Skip to content

Title 25

Chapter 25.70 — HILLSIDE AREA CONSTRUCTION PERMITS

Burlingame Zoning Code · 2026-06 edition · updated 2026-07-06 · Burlingame

§ 25.70.010. Purpose.

The purpose of this chapter is to provide processes for the review of certain hillside development proposals to ensure compliance with the provisions of Section 25.20.040 (Hillside Overlay (H)) and review all construction that changes the building envelope of a structure in the hillside area that could affect existing distant views from inside structures on nearby properties. (Ord. 2000, 2021; Ord. 2046, 3/2/2026)

§ 25.70.020. Applicability.

  • A. The provisions of this chapter shall apply to all areas in the City located within the Hillside Overlay (H) Zone, as shown on the Zoning Map.

  • B. The requirements of Chapter 25.68 (Design Review) shall apply to Hillside Area Construction Permits for such projects that trigger design review pursuant to Section 25.68.020 (Applicability and Types of Design Review).

  • C. A Hillside Area Construction Permit shall be required for all new dwelling units; new accessory structures; or additions to any existing dwelling unit or accessory structure including changes in roof elevations except for the following exclusions:

    1. Fences that meet code requirements;

    2. Interior remodels;

    3. Accessory dwelling units;

    4. Structures that are 120 square feet or less that do not require a building permit; and

  1. Filling in of interior courtyard spaces that do not result in expansions to the exterior perimeter of the building or result in an increase to the overall building height.

(Ord. 2000, 2021; Ord. 2046, 3/2/2026)

§ 25.70.025. Application Filing.

Hillside Area Construction Permit. A Hillside Area Construction Permit application shall be filed and processed in compliance with Section 25.68.040 (Application Filing). The application shall include the information and materials specified in the most up- to-date Department handout for Hillside Area Construction Permit applications, together with the required fee. It is the responsibility of the applicant to provide evidence in support of the findings required by Section 25.70.040 (Findings), below.

(Ord. 2000, 2021; Ord. 2046, 3/2/2026)

§ 25.70.030. Application Review and Processing.

  • A. Review. Upon making the determination that a Hillside Area Construction Permit application is complete, the Director or designee shall review the application for consistency with any applicable design guidelines and requirements and prepare written findings indicating how the application does or does not comply with applicable design guidelines and requirements. Prior to preparing the findings and any conditions of approval,

Downloaded from https://ecode360.com/BU4910 on 2026-05-11

City of Burlingame, CA

ZONING

§ 25.70.030

§ 25.70.040

the Director may give the applicant the opportunity to revise plans to achieve compliance.

  • B. Public Notice. Once the application and all supporting information and documentation have been received and the application deemed complete, notice of the application shall be given according to the provision of Section 25.100.020.B (Method of Notice Distribution). The notice shall state that, unless a written request for a public hearing is received by the Community Development Department within 10 days after the date of the notice, the Director shall take action on the application.

  • C. Call for Review. If a written request for a public hearing is received pursuant to subsection B above, the Director shall schedule the application for a public hearing before the Planning Commission within 45 days of the filing of the call for review in accordance with Chapter 25.100 (Public Hearings and Notice). The person filing the written request may be charged a fee to cover hearing costs.

  • D. Director or Commission Action. The Director or the Planning Commission may deny, deny without prejudice, approve, or approve with conditions any application under this section.

  • E. Story Poles. In review of the application, story poles may be required to help visualize the proposed addition or new structure and assess potential view impacts on neighboring properties. Story poles shall be installed as specified in the most up-to-date Department handout for Story Pole Installation Requirements.

  • (Ord. 2000, 2021; Ord. 2046, 3/2/2026)

§ 25.70.040. Findings.

  • A. The following findings shall be made for any permit in the Hillside Overlay Zone:

    1. The project is consistent with the purpose of the Hillside Overlay Zone found in Section 25.20.040.A.

    2. The project complies with the development standards found in Section 25.20.040.B through I.

  1. The placement of the proposed construction does not have a substantial impact on adjacent properties or on the character of the immediate neighborhood.

