applicant, or the applicant's authorized agent.
Give such other data and information as required by the building official.
[A] 105.3.1 Action on application. The building official shall examine or cause to be examined applications for permits and amendments thereto within a reasonable time after filing. If the application or the construction documents do not conform to the requirements of pertinent laws, the building official shall reject such application in writing, stating the reasons therefor. If the building official is satisfied that the proposed work conforms to the requirements of this code and laws and ordinances applicable thereto, the building official shall issue a permit therefor as soon as practicable.
[A] 105.3.2 Time limitation of application. An application for a permit for any proposed work shall be deemed to have been abandoned 180 days after the date of filing, unless such application has been pursued in good faith or a permit has been issued; except that the Building Official is authorized to grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated.
[A] 105.4 Validity of permit. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. Permits presuming to give authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. The Building Official is also authorized to prevent occupancy or use of a structure where in violation of this code or of any other ordinances of the City of Cupertino.
[A] 105.5 Expiration. On or after January 1, 2019, every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 12 months after the time the work is commenced. The Building Official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
[A] 105.6 Suspension or revocation. The Building Official is authorized to suspend or revoke a permit issued under the provisions of this code wherever the permit is issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any ordinance or regulation or any of the provisions of this code.
[A] 105.7 Placement of permit. The building permit or copy shall be posted on site at a location visible from the street frontage on and shall remain until the completion of the project.
(Ord. 22-2245, part, 2022; Ord. 25-2278, Att. A (part), 2025)
16.04.060 Section 107 - Construction Documents.¶
Adopt Section [A] 107 of the 2025 California Building Code as follows:
[A] 107.1 General. Submittal documents consisting of construction documents, statement of special inspections, geotechnical report and other data shall be submitted in digital format with each permit application. The construction document shall be prepared by a registered design professional where required by the building official. Where special conditions exist, the building official is authorized to require additional construction documents to be prepared by a registered design professional.
Exception: The building official is authorized to waive the submission of construction documents and other data not required to be prepared by a registered design professional if it is found that the nature of the work applied for is such that the review of construction documents is not necessary to obtain compliance with this code.
[A] 107.2 Construction documents. Construction documents shall be in accordance with Sections 107.2.1 through 107.2.8.
[A] 107.2.1 Information on Construction Documents. Construction documents shall be dimensioned and drawn on suitable material. Electronic media documents are permitted to be submitted where approved by the building official. Construction documents shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of this code and relevant laws, ordinances, rules and regulations, as determined by the building official.
[A] 107.2.2 Fire Protection System Shop Drawings. Shop drawings for the fire protection system(s) shall be submitted to indicate conformance to this code and the construction documents and shall be approved prior to the start of system installation. Shop drawings shall contain all information as required by the referenced installation standards in Chapter 9.
[A] 107.2.3 Means of Egress. The construction documents shall show in sufficient detail the location, construction, size and character of all portions of the means of egress including the path of the exit discharge to the public way in compliance with the provisions of this code. In other than occupancies in Groups R-2, R-2.1 and R-3, the construction documents shall designate the number of occupants to be accommodated on every floor, and in all rooms and spaces.
[A] 107.2.4 Exterior Wall Envelope. Construction documents for all buildings shall describe the exterior wall envelope in sufficient detail to determine compliance with this code. The construction documents shall provide details of the exterior wall envelope as required, including flashing, intersections with dissimilar materials, corners, end details, control joints, intersections at roof, eaves or parapets, means of drainage, water-resistive membrane and details around openings.
The construction documents shall include manufacturer's installation instructions that provide supporting documentation that the proposed penetration and opening details described in the construction documents maintain the weather resistance of the exterior wall envelope. The supporting documentation shall fully describe the exterior wall system that was tested, where applicable, as well as the test procedure used.
[A] 107.2.5 Exterior Balconies and Elevated Walking Surfaces. Where balconies or other elevated walking surfaces are exposed to water from direct or blowing rain, snow, or irrigation, and the structural framing is protected by an impervious moisture barrier, the construction documents shall include details for all elements of the impervious moisture barrier system. The construction documents shall include manufacturer's installation instructions.
