Which rules and permits must be checked for an ADU in San Diego's Coastal Overlay Zone?
For Architect · Builder · Inspector
Check the Coastal Overlay Zone, the permit jurisdiction, and the applicable amendment version before applying an ADU design standard.
View supporting passages (4)
- SD Municipal Code 141.0302: official PDF · §141.0302(a)(7)(A), printed 14·1·3·2; other coastal rules follow · PDF page 2
An existing structure may only be converted or reconstructed as an ADU or JADU if the structure conforms to all the following regulations: (i) The wetland regulations in Section 143.0141(b); (ii) The sensitive coastal bluffs regulations in Section 143.0143; (iii) The coastal beaches regulations in Section 143.0144; and (iv) The Supplemental Regulations of the Coastal Overlay Zone in Section 132.0403.
- SD Municipal Code coastal permit procedures: official PDF · §126.0702(a)–(c), printed 12·6·7·1 · PDF page 1
(a) Permits Issued by the City. A Coastal Development Permit issued by the City is required for all coastal development of a premises within the Coastal Overlay Zone described in Chapter 13, Article 2, Division 4, unless exempted by Section 126.0704, or if the proposed project site lies completely within the Coastal Commission Permit Jurisdiction or the Deferred Certification Area as described in Section 126.0702(b). (b) Permits Issued by the Coastal Commission. A Coastal Development Permit or exemption for all coastal development on a project site located completely within the Coastal Commission Permit Jurisdiction or in the Deferred Certification Area must be obtained from the Coastal Commission. The Coastal Commission Permit Jurisdiction and the Deferred Certification Area are shown on Map No. C-730.1, Map No. C-908, and Map No. C-1028, on file in the office of the City Clerk as Documents No. OO-17067-1, No. OO-18872, and No. OO-21719. (c) Permits Issued by the City and the Coastal Commission. A Coastal Development Permit or exemption issued by the City and the Coastal Commission are required for all coastal development on a premises located partially within the Coastal Commission permit jurisdiction. A Coastal Development Permit from each agency is required for the portion of the project within the agency’s jurisdiction.
- SD adopted code update status · 2024 Code Update: ordinance numbers and effective dates
Ordinances O-21836 2024 Land Development Code Ordinance O-21837 2024 Centre City Planned District and Gaslamp Quarter Planned District Ordinance Effective Dates Outside of the Coastal Overlay Zone: October 5, 2024 Inside of the Coastal Overlay Zone: September 10, 2026
- SD Information Bulletin 400 · Editor’s Note: certification warning and named ordinances
The regulations and guidelines outlined below will become effective within the Coastal Overlay Zone when the California Coastal Commission certifies Ordinance Numbers O-21618 , O-21758 , O-21836 , and O-21989 .
These passages support the limited statement or research recommendation. They do not establish a property's eligibility. If the source opens at the top, use the quoted text to find the passage.
Section 141.0302(a)(7) addresses coastal ADU conditions. Sections 126.0702 and 126.0704 address the coastal permit route and exemptions.
View supporting passages (3)
- SD Municipal Code 141.0302: official PDF · §141.0302(a)(7)(A), printed 14·1·3·2; other coastal rules follow · PDF page 2
An existing structure may only be converted or reconstructed as an ADU or JADU if the structure conforms to all the following regulations: (i) The wetland regulations in Section 143.0141(b); (ii) The sensitive coastal bluffs regulations in Section 143.0143; (iii) The coastal beaches regulations in Section 143.0144; and (iv) The Supplemental Regulations of the Coastal Overlay Zone in Section 132.0403.
