Skip to content

Division 2 — DEVELOPMENT AGREEMENTSPart 7 — NONCONFORMITY TO PERFORMANCE STANDARDS9708. - Modification to nonconforming lots, buildings and uses.

9708.3. - Reconstruction of damaged buildings.

Agoura Hills Zoning Code · 2026-06 edition · updated 2026-07-25 · Agoura Hills

A.

Nonconforming residential structures. Any nonconforming residential structure that is damaged or partially destroyed by fire, flood, wind, earthquake or other calamity or act of God may be rehabilitated or reconstructed up to one hundred (100) percent of the pre-damage size and floor area of the damaged structure provided that such restoration is started within one (1) year after the date the damaging event occurred and is diligently pursued to completion thereafter. An extension beyond the one-year commencement requirement may be approved by the planning and community development director, upon the property owner demonstrating good cause. There shall be no increase in the size or area of the structure or the number of dwelling units, and the acceptability of the architectural design of the structure shall be determined by the director of planning and community development. Restoration and reconstruction of the structure shall be subject to review and approval by the director of planning and community development.

B.

Nonconforming nonresidential structures. Any nonconforming nonresidential structure that is damaged or partially destroyed by fire, flood, wind, earthquake or other calamity or act of God may be restored or reconstructed up to one hundred (100) percent of the size and area of the damaged structure, and the occupancy or use of such building, structure or part thereof that existed at the time of such damage may be continued, only if the total cost of such reconstruction or repair does not exceed fifty (50) percent of the total reconstruction cost of the building or structure on the date the damaging event occurred, as determined by the building official. The restoration shall commence within one (1) year after the date the damaging event occurred and shall be diligently pursued to completion thereafter. An extension beyond the one-year commencement requirement may be approved by the planning and community development director, upon the property owner demonstrating good cause. There shall be no increase in the size or area of the structure, and the acceptability of the architectural design of the structure shall be determined by the director of planning and community development. Restoration and reconstruction of the structure shall be subject to review and approval by the director of planning and community development. In the event the cost to repair or reconstruct the structure exceeds fifty (50) percent of the total reconstruction cost of such building or structure, no repairs or reconstruction shall be made unless every portion of such building or structure is made to conform to all regulations of the zone district in which it is located.

C.

Nonconforming nonresidential historic structures. The following structures located in Old Agoura and identified in section 9552.2 are considered historic structures for the purposes of this section: "Amazing Kate's", "Old Post Office", "Stage Door Theatre" and the "Agoura Sign". Historic structures that are damaged or partially destroyed by fire, flood, wind, earthquake or other calamity or act of God may be rehabilitated or reconstructed up to one hundred (100) percent of the pre-damage size and floor area of the damaged structure provided that such restoration is started within one (1) year after the date the damaging event occurred and is diligently pursued to completion thereafter. An extension beyond the one-year commencement requirement may be approved by the planning and community development director, upon the property owner demonstrating good cause. There shall be no increase in the size or area of the structure and the acceptability of the architectural design of the structure shall be determined by the director of planning and community development. restoration and reconstruction of the structure shall be subject to review and approval by the director of planning and community development.

(Ord. No. 04-328U, § 1, 10-27-2004; Ord. No. 07-344, § 1, 6-13-2007)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Agoura Hills Zoning Code
Agoura Hills Zoning Code
  1. Article IX — ZONING[1]
  2. Article IX — ZONING[[1]]
  3. Chapter 1 — INTRODUCTION
  4. Part 1 — CONTENT AND PURPOSE
  5. Part 3 — RV RESIDENTIAL-VERY LOW DENSITY DISTRICT
  6. Part 1 — PURPOSE AND DESIGN STANDARDS
  7. Part 3 — CS COMMERCIAL SHOPPING CENTER DISTRICT
  8. Part 11 — POM PLANNED OFFICE AND MANUFACTURING DISTRICT
  9. Part 9 — OS-DR OPEN SPACE-DEED RESTRICTED DISTRICT
  10. Part 1 — PURPOSE
  11. Part 4 — RESERVED
  12. Division 3 — UNDERGROUND FACILITIES[[16]]
  13. Division 5 — YARD STANDARDS
  14. Division 4 — OFF-STREET PARKING, LOADING AND LANDSCAPING
  15. Division 6 — NOISE REGULATIONS
  16. Division 7 — OAK TREE PRESERVATION GUIDELINES
  17. Division 8 — GUIDELINES FOR LANDSCAPING, PLANTING AND IRRIGATI…
  18. Division 3 — CONDITIONAL USE PERMIT
  19. Division 4 — RESIDENTIAL DENSITY BONUS[[20]]
  20. Division 7 — SITE PLANS/ARCHITECTURAL REVIEW
  21. Division 8 — TEMPORARY USES
  22. Division 9 — REVOCATION PROVISIONS
  23. Division 2 — DEVELOPMENT AGREEMENTS
  24. Division 4 — PUBLIC HEARING PROCEDURES
  25. Division 5 — ZONING TEXT AMENDMENTS
  26. Division 6 — DETERMINATION OF USES NOT LISTED
  27. Division 7 — RULES OF INTERPRETATION
  28. Division 8 — CERTIFICATE OF USE AND OCCUPANCY
  29. Division 9 — REASONABLE ACCOMMODATIONS

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.