[A] 107.2.6 Site Plan. The construction documents submitted with the application for permit shall be accompanied by a site plan showing to scale the size and location of new construction and existing structures on the site, distances from lot lines, the established street grades and the proposed finished grades and, as applicable, flood hazard areas, floodways, and design flood elevations; and it shall be drawn in accordance with an accurate boundary line survey. In the case of demolition, the site plan shall show construction to be demolished and the location and size of existing structures and construction that are to remain on the site or plot. The building official is authorized to waive or modify the requirement for a site plan where the application for permit is for alteration or repair or where otherwise warranted.
[A] 107.2.6.1 Design Flood Elevations. Where design flood elevations are not specified, they shall be established in accordance with Section 1612.3.1.
[A] 107.2.7 Structural Information. The construction documents shall provide the information specified in Section 1603.
[A] 107.2.8 Relocatable Buildings. Construction documents for relocatable buildings shall comply with Section 3113.
[A] 107.3 Examination of documents. The building official shall examine or cause to be examined the accompanying submittal documents and shall ascertain by such examinations whether the construction indicated and described is in accordance with the requirements of this code and other pertinent laws or ordinances.
[A] 107.3.1 Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by stamp, as "Reviewed for Code Compliance". It shall be the responsibility of the owner or owner's representative to obtain a hard-copy of the approved plans and documents which shall be kept at the site of work and shall be open to inspection by the building official or a duly authorized representative.
[A] 107.3.2 Previous approvals. This code shall not require changes in the construction documents, construction or designated occupancy of a structure for which a lawful permit has been heretofore issued or otherwise lawfully authorized, and the construction of which has been pursued in good faith within 180 days after the effective date of this code and has not been abandoned.
[A] 107.3.3 Phased approval. The building official is authorized to issue a permit for the construction of foundations or any other part of a building or structure before the construction documents for the whole building or structure have been submitted, provided that adequate information and detailed statements have been filed complying with pertinent requirements of this code. The holder of such permit for the foundation or other parts of a building or structure shall proceed at the holder's own risk with the building operation and without assurance that a permit for the entire structure will be granted.
[A] 107.3.4 Design professional in responsible charge. Where it is required that documents be prepared by a registered design professional, the building official shall be authorized to require the owner or the owner's authorized agent to engage and designate on the building permit application a registered design professional who shall act as the registered design professional in responsible charge. If the circumstances require, the owner or the owner's authorized agent shall designate a substitute registered design professional in responsible charge who shall perform the duties required of the original registered design professional in responsible charge. The building official shall be notified in writing by the owner or the owner's authorized agent if the registered design professional in responsible charge is changed or is unable to continue to perform the duties.
The registered design professional in responsible charge shall be responsible for reviewing and coordinating submittal documents prepared by others, including phased and deferred submittal items, for compatibility with the design of the building.
[A] 107.3.4.1 Deferred submittals. Deferral of any submittal items shall have the prior approval of the building official. The registered design professional in responsible charge shall list the deferred submittals on the construction documents for review by the building official.
Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and found to be in general conformance to the design of the building. The deferred submittal items shall not be installed until the deferred submittal documents have been approved by the building official.
[A] 107.4 Amended construction documents. Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in compliance with the approved construction shall be submitted for approval as an amended set of construction documents.
[A] 107.5 Retention of construction documents. One set of approved construction documents shall be retained by the building official for a period of not less than required by the approved City of Cupertino's document retention plan.
(Ord. 22-2245, part, 2022; Ord. 25-2278, Att. A (part), 2025)
16.04.070 Responsibility of permittee.¶
Responsibility of permittee. Building permits shall be presumed to incorporate the provision that the applicant, the applicant's agent, employees or contractors shall carry out the proposed work in accordance with the approved plans and with all requirements of this code and any other laws or regulations applicable thereto, whether specified or not. No approval shall relieve or exonerate any person from the responsibility of complying with the provisions and intent of this code.
(Ord. 22-2245, part, 2022)
16.04.080 Section 109 - Fees.¶
Fees shall be paid to the city as set forth in the latest resolution adopted by the city.