- SD Municipal Code coastal permit procedures: official PDF · §126.0702(a)–(c), printed 12·6·7·1 · PDF page 1
(a) Permits Issued by the City. A Coastal Development Permit issued by the City is required for all coastal development of a premises within the Coastal Overlay Zone described in Chapter 13, Article 2, Division 4, unless exempted by Section 126.0704, or if the proposed project site lies completely within the Coastal Commission Permit Jurisdiction or the Deferred Certification Area as described in Section 126.0702(b). (b) Permits Issued by the Coastal Commission. A Coastal Development Permit or exemption for all coastal development on a project site located completely within the Coastal Commission Permit Jurisdiction or in the Deferred Certification Area must be obtained from the Coastal Commission. The Coastal Commission Permit Jurisdiction and the Deferred Certification Area are shown on Map No. C-730.1, Map No. C-908, and Map No. C-1028, on file in the office of the City Clerk as Documents No. OO-17067-1, No. OO-18872, and No. OO-21719. (c) Permits Issued by the City and the Coastal Commission. A Coastal Development Permit or exemption issued by the City and the Coastal Commission are required for all coastal development on a premises located partially within the Coastal Commission permit jurisdiction. A Coastal Development Permit from each agency is required for the portion of the project within the agency’s jurisdiction.
- SD Municipal Code coastal permit procedures: official PDF · §126.0704(a), printed 12·6·7·2; exclusions (1)–(6) follow · PDF page 2
Improvements to existing structures are exempt, except if the improvements involve any of the following:
These passages support the limited statement or research recommendation. They do not establish a property's eligibility. If the source opens at the top, use the quoted text to find the passage.
This guide concerns City of San Diego ADU research. It does not establish an exemption, an applicable coastal version, or project approval.
View supporting passages (5)
- SD Municipal Code 141.0302: official PDF · §141.0302(a)(7)(A), printed 14·1·3·2; other coastal rules follow · PDF page 2
An existing structure may only be converted or reconstructed as an ADU or JADU if the structure conforms to all the following regulations: (i) The wetland regulations in Section 143.0141(b); (ii) The sensitive coastal bluffs regulations in Section 143.0143; (iii) The coastal beaches regulations in Section 143.0144; and (iv) The Supplemental Regulations of the Coastal Overlay Zone in Section 132.0403.
- SD Municipal Code coastal permit procedures: official PDF · §126.0702(a)–(c), printed 12·6·7·1 · PDF page 1
(a) Permits Issued by the City. A Coastal Development Permit issued by the City is required for all coastal development of a premises within the Coastal Overlay Zone described in Chapter 13, Article 2, Division 4, unless exempted by Section 126.0704, or if the proposed project site lies completely within the Coastal Commission Permit Jurisdiction or the Deferred Certification Area as described in Section 126.0702(b). (b) Permits Issued by the Coastal Commission. A Coastal Development Permit or exemption for all coastal development on a project site located completely within the Coastal Commission Permit Jurisdiction or in the Deferred Certification Area must be obtained from the Coastal Commission. The Coastal Commission Permit Jurisdiction and the Deferred Certification Area are shown on Map No. C-730.1, Map No. C-908, and Map No. C-1028, on file in the office of the City Clerk as Documents No. OO-17067-1, No. OO-18872, and No. OO-21719. (c) Permits Issued by the City and the Coastal Commission. A Coastal Development Permit or exemption issued by the City and the Coastal Commission are required for all coastal development on a premises located partially within the Coastal Commission permit jurisdiction. A Coastal Development Permit from each agency is required for the portion of the project within the agency’s jurisdiction.
- SD Municipal Code coastal permit procedures: official PDF · §126.0704(a), printed 12·6·7·2; exclusions (1)–(6) follow · PDF page 2
Improvements to existing structures are exempt, except if the improvements involve any of the following:
- SD adopted code update status · 2024 Code Update: ordinance numbers and effective dates
Ordinances O-21836 2024 Land Development Code Ordinance O-21837 2024 Centre City Planned District and Gaslamp Quarter Planned District Ordinance Effective Dates Outside of the Coastal Overlay Zone: October 5, 2024 Inside of the Coastal Overlay Zone: September 10, 2026
- SD Information Bulletin 400 · Editor’s Note: certification warning and named ordinances
The regulations and guidelines outlined below will become effective within the Coastal Overlay Zone when the California Coastal Commission certifies Ordinance Numbers O-21618 , O-21758 , O-21836 , and O-21989 .
