Local zoning · San Leandro
San Leandro — Overlay Districts
Overlay Districts under the San Leandro local zoning and planning code, with the controlling citations.
Last reviewed: July 2, 2026
Overview
San Leandro’s zoning code establishes a set of overlay districts that are combined with base zoning to address area‑specific goals (design, conservation, temporary study, historic preservation, housing, etc.). Overlay chapters set the purpose, map designator, whether special plans or findings are required, and whether additional discretionary review (use permits, administrative review, amortization schedules, or termination dates) applies; otherwise the base district rules control. See the city’s zoning map and the applicable overlay ordinance to know what controls a parcel; the list of overlays is in § 1.08.108.
Note on related topics: When you check overlays you will inevitably need the city’s San Leandro Zoning, review the San Leandro Development Standards (setbacks, heights), confirm required San Leandro Parking, and whether your project triggers San Leandro Design Review or the San Leandro Historic Preservation rules. For accessory units remember to cross‑check the San Leandro ADUs page and the California Building Standards Code (Title 24) for building code requirements.
The code’s Title 3 (Overlay District Regulations) includes the principal overlay chapters summarized below; where an overlay does not change a rule, the base district’s regulations remain in effect (explicitly stated in many overlay chapters).
How to read these subsections
Each overlay below lists (1) the code’s stated purpose, (2) typical permitted uses or permit triggers, (3) the overlay’s relationship to base district development standards (setbacks, heights, lot coverage — i.e., whether they remain the base rules or are modified), and (4) how it is shown/where it applies on the zoning map (the map suffix). Every requirement below is grounded in the San Leandro zoning code; I cite the controlling § and the file reference.
Planned Development (PD)
- Purpose: To allow project‑level custom regulation of large or integrated developments through a Planned Development Project approval that sets site plan, design, and modified standards. § 3.04.100–§ 3.04.148.
- Typical permitted uses: Uses are those approved in the Planned Development Project approval; the PD approval may alter what uses are allowed compared to the base district. See the specific PD ordinance for a parcel. § 3.04.120 and § 3.04.136.
- Key dimensional / submission standards: The PD application requires a detailed Neighborhood/Project plan (site plan, building elevations, parking, circulation, signage, grading, utilities, planting, phasing and construction schedule) and the project’s development standards are those in the PD approval. See § 3.04.124 for the submittal list.
- Where it applies / map designator: Combined with base districts and shown by a “-PD” designator on the zoning map; PD approvals are adopted by ordinance (map amendment) per the code. § 3.04.116.
IS — Interim Study Overlay (IS)
- Purpose: A temporary overlay to allow discretionary review where major zoning changes are under study. § 3.08.100.
- Typical permitted uses / triggers: Establishment of a new or expanded use in an IS area requires a use permit; review must include the finding that the use does not fall within issues under study. § 3.08.108.
- Key dimensional standards: Development regulations are those of the base district unless the IS ordinance specifies otherwise or a use permit specifies conditions. § 3.08.112.
- Where it applies / map designator & duration: Shown with an “-IS” suffix; each IS ordinance must include an expiration/termination not more than two years after its effective date (renewals require further action). § 3.08.104 and § 3.08.116.
CV — Conservation Overlay (CV)
- Purpose: To enable neighborhood‑initiated conservation or revitalization where areas have distinctive building, streetscape, or site characteristics; implemented through a Neighborhood Conservation Plan that can alter base standards to preserve character. § 3.12.100.
- Typical permitted uses: The underlying base district uses continue unless the CV Neighborhood Conservation Plan and its related use permit specify otherwise; the CV plan can permit modifications to land‑use rules to achieve conservation goals. § 3.12.108–§ 3.12.112.
- Key dimensional / submission standards: Minimum area is three acres and at least three parcels for a CV district (§ 3.12.104); the required Neighborhood Conservation Plan must include detailed maps, site planning, building types/designs, signing, circulation, parking, and a list of modifications to the base district regulations. Building permits must conform to the approved CV plan. § 3.12.104, § 3.12.116, § 3.12.128.