(Ord. 22-2245, part, 2022)
16.04.090 Section 110 - Inspections.¶
Amend and Adopt Section [A] 110 of the 2025 California Building Code as follows:
[A] 110.1 General. Construction or work for which a permit is required shall be subject to inspection by the Building Official and such construction or work shall remain accessible and exposed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this code or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of this code or of other ordinances of the jurisdiction shall not be valid. It shall be the duty of the owner or the owner’s authorized agent to cause the work to remain visible and able to be accessed for inspection purposes. Neither the Building Official nor the City of Cupertino shall be liable for expense entailed in the removal or replacement of any material required to allow inspections.
[A] 110.2 Preliminary inspection. Before issuing a permit, the Building Official is authorized to examine or cause to be examined buildings, structures and sites for which an application has been filed.
[A] 110.3 Required inspections. The Building Official, upon notification, shall make the inspections set forth in Section 110.3.1 through 110.3.12.
[A] 110.3.1 Footing and Foundation Inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place prior to inspection. Materials for the foundation shall be on the job, except where concrete is ready mixed in accordance with ASTM C94, the concrete need not be on the job.
[A] 110.3.2 Concrete Slab and Under-Floor Inspection. Concrete slab and under-floor inspections shall be made after in-slab or under-floor reinforcing steel and building service equipment, conduit, piping accessories and other ancillary equipment items are in place, but before any concrete is placed or floor sheathing installed, including the subfloor.
[A] 110.3.3 Lowest Floor Elevation. In flood hazard areas, upon placement of the lowest floor, including the basement, and prior to further vertical construction, the elevation certification required in Section 1612.4 or the California Residential Code, as applicable, shall be submitted to the building official.
[A] 110.3.4 Frame Inspection. Framing inspections shall be made after the roof deck or sheathing, all framing, fire-blocking and bracing are in place and pipes, chimneys and vents to be concealed are complete and the rough electrical, plumbing, heating wires, pipes and ducts are approved.
[A] 110.3.4.1 Moisture Content Verification. Moisture content of framing members shall be verified in accordance with the California Green Building Standards Code (CALGreen), Chapter 4, Division 4.5.
[A] 110.3.5 Types IV-A, IV-B and IV-C connection protection inspection. In building of Types IV-A, IV-B and IV-C construction, where connection fire-resistance ratings are provided by wood cover calculated to meet the requirements of Section 2304.10.1, inspection of the wood cover shall be made after the cover is installed, but before any other coverings or finishes are installed.
[A] 110.3.6 Lath, Gypsum Board and Gypsum Panel Product Inspection. Lath, gypsum board and gypsum panel product inspections shall be made after lathing, gypsum board and gypsum panel products, interior and exterior, are in place, but before any plastering is applied or gypsum board and gypsum panel product joints and fasteners are taped and finished.
Exception: Gypsum board and gypsum panel products that are not part of a fire- resistance-rated assembly or a shear assembly.
[A] 110.3.7 Weather-Exposed Balcony and Walking Surface Waterproofing. Where balconies or other elevated walking surfaces are exposed to water from direct or blowing rain, snow or irrigation, and the structural framing is protected by an impervious moisture barrier, all elements of the impervious moisture barrier system shall not be concealed until inspected and approved.
Exception: Where special inspections are provided in accordance with Section 1705.1.1, Item 3.
[A] 110.3.8 Fire- and smoke-resistant penetrations. Protection of joints and penetrations in fire-resistance-rated assemblies, smoke barriers and smoke partitions shall not be concealed from view until inspected and approved.
[A] 110.3.9 Energy efficiency inspections. Inspections shall be made to determine compliance with Chapter 13 and shall include, but not be limited to, inspection for: envelope insulation R- and U-values, fenestration U-value, duct system R-value, and HVAC and water-heating equipment efficiency.
[A] 110.3.10 Other Inspections. In addition to the inspections specified in Sections 110.3.1 through 110.3.9, the building official is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of this code and other laws that are enforced by the department of building safety.
[A] 110.3.11 Special Inspections. For special inspections, see Chapter 17.