These passages support the limited statement or research recommendation. They do not establish a property's eligibility. If the source opens at the top, use the quoted text to find the passage.
How to check
Confirm the parcel and coastal maps
Record the parcel, City boundary, Coastal Overlay Zone, and permit jurisdiction. Identify whether the City, Commission, or both issue permits.
View supporting passages (1)
- SD Municipal Code coastal permit procedures: official PDF · §126.0702(a)–(c), printed 12·6·7·1 · PDF page 1
(a) Permits Issued by the City. A Coastal Development Permit issued by the City is required for all coastal development of a premises within the Coastal Overlay Zone described in Chapter 13, Article 2, Division 4, unless exempted by Section 126.0704, or if the proposed project site lies completely within the Coastal Commission Permit Jurisdiction or the Deferred Certification Area as described in Section 126.0702(b). (b) Permits Issued by the Coastal Commission. A Coastal Development Permit or exemption for all coastal development on a project site located completely within the Coastal Commission Permit Jurisdiction or in the Deferred Certification Area must be obtained from the Coastal Commission. The Coastal Commission Permit Jurisdiction and the Deferred Certification Area are shown on Map No. C-730.1, Map No. C-908, and Map No. C-1028, on file in the office of the City Clerk as Documents No. OO-17067-1, No. OO-18872, and No. OO-21719. (c) Permits Issued by the City and the Coastal Commission. A Coastal Development Permit or exemption issued by the City and the Coastal Commission are required for all coastal development on a premises located partially within the Coastal Commission permit jurisdiction. A Coastal Development Permit from each agency is required for the portion of the project within the agency’s jurisdiction.
These passages support the limited statement or research recommendation. They do not establish a property's eligibility. If the source opens at the top, use the quoted text to find the passage.
- SD Municipal Code coastal permit procedures: official PDF · §126.0702(a)–(c), printed 12·6·7·1 · PDF page 1
Describe the proposed work
Separate conversion of existing space from new construction or expansion. Keep the existing plans and proposed plans together for the exemption review.
View supporting passages (2)
- SD Municipal Code 141.0302: official PDF · §141.0302(a)(7)(A), printed 14·1·3·2; other coastal rules follow · PDF page 2
An existing structure may only be converted or reconstructed as an ADU or JADU if the structure conforms to all the following regulations: (i) The wetland regulations in Section 143.0141(b); (ii) The sensitive coastal bluffs regulations in Section 143.0143; (iii) The coastal beaches regulations in Section 143.0144; and (iv) The Supplemental Regulations of the Coastal Overlay Zone in Section 132.0403.
- SD Municipal Code coastal permit procedures: official PDF · §126.0704(a), printed 12·6·7·2; exclusions (1)–(6) follow · PDF page 2
Improvements to existing structures are exempt, except if the improvements involve any of the following:
These passages support the limited statement or research recommendation. They do not establish a property's eligibility. If the source opens at the top, use the quoted text to find the passage.
- SD Municipal Code 141.0302: official PDF · §141.0302(a)(7)(A), printed 14·1·3·2; other coastal rules follow · PDF page 2
Review the permit or exemption route
Compare the proposed work with Section 126.0704 and its exclusions. Record the provision and evidence for any claimed exemption.
View supporting passages (1)
- SD Municipal Code coastal permit procedures: official PDF · §126.0704(a), printed 12·6·7·2; exclusions (1)–(6) follow · PDF page 2
Improvements to existing structures are exempt, except if the improvements involve any of the following:
These passages support the limited statement or research recommendation. They do not establish a property's eligibility. If the source opens at the top, use the quoted text to find the passage.