- Where it applies / map designator: Shown with a “-CV” suffix and adopted by ordinance; the ordinance references the approved plan and modifications. § 3.12.124 and § 3.12.120.
S — Special Review Overlay (S)
- Purpose: Discretionary review in areas with unique needs (the code explicitly cites the Marina Automall area as an example) to manage transitions from obsolete uses to compatible new uses. § 3.16.100.
- Typical permitted uses / triggers: A Use Permit is required for establishment of any new land use/structure (except minor accessory structures), substantial expansions/alterations, approval of tentative/parcel maps, or any action the Council specifies when adopting the S overlay. § 3.16.112.
- Key dimensional standards: The S District defers to the base district’s land‑use and development regulations unless the adopting ordinance for that particular S overlay modifies them; the S ordinance governs in conflicts. § 3.16.108.
- Where it applies / map designator: Shown with an “-S” suffix and must include a reference to the adopting ordinance on the zoning map. § 3.16.104.
AU — Assembly Use Overlay (AU)
- Purpose: To allow discretionary consideration of assembly uses on certain nonresidential properties by placing them on a conditional/permit basis. § 3.20.100.
- Typical permitted uses / triggers: A use permit is required to establish any new assembly use or substantially expand/alter an existing assembly use; the Council may set additional review procedures at the time the AU overlay is adopted. § 3.20.112.
- Key dimensional standards: Development regulations remain those of the base district unless altered by the AU overlay ordinance or other overlay. § 3.20.108.
- Where it applies / map designator: Shown with an “-AU” suffix. § 3.20.104.
N — Nonconforming Use / Amortization Overlay (N)
- Purpose: To modify how nonconforming uses are terminated in areas with multiple nonconforming properties, to facilitate conversion to conforming uses. § 3.24.104.
- Typical permitted uses / triggers: The N overlay authorizes the City to require termination (amortization) of certain nonconforming uses on a district schedule that supersedes the general nonconforming rules. The Planning Commission recommends and the Council adopts the amortization schedule. § 3.24.120.
- Key dimensional standards: Development regulations are those of the base district except where the N overlay ordinance prescribes alternative termination or conversion requirements. § 3.24.108.
- Where it applies / map designator & findings required: Shown with a “-N” suffix. The Council may establish an N district only after findings that (1) three or more nonconforming uses cover ≥1/3 of parcels in the area, (2) the district will reduce blight/vacancy, and (3) it won’t injure property for conforming uses. § 3.24.112.
L — Landmark / Historic Overlay (L)
- Purpose: To implement historic preservation goals, deter demolition or inappropriate alteration, and stabilize/enhance property values via a Landmark District Conservation Plan with design criteria. § 3.28.100.
- Typical permitted uses / triggers: Uses default to the base district unless the Landmark District Conservation Plan prescribes rules or exceptions for significant structures. Design review, specific alteration lists, and performance guidelines are required as part of the plan. § 3.28.120–128.
- Key dimensional / maintenance standards: The L overlay allows exceptions for historic structures, but generally defers to the base district unless the Conservation Plan governs; property owners in L Districts must maintain structures in good repair. § 3.28.108 and § 3.28.124.
- Where it applies / map designator: Shown with an “-L” suffix; L Districts and landmark designations require public hearings and specific application materials (evidence of significance, proposed conservation plan, owner consents for non‑City initiated applications). § 3.28.104–128.
MHP — Mobile Home Park Overlay (MHP)
- Purpose: Reserve land for mobile home park construction, use, and occupancy. § 3.34.100.
- Typical permitted uses: The overlay allows only mobile home parks as defined in the code; those uses are subject to Administrative Review by the Zoning Enforcement Official. § 3.34.112.
- Key dimensional standards: Development regulations are those of the base district unless the MHP ordinance specifies otherwise; special noticing rules apply if an owner applies to remove property from the MHP overlay (30‑day notice to park residents). § 3.34.116–120.
- Where it applies / map designator: Shown by adding “MHP” to the base district on the zoning map. § 3.34.104.