[A] 110.3.12 Final inspection. The final inspection shall be made after all work required by the building permit is completed.
[A] 110.3.12.1 Flood hazard documentation. If located in a flood hazard area, documentation of the elevation of the lowest floor or the elevation of dry floodproofing, if applicable, as required in Section 1612.4 shall be submitted to the building official prior to final inspection.
[A] 110.4 Inspection agencies. The building official is authorized to accept reports of approved inspection agencies, provided such agencies satisfy the requirements as to qualifications and reliability.
[A] 110.5 Inspection requests. It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work that are required by this code.
[A] 110.6 Approval required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or notify the permit holder or his or her agent wherein the same fails to comply with this code. Any portions that do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the building official.
(Ord. 22-2245, part, 2022; Ord. 25-2278, Att. A (part), 2025)
16.04.100 Section 111 - Certificate of Occupancy.¶
Adopt Section [A] 111 of the 2025 California Building Code to read as follows:
[A] 111.1 Change of Occupancy. A building or structure shall not be used or occupied in whole or in part, and a change of occupancy of a building or structure or portion thereof shall not be made, until the Building Official has issued a certificate of occupancy therefor as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of any provision of this code or any ordinance of the City of Cupertino. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the City of Cupertino shall not be valid.
Exception: Certificates of occupancy are not required for work exempt from permits in accordance with Section 105.2.
[A] 111.2 Certificate issued. After the Building Official inspects the building or structure and finds no violations of the provisions of this code or other laws that are enforced by the Building Department, the Building Official may issue a certificate of occupancy that contains the following:
The building permit number.
The address of the building or structure.
The name and address of the owner or the owner’s authorized agent.
A description of that portion of the structure for which the certificate is issued.
A statement that the described portion of the structure has been inspected for compliance with the requirements of this code.
The name of the Building Official.
The edition of the code under which the permit was issued.
The use and occupancy, in accordance with the provision of Chapter 3 of the California Building Code.
The type of construction as defined in Chapter 6 of the California Building Code.
The design occupant load.
Where an automatic sprinkler system is provided, whether the sprinkler system is required.
Any special stipulations and conditions of the building permit.
[A] 111.3 Temporary occupancy. The Building Official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The Building Official shall set a time period during which the temporary certificate of occupancy is valid.
[A] 111.4 Revocation. The Building Official is authorized to suspend or revoke a certificate of occupancy or completion issued under the provisions of this code, in writing, wherever the certificate is issued in error, or on the basis of incorrect information supplied, or where it is determined that the building or structure or portion thereof is in violation of the provisions of this code or other ordinance of the City of Cupertino.
(Ord. 22-2245, part, 2022; Ord. 25-2278, Att. A (part), 2025)
16.04.110 Section 112 – Service Utilities.¶
Adopt Section [A] 112 of the 2025 California Building Code to read as follows:
[A] 112.1 Connection of service utilities. A person shall not make connections from a utility, a source of energy, fuel, or power, or a water system or sewer system to any building or system that is regulated by this code for which a permit is required, until approved by the building official.
[A] 112.2 Temporary connection. The building official shall have the authority to authorize the temporary connection of the building or system to the utility, the source of energy, fuel, or power, or the water system or sewer system for the purpose of testing systems or for use under a temporary approval.
[A] Authority or disconnect service utilities. The building official shall have the authority to authorize disconnection of utility service to the building, structure or system regulated by the code and the referenced codes and standards in case of emergency where necessary to eliminate an immediate hazard to life or property or where such utility connection has been made without the approval required by Sections 112.2 or 112.2. The building official shall notify the serving utility, and wherever possible the owner or the owner’s authorized agent and occupant of the building, structure or service system of the decision to disconnect prior to taking such action. If not notified prior to disconnecting, the owner or the owner’s authorized agent or occupant of the building, structure or service system shall be notified in writing, as soon as practical thereafter.