- SD Municipal Code coastal permit procedures: official PDF · §126.0704(a), printed 12·6·7·2; exclusions (1)–(6) follow · PDF page 2
Match the amendment to its coastal status
The City's update page lists a September 10, 2026 coastal date for the 2024 update. Review individual amendments separately.
View supporting passages (2)
- SD adopted code update status · 2024 Code Update: ordinance numbers and effective dates
Ordinances O-21836 2024 Land Development Code Ordinance O-21837 2024 Centre City Planned District and Gaslamp Quarter Planned District Ordinance Effective Dates Outside of the Coastal Overlay Zone: October 5, 2024 Inside of the Coastal Overlay Zone: September 10, 2026
- SD Information Bulletin 400 · Editor’s Note: certification warning and named ordinances
The regulations and guidelines outlined below will become effective within the Coastal Overlay Zone when the California Coastal Commission certifies Ordinance Numbers O-21618 , O-21758 , O-21836 , and O-21989 .
These passages support the limited statement or research recommendation. They do not establish a property's eligibility. If the source opens at the top, use the quoted text to find the passage.
- SD adopted code update status · 2024 Code Update: ordinance numbers and effective dates
What the facts change
| If the record shows | Next research action |
|---|---|
| Parcel lies in the Coastal Overlay Zone | Review the coastal permit jurisdiction, exemption conditions, and applicable amendment version.View supporting passages (5)
These passages support the limited statement or research recommendation. They do not establish a property's eligibility. If the source opens at the top, use the quoted text to find the passage. |
| An exemption is claimed for work in an existing structure | Check the precise work and the exclusions. An existing structure alone does not establish an exemption.View supporting passages (1)
These passages support the limited statement or research recommendation. They do not establish a property's eligibility. If the source opens at the top, use the quoted text to find the passage. |
| Bulletin guidance and amendment status differ | Keep the affected version unresolved. Match the ordinance and provision to the certified LCP records.View supporting passages (2)
These passages support the limited statement or research recommendation. They do not establish a property's eligibility. If the source opens at the top, use the quoted text to find the passage. |
Illustrative example
Illustrative case: an architect proposes a detached ADU on a coastal parcel. The project has no documented permit exemption or amendment review.
Prepare the coastal permit and version review before using the design standard. The parcel's coastal status does not determine the final permit result.
View supporting passages (4)
- SD Municipal Code coastal permit procedures: official PDF · §126.0702(a)–(c), printed 12·6·7·1 · PDF page 1
(a) Permits Issued by the City. A Coastal Development Permit issued by the City is required for all coastal development of a premises within the Coastal Overlay Zone described in Chapter 13, Article 2, Division 4, unless exempted by Section 126.0704, or if the proposed project site lies completely within the Coastal Commission Permit Jurisdiction or the Deferred Certification Area as described in Section 126.0702(b). (b) Permits Issued by the Coastal Commission. A Coastal Development Permit or exemption for all coastal development on a project site located completely within the Coastal Commission Permit Jurisdiction or in the Deferred Certification Area must be obtained from the Coastal Commission. The Coastal Commission Permit Jurisdiction and the Deferred Certification Area are shown on Map No. C-730.1, Map No. C-908, and Map No. C-1028, on file in the office of the City Clerk as Documents No. OO-17067-1, No. OO-18872, and No. OO-21719. (c) Permits Issued by the City and the Coastal Commission. A Coastal Development Permit or exemption issued by the City and the Coastal Commission are required for all coastal development on a premises located partially within the Coastal Commission permit jurisdiction. A Coastal Development Permit from each agency is required for the portion of the project within the agency’s jurisdiction.
