Appendix L — EARTHQUAKE RECORDING INSTRUMENTATION

Section L101 — GENERAL

2025 California Building Code (Title 24, Part 2) · 2025 edition · updated 2026-07-27 · California

Italicized text is a California amendment to the model code, as printed in the official publication.

L101.1 General.

Every structure located where the 1-second spectral response acceleration, S 1, determined in accordance with Chapter 11 of ASCE 7, is greater than 0.40 and either exceeds six stories in height with an aggregate floor area of 60,000 square feet (5574 m [2] ) or more, or exceeds 10 stories in height regardless of floor area, shall be equipped with not fewer than three approved recording accelerographs. The accelerographs shall be interconnected for common start and common timing.

[OSHPD 1 & 4] There shall be a sufficient number of instruments to characterize the response of the building during an earthquake and shall include at least one tri-axial free field instrument or equivalent.

L101.2 Location.

As a minimum, instruments shall be located at the lowest level, mid-height, and near the top of the structure. Each instrument shall be located so that access is maintained at all times and is unobstructed by room contents. A sign stating “MAINTAIN CLEAR ACCESS TO THIS INSTRUMENT” in 1-inch (25 mm) block letters shall be posted in a conspicuous location.

[OSHPD 1 & 4] A proposal for instrumentation and equipment specifications shall be forwarded to the enforcement agency for review and approval.

L101.3 Maintenance.

Maintenance and service of the instrumentation shall be provided by the owner of the structure. Data produced by the instrument shall be made available to the building official on request.

Maintenance and service of the instruments shall be performed annually by an approved testing agency. The owner shall file with the building official a written report from an approved testing agency certifying that each instrument has been serviced and is in proper working condition. This report shall be submitted when the instruments are installed and annually thereafter. Each instrument shall have affixed to it an externally visible tag specifying the date of the last maintenance or service and the printed name and address of the testing agency.

[OSHPD 1] Data retrieval from the instrument and processing of the records shall be the responsibility of the enforcement agency.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — 2025 California Building Code (Title 24, Part 2)
2025 California Building Code (Title 24, Part 2)
  1. Chapter 1 — ADMINISTRATION
  2. Chapter 2 — DEFINITIONS
  3. Chapter 3 — OCCUPANCY CLASSIFICATION AND USE
  4. Chapter 4 — SPECIAL DETAILED REQUIREMENTS BASED ON OCCUPANCY A…
  5. Chapter 5 — GENERAL BUILDING HEIGHTS AND AREAS
  6. Chapter 6 — TYPES OF CONSTRUCTION
  7. Chapter 7 — FIRE AND SMOKE PROTECTION FEATURES
  8. Chapter 7A — MATERIALS AND CONSTRUCTION METHODS FOR EXTERIOR W…
  9. Chapter 8 — INTERIOR FINISHES
  10. Chapter 9 — FIRE PROTECTION AND LIFE SAFETY SYSTEMS
  11. Chapter 10 — MEANS OF EGRESS
  12. Chapter 11 — RESERVED
  13. Chapter 11A — HOUSING ACCESSIBILITY
  14. Chapter 11B — ACCESSIBILITY TO PUBLIC BUILDINGS, PUBLIC ACCOMM…
  15. Chapter 12 — INTERIOR ENVIRONMENT
  16. Chapter 13 — ENERGY EFFICIENCY
  17. Chapter 14 — EXTERIOR WALLS
  18. Chapter 15 — ROOF ASSEMBLIES AND ROOFTOP STRUCTURES
  19. Chapter 16 — STRUCTURAL DESIGN
  20. Chapter 16A — STRUCTURAL DESIGN
  21. Chapter 17 — SPECIAL INSPECTIONS AND TESTS
  22. Chapter 17A — SPECIAL INSPECTIONS AND TESTS
  23. Chapter 18 — SOILS AND FOUNDATIONS
  24. Chapter 18A — SOILS AND FOUNDATIONS
  25. Chapter 19 — CONCRETE
  26. Chapter 19A — CONCRETE
  27. Chapter 20 — ALUMINUM
  28. Chapter 21 — MASONRY
  29. Chapter 21A — MASONRY
  30. Chapter 22 — STEEL
  31. Chapter 22A — STEEL
  32. Chapter 23 — WOOD
  33. Chapter 24 — GLASS AND GLAZING
  34. Chapter 25 — GYPSUM PANEL PRODUCTS AND PLASTER
  35. Chapter 26 — PLASTIC
  36. Chapter 27 — ELECTRICAL
  37. Chapter 28 — MECHANICAL SYSTEMS
  38. Chapter 29 — PLUMBING SYSTEMS
  39. Chapter 30 — ELEVATORS AND CONVEYING SYSTEMS
  40. Chapter 31 — SPECIAL CONSTRUCTION
  41. Chapter 31A — SYSTEMS FOR WINDOW CLEANING OR EXTERIOR BUILDING…
  42. Chapter 31B — PUBLIC POOLS
  43. Chapter 31C — RADIATION
  44. Chapter 31D — FOOD ESTABLISHMENTS
  45. Chapter 31F — MARINE OIL TERMINALS
  46. Chapter 32 — ENCROACHMENTS INTO THE PUBLIC RIGHT-OF-WAY
  47. Chapter 33 — SAFEGUARDS DURING CONSTRUCTION
  48. Chapter 34 — RESERVED
  49. Chapter 35 — REFERENCED STANDARDS
  50. Appendix A — EMPLOYEE QUALIFICATIONS
  51. Appendix B — BOARD OF APPEALS
  52. Appendix C — GROUP U—AGRICULTURAL BUILDINGS
  53. Appendix D — FIRE DISTRICTS
  54. Appendix E — RESERVED
  55. Appendix F — RODENTPROOFING
  56. Appendix G — FLOOD-RESISTANT CONSTRUCTION
  57. Appendix H — SIGNS
  58. Appendix I — PATIO COVERS
  59. Appendix J — GRADING
  60. Appendix K — GROUP R-3 AND GROUP R-3.1 OCCUPANCIES PROTECTED B…
  61. Appendix L — EARTHQUAKE RECORDING INSTRUMENTATION
  62. Appendix M — TSUNAMI-GENERATED FLOOD HAZARDS
  63. Appendix N — REPLICABLE BUILDINGS
  64. Appendix O — PERFORMANCE-BASED APPLICATION
  65. Appendix P — SLEEPING LOFTS
  66. Appendix Q — EMERGENCY HOUSING

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.