Section R108 — FEES
2025 California Residential Code (Title 24, Part 2.5) · 2025 edition · ingested 2026-07-07 · California
Full text via GoCodebook AI
We have the complete 2025 text of this code. Ask a question and get the exact controlling section with a citation.
R108.1 Payment of fees. ¶
R108.1 Payment of fees. A permit shall not be valid until the fees prescribed by law have been paid, nor shall an amendment to a permit be released until the additional fee, if any, has been paid.
R108.2 Schedule of permit fees. ¶
R108.2 Schedule of permit fees. On buildings, structures, electrical, gas, mechanical and plumbing systems or alterations requiring a permit, a fee for each permit shall be paid as required, in accordance with the schedule as established by the applicable governing authority.
R108.3 Building permit valuations. ¶
R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment and other permanent systems, including materials and labor.
R108.4 Related fees. ¶
R108.4 Related fees. The payment of the fee for the construction, alteration, removal or demolition for work done in connection to or concurrently with the work authorized by a building permit shall not relieve the applicant or holder of the permit from the payment of other fees that are prescribed by law.
R108.5 Refunds. The building official is authorized to establish a refund policy. ¶
R108.5 Refunds. The building official is authorized to establish a refund policy.
R108.6 Work commencing before permit issuance. ¶
R108.6 Work commencing before permit issuance. Any person who commences work requiring a permit on a building, structure, electrical, gas, mechanical or plumbing system before obtaining the necessary permits shall be subject to a fee established by the applicable governing authority that shall be in addition to the required permit fees.