- SD Municipal Code coastal permit procedures: official PDF · §126.0704(a), printed 12·6·7·2; exclusions (1)–(6) follow · PDF page 2
Improvements to existing structures are exempt, except if the improvements involve any of the following:
- SD adopted code update status · 2024 Code Update: ordinance numbers and effective dates
Ordinances O-21836 2024 Land Development Code Ordinance O-21837 2024 Centre City Planned District and Gaslamp Quarter Planned District Ordinance Effective Dates Outside of the Coastal Overlay Zone: October 5, 2024 Inside of the Coastal Overlay Zone: September 10, 2026
- SD Information Bulletin 400 · Editor’s Note: certification warning and named ordinances
The regulations and guidelines outlined below will become effective within the Coastal Overlay Zone when the California Coastal Commission certifies Ordinance Numbers O-21618 , O-21758 , O-21836 , and O-21989 .
These passages support the limited statement or research recommendation. They do not establish a property's eligibility. If the source opens at the top, use the quoted text to find the passage.
Records to collect
Download checklist CSV- Parcel and coastal maps: Official parcel, overlay, and permit jurisdiction records
View supporting passages (1)
- SD Municipal Code coastal permit procedures: official PDF · §126.0702(a)–(c), printed 12·6·7·1 · PDF page 1
(a) Permits Issued by the City. A Coastal Development Permit issued by the City is required for all coastal development of a premises within the Coastal Overlay Zone described in Chapter 13, Article 2, Division 4, unless exempted by Section 126.0704, or if the proposed project site lies completely within the Coastal Commission Permit Jurisdiction or the Deferred Certification Area as described in Section 126.0702(b). (b) Permits Issued by the Coastal Commission. A Coastal Development Permit or exemption for all coastal development on a project site located completely within the Coastal Commission Permit Jurisdiction or in the Deferred Certification Area must be obtained from the Coastal Commission. The Coastal Commission Permit Jurisdiction and the Deferred Certification Area are shown on Map No. C-730.1, Map No. C-908, and Map No. C-1028, on file in the office of the City Clerk as Documents No. OO-17067-1, No. OO-18872, and No. OO-21719. (c) Permits Issued by the City and the Coastal Commission. A Coastal Development Permit or exemption issued by the City and the Coastal Commission are required for all coastal development on a premises located partially within the Coastal Commission permit jurisdiction. A Coastal Development Permit from each agency is required for the portion of the project within the agency’s jurisdiction.
These passages support the limited statement or research recommendation. They do not establish a property's eligibility. If the source opens at the top, use the quoted text to find the passage.
- SD Municipal Code coastal permit procedures: official PDF · §126.0702(a)–(c), printed 12·6·7·1 · PDF page 1
- Existing and proposed work: Permit history, existing plans, and proposed drawings
View supporting passages (2)
- SD Municipal Code 141.0302: official PDF · §141.0302(a)(7)(A), printed 14·1·3·2; other coastal rules follow · PDF page 2
An existing structure may only be converted or reconstructed as an ADU or JADU if the structure conforms to all the following regulations: (i) The wetland regulations in Section 143.0141(b); (ii) The sensitive coastal bluffs regulations in Section 143.0143; (iii) The coastal beaches regulations in Section 143.0144; and (iv) The Supplemental Regulations of the Coastal Overlay Zone in Section 132.0403.
- SD Municipal Code coastal permit procedures: official PDF · §126.0704(a), printed 12·6·7·2; exclusions (1)–(6) follow · PDF page 2
Improvements to existing structures are exempt, except if the improvements involve any of the following:
These passages support the limited statement or research recommendation. They do not establish a property's eligibility. If the source opens at the top, use the quoted text to find the passage.
