Chapter 44 — REFERENCED STANDARDS

Section BM105 — SPECIAL INSPECTIONS

2025 California Residential Code (Title 24, Part 2.5) · 2025 edition · ingested 2026-07-07 · California

Full text via GoCodebook AI

We have the complete 2025 text of this code. Ask a question and get the exact controlling section with a citation.

Ask about this chapter

BM105.1 Initial inspection.

BM105.1 Initial inspection. An initial inspection of the production equipment, including 3D printer, and the fabrication process shall be performed after the production equipment is located on site and before building fabrication has begun. The inspection shall be on Jul 18, 2025 11:14 AM (CDT) THEREUNDER. APPENDIX BM — 3D-PRINTED BUILDING CONSTRUCTION conducted by representatives of the approved agency that evaluated the fabrication process for compliance with UL 3401. The inspection shall verify that the fabrication process, including production equipment, 3D-printing parameters and…