(Ord. 25-2278, Att. A (part), 2025)
16.04.120 Section 113 - Means of Appeals.¶
Adopt Section [A] 113 of the 2025 California Building Code and to read as follows:
[A] 113.1 General. In order to hear and decide appeals of orders, decisions or determinations made by the building official relative to application and interpretation of this code, there shall be and is hereby created a board of appeals. The board of appeals shall be appointed by the applicable governing authority and shall hold office at its pleasure. The board shall adopt rules of procedure for conducting its business and shall render all decisions and finding in writing to the appellant with a duplicate copy to the Building Official. In the event where no such board of appeals has been established, the City Council shall serve as said appeals board.
[A] 113.2 Limitations on authority. An application for appeal shall be based on a claim that the true intent of this code or the rules legally adopted thereunder have been incorrectly interpreted, the provisions of this code do not fully apply or an equivalent or better form of construction is proposed. The board shall not have authority to waive requirements of this code.
[A] 113.3 Qualifications for Board of Appeals. The Board shall consist of members who are qualified by experience and training to pass on matters pertaining to building construction and are not employees of the City of Cupertino.
[A] 113.4 Administration. The building official shall take action without delay in accordance with the decision of the board.
(Ord. 22-2245, part, 2022; Ord. 25-2278, Att. A (part), 2025)
16.04.130 Section 114 - Violations.¶
Adopt Section [A] 114 of the 2025 California Building Code to read as follows:
[A] 114.1 Unlawful acts. It shall be unlawful for any person, firm or corporation to erect, construct, alter, extend, repair, move, remove, demolish or occupancy any building, structure or equipment regulated by the codes identified in this title, or cause same to be done, in conflict with or in violation of any of the provisions of this code.
[A] 114.2 Notice of violation. The building official is authorized to serve a notice of violation or order on the person responsible for the erection, construction, alteration, extension, repair, moving, removal, demolition or occupancy of a building or structure in violation of any provisions of any code identified in this title, or in violation of a permit or certificate issued under the provisions of this code. Such order shall direct the discontinuance of the illegal action or condition and the abatement of the violation.
[A] 114.3 Prosecution of violation. If the notice of violation is not complied with promptly, the building official is authorized to request the legal counsel of the City of Cupertino to institute the appropriate proceeding at law or in equity to restrain, correct or abate such violation, or to require the removal or termination of the unlawful occupancy of the building or structure in violation of the provisions of this code or of the order or direction made pursuant thereto.
[A] 114.4 Violation penalties. Any person who violates a provision of this code or fails to comply with any of the requirements thereof or who erects, constructs, alters or repairs a building or structure in violation of the approved construction documents or directive of the building official, or of a permit or certificate issued under the provisions of this code, shall be subject to penalties as prescribed by law.
(Ord. 22-2245, part, 2022; Ord. 25-2278, Att. A (part), 2025)
16.04.140 Section 115 - Stop Work Order.¶
Adopt Section [A] 115 of the 2025 California Building Code to read as follows:
[A] 115.1 Authority. Whenever the Building Official finds any work regulated by this code being performed in a manner either contrary to the provisions of any code identified in this title or dangerous or unsafe, the Building Official is authorized to issue a stop work order.
[A] 115.2 Issuance. The stop work order shall be in writing and shall be given to the owner of the property involved, or to the owner’s agent, or to the person doing the work. Upon issuance of a stop work order, the cited work shall immediately cease. The stop work order shall state the reason for the order, and the conditions under which the cited work will be permitted to resume.
[A] 115.3 Emergencies. Where an emergency exists, the building official shall not be required to give a written notice prior to stopping the work.
[A] 115.4 Failure to comply. Any person who shall continue any work after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject to fines established by the authority having jurisdiction.
(Ord. 22-2245, part, 2022; Ord. 25-2278, Att. A (part), 2025)
16.04.160 Section 116 – Unsafe Structures and Equipment.¶
Adopt Section [A] 116 of the 2025 California Building Code to read as follows:
[A] 116.1 Unsafe conditions. Structures or existing equipment that are or hereafter become unsafe, insanitary or deficient because of inadequate means of egress facilities, inadequate light and ventilation, or that constitute a fire hazard, or are otherwise dangerous to human life or the public welfare, or that involve illegal or improper occupancy or inadequate maintenance, shall be deemed an unsafe condition. Unsafe structures shall be taken down and removed or made safe, as the building official deems necessary and as provided for in this section. A vacant structure that is not secured against unauthorized entry shall be deemed unsafe.
