California ADU rules · Los Angeles County
Can I Build an ADU in Pasadena?
Yes — you can build an ADU in Pasadena. California's statewide ADU law requires every city, including Pasadena, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.
Can you build one?
ADUs allowed
CA state lawYes — by right
ADUs and JADUs are allowed by right in all residential and mixed-use zones; ministerial approval, no hearing.
Units on a single-family lot
CA state law1 ADU + 1 JADU
At least one ADU and one JADU per single-family lot (a conversion ADU may also be possible).
Units on a multifamily lot
Local ruleConversion ADUs (≥1, up to 25% of existing units) + up to 2 detached
Pasadena caps detached new-construction/conversion ADUs on a multifamily lot at 2 (the state floor allows up to 8), alongside interior-conversion ADUs of up to 25% of existing units.
Junior ADU (JADU)
CA state lawAllowed
Up to 500 sq ft, within the walls of an existing single-family home (single-family lots only).
Size & height
Max detached ADU size
Local rule1,200 sq ft
A non-exemption detached ADU may reach 1,200 sq ft. The 800 sq ft / 16-ft / 4-ft-setback 'exemption' ADU must be allowed by right regardless of underlying-zone standards.
Max attached ADU size
Local ruleNon-exemption attached ADU up to 850 sq ft (studio/1-bedroom) or 1,000 sq ft (2+ bedrooms); the 800 sq ft 'exemption' ADU is always allowed
Guaranteed minimum size
CA state law800 sq ft
An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).
Max JADU size
CA state law500 sq ft
Max height
CA state law16 ft
16 ft baseline; cities must allow 18 ft within ½ mi of a major transit stop or where the primary dwelling is two-story, and 20 ft on a lot with a multistory multifamily building.
Setbacks
Side setback
CA state law4 ft
A city cannot require more than 4 ft side or rear setback; conversions of existing structures are exempt.
Rear setback
CA state law4 ft
Front setback
CA state lawNo front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone
Separation from main house
Local rule6 ft
A non-exemption new-construction ADU must maintain a minimum 6-ft building separation (eave to eave) from any other structure on the site (excluding walls and fences). The 800 sq ft 'exemption' ADU is not subject to this; state law sets no separation.
Parking
Parking required
CA state lawUp to 1 space
At most 1 space per ADU (or per bedroom, whichever is less) — and waived in the common cases below.
Transit parking exemption
CA state lawYes — no parking required near transit & for conversions
No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.
Garage-conversion replacement parking
CA state lawNot required
When a garage/carport is demolished or converted to build an ADU, replacement parking cannot be required.
Approval, timeline & cost
Approval path
CA state lawMinisterial (by right)
No public hearing or discretionary design review for a qualifying ADU.
Approval timeline
CA state law60 days
The agency must act within 60 days of a complete application — and the ADU is deemed approved if it does not.
Owner-occupancy
CA state lawOnly for a JADU
No owner-occupancy requirement for ADUs (the prior sunset was removed). A JADU may require owner-occupancy, principally where it shares sanitation with the main house.
Impact-fee waiver
CA state lawWaived under 750 sq ft
An ADU of 750 sq ft or less pays no impact fees (the 750 sq ft threshold itself is exempt under § 66311.5); larger ADUs pay fees proportional to the primary dwelling. JADUs (≤ 500 sq ft) are exempt.
Permits required
Local ruleBuilding permit, Ministerial planning review
Pasadena routes ADUs through a ministerial planning review in addition to the building permit — no hearing or discretion, but a planning sign-off the bare state floor does not name.
Pasadena-specific factors that can change the answer
State law sets the floor, but these local conditions often decide whether a specific parcel works.
Historic districts & landmark properties
An ADU in a historic/landmark district must not be visible from the public right-of-way unless that would prevent creation of the unit — an added design constraint on top of the ministerial process.
Hillside Overlay Districts
In Hillside Overlay Districts a detached ADU is capped at 1,000 sq ft (below the 1,200 sq ft citywide max), and attached ADUs are not permitted in some hillside areas.
Pasadena splits ADUs into a state-mandated 'exemption' track (up to 800 sq ft, allowed by right regardless of zone standards) and a larger 'non-exemption' track capped at 1,200 sq ft detached — the latter must keep a 6-ft eave-to-eave separation from other structures. In hillside overlays the detached cap drops to 1,000 sq ft and attached ADUs may be barred; historic-district ADUs must stay out of view from the street.
Frequently asked questions
Can I build an ADU in Pasadena?
Yes. California's statewide ADU law requires Pasadena to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.
How big can an ADU be in Pasadena?
A detached ADU of at least 1,200 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.
What are the setback requirements for an ADU in Pasadena?
Side and rear setbacks are limited to 4 ft. No front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone.
Is parking required for an ADU in Pasadena?
Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is not required.
How long does ADU approval take in Pasadena?
A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.
Do I have to live on the property to build an ADU in Pasadena?
Owner-occupancy: only for a jadu. ADUs under 750 sq ft are also exempt from impact fees.
Sources
- Pasadena Zoning Code § 17.50.275 (Accessory Dwelling Units)
- Pasadena Zoning Code § 17.50.275.B.2.b
- Pasadena Zoning Code § 17.50.275.D.1.a(3)
- Pasadena Zoning Code § 17.50.275.D.1.a(3)b
- Pasadena Zoning Code § 17.50.275.D.5.b
- Pasadena Zoning Code § 17.50.275.A.2
- Pasadena Zoning Code § 17.50.275.D.4
- Pasadena Zoning Code § 17.50.275.D.3
- Cal. Gov. Code §§ 66310–66342 (ADU Law)
- HCD 2025 Accessory Dwelling Unit Handbook
- Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
- Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
- Cal. Gov. Code § 66333 (junior ADUs)
- Cal. Gov. Code § 66321 (size minimums & height)
- Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)
- Cal. Gov. Code § 66314 (local ordinance standards)
- Cal. Gov. Code § 66315 (owner-occupancy)
- Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)
Last updated 2026-06-25. This is an AI-assisted summary of Pasadena's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with Pasadena Planning before relying on it.
Will an ADU work on your Pasadena lot?
Ask GoCodebook about your address and get the size, setback, parking and permit rules that actually apply to your parcel — with the exact citation.
Check my parcel free