Title 15 — BUILDINGS AND CONSTRUCTION Chapter 15.01 - BUILDING CODE
Chapter 15.04 — PLUMBING CODE
Arroyo Grande Municipal Code · 2026-09 edition · updated 2026-10-01 · Arroyo Grande
Footnotes:
--- ( 1 ) ---
Editor's note— Ord. No. 721, § 2, adopted Jan. 24, 2023, repealed Ch. 15.04, §§ 15.04.010—15.04.080, which pertained to building and construction codes adopted and derived from Prior code §§ 8-1.02, 8-1.04, 8-1.06; Ord. 594 § 10, Exh. E, adopted 2007; Ord. No. 627, §§ 14, 16—18, 20—22, adopted Dec. 14, 2010; Ord. No. 657, §§ 13— 16, adopted Oct. 8, 2013; Ord. No. 671, § 2, adopted Oct. 13, 2015; Ord. No. 679, §§ 12—16, adopted Oct. 25, 2016; Ord. No. 691, § 2, adopted March 27, 2018; Ord. No. 710, §§ 10—15, adopted Nov. 24, 2020. Subsequently § 6 of Ord. No. 721 added a new Ch. 15.04, to read as herein set out.
15.04.010 - Adoption of the California Plumbing Code.¶
For the purposes of prescribing regulations governing plumbing systems, the 2022 California Plumbing Code (CPC) promulgated by the California Building Standards Commission, which incorporates the adoption of the 2021 Edition of the Uniform Plumbing Code, excluding Table 104.5, is hereby adopted by reference thereto as if fully set forth in this chapter, save and except for portions as are deleted, modified, or amended by the provisions of this chapter. Copies of the 2022 California Plumbing Code are on file in the office of the City Clerk and Building Official. Any changes made by the California Building Standards Commission applicable to the City, including new editions, shall be deemed incorporated herein. If any conflicts between this Code and any other City, State or Federal Code should arise, the most restrictive code providing the highest level of safety as determined by the Building Official shall prevail.)
(Ord. No. 721, § 6, 1-24-2023)
15.04.010.1 - Amendments to Plumbing Code.¶
The California Plumbing Code adopted by reference by Section 15.04.010 of this Code is amended as follows:
(a) The following provision is hereby added to the CPC to read as follows:
Section 1305.1.1
In all existing commercial and industrial establishments and places of assembly, when the service has been discontinued for ninety (90) days or more, the gas meter may be turned on only after the piping has been pressure tested and when the test and gas appliances have been approved by the Administrative Authority. A permit shall be required for such test.
In all existing residential buildings where service has been discontinued for ninety (90) days or longer, the gas may be turned on only after the piping has been pressure tested and when the test and gas appliances have been approved by the Administrative Authority. A permit shall be required for such test.
(Ord. No. 721, § 6, 1-24-2023)
Get a plain-English answer with a citation back to this text.
Ask AI about this code