H — Housing Overlay (H)
- Purpose: To allow multi‑family and mixed‑use housing as permitted uses in areas designated for housing expansion. § 3.38.100.
- Typical permitted uses: Within an H overlay, Mixed‑Use Residential and Multi‑Family Residential are expressly permitted even where the base district otherwise would not list them as permitted uses. § 3.38.108.
- Key dimensional standards: Development regulations remain those of the base district unless the H overlay ordinance modifies them. § 3.38.112.
- Where it applies / map designator: Shown by adding an “H” to the base district on the zoning map; the map includes a reference to the ordinance adopting the H overlay. § 3.38.104.
Quick reference table — decision‑relevant items (high level)
| Overlay (map suffix) | Typical effect on uses / triggers | Quick note / Code reference |
|---|---|---|
| PD (-PD) | Custom project rules; PD approval controls uses and development standards | See § 3.04.124 for submittal and § 3.04.116 for map designation. |
| IS (-IS) | Temporary study area; new/expanded uses require use permit; ordinance expires ≤2 years | § 3.08.108, § 3.08.116. |
| CV (-CV) | Neighborhood Conservation Plan can modify base standards; min area 3 acres | § 3.12.100, § 3.12.104, § 3.12.128. |
| S (-S) | Discretionary review; use permits typically required for new/expanded uses | § 3.16.100, § 3.16.112. |
| AU (-AU) | Assembly uses allowed only via use permit on specified properties | § 3.20.100, § 3.20.112. |
| N (-N) | Amortization/termination schedules for nonconforming uses; special findings required | § 3.24.112, § 3.24.120. |
| L (-L) | Landmark/historic conservation plan and design review; maintenance obligations | § 3.28.100–128. |
| MHP | Only mobile home parks allowed (administrative review) | § 3.34.112, § 3.34.116. |
| H | Explicitly permits Mixed‑Use Residential and Multi‑Family | § 3.38.108–112. |
Checklist
- Verify overlay(s) that apply to the parcel on the official zoning map and note the exact overlay suffix (e.g., -S, -CV, -H) — see § 1.08.108.
- Pull the adopting ordinance for that overlay (the zoning map must reference the ordinance) and read any overlay‑specific modifications or conditions — required by the overlay map rules (e.g., § 3.16.104, § 3.12.124).
- Confirm whether the overlay requires a Use Permit or Administrative Review for your proposal (common triggers are in § 3.16.112, § 3.20.112, § 3.08.108).
- For CV or PD overlays, prepare the Neighborhood Conservation Plan or PD Project submittal package including site plans, elevations, parking/circulation, signage, landscape, and phasing schedule per § 3.12.116 and § 3.04.124.
- If in an N district, obtain the amortization schedule and deadlines adopted with the ordinance (the schedule supersedes § 4.20.124) — § 3.24.120.
- If in an IS district, check the ordinance effective/expiration date (IS overlays expire ≤2 years unless extended) — § 3.08.116.
- Check whether the overlay imposes special notice, owner‑consent, or resident‑notice requirements (e.g., MHP map removal notice requirement — § 3.34.120).