[A] 116.2 Record. The building official shall cause a report to be filed on an unsafe condition. The report shall state the occupancy of the structure and the nature of the unsafe condition.
[A] 116.3 Notice. If an unsafe condition is found, the building official shall serve on the owner of the structure, or the owner’s authorized agent, a written notice that describes the condition deemed unsafe and specifies the required repairs or improvements to be made to abate the unsafe condition, or that requires the unsafe structure to be demolished within a stipulated time. Such notice shall require the person thus notified to declare immediately to the building official acceptance or rejection of the terms of the order.
[A] 116.4 Method of service. Such notice shall be deemed properly served where a copy thereof is served in accordance with one of the following methods:
A copy is delivered to the owner personally.
A copy is sent by certified or registered mail addressed to the owner at the last known address with the return receipt requested.
A copy is delivered in any other manner as prescribed by local law. If the certified or registered letter is returned showing that the letter was not delivered, a copy thereof shall be posted in a conspicuous place in or about the structure affected by such notice. Service of such notice in the foregoing manner on the owner’s authorized agent shall constitute service of notice on the owner.
[A] 116.5 Restoration or abatement. Where the structure or equipment determined to be unsafe by the building official is restored to a safe condition, the owner, the owner’s authorized agent, operator or occupant of a structure, premises or equipment deemed unsafe by the building official shall abate or cause to be abated or corrected such unsafe conditions either by repair, rehabilitation, demolition or other approved corrective action. To the extent that repairs, alterations or additions are made or a change of occupancy occurs during the restoration of the structure, such repairs, alterations, additions and change of occupancy shall comply with the requirements of the California Existing Building Code.
(Ord. 25-2278, Att. A (part), 2025)
16.04.220 Chapter 5 - General Building Heights and Areas.¶
Amend and Adopt Section 501.2 of the 2025 California Building Code and amend to read as follows:
502.1 Address Identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained.
No Certificate of Occupancy or final building approval for new construction or alterations shall be granted until the building or residence has a street address number posted. Subdivisions and Planned Developments shall submit a numbering schedule for approval by the Building Department and the Fire Department. All commercial buildings having a single address assigned with multi-suite arrangements shall have the suite-numbering system approved or assigned by the Building Department with an approved copy to the Fire Department for emergency use.
(Ord. 22-2245, part, 2022; Ord. 19-2189, § 1 (part), 2019; Ord. 25-2278, Att. A (part), 2025)
16.04.240 (Reserved)¶
16.04.260 Chapter 9 - Fire Protection and Life Safety Systems.¶
Amend Section 903.2 of the 2025 California Building Code to read as follows:
903.2 Where required. Approved automatic sprinkler systems in new and existing buildings and structures shall be provided in the locations described in this Section or in Sections 903.2.1 through 903.2.18 whichever is the more restrictive and Sections 903.2.14 through 903.2.21.
For the purposes of this section, firewalls and fire barriers used to separate building areas shall be constructed in accordance with the California Building Code and shall be without openings or penetrations.
- An approved automatic sprinkler system shall be provided throughout all new buildings and structures, other than Group R occupancies, except as follows: Exceptions:
a. Buildings and structures not located in any Wildland-Urban Interface and not exceeding 1,200 square feet of fire area.
b. Buildings and structures located in any Wildland-Urban Interface Fire Area and not exceeding 500 square feet of fire area.
c. Group S-2 or U occupancies, including photovoltaic support structures, used exclusively for vehicle parking which meet all of the following conditions:
i. Noncombustible construction.
ii. Maximum 5,000 square feet in building area.
iii. Structure is open on not less than three (3) sides or not less than 75% of structure perimeter.
iv. Minimum of 10 feet separation from existing buildings, or similar structures, unless area is separated by fire walls complying with CBC 706.
d. Canopies, constructed in accordance with CBC 406.7.2, used exclusively for weather protection of vehicle fueling pads per CBC 406.7.1 and not exceeding 5,000 square feet of fire area.
e. Temporary Construction Trailers less than 2,500 square feet permitted for a period of not more than one year.