- SD Municipal Code 141.0302: official PDF · §141.0302(a)(7)(A), printed 14·1·3·2; other coastal rules follow · PDF page 2
- Coastal permit or exemption route: Exact provision and evidence for its conditions
View supporting passages (2)
- SD Municipal Code coastal permit procedures: official PDF · §126.0702(a)–(c), printed 12·6·7·1 · PDF page 1
(a) Permits Issued by the City. A Coastal Development Permit issued by the City is required for all coastal development of a premises within the Coastal Overlay Zone described in Chapter 13, Article 2, Division 4, unless exempted by Section 126.0704, or if the proposed project site lies completely within the Coastal Commission Permit Jurisdiction or the Deferred Certification Area as described in Section 126.0702(b). (b) Permits Issued by the Coastal Commission. A Coastal Development Permit or exemption for all coastal development on a project site located completely within the Coastal Commission Permit Jurisdiction or in the Deferred Certification Area must be obtained from the Coastal Commission. The Coastal Commission Permit Jurisdiction and the Deferred Certification Area are shown on Map No. C-730.1, Map No. C-908, and Map No. C-1028, on file in the office of the City Clerk as Documents No. OO-17067-1, No. OO-18872, and No. OO-21719. (c) Permits Issued by the City and the Coastal Commission. A Coastal Development Permit or exemption issued by the City and the Coastal Commission are required for all coastal development on a premises located partially within the Coastal Commission permit jurisdiction. A Coastal Development Permit from each agency is required for the portion of the project within the agency’s jurisdiction.
- SD Municipal Code coastal permit procedures: official PDF · §126.0704(a), printed 12·6·7·2; exclusions (1)–(6) follow · PDF page 2
Improvements to existing structures are exempt, except if the improvements involve any of the following:
These passages support the limited statement or research recommendation. They do not establish a property's eligibility. If the source opens at the top, use the quoted text to find the passage.
- SD Municipal Code coastal permit procedures: official PDF · §126.0702(a)–(c), printed 12·6·7·1 · PDF page 1
- Applicable coastal amendment version: Ordinance number, affected provision, certification record, and effective date
View supporting passages (2)
- SD adopted code update status · 2024 Code Update: ordinance numbers and effective dates
Ordinances O-21836 2024 Land Development Code Ordinance O-21837 2024 Centre City Planned District and Gaslamp Quarter Planned District Ordinance Effective Dates Outside of the Coastal Overlay Zone: October 5, 2024 Inside of the Coastal Overlay Zone: September 10, 2026
- SD Information Bulletin 400 · Editor’s Note: certification warning and named ordinances
The regulations and guidelines outlined below will become effective within the Coastal Overlay Zone when the California Coastal Commission certifies Ordinance Numbers O-21618 , O-21758 , O-21836 , and O-21989 .
These passages support the limited statement or research recommendation. They do not establish a property's eligibility. If the source opens at the top, use the quoted text to find the passage.
- SD adopted code update status · 2024 Code Update: ordinance numbers and effective dates
- Complete source text: Official Chapter 14 PDF; the stored §141.0302 excerpt is incomplete
View supporting passages (1)
- SD Municipal Code 141.0302: official PDF · §141.0302(a)(7)(A), printed 14·1·3·2; other coastal rules follow · PDF page 2
An existing structure may only be converted or reconstructed as an ADU or JADU if the structure conforms to all the following regulations: (i) The wetland regulations in Section 143.0141(b); (ii) The sensitive coastal bluffs regulations in Section 143.0143; (iii) The coastal beaches regulations in Section 143.0144; and (iv) The Supplemental Regulations of the Coastal Overlay Zone in Section 132.0403.
These passages support the limited statement or research recommendation. They do not establish a property's eligibility. If the source opens at the top, use the quoted text to find the passage.
- SD Municipal Code 141.0302: official PDF · §141.0302(a)(7)(A), printed 14·1·3·2; other coastal rules follow · PDF page 2
The checklist starts with every finding marked Unresolved.
Your next deliverable
A coastal review record that identifies the permit route, amendment version, supporting records, and unresolved questions.