Risks & Ambiguities
| Issue | Why it matters | What to verify |
|---|---|---|
| Overlay modifies base district standards | Overlays commonly defer to the base district, but the adopting ordinance can alter uses, setbacks, heights, parking, or require additional findings — failure to read it can lead to incorrect permit applications | Confirm and read the adopting ordinance referenced on the zoning map for that overlayed parcel (verify ordinance text and any plan attached). See § 3.16.108 and § 3.12.124. |
| Parcel‑specific applicability | Overlays are map‑based; an overlay may apply to only some parcels on a block | Verify the parcel on the official zoning map and the ordinance exhibit that defines overlay boundaries. § 3.12.116, § 3.16.104. |
| Temporary (IS) overlays and expiration | IS overlays can expire and may change review rules when they do — project timing matters | Check the IS ordinance for the effective and expiration dates; § 3.08.116 requires termination ≤2 years. |
| Amortization schedules in N districts | An adopted schedule can force earlier termination of uses than the generic nonconforming rules | Obtain the N overlay ordinance and its amortization schedule; § 3.24.120 mandates the schedule be in the ordinance. |
| Historic overlay exceptions | Landmark overlays may allow exceptions or require stricter design review and maintenance obligations | Review the Landmark District Conservation Plan and design review rules the overlay adopts; see § 3.28.120–128. |
| Conflicting overlays | Multiple overlays may apply to one parcel (e.g., -CV and -S) and overlay ordinances may conflict | The code says where conflicts arise, the requirements of the applicable overlay ordinance shall govern — but the adopting ordinances may state precedence. Verify all applicable overlay ordinances and the City’s interpretation. § 3.12.108, § 3.16.108. |
Plain‑English Summary
San Leandro’s overlay districts are map‑based modifiers that sit on top of the regular zoning for a parcel. Most overlays either (1) add a required discretionary step (e.g., a use permit or plan), (2) create a special permitted‑use list for housing or mobile homes, or (3) attach a conservation/design plan that changes how the base rules apply — always check the overlay suffix on the zoning map and read the adopting ordinance to know which rule controls. See § 1.08.108 and the overlay chapters listed above.
Source References
- San Leandro Zoning Code — Title 1 (overlay list): § 1.08.108. (Downloaded from https://ecode360.com/SA5044)
- Planned Development (PD): § 3.04.116, § 3.04.124 (application/submittal items).
- IS Interim Study Overlay: § 3.08.100–§ 3.08.116 (purpose, use permit requirement, expiration).
- CV Conservation Overlay: § 3.12.100–§ 3.12.128 (purpose, area min, plan requirements, map designation).
- S Special Review Overlay: § 3.16.100–§ 3.16.124 (purpose, use permit triggers, map suffix).
- AU Assembly Use Overlay: § 3.20.100–§ 3.20.120 (assembly uses by conditional use).
- N Nonconforming Use Overlay: § 3.24.104–§ 3.24.120 (findings, amortization schedule).
- L Landmark Overlay: § 3.28.100–§ 3.28.128 (conservation plan, design review, owner initiation).
- MHP Mobile Home Park Overlay: § 3.34.100–§ 3.34.120 (uses, administrative review, removal notice).
- H Housing Overlay: § 3.38.100–§ 3.38.112 (permits mixed‑use and multi‑family uses).
Sources
Retrieved passages
- San Leandro Zoning Code (§ 1) High relevance
- San Leandro Zoning Code (§ 1) High relevance
- San Leandro Zoning Code (chapter shall) High relevance
- San Leandro Zoning Code (§ 3.20.116) High relevance
- San Leandro Zoning Code (§ 3.12.120) High relevance
- San Leandro Zoning Code (Section 3.12.120) High relevance
- San Leandro Zoning Code (§ 3.24.120.) High relevance
- San Leandro Zoning Code (§ 3.08.104.) High relevance
Cited sections
- San Leandro Zoning Code — Title 1 (overlay list): **§ 1.08.108**. (Downloaded from ) (Title 1)
- Planned Development (PD): **§ 3.04.116**, **§ 3.04.124** (application/submittal items). (§ 3.04.116)
- IS Interim Study Overlay: **§ 3.08.100–§ 3.08.116** (purpose, use permit requirement, expiration). (§ 3.08.100)
- CV Conservation Overlay: **§ 3.12.100–§ 3.12.128** (purpose, area min, plan requirements, map designation). (§ 3.12.100)
- S Special Review Overlay: **§ 3.16.100–§ 3.16.124** (purpose, use permit triggers, map suffix). (§ 3.16.100)
- AU Assembly Use Overlay: **§ 3.20.100–§ 3.20.120** (assembly uses by conditional use). (§ 3.20.100)
- N Nonconforming Use Overlay: **§ 3.24.104–§ 3.24.120** (findings, amortization schedule). (§ 3.24.104)
- L Landmark Overlay: **§ 3.28.100–§ 3.28.128** (conservation plan, design review, owner initiation). (§ 3.28.100)
- MHP Mobile Home Park Overlay: **§ 3.34.100–§ 3.34.120** (uses, administrative review, removal notice). (§ 3.34.100)
- H Housing Overlay: **§ 3.38.100–§ 3.38.112** (permits mixed‑use and multi‑family uses). (§ 3.38.100)
- SanLeandro_ZoningCode.md
Frequently asked questions
What overlays might be on my San Leandro parcel and how do I find them?