- An automatic sprinkler system shall be installed throughout all new buildings with a Group R fire area. Exception: Detached Accessory Dwelling Unit, provided that all of the following are met:
a. The unit meets the definition of an Accessory Dwelling Unit as defined in the Government Code Section 65852.2.
b. The existing primary residence does not have automatic fire sprinklers.
c. The accessory detached dwelling unit does not exceed 1,200 square feet in size.
d. The unit is on the same lot as the primary residence.
e. The unit meets all apparatus access and water supply requirements of Chapter 5 and Appendix B of the 2025 California Fire Code.
An approved automatic fire sprinkler system shall be installed in new manufactured homes (as defined in California Health and Safety Code Sections 18007 and 18009) and multifamily manufactured homes with two dwelling units (as defined in California Health and Safety Code Section 18008.7) in accordance with Title 25 of the California Code of Regulations.
An automatic sprinkler system shall be installed throughout existing buildings with a Group R fire area when additions are made causing the fire area to exceed 3,600 square feet. Exception: Additions where all of the following are met:
a. Building addition does not exceed 500 square feet.
b. The resultant structure meets all water supply requirements of Chapter 5 and Appendix B of the 2025 California Fire Code.
An automatic sprinkler system shall be provided throughout existing Group A, B, E, F, L, M, S and U buildings and structures, when additions are made that increase the fire area to more than 3,600 square feet or that create conditions described in Sections 903.2.1 through 903.2.18.
Any change in the character of occupancy or in use of any building with a building area equal to or greater than 3,600 square feet which, in the opinion of the fire code official or Building Official, would place the building into a more hazardous division of the same occupancy group or into a different group of occupancies and constitutes a greater degree of life safety1 or increased fire risk2, shall require the installation of an approved automatic fire sprinkler system.
1 Life Safety - Shall include, but not limited to: Increased occupant load, public assembly areas, public meeting areas, churches, indoor amusement attractions, buildings with complex exiting systems due to increased occupant loads, large schools/day-care facilities, large residential care facilities with non-ambulatory;
2 Fire Risks - Shall include, but not limited to: High-piled combustible storage, woodworking operations, hazardous operations using hazardous materials, increased fuel loads (storage of moderate to highly combustible materials), increased sources of ignition (welding, automotive repair with the use of flammable liquids and open flames).
Add Section 903.2.11.7 to the 2025 California Building Code to read as follows:
903.2.11.7 Chemical Fume Hood Fire Protection. Approved automatic fire extinguishing systems shall be provided in chemical fume hoods in the following cases:
Existing hoods having interiors with a flame spread index greater than 25 in which flammable liquids are handled
If a hazard assessment determines that an automatic extinguishing system is required for the chemical fume hood, then the applicable automatic fire protection system standard shall be followed.
Amend Section 907.8 the 2025 California Building Code to read as follows:
907.8 Inspection, testing and maintenance. The maintenance and testing schedules and procedures for fire alarm and fire detection systems shall be in accordance with Sections 907.8.1 through 907.8.4 of the 2025 California Fire Code and NFPA 72. Records of inspection, testing and maintenance shall be documented using NFPA 72 record of inspection and testing forms.
(Ord. 22-2245, part, 2022; Ord. 25-2278, Att. A (part), 2025)
16.04.300 Chapter 15 - Roof Assemblies and Rooftop Structures.¶
Amend Section 1505.1.1 of the 2025 California Building Code to read as follows:
1505.1.1 Roofing requirements within Fire hazard Severity Zones or in the Wildland-Urban Interface (WUI). Roofing requirements for structures located within Fire Hazard Severity Zones or in the Wildland-Urban Interface (WUI) shall also comply with Sections 504.2 and 507.1 of the 2025 California Wildland-Urban Interface Code.
