Skip to content

Chapter 25Article III — DIVISION OF LAND BY PARCEL MAP

§ 25-22 of supervisors for ultimate transmittal to the county recorder.

Cypress Planning Code · edición 2026-07 · actualizado 2026-07-25 · Cypress

Esta sección aún no está traducida y se muestra en inglés.

  • (b) Required information on final parcel map. The final parcel map shall contain all of the same information and data as are required on a final tract map, and shall be prepared following the format as described in the Subdivision Map Act. Appropriate certificates for signature by the director of public works, the county surveyor and the engineer or surveyor who prepared the map shall be provided, in a form as required by the director of public works and the Subdivision Map Act. The location and description of existing monuments or established lines, the setting of new points and monuments before or after map recordation, and the required survey data to be shown and provided, shall all be done on a similar manner to that required by a final tract map and as required by the director of public works. The delineation of lots and parcels, their minimum frontages and widths, and the method of averaging lot sizes shall also conform to the same standards and codes as if the division of land were a subdivision of over four lots. All information shown on the final parcel map shall be based upon a field survey, made in conformance with good engineering and survey practices and with the state Land Surveyors' Act. Final maps for lot line adjustments, as defined in this chapter, may be based upon record data, if approved by the director of public works. Certificates for signature by the director of public works, and other required by law and this Code, shall be shown on the final parcel maps. The fact that a soils report was made as required in this chapter shall also be noted on the final map.

  • (Ord. No. 582, § 2, 9-13-76; Ord. No. 717, § 15, 11-28-83)

Obtén una respuesta en español sencillo con una cita a este texto.

Pregúntale a la IA sobre este código
Contenido — Cypress Planning Code

GoCodebook ofrece acceso público, búsqueda, citas, explicación multilingüe e interpretación práctica de normas de construcción legalmente adoptadas. No sustituye a las publicaciones oficiales del ICC ni de los códigos de California.