(Ord. 2000, 2021; Ord. 2046, 3/2/2026)

Downloaded from https://ecode360.com/BU4910 on 2026-05-11

City of Burlingame, CA

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Burlingame Zoning Code
Burlingame Zoning Code
  1. Title 25
    Overview
    1. Article 1 — General Provisions
    2. Article 2 — Zoning Districts, Allowable uses, and Development …
    3. Chapter 25.02 — PURPOSE AND APPLICABILITY
    4. Chapter 25.36 — LANDSCAPING AND OPEN SPACE
    5. Chapter 25.42 — SIGNS
    6. Chapter 25.43 — TRANSPORTATION DEMAND MANAGEMENT
    7. Chapter 25.45 — RESIDENTIAL IMPACT FEES
    8. Chapter 25.50 — GENERAL NONCONFORMING PROVISIONS
    9. Chapter 25.56 — NONCONFORMING USES
    10. Chapter 25.58 — OTHER NONCONFORMING PROVISIONS
    11. Chapter 25.02 — PURPOSE AND APPLICABILITY
    12. Chapter 25.04 — INTERPRETATION OF THE ZONING CODE
    13. Chapter 25.06 — ZONING MAP AND ZONING DISTRICTS
    14. Chapter 25.10 — RESIDENTIAL ZONING DISTRICTS (R-1, R-2, R-3, R…
    15. Chapter 25.12 — COMMERCIAL AND INDUSTRIAL ZONING DISTRICTS (C-…
    16. Chapter 25.14 — MIXED-USE ZONING DISTRICTS (RRMU, NBMU, BRMU, …
    17. Chapter 25.16 — DOWNTOWN SPECIFIC PLAN ZONING DISTRICTS (BAC, …
    18. Chapter 25.18 — PUBLIC/INSTITUTIONAL, PARKS AND RECREATION, AN…
    19. Chapter 25.20 — OVERLAY ZONING DISTRICTS
    20. Chapter 25.24 — COMPREHENSIVE AIRPORT LAND USE COMPATIBILITY P…
    21. Chapter 25.30 — RULES OF MEASUREMENT
    22. Chapter 25.31 — SITE PLANNING AND GENERAL DEVELOPMENT STANDARDS
    23. Chapter 25.33 — AFFORDABLE HOUSING
    24. Chapter 25.35 — HISTORIC RESOURCES
    25. Chapter 25.36 — LANDSCAPING AND OPEN SPACE
    26. Chapter 25.40 — PARKING REGULATIONS
    27. Chapter 25.41 — PERFORMANCE STANDARDS
    28. Chapter 25.42 — SIGNS
    29. Chapter 25.43 — TRANSPORTATION DEMAND MANAGEMENT
    30. Chapter 25.44 — COMMERCIAL LINKAGE FEES
    31. Chapter 25.45 — RESIDENTIAL IMPACT FEES
    32. Chapter 25.46 — PUBLIC FACILITIES IMPACT FEES
    33. Chapter 25.48
    34. Chapter 25.50 — GENERAL NONCONFORMING PROVISIONS
    35. Chapter 25.52 — NONCONFORMING LOTS
    36. Chapter 25.54 — NONCONFORMING STRUCTURES
    37. Chapter 25.56 — NONCONFORMING USES
    38. Chapter 25.58 — OTHER NONCONFORMING PROVISIONS
    39. Chapter 25.60 — GENERAL PROVISIONS
    40. Chapter 25.62 — APPLICATION PROCESSING PROCEDURES
    41. Chapter 25.66 — CONDITIONAL USE PERMITS AND MINOR USE PERMITS
    42. Chapter 25.68 — DESIGN REVIEW
    43. Chapter 25.70 — HILLSIDE AREA CONSTRUCTION PERMITS
    44. Chapter 25.72 — HOME OCCUPATION PERMITS
    45. Chapter 25.74 — MINOR MODIFICATIONS
    46. Chapter 25.76 — REASONABLE ACCOMMODATIONS
    47. Chapter 25.78 — SPECIAL PERMIT
    48. Chapter 25.80 — SPECIFIC PLANS
    49. Chapter 25.82 — TEMPORARY USE PERMITS
    50. Chapter 25.84 — VARIANCES
    51. Chapter 25.86 — (RESERVED)
    52. Chapter 25.88 — PERMIT IMPLEMENTATION, EXTENSIONS, AMENDMENTS,…
    53. Chapter 25.92 — (RESERVED)
    54. Chapter 25.94 — ADMINISTRATIVE RESPONSIBILITY
    55. Chapter 25.96
    56. Chapter 25.98 — APPEALS AND CALLS FOR REVIEW
    57. Chapter 25.100 — PUBLIC HEARINGS AND NOTICE
    58. Chapter 25.102 — ENFORCEMENT PROVISIONS
    59. Chapter 25.103 — DEVELOPER INDEMNIFICATION
    60. Chapter 25.104 — DEVELOPMENT AGREEMENTS
    61. Chapter 25.105 — PURPOSE
    62. Chapter 25.106 — LAND USE DEFINITIONS
    63. Chapter 25.108 — GENERAL DEFINITIONS

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.