California ADU rules · Placer County
Can I Build an ADU in Roseville?
Yes — you can build an ADU in Roseville. California's statewide ADU law requires every city, including Roseville, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.
Can you build one?
ADUs allowed
CA state lawYes — by right
ADUs and JADUs are allowed by right in all residential and mixed-use zones; ministerial approval, no hearing.
Units on a single-family lot
CA state law1 ADU + 1 JADU
At least one ADU and one JADU per single-family lot (a conversion ADU may also be possible).
Units on a multifamily lot
Local ruleConversion ADUs (≥1, up to 25% of units) + up to 2 detached (proposed MF) or up to 8 detached (existing MF)
Up to 2 detached ADUs on a lot with a proposed multifamily dwelling, or up to 8 detached ADUs (not exceeding the number of existing units) on a lot with an existing multifamily dwelling, plus conversions of non-livable space (≥1, up to 25% of existing units).
Junior ADU (JADU)
CA state lawAllowed
Up to 500 sq ft, within the walls of an existing single-family home (single-family lots only).
Size & height
Max detached ADU size
Local rule1,000 sq ft
Roseville caps a detached ADU at 850 sq ft (studio/1-bedroom) or 1,000 sq ft (2+ bedrooms) — below the 1,200 sq ft state default. At least 800 sq ft must still be allowed via the state-mandated 4-ft-setback path even where this cap would otherwise apply.
Max attached ADU size
Local rule850 sq ft (studio/1-bed) or 1,000 sq ft (2+ bed), and not exceeding the primary dwelling's floor area; up to 150 sq ft may be added for ingress/egress
Roseville sizes attached ADUs by the same 850/1,000 sq ft caps as detached, additionally bounded by the primary dwelling's floor area (state law guarantees ≥850 / ≥1,000 sq ft regardless).
Guaranteed minimum size
CA state law800 sq ft
An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).
Max JADU size
CA state law500 sq ft
Max height
CA state law16 ft
16 ft baseline; cities must allow 18 ft within ½ mi of a major transit stop or where the primary dwelling is two-story, and 20 ft on a lot with a multistory multifamily building.
Setbacks
Side setback
CA state law4 ft
A city cannot require more than 4 ft side or rear setback; conversions of existing structures are exempt.
Rear setback
CA state law4 ft
Front setback
CA state lawNo front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone
Separation from main house
CA state lawNone required
No statewide separation requirement between the ADU and the primary dwelling.
Parking
Parking required
CA state lawUp to 1 space
At most 1 space per ADU (or per bedroom, whichever is less) — and waived in the common cases below.
Transit parking exemption
CA state lawYes — no parking required near transit & for conversions
No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.
Garage-conversion replacement parking
CA state lawNot required
When a garage/carport is demolished or converted to build an ADU, replacement parking cannot be required.
Approval, timeline & cost
Approval path
Local ruleMinisterial (by right)
Ministerial/by-right when the ADU or JADU meets every Chapter 19.60 standard; an ADU that does not meet those objective standards instead needs a discretionary Administrative Permit.
Approval timeline
CA state law60 days
The agency must act within 60 days of a complete application — and the ADU is deemed approved if it does not.
Owner-occupancy
CA state lawOnly for a JADU
No owner-occupancy requirement for ADUs (the prior sunset was removed). A JADU may require owner-occupancy, principally where it shares sanitation with the main house.
Impact-fee waiver
CA state lawWaived under 750 sq ft
An ADU of 750 sq ft or less pays no impact fees (the 750 sq ft threshold itself is exempt under § 66311.5); larger ADUs pay fees proportional to the primary dwelling. JADUs (≤ 500 sq ft) are exempt.
Permits required
Local ruleBuilding permit
A ministerial building permit for a compliant ADU/JADU; a non-compliant project requires a discretionary Administrative Permit in addition.
Roseville-specific factors that can change the answer
State law sets the floor, but these local conditions often decide whether a specific parcel works.
Old Town Historic District (DT-4) & Central Business District (DT-6)
ADUs in the Old Town Historic District and Central Business District are exempt from off-street parking (on top of the standard transit/conversion exemptions).
Roseville's Chapter 19.60 sets local detached AND attached ADU caps of 850 sq ft (studio/1-bed) and 1,000 sq ft (2+ bed) — below the 1,200 sq ft state default — and routes any ADU that misses an objective standard to a discretionary Administrative Permit rather than ministerial review. It also names its Old Town Historic District and Central Business District as parking-exempt areas. No fire, coastal, or hillside ADU overlays.
Frequently asked questions
Can I build an ADU in Roseville?
Yes. California's statewide ADU law requires Roseville to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.
How big can an ADU be in Roseville?
A detached ADU of at least 1,000 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.
What are the setback requirements for an ADU in Roseville?
Side and rear setbacks are limited to 4 ft. No front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone.
Is parking required for an ADU in Roseville?
Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is not required.
How long does ADU approval take in Roseville?
A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.
Do I have to live on the property to build an ADU in Roseville?
Owner-occupancy: only for a jadu. ADUs under 750 sq ft are also exempt from impact fees.
Sources
- Roseville Mun. Code Ch. 19.60 (Ord. 6829, 6954)
- RMC §§ 19.60.070, 19.60.120
- RMC § 19.60.070(D)–(E)
- RMC §§ 19.60.070(D)–(E), 19.60.080(B)
- RMC §§ 19.60.010, 19.60.110
- RMC § 19.60.110
- RMC § 19.60.070(H)
- Cal. Gov. Code §§ 66310–66342 (ADU Law)
- HCD 2025 Accessory Dwelling Unit Handbook
- Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
- Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
- Cal. Gov. Code § 66333 (junior ADUs)
- Cal. Gov. Code § 66321 (size minimums & height)
- Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)
- Cal. Gov. Code § 66314 (local ordinance standards)
- Cal. Gov. Code § 66315 (owner-occupancy)
- Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)
Last updated 2026-06-25. This is an AI-assisted summary of Roseville's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with Roseville Planning before relying on it.