California ADU rules · Marin County
Can I Build an ADU in Ross?
Yes — you can build an ADU in Ross. California's statewide ADU law requires every city, including Ross, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.
Can you build one?
ADUs allowed
CA state lawYes — by right
ADUs and JADUs are allowed by right in all residential and mixed-use zones; ministerial approval, no hearing.
Units on a single-family lot
CA state law1 ADU + 1 JADU
At least one ADU and one JADU per single-family lot (a conversion ADU may also be possible).
Units on a multifamily lot
Local ruleconversions (>=1 or 25% of units) + up to 8 detached (not more than number of existing units); up to 2 detached on lot with proposed multifamily dwelling
Detached ADUs on multifamily lots capped at number of existing units; only 2 detached allowed on lots with proposed multifamily dwellings.
Junior ADU (JADU)
CA state lawAllowed
Up to 500 sq ft, within the walls of an existing single-family home (single-family lots only).
Size & height
Max detached ADU size
Local rule1,000 sq ft
Standard max: 850 sq ft (1 bedroom or less), 1,000 sq ft (2+ bedrooms); up to 1,200 sq ft by Town Council for rent-restricted ADUs.
Max attached ADU size
Local rule850 sq ft (1 bedroom or less), 1,000 sq ft (2+ bedrooms); at least 800 sq ft by-right
Same as detached; up to 1,200 sq ft by Town Council for rent-restricted ADUs.
Guaranteed minimum size
CA state law800 sq ft
An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).
Max JADU size
CA state law500 sq ft
Max height
Local rule16 ft
Detached: 16 ft standard; 18 ft near transit or for multifamily/multistory lots; attached: up to 25 ft or primary dwelling height, whichever is less.
Setbacks
Side setback
CA state law4 ft
A city cannot require more than 4 ft side or rear setback; conversions of existing structures are exempt.
Rear setback
CA state law4 ft
Front setback
CA state lawNo front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone
Separation from main house
Local rule3 ft
Detached ADUs must be separated from primary dwelling and accessory structures by at least 3 feet.
Parking
Parking required
Local ruleUp to 1 space
1 off-street space per ADU; multiple local exemptions apply.
Transit parking exemption
CA state lawYes — no parking required near transit & for conversions
No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.
Garage-conversion replacement parking
Local ruleNot required
No replacement parking required when a garage/carport/parking space is converted to an ADU.
Approval, timeline & cost
Approval path
CA state lawMinisterial (by right)
No public hearing or discretionary design review for a qualifying ADU.
Approval timeline
CA state law60 days
The agency must act within 60 days of a complete application — and the ADU is deemed approved if it does not.
Owner-occupancy
Local ruleOnly for a JADU
Owner occupancy required for JADUs only, not for ADUs.
Impact-fee waiver
CA state lawWaived under 750 sq ft
An ADU of 750 sq ft or less pays no impact fees (the 750 sq ft threshold itself is exempt under § 66311.5); larger ADUs pay fees proportional to the primary dwelling. JADUs (≤ 500 sq ft) are exempt.
Permits required
Local ruleADU or JADU permit, Building permit
Both an ADU/JADU permit and a building permit are required.
Ross-specific factors that can change the answer
State law sets the floor, but these local conditions often decide whether a specific parcel works.
Very High Fire Hazard Severity Zone (VHFHSZ)
No sprinklers required in ADU/JADU if not required for primary residence; fire chief must confirm water supply for exceptions (e.g., increased size/height).
Hillside areas
Rent-restricted ADU exceptions (up to 1,200 sq ft) not allowed in hillside areas as defined in § 18.39.020(a).
Ross caps standard detached and attached ADUs at 1,000 sq ft (2+ bedrooms) or 850 sq ft (1 bedroom or less), with larger ADUs (up to 1,200 sq ft) allowed only for rent-restricted units by Town Council approval. Detached ADUs must be separated from the primary dwelling by at least 3 feet.
Frequently asked questions
Can I build an ADU in Ross?
Yes. California's statewide ADU law requires Ross to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.
How big can an ADU be in Ross?
A detached ADU of at least 1,000 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.
What are the setback requirements for an ADU in Ross?
Side and rear setbacks are limited to 4 ft. No front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone.
Is parking required for an ADU in Ross?
Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is not required.
How long does ADU approval take in Ross?
A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.
Do I have to live on the property to build an ADU in Ross?
Owner-occupancy: only for a jadu. ADUs under 750 sq ft are also exempt from impact fees.
Sources
- Ross Municipal Code Chapter 18.42 (Ord. 728, 2025; Ord. 727, 2024)
- Ross Municipal Code §§ 18.42.050(g), 18.42.055, 18.42.075
- Ross Municipal Code §§ 18.42.055(d), 18.42.060, 18.42.065, 18.42.080
- Ross Municipal Code §§ 18.42.055(d), 18.42.065, 18.42.080
- Ross Municipal Code § 18.42.055(c), 18.42.065(c)
- Ross Municipal Code § 18.42.055(b)
- Ross Municipal Code § 18.42.055(f)
- Ross Municipal Code § 18.42.055(f)(2)
- Ross Municipal Code §§ 18.42.040(a)(2), 18.42.050(c)
- Ross Municipal Code § 18.42.030
- Ross Municipal Code §§ 18.42.065, 18.42.080
- Ross Municipal Code § 18.42.080
- Cal. Gov. Code §§ 66310–66342 (ADU Law)
- HCD 2025 Accessory Dwelling Unit Handbook
- Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
- Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
- Cal. Gov. Code § 66333 (junior ADUs)
- Cal. Gov. Code § 66321 (size minimums & height)
- Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)
- Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)
Last updated 2026-06-25. This is an AI-assisted summary of Ross's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with Ross Planning before relying on it.