The San Leandro zoning map shows overlay designators appended to base districts (for example, -CV, -S, -H). The code lists the available overlays in § 1.08.108; confirm the parcel on the official zoning map and click the ordinance reference shown on the map to read the exact overlay rules.
Do overlays change setback, height, or lot coverage requirements in San Leandro?
Overlays generally state that development regulations are those of the base zoning district unless the overlay’s adopting ordinance or plan explicitly modifies them. Always read the overlay ordinance or PD/CV plan to see any deviations from the base standards. See § 3.12.108 and § 3.16.108.
If my parcel has an H overlay, can I build multi‑family housing?
Yes. The H Housing Overlay specifically makes Mixed‑Use Residential and Multi‑Family Residential permitted uses within the overlay regardless of the base district’s prior use list. Confirm applicable development standards still come from the base district unless the H ordinance modifies them. § 3.38.108–112.
Will I always need a use permit in an S or AU overlay area?
Not always, but both S and AU overlays explicitly require use permits for many actions: the S overlay requires a use permit for new uses, substantial expansions, and some other actions listed in § 3.16.112; the AU overlay requires use permits for assembly uses in § 3.20.112. Check the adopting ordinance as the Council may add or waive certain procedures.
If my business is a nonconforming use, can the City force me to stop operating sooner under an N overlay?
Yes. An N Nonconforming Use Overlay allows the City to adopt an amortization schedule that can require earlier termination of nonconforming uses than the general code. Any amortization period must be stated in the ordinance establishing the N district. § 3.24.120.
What does the Planned Development (PD) overlay require when I apply?
A PD application must include a full Planned Development Project package (site plan, building elevations, parking and circulation details, signage elevations, landscape/irrigation, utilities, grading, refuse storage, construction schedule, and major elevations/renderings) and the PD approval establishes the project‑specific development regulations. See § 3.04.124.
Can an Interim Study (IS) overlay stop my project from proceeding?
An IS overlay imposes discretionary review and requires a use permit for new/expanded uses; IS designations also expire within two years unless extended, so they can affect timing and the procedural path of your project. Check the ordinance’s termination date and the required study plan. § 3.08.104–116.
Are there minimum area requirements to create a Conservation (CV) overlay?
Yes. A CV Conservation Overlay must include at least three acres and at least three separate parcels; the Neighborhood Conservation Plan submitted with the application must document the boundary and proposed modifications. § 3.12.104, § 3.12.116.
If my property is in a Landmark (L) district, am I allowed to alter exterior features?
Alterations to landmark structures are subject to the Landmark District Conservation Plan’s rules and may be subject to design review; the plan should list specific alterations that require design review and performance guidelines for new work. Check the Conservation Plan and the L overlay ordinance. § 3.28.120–128.
Who decides to create or remove an overlay in San Leandro?
Overlay districts are adopted or removed by City Council ordinance following the zoning map amendment procedures and Planning Commission recommendation; some overlays (for L districts) may be initiated by owners representing ≥51% of the land area in a proposed district. See the adoption procedures in the respective overlay chapters (e.g., § 3.12.120, § 3.28.124, Chapter 5.16 references).
More in San Leandro code
Ask about any San Leandro property
Get a cited, plain-English answer on San Leandro zoning, setbacks, FAR, ADUs and permits — for any address.
Start Free TrialMore San Leandro zoning topics
San Leandro Zoning
San Leandro Land Use
San Leandro Development Standards
San Leandro Parking
San Leandro Design Review
San Leandro Historic Preservation
San Leandro Signage
San Leandro Nonconforming Uses
San Leandro Variances and Exceptions
San Leandro Landscaping and Screening
San Leandro overview