Earlier editions: 2026-09
Title 15 — BUILDINGS AND CONSTRUCTION
Banning Municipal Code Ch. 15.26 Grading
Banning Municipal Code · 2026-10 edition · updated 2026-10-04 · Banning
Cite as: Banning Municipal Code Chapter 15.26 · Text as of 2026-10-04
15.26.010 - [Grading]¶
Grading plans shall be prepared and certified by a registered engineer and design professional who has demonstrated competency in the preparation of engineering plans by the City engineer. Each application for a grading permit shall be accompanied by copies of the certified grading plan, including all applicable specifications and special provisions. The number of copies shall be set by directive issued by the City engineer. Supporting data consisting of a soil engineering report and geology report shall be required at the discretion of the City engineer and/or the Building Official. The grading plans, specifications and other supporting data shall be submitted to the City engineer for review.
The following language is added to Appendix J of the Building Code to read as follows:
J109.5
It is unlawful for storm water on a lot to be diverted onto an adjected lot unless it is specifically designed to do so and provisions have been made for it to do so because of topographical conditions which do not allow for any other path of drainage. Stormwater drainage across lot lines is prohibited and all stormwater must be diverted onto the public right-of-way or into a private catchment system, or into the public storm drainage system. Drainage easements must be recorded where stormwater is to be diverted across lot lines.
(Ord. No. 1613, § 5 (Exh. A), 11-12-25)
Get a plain-English answer with a citation back to this text.
Ask AI about this code