Skip to content

Division 8 — Special Requirements For Certain Uses

§ 9148.7. Sidewalk, Parking Lot and Tent Sales.

Carson Zoning Code · 2026-06 edition · updated 2026-07-25 · Carson

In connection with temporary sidewalk, parking lot, and tent sales, the following requirements shall be met:

  • A. Only nonprofit organizations and merchants with a permanent location may conduct such sales.

  • B. The applicant shall obtain written approval to conduct such sales from the property owner.

  • C. The event shall be conducted outside an enclosed building and shall not encroach upon public rights-of-way.

  • D. The applicant shall submit adequate plot plans depicting pedestrian and vehicular circulation, parking and fire lanes acceptable to the Planning Division.

  • E. In the case of a "Tent Sale," County Fire Department approval must accompany the application.

  • F. Such sales shall be subject to prior approval of the Director. (Ord. 89-888 § 2; Ord. 88-857 § 5)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Carson Zoning Code
Carson Zoning Code
  1. Article 9 — Planning and Zoning
  2. Chapter 1 — ZONING
  3. Division 1 — Title, Authority And Purpose
  4. Division 2 — Format
  5. Division 3 — Zoning Classifications
  6. Division 4 — Zoning Boundaries
  7. Division 1 — Uses Permitted
  8. Division 2 — Accessory Uses
  9. Division 3 — Conditional Use Criteria
  10. Division 4 — Density
  11. Division 5 — Site Requirements
  12. Division 6 — Site Development Standards
  13. Division 7 — Environmental Effects
  14. Division 8 — Special Requirements For Certain Uses
  15. Division 4 — (Reserved)
  16. Division 8 — Special Requirements For Certain Uses
  17. Division 4 — (Reserved)
  18. Division 8 — Special Requirements For Certain Uses
  19. Division 4 — (Reserved)
  20. Division 9 — Special Use Zones
  21. Division 1 — Street Dedication And Improvement
  22. Division 2 — Vehicular Parking, Loading And Maneuvering Areas
  23. Division 3 — Walls
  24. Division 4 — Trash And Recycling Areas
  25. Division 5 — Transportation Demand And Trip Reduction Measures
  26. Division 6 — Project Grading
  27. Division 7 — Signs
  28. Division 8 — Water Efficient Landscaping
  29. Division 1 — Procedures In General
  30. Division 2 — Procedures By Type
  31. Division 1 — Applicability Of Regulations
  32. Division 2 — Nonconformities
  33. Division 3 — Relationship Of Zoning Regulations To Other Laws …
  34. Division 4 — Interpretation Of Provisions
  35. Division 5 — Violations And Penalties
  36. Division 6 — Assignment Of Authority, Powers And Duties
  37. Division 1 — Definitions

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.