Can I Build an ADU in South El Monte?

Yes — you can build an ADU in South El Monte. California's statewide ADU law requires every city, including South El Monte, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.

Figures below reflect South El Monte's adopted ADU ordinance layered on California state law.

Can you build one?

ADUs allowed

CA state law

Yes — by right

ADUs and JADUs are allowed by right in all residential and mixed-use zones; ministerial approval, no hearing.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Units on a single-family lot

CA state law

1 ADU + 1 JADU

At least one ADU and one JADU per single-family lot (a conversion ADU may also be possible).

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Units on a multifamily lot

Local rule

conversions (>=1 or 25% of units) + up to 2 detached

City limits detached ADUs on multifamily lots to 2 per lot, not 8.

§ 17.12.040(A); § 17.12.090(A)(2)-(3)

Junior ADU (JADU)

CA state law

Allowed

Up to 500 sq ft, within the walls of an existing single-family home (single-family lots only).

Cal. Gov. Code § 66333 (junior ADUs)

Size & height

Max detached ADU size

Local rule

1,000 sq ft

Detached ADUs: 850 sq ft (1 bedroom or less), 1,000 sq ft (2+ bedrooms); no cap for conversions.

§ 17.12.050(A)-(B)

Max attached ADU size

Local rule

850 sq ft (1 bedroom or less), 1,000 sq ft (2+ bedrooms); no cap for conversions

Same size limits as detached; no cap for conversions.

§ 17.12.050(A)-(B)

Guaranteed minimum size

CA state law

800 sq ft

An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).

Cal. Gov. Code § 66321 (size minimums & height)

Max JADU size

CA state law

500 sq ft

Cal. Gov. Code § 66333 (junior ADUs)

Max height

Local rule

16 ft

No local transit/2-story exception specified.

§ 17.12.050(C)

Setbacks

Side setback

Local rule

3 ft

3 ft for detached ADUs (4 ft if >1 story); attached ADUs: same as main building or 4 ft, whichever is less.

§ 17.12.050(F)-(H)

Rear setback

Local rule

3 ft

3 ft for detached ADUs (4 ft if >1 story); conversions: no setback unless for fire safety.

§ 17.12.050(F)-(H)

Front setback

Local rule

If any portion is in front of main building, must meet main building setbacks for the zone

§ 17.12.050(H)

Separation from main house

CA state law

None required

No statewide separation requirement between the ADU and the primary dwelling.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Parking

Parking required

Local rule

Up to 1 space

1 per ADU; multiple exemptions apply.

§ 17.12.060(A)-(C)

Transit parking exemption

CA state law

Yes — no parking required near transit & for conversions

No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.

Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)

Garage-conversion replacement parking

Local rule

Not required

No replacement required if garage/carport/covered parking is converted to ADU.

§ 17.12.060(C)

Approval, timeline & cost

Approval path

CA state law

Ministerial (by right)

No public hearing or discretionary design review for a qualifying ADU.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Approval timeline

CA state law

60 days

The agency must act within 60 days of a complete application — and the ADU is deemed approved if it does not.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Owner-occupancy

Local rule

Not required

Owner-occupancy required only if both ADU and JADU are present; otherwise, not required.

§ 17.12.050(J)(1)(c)

Impact-fee waiver

CA state law

Waived under 750 sq ft

An ADU of 750 sq ft or less pays no impact fees (the 750 sq ft threshold itself is exempt under § 66311.5); larger ADUs pay fees proportional to the primary dwelling. JADUs (≤ 500 sq ft) are exempt.

Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Permits required

Local rule

Building permit, Covenant/deed restriction for JADUs

JADUs require a recorded covenant/deed restriction.

§ 17.12.040(F)

South El Monte-specific factors that can change the answer

State law sets the floor, but these local conditions often decide whether a specific parcel works.

Fire safety setback increases

Setbacks may be increased for fire safety as required by City Code.

Historic district parking exemption

No parking required for ADUs in a historic district.

South El Monte caps detached and attached ADUs at 850 sq ft (1 bedroom) or 1,000 sq ft (2+ bedrooms), and allows only 2 detached ADUs on multifamily lots. Setbacks for detached ADUs are 3 ft (4 ft if >1 story), and owner-occupancy is required only if both an ADU and JADU are present.

Frequently asked questions

Can I build an ADU in South El Monte?

Yes. California's statewide ADU law requires South El Monte to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.

How big can an ADU be in South El Monte?

A detached ADU of at least 1,000 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.

What are the setback requirements for an ADU in South El Monte?

Side and rear setbacks are limited to 3 ft. If any portion is in front of main building, must meet main building setbacks for the zone.

Is parking required for an ADU in South El Monte?

Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is not required.

How long does ADU approval take in South El Monte?

A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.

Do I have to live on the property to build an ADU in South El Monte?

Owner-occupancy: not required. ADUs under 750 sq ft are also exempt from impact fees.

Sources

  • South El Monte Municipal Code, Chapter 17.12 (Ord. 1271, adopted 4/23/2024)
  • § 17.12.040(A); § 17.12.090(A)(2)-(3)
  • § 17.12.050(A)-(B)
  • § 17.12.050(C)
  • § 17.12.050(F)-(H)
  • § 17.12.050(H)
  • § 17.12.060(A)-(C)
  • § 17.12.060(C)
  • § 17.12.050(J)(1)(c)
  • § 17.12.040(F)
  • § 17.12.050(G)
  • § 17.12.060(B)(2)
  • Cal. Gov. Code §§ 66310–66342 (ADU Law)
  • HCD 2025 Accessory Dwelling Unit Handbook
  • Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
  • Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
  • Cal. Gov. Code § 66333 (junior ADUs)
  • Cal. Gov. Code § 66321 (size minimums & height)
  • Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)
  • Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Last updated 2026-06-25. This is an AI-assisted summary of South El Monte's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with South El Monte Planning before relying on it.

Will an ADU work on your South El Monte lot?

Ask GoCodebook about your address and get the size, setback, parking and permit rules that actually apply to your parcel — with the exact citation.

Check my parcel free

Related