Amend Section 1505.1.2 of the 2025 California Building Code to read as follows:
1505.1.2 Roof coverings within all other areas other than Fire Hazard Severity Zones or a Wildland-Urban Interface (WUI). The entire roof covering of every existing structure where more than 50 percent of the total roof area is replaced within any one-year period, the entire roof covering o every new structure, and any roof covering applied in the alteration, repair or replacement of the roof of every existing structure, shall be a fire-retardant roof covering that is at least Class A fire classification.
(Ord. 22-2245, part, 2022; Ord. 25-2278, Att. A (part), 2025)
16.04.320 Chapter 17 – Special Inspection and Tests.¶
Amend Section 1705.3 Exception #1 of the 2025 California Building Code to read as follows:
1705.3 Concrete Construction.¶
The special inspections and verifications for concrete construction shall be as required by this section and Table 1705.3.
Exception: Special inspections and tests shall not be required for:
- Isolated spread concrete footings of buildings three stories or less above grade plane that are fully supported on earth or rock, where the structural design of the footing is based on a specified compressive strength, f'c, no greater than 2,500 pound per square inch (psi) (17.2 Mpa).
(Ord. 22-2245, part, 2022; Ord. 19-2189, § 1 (part), 2019; Ord. 25-2278, Att. A (part), 2025)
16.04.340 Chapter 19 – Concrete.¶
Delete Section 1905.6 of the 2025 California Building Code and ACI 318 Section 14.1.4 and replace with the following:
1905.6 ACI 318, Section 14.1.4.
14.1.4 - Plain concrete in structures assigned to Seismic Design Category C, D, E or F.¶
14.1.4.1- Structures assigned to Seismic Design Category C, D, E or F shall not have…¶
(a) Isolated footings of plain concrete supporting pedestals or columns are permitted, provided the projection of the footing beyond the face of the supported member does not exceed the footing thickness.
Exception:
In detached one and two-family dwelling three stories or less in height, the projection of the footing beyond the face of the supported member is permitted to exceed the footing thickness.
(b) Plain concrete footing supporting walls are permitted, provided the footings have at least two continuous longitudinal reinforcing bars. Bars shall not be smaller than No. 4 and shall have a total area of not less than 0.002 times the gross cross- sectional area of the footing. A minimum of one bar shall be provided at the top and bottom of the footing. Continuity of reinforcement shall be provided at corners and intersections.
Exception:
In detached one and two-family dwellings three stores or less in height and constructed with stud bearing walls, plain concrete footings with at least two continuous longitudinal reinforcing bars not smaller than No. 4 are permitted to have a total area of less than 0.002 times the gross cross-sectional area of the footing.
(Ord. 22-2245, part, 2022; Ord. 19-2189, § 1 (part), 2019; Ord. 25-2278, Att. A (part), 2025)
16.04.360 Chapter 23 – Wood.¶
Amend Table 2308.10.3(1) 2308.10.3(1) of the 2025 California Building Code, to add a new footnote "b" to the end of California Building Code Table 2308.10.3(1) to read as follows:
b. In Seismic Design Categories D, E, and F, Methods GB, SFB, HPS and PBS is not permitted and the use of Method PCP is limited to one-story buildings and structures.
Add Section 2308.10.3.1 to the 2025 California Building Code to read as follows:
2308.10.3.1 Limits on methods GB, SFB, HPS, PBS and PCP. In Seismic Design Categories D, E, and F, Methods GB, SFB, HPS, and PBS are not permitted for use as intermittent braced wall panels, but gypsum board is permitted to be installed when required by this Section to be placed on the opposite side of the studs from other types of braced wall panel sheathing. In Seismic Design Categories D, E, and F the use of Method PCP is limited to one-story building and structures.
(Ord. 22-2245, part, 2022; Ord. 19-2189, § 1 (part), 2019; Ord. 25-2278, Att. A (part), 2025; Ord. 26-2281, 2026)
16.04.380 (Reserved)¶
(Ord. 22-2245, part, 2022; Ord. 19-2189, § 1 (part), 2019; Ord. 25-2278, Att. A (part), 2025)
Get a plain-English answer with a citation back to this text.
Ask AI about this code