View supporting passages (4)
- SD Municipal Code coastal permit procedures: official PDF · §126.0702(a)–(c), printed 12·6·7·1 · PDF page 1
(a) Permits Issued by the City. A Coastal Development Permit issued by the City is required for all coastal development of a premises within the Coastal Overlay Zone described in Chapter 13, Article 2, Division 4, unless exempted by Section 126.0704, or if the proposed project site lies completely within the Coastal Commission Permit Jurisdiction or the Deferred Certification Area as described in Section 126.0702(b). (b) Permits Issued by the Coastal Commission. A Coastal Development Permit or exemption for all coastal development on a project site located completely within the Coastal Commission Permit Jurisdiction or in the Deferred Certification Area must be obtained from the Coastal Commission. The Coastal Commission Permit Jurisdiction and the Deferred Certification Area are shown on Map No. C-730.1, Map No. C-908, and Map No. C-1028, on file in the office of the City Clerk as Documents No. OO-17067-1, No. OO-18872, and No. OO-21719. (c) Permits Issued by the City and the Coastal Commission. A Coastal Development Permit or exemption issued by the City and the Coastal Commission are required for all coastal development on a premises located partially within the Coastal Commission permit jurisdiction. A Coastal Development Permit from each agency is required for the portion of the project within the agency’s jurisdiction.
- SD Municipal Code coastal permit procedures: official PDF · §126.0704(a), printed 12·6·7·2; exclusions (1)–(6) follow · PDF page 2
Improvements to existing structures are exempt, except if the improvements involve any of the following:
- SD adopted code update status · 2024 Code Update: ordinance numbers and effective dates
Ordinances O-21836 2024 Land Development Code Ordinance O-21837 2024 Centre City Planned District and Gaslamp Quarter Planned District Ordinance Effective Dates Outside of the Coastal Overlay Zone: October 5, 2024 Inside of the Coastal Overlay Zone: September 10, 2026
- SD Information Bulletin 400 · Editor’s Note: certification warning and named ordinances
The regulations and guidelines outlined below will become effective within the Coastal Overlay Zone when the California Coastal Commission certifies Ordinance Numbers O-21618 , O-21758 , O-21836 , and O-21989 .
These passages support the limited statement or research recommendation. They do not establish a property's eligibility. If the source opens at the top, use the quoted text to find the passage.
Still to verify
- The section-level history identifies certified amendments. Parcel location and the operative text for the proposed work still need review.
- The official section editor's note still identifies O-21989 and O-22109 for a coastal certification check.
- The stored section now includes the full captured source span with 3-2026 body labels. The official PDF has 9-2026 labels. Compare the official text before applying a standard.
- No parcel-specific permit or rental decision has been made.
Sources and review record
These related references can include stored text or inaccessible publishers. The supporting passages beside each statement identify the sources used for its evidence check.
- San Diego — Information Bulletin 400
Editor's Note; JADU General Regulations item 7 · January 2026
Text checked: 2026-10-18
- San Diego Municipal Code — Chapter 14 Article 1 Division 3
PDF printed pages 2–3; §141.0302(a)(7)–(8) · 9-2026
Text checked: 2026-10-18
- San Diego Municipal Code — Coastal Development Permits
§126.0704 · 9-2026 official PDF; individual amendment applicability remains unresolved
Text checked: 2026-10-18
- San Diego Municipal Code § 141.0302
§ 141.0302 · 2026-10 library edition; 3-2026 body labels; section boundary restored October 18, 2026
Text checked: 2026-10-18
- San Diego Municipal Code § 126.0704
§ 126.0704 · 2026-10; completeness unverified
Text checked: 2026-10-17
- San Diego Planning — Adopted LDC Updates
2022, 2024, 2026 Code Update — Effective Dates · Dated status page
Text checked: 2026-10-18
- San Diego official §141.0302 amendment history
§141.0302 and its section-level history · Official electronic code; read October 18, 2026
Text checked: 2026-10-18
- O-21989 comparison: former and amended §141.0302
PDF page 2; strikeout and added text · Official comparison, not a clean coastal code
Text checked: 2026-10-18
AI-assisted research with recorded source checks. Open questions remain. Verify current law, effective dates, and property records before a property decision.