Earlier editions: 2026-09
Title 9 — BUILDING AND PROPERTY HEALTH AND SAFETY REGULATIONS›Chapter 5 — SEISMIC SAFETY PROGRAM
Beverly Hills Municipal Code Art. 3 Remedies
Beverly Hills Municipal Code · 2026-10 edition · updated 2026-10-03 · Beverly Hills
Cite as: Beverly Hills Municipal Code Article 3 · Text as of 2026-10-03
9-5-301: INJUNCTIVE RELIEF:¶
In addition to any other remedies provided by this chapter or other law, the city may seek injunctive relief or require a building to be vacated in order to prevent a continuing violation of any provision of this chapter. (Ord. 92-O-2153, eff. 10-23-1992)
TABLE 9-5-1
RATING CLASSIFICATIONS
| Type Of Building | Classification |
|---|---|
| Essential building | I |
| Hazardous building | I |
| High risk building | II |
| Medium risk building | III |
| Low risk building | IV |
TABLE 9-5-2
TIME LIMITS FOR COMPLIANCE
| Required Action By Owner | Obtain Building Or Demolition Permit Within 1 | Commence Construction Within | Complete Construction Or Demolition Within |
|---|---|---|---|
| Structural alterations | 1 year | 180 days 2 | 2 years 2 |
| Building demolition | 1 year | - | 180 days 2 |
| Wall anchors | 180 days | 270 days 1 | 1 year 1 |
Notes:
Measure from date of service notice.
Measured from date of building permit issuance.
TABLE 9-5-3
SERVICE PRIORITIES
| Rating Classification | Occupant Load | Maximum Periods For Service Of Notice 1 |
|---|---|---|
| I (highest priority) | n/a | n/a |
| II-A | 300 or more | 180 days 2 |
| II-B | 200 to 299 | 1 year |
| II-C | 150 to 199 | 1 1 / 2 years |
| II-D | 100 to 149 | 2 years |
| III-A | 50 to 99 | 3 1 / 2 years |
| III-B | 20 to 49 | 4 years |
| IV (lowest priority) | Less than 20 | 5 years |
Notes:
Measured from date of adoption of initial seismic safety ordinance.
Seismic renovation shall be completed by January 1, 1995.
(Ord. 92-O-2153, eff. 10-23-1992)
Get a plain-English answer with a citation back to this text.
